Loading...
HomeMy WebLinkAboutContract 42585-CO1 (2) • Pc3n- ' WORTH City of Fort Worth C Change Order Request C%iffllffi Project Name I Bonds Ranch Road Water Main Extention City Sec No. 42585 Project No.(s) P265-602140035683 DOE No. 5236 City Proj.No. 00356 Project Description: The construction of a 16-inch water transmission main Bonds Ranch Road from Molina Lane to Colonial Heights Lane. Contractor: S.J.Louis Construction of Texas,Ltd. Change Order: Date: 6I7I2012 City Project Mgr. Roberto C.Sauceda City Inspector: Paul Gieger Phone Number: 817-392-2387 Phone Number: 817-223-2269 Dept. WATER Totals Contract Time (Calendar days) Original Contract Amount $893,894.75 $893,894.75 180 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $893,894.75 $893,894.75 180 Amount of Proposed Change Order $18,000.00 $18,000.00 Revised Contract Amount L $911,894.75 $911,894.75 180 Original Funds Available for Change Orders $26,817.00 $26,817.00 Remaining Funds Available for this CO $26,817.00 $26,817.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 2.01% MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) H-17,1177,368.441 The change order will provide additional pay item quantities for the following: • The removal and disposal of Concrete riprap. • The installation of markers on air release valves. • Remobilization to conduct the above items dog cl�ttin� o ��10��00 ����� °� d A by: �� a� , OFFICIAL RECORD ' o v SECRETARY o CITY 0 0°�pc a FT. WORTH,TX .fi. Kayser, City a�a� X�,S as - — o It is understood and agreed that the acceptance of this Change Order—by't e contractor constitutes an accord and satisfaction and represents paymeni in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Z "Louisruction of Texas,Ltd. Peter #a A R� iy Z - - - - 0* iw - 06 Jet l 6 Z- G�•..-.•...aG �.. 1, !g 12 M&C Number M&C Date Approved FURT WORTH City of Fort Worth oo- Change Order Additions Project Name Bonds Ranch Road Water Main Extention City Sec No. 1 42585 Project No.(s) P265-602140035683 DOE No. 5236 City Proj.No. 1 00356 Project The construction of a 16-inch water transmission main Bonds Ranch Road from Molina Lane to Colonial Heights Lane. Description Contractor S.J.Louis Construction of Texas,Ltd. Change Order: = Date: 6/7/2012 City Project Mgr. Roberto C.Sauceda City Inspector Paul Gie er ADDITIONS DEPT U»it Unit Cost Total 30 Remobilization Water 1.00 LS $5,000.00 $5,000.00 31 Installation of Water Markers for ARV Water 1.00 LS $3,400.00 $3,400.00 32 Removal and Disposal of Concrete Riprap Water 1.00 LS $9,600.00 $9,600.00 WATER $18,000.00 Page 2 of 4 Additions Sub Total $18,000.00 Pro T WO TH City of Fort Worth Change Order Deletions Project Name Bonds Ranch Road Water Main Extention City Sec No. 42585 Project No.(s) P265-602140035683 DOE No. D23D City Proj. No. 00356 Project Description The construction of a 16-inch water transmission main Bonds Ranch Road from Molina Lane to Colonial Heights Lane. Contractor S.J.Louis Construction of Texas,Ltd. Change Order: 0 Date 6R/2012 City Project Mgr. I Roberto C. Sauceda City Inspector F Paul Gieger DELETIONS ITEM MtCMPTION DEPT Oty Unit Unit Cost Total WATER Page 3 of 4 IDeletions Sub Total MMBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 Page 4 of 4