Loading...
HomeMy WebLinkAboutContract 42547-A1 x CITY SECRETARY AMENDMENT No.1 CONTRACT NO.H(�� -4 TO CITY SECRETARY CONTRACT No. 42547 WHEREAS, the City of Fort Worth (CITY) and TranSystems Corporation, DBA TranSystems Corporation Consultants, (ENGINEER) made and entered into City Secretary Contract No. 42547, (the CONTRACT) which was authorized by City Council by M&C C-25255 on the 01 day of November, 2011 in the amount of $ 243, 322; and WHEREAS, the CONTRACT involves engineering services for the following project: North Fort Worth Intersections; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated September 9, 2012, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $13,010. 00. (See Attached Funding Breakdown Sheet, Page -3-) 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $256,332. 00. 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, City of Fort Worth Professional Services Agreement Amendment Template R�`►®R® PMO Official Release 8/1/2012 QFFICIA` Page 1 of 3 CITY SECRETAR FT.WORTH,T'X below. APPROVED: City of Fort Worth TranSystems Corporation DBA TranSystems Corporation Consultants Fernando Costa Raul Pena I I, P.E. �— Assistant City Manager Senior Vice President DATE: L/j= DATE: APPROVAL RECOMMENDED: Douglas Wiersig, P.E. Director, Department of Vransporation And Public Works APPROVED AS TO FORM AND LEGALITY: M&C: AJI 4 Date: Douglas W. Black Assistant City Attorney ATTEST: •4 �' F��3pb °° ° ° Pa.1 O YY' a Mary J. y o o° City Secr ary ° 0000°°o°*d'O' City of Fort Worth OFFICIAL RECORD Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 CITY SECRETARY Page 2 of 3 FT.WORTH,TX FUNDING BREAKDOWN SHEET City Secretary No. Amendment No. 1 Department Fund-Account-Center Amount C200 531200 202390165230 $13, 010 Total : $13, 010 City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 3 of 3 Intersection Improvement Projects TranSystems Corporation Consultants 09/07/2012 Amendment#1 Proposed M/WBE Fee Participation Mark IV $ 13,010 $ 7,950 Alta Vista $ - $ - Marine Creek $ - $ - Bob Hanger $ - $ - Subtotal $ 13,010 $ 7,950 61% Or inal Contract Subtotal $ 243,322 $ 37,265 15% New Total $ 256,332 $ 45,215 18% Revisions to Proposal include: 1 Adding final leg of Mark IV/Cantrell Samson Intersection K:\PROPOSAL\TxDOTq"-029500.57\ADWproposed fee Amendment I @%Cfi;3012.xls Intersection Improvement Projects Mark IV at Cantrell Samson TranSystems Corporation Consultants 09/07/2012 Design Services-Amendement 1 HOURLY RATE WORK Total Estimated an ours Cost Project Senior Design RPLS Survey Tech Clerical Estimate WORK TASK DESCRIPTION Manager Enginer Engineer Crew {$} 195.00 15000 130.00 125.E 130.00 95,00 5000 MM18E —77 —77 S 'al S' lc r 1. Project Management $ 390,00 Project Management 4 hourstmonth 2 sub-total S 390.00 2. Sure -Subconsultant $ 500.00 Control $ 750.00 ToDoqraphy(alrady completed-Just supplemental) 500.00 Tie exist ROW $ 2,200.00 ROW Parcel descrition,exhibit and setti comer -4 sub-total $ 3,950.00 3. Plans and Specifications $ Geometries Lprelimina Geometries already completed) Typical Sections 1 2 3Z0.00 $ Grading Plan 1 2 $ 320.00 Drainage Plan 2 $ 260.00 Traffic Control Plan 4 $ 520.00 Sidewalks I ADA 2 $ 190.00 X-Sections 2 6 $ 830.00 Si nin and Stri in 1 8 $ 890.00 SWPPP 1 i $ 225.00 S ecifcations sub-total $ 3,555.00 4. Draina a Analysis-Subconsultant $ 800.00 DA Ma 3,200AD P&P Sheets,Calculations $ subtotal $ 4,OOOA0 5. Si nai De'n 320.00 Si vial L ut- Ram ,sidewalks and pavement ma kin s-in PSE $ sub-total $ 320.00 6. MIWBE Marku subtotal $ 795.00 Total $ 13,010.00 PAGE 1