AMENDMENT No.1 CONTRACT NO.H(�� -4
TO CITY SECRETARY CONTRACT No. 42547
WHEREAS, the City of Fort Worth (CITY) and TranSystems Corporation,
DBA TranSystems Corporation Consultants, (ENGINEER) made and entered into
City Secretary Contract No. 42547, (the CONTRACT) which was authorized by
City Council by M&C C-25255 on the 01 day of November, 2011 in the amount
of $ 243, 322; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
North Fort Worth Intersections; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal dated September 9, 2012, a
copy of which is attached hereto and incorporated herein. The cost to
City for the additional design services to be performed by Engineer
totals $13,010. 00. (See Attached Funding Breakdown Sheet, Page -3-)
2 .
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $256,332. 00.
3 .
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by a signatory,
City of Fort Worth
Professional Services Agreement Amendment Template R�`►®R®
PMO Official Release 8/1/2012 QFFICIA`
Page 1 of 3
CITY SECRETAR
FT.WORTH,T'X
below.
APPROVED:
City of Fort Worth TranSystems Corporation DBA
TranSystems Corporation
Consultants
Fernando Costa Raul Pena I I, P.E. �—
Assistant City Manager Senior Vice President
DATE: L/j= DATE:
APPROVAL RECOMMENDED:
Douglas Wiersig, P.E.
Director, Department of Vransporation
And Public Works
APPROVED AS TO FORM AND LEGALITY: M&C: AJI 4
Date:
Douglas W. Black
Assistant City Attorney
ATTEST: •4 �' F��3pb
°° ° °
Pa.1
O YY'
a
Mary J. y o o°
City Secr ary ° 0000°°o°*d'O'
City of Fort Worth OFFICIAL RECORD
Professional Services Agreement Amendment Template
PMO Official Release 8/1/2012 CITY SECRETARY
Page 2 of 3
FT.WORTH,TX
FUNDING BREAKDOWN SHEET
City Secretary No.
Amendment No. 1
Department Fund-Account-Center Amount
C200 531200 202390165230 $13, 010
Total : $13, 010
City of Fort Worth
Professional Services Agreement Amendment Template
PMO Official Release 8/1/2012
Page 3 of 3
Intersection Improvement Projects
TranSystems Corporation Consultants
09/07/2012
Amendment#1
Proposed M/WBE
Fee Participation
Mark IV $ 13,010 $ 7,950
Alta Vista $ - $ -
Marine Creek $ - $ -
Bob Hanger $ - $ -
Subtotal $ 13,010 $ 7,950 61%
Or inal Contract Subtotal $ 243,322 $ 37,265 15%
New Total $ 256,332 $ 45,215 18%
Revisions to Proposal include:
1 Adding final leg of Mark IV/Cantrell Samson Intersection
K:\PROPOSAL\TxDOTq"-029500.57\ADWproposed fee Amendment I @%Cfi;3012.xls
Intersection Improvement Projects
Mark IV at Cantrell Samson
TranSystems Corporation Consultants
09/07/2012
Design Services-Amendement 1 HOURLY RATE WORK Total
Estimated an ours Cost
Project Senior Design RPLS Survey Tech Clerical Estimate
WORK TASK DESCRIPTION Manager Enginer Engineer Crew {$}
195.00 15000 130.00 125.E 130.00 95,00 5000 MM18E
—77
—77
S 'al S' lc r
1. Project Management $ 390,00
Project Management 4 hourstmonth 2
sub-total S 390.00
2. Sure -Subconsultant $ 500.00
Control $ 750.00
ToDoqraphy(alrady completed-Just supplemental) 500.00
Tie exist ROW $ 2,200.00
ROW Parcel descrition,exhibit and setti comer -4 sub-total $ 3,950.00
3. Plans and Specifications $
Geometries Lprelimina Geometries already completed)
Typical Sections 1 2 3Z0.00
$
Grading Plan 1 2 $ 320.00
Drainage Plan 2 $ 260.00
Traffic Control Plan 4 $ 520.00
Sidewalks I ADA 2 $ 190.00
X-Sections 2 6 $ 830.00
Si nin and Stri in 1 8 $ 890.00
SWPPP 1 i $ 225.00
S ecifcations sub-total $ 3,555.00
4. Draina a Analysis-Subconsultant $ 800.00
DA Ma
3,200AD
P&P Sheets,Calculations $
subtotal $ 4,OOOA0
5. Si nai De'n 320.00
Si vial L ut-
Ram ,sidewalks and pavement ma kin s-in PSE $
sub-total $ 320.00
6. MIWBE Marku subtotal $ 795.00
Total $ 13,010.00