HomeMy WebLinkAboutContract 42585-CO1 (2) • Pc3n- ' WORTH City of Fort Worth C
Change Order Request
C%iffllffi
Project Name I Bonds Ranch Road Water Main Extention City Sec No. 42585
Project No.(s) P265-602140035683 DOE No. 5236 City Proj.No. 00356
Project Description: The construction of a 16-inch water transmission main Bonds Ranch Road from Molina Lane to Colonial Heights Lane.
Contractor: S.J.Louis Construction of Texas,Ltd. Change Order: Date: 6I7I2012
City Project Mgr. Roberto C.Sauceda City Inspector: Paul Gieger
Phone Number: 817-392-2387 Phone Number: 817-223-2269
Dept. WATER Totals Contract Time
(Calendar days)
Original Contract Amount $893,894.75 $893,894.75 180
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $893,894.75 $893,894.75 180
Amount of Proposed Change Order $18,000.00 $18,000.00
Revised Contract Amount L $911,894.75 $911,894.75 180
Original Funds Available for Change Orders $26,817.00 $26,817.00
Remaining Funds Available for this CO $26,817.00 $26,817.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 2.01%
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) H-17,1177,368.441
The change order will provide additional pay item quantities for the following:
• The removal and disposal of Concrete riprap.
• The installation of markers on air release valves.
• Remobilization to conduct the above items dog cl�ttin�
o ��10��00
�����
°� d
A by: �� a� , OFFICIAL RECORD
' o v SECRETARY
o CITY
0 0°�pc a FT. WORTH,TX
.fi. Kayser, City a�a� X�,S as - —
o It is understood and agreed that the acceptance of this Change Order—by't e contractor constitutes an accord and satisfaction and represents paymeni
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Z
"Louisruction of Texas,Ltd. Peter #a A R� iy Z
- - - - 0*
iw
- 06 Jet l
6 Z- G�•..-.•...aG �.. 1, !g 12
M&C Number M&C Date Approved
FURT WORTH City of Fort Worth
oo- Change Order Additions
Project Name Bonds Ranch Road Water Main Extention City Sec No. 1 42585
Project No.(s) P265-602140035683 DOE No. 5236 City Proj.No. 1 00356
Project The construction of a 16-inch water transmission main Bonds Ranch Road from Molina Lane to Colonial Heights Lane.
Description
Contractor S.J.Louis Construction of Texas,Ltd. Change Order: = Date: 6/7/2012
City Project Mgr. Roberto C.Sauceda City Inspector Paul Gie er
ADDITIONS
DEPT U»it Unit Cost Total
30 Remobilization Water 1.00 LS $5,000.00 $5,000.00
31 Installation of Water Markers for ARV Water 1.00 LS $3,400.00 $3,400.00
32 Removal and Disposal of Concrete Riprap Water 1.00 LS $9,600.00 $9,600.00
WATER $18,000.00
Page 2 of 4 Additions Sub Total $18,000.00
Pro T WO TH City of Fort Worth
Change Order Deletions
Project Name Bonds Ranch Road Water Main Extention City Sec No. 42585
Project No.(s) P265-602140035683 DOE No. D23D City Proj. No. 00356
Project Description The construction of a 16-inch water transmission main Bonds Ranch Road from Molina Lane to Colonial Heights
Lane.
Contractor S.J.Louis Construction of Texas,Ltd. Change Order: 0 Date 6R/2012
City Project Mgr. I Roberto C. Sauceda City Inspector F Paul Gieger
DELETIONS
ITEM MtCMPTION DEPT Oty Unit Unit Cost Total
WATER
Page 3 of 4 IDeletions Sub Total
MMBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
Page 4 of 4