Loading...
HomeMy WebLinkAboutContract 42610-CO1 (2) CITY SECT TAi 44 . 4)4 C-ONTMC "in Deportment of TP&W ConsL Senrim Dow Dar—p Risk Management J.Palle _ tT WO RT H , v-c �,1 a D.O.E. Brothedon v CFA Westerman/Sunned The Proceeding people have been Cordacted ng the request for final Payment a fire released this Project for sudi PpnawrL ATION AND PUBLIC WORE5 Clearance Conducted By Shameka Kennedy F PROJECT COMPLETION D.O.E.Ntt: 6729 Regarding contract 42610 for SEWER MAIN REPLACEMENT as required by the WATER DEPARTMENT as approved by City Council on U/15/20U through M&C C-25M2 the director of the WATER DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. Orig `_' t/ to inal Contract Prices: 51,000,000.00 Amount of Approved Change Orders: AUG 29 ?,m Ns Revised Contract Amount: Total Cott Work Completed: S958,426.17 Deductions: Liquidated Damages: Days @ S210.00/Day Pavement Deficiencies: Total Deduction Amount: Total Cott Work Completed: S958,426.17 Less Previous Payments: S958,426.17 Final Payment Doe �rS0.00J # Recommended for Acceptance Date Asst. Director,TPW - Infrastructure Design and Construction 1� ^ � ts Accepted d Date Asst. Director, WATER DEPARTMENT Asst. City Manager Date Comments: P258-541200-701170168183 OFFICIAL RECORD CITY SECRETABRI ) FT. WORTH,TX j -] SCANNED FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name Sewer Main Replacements Contract Limits Contract 201 IA®Various Locations Project Type SEWER City Project Numbers 01681 DOE Number 6729 Estimate Number 12 Payment Number 12 For Period Ending 5/15/2015 CD City Secretary Contract Number 42610 Contract Time 36ED Contract Date 11/15/2011 Days Charged to Date 571 Project Manager LopezA Contract is 59.000 Complete Contractor CIRCLE C CONSTRUCTION COMPANY PO BOX 40328 FORT WORTH, TX 76140 Inspectors GREGORY / WATSON Friday,May 15,2015 Page 1 of 9 City Project Numbers 01681 DOE Number 6729 Contract Name Sewer Main Replacements Estimate Number 12 Contract Limits Contract 2011A @ Various Locations Payment Number 12 Project Type SEWER For Period Ending 5/15/2015 Project Funding I i Sewer Main Replacements Contract 2011A Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total ---- -- -- - -- -- -- ----- ---------- 1 PIPE-SEWER-6 INCH-0 TO 6 FT PVC PIPE 75 LF $30.00 $2,250-00 2 PIPE-SEWER-6 INCH-6 TO 8 FT PVC PIPE 75 LF $32.00 $2,400.00 3 PIPE-SEWER-6 INCH-8 TO 10 FT PVC PIP 75 LF $33.00 $2,475-00 4 PIPE-SEWER-6 INCH-1 0 TO 12 FT PVC PI 50 LF $35.00 $1,750.00 5 PIPE-SEWER-8 INCH-0 TO 6 FT PVC PIPE 750 LF $40.00 $30,000-00 494.5 $19,780.00 6 PIPE-SEWER-8 INCH-6 TO 8 FT PVC PIPE 1000 LF $42.00 $42,000.00 7 PIPE-SEWER-8 INCH-8 TO 10 FT PVC PIP 1000 LF $44.00 $44,000.00 8 PIPE-SEWER-8 INCH-10 TO 12 FT PVC PI 400 LF $46.00 $18,400.00 9 PIPE-SEWER-8 INCH-12 TO 14 FT PVC PI 100 LF $48.00 $4,800.00 10 PIPE-SEWER-8 INCH-14 TO 16 FT PVC PI 100 LF $52.00 $5,200.00 11 PIPE-SEWER-8 INCH-16 TO 18 FT PVC PI 100 LF $60.00 $6,000.00 12 PIPE-SEWER-10 INCH-0 TO 6 FT PVC PIP 100 LF $45.00 $4,500.00 13 PIPE-SEWER-10 INCH-6 TO 8 FT PVC PIP 100 LF $47.00 $4,700.00 14 PIPE-SEWER-10 INCH-8 TO 10 FT PVC PI 100 LF $49.00 $4,900.00 15 PIPE-SEWER-10 INCH-10 TO 12 FT PVC P 50 LF $55.00 $2,750.00 16 PIPE-SEWER-10 INCH-12 TO 14 FT PVC P 50 LF $60.00 $3,000.00 17 PIPE-SEWER-10 INCH-14 TO 16 FT PVC P 50 LF $65.00 $3,250.00 18 PIPE-SEWER-10 INCH-16 TO 18 FT PVC P 50 LF $75.00 $3,750.00 19 PIPE-SEWER-12 INCH-0 TO 6 FT PVC PIP 50 LF $49.00 $2,450.00 20 PIPE-SEWER-12 INCH-6 TO 8 FT PVC PIP 50 LF $51.00 $2,550.00 21 PIPE-SEWER-12 INCH-8 TO 10 FT PVC PI 50 LF $53.00 $2,650.00 22 PIPE-SEWER-12 INCH-10 TO 12 FT PVC P 50 LF $55.00 $2,750.00 23 PIPE-SEWER-12 INCH-12 TO 14 FT PVC P 50 LF $60.00 $3,000.00 24 PIPE-SEWER-12 INCII-14 TO 16 FT PVC P 50 LF $65.00 $3,250.00 25 PIPE-SEWER-12 INCH-16 TO 18 FT PVC P 50 LF $75.00 $3,750.00 26 PIPE-SEWER-15 INCH-0 TO 6 FT PVC PIP 50 LF $53.00 $2,650.00 27 PIPE-SEWER-15 INCH-6 TO 8 FT PVC PIP 50 LF $55.00 $2,750.00 28 PIPE-SEWER-15 INCH-8 TO 10 FT PVC PI 50 LF $58.00 $2,900.00 29 PIPE-SEWER-15 INCH-10 TO 12 FT PVC P 50 LF $62.00 $3,100.00 513.2 $31,818.40 30 PIPE-SEWER-15 INCH-12 TO 14 FT PVC P 50 LF $70.00 $3,500.00 31 PIPE-SEWER-15 INCH-14 TO 16 FT PVC P 50 LF $75.00 $3,750.00 Friday,May 15,2015 Page 2 of 9 City Project Numbers 01681 DOE Number 6729 Contract Name Sewer Main Replacements Estimate Number 12 Contract Limits Contract 201 IA @ Various Locations Payment Number 12 Project Type SEWER For Period Ending 5/15/2015 Project Funding 32 PIPE-SEWER-15 INCH-16 TO 18 FT PVC P 50 LF $85.00 $4,250.00 33 PIPE-SEWER-6 INCH-0 TO 6 FT DUCTILE 50 LF $50.00 $2,500.00 34 PIPE-SEWER-6 INCH-0 TO 8 FT DUCTILE 50 LF $52.00 $2,600.00 35 PIPE-SEWER-6 INCH-8 TO 10 FT DUCTILE 50 LF $55.00 $2,750.00 36 PIPE-SEWER-6 INCH-10 TO 12 FT DUCTIL 50 LF $58.00 $2,900.00 37 PIPE-SEWER-8 INCH-0 TO 6 FT DUCTILE 50 LF $60.00 $3,000.00 61 $3,660.00 38 PIPE-SEWER-8 INCH-0 TO 8 FT DUCTILE 50 LF $62.00 $3,100.00 39 PIPE-SEWER-8 INCH-8 TO 10 FT DUCTILE 50 LF $65.00 $3,250.00 40 PIPE-SEWER-8 INCH-10 TO 12 FT DUCTIL 50 LF $68.00 $3,400.00 41 PIPE-SEWER-8 INCH-12 TO 14 FT DUCTIL 50 LF $75.00 $3,750.00 42 PIPE-SEWER-8 INCII-14 TO 16 FT DUCTIL 50 LF $85.00 $4,250.00 43 PIPE-SEWER-8 INCH-16 TO 18 FT DUCTIL 50 LF $95.00 $4,750.00 44 PIPE-SEWER-8 INCH-18 TO 20 FT DUCTIL 50 LF $110.00 $5,500.00 45 PIPE-SEWER-10 INCH-0 TO 6 FT DUCTILE 50 LF $65.00 $3,250.00 46 PIPE-SEWER-10 INCH-6 TO 8 FT DUCTILE 50 LF $67.00 $3,350.00 47 PIPE-SEWER-10 INCH-8 TO 10 FT DUCTIL 50 LF $69.00 $3,450.00 48 PIPE-SEWER-10 INCH-10 TO 12 FT DUCTI 50 LF $75.00 $3,750.00 49 PIPE-SEWER-10 INCH-12 TO 14 FT DUCTI 50 LF $80.00 $4,000.00 50 PIPE-SEWER-10 INCH-14 TO 16 FT DUCTI 50 LF $90.00 $4,500.00 51 PIPE-SEWER-10 INCH-16 TO 18 FT DUCTI 50 LF $100.00 $5,000.00 52 PIPE-SEWER-10 INCH-18 TO 20 FT DUCTI 50 LF $110.00 $5,500.00 53 P1PE-SEWER-12 INCH-0 TO 6 FT DUCTILE 50 LF $70.00 $3,500.00 54 PIPE-SEWER-12 INCH-6 TO 8 FT DUCTILE 50 LF $72.00 $3,600.00 55 PIPE-SEWER-12 INCH-8 TO 10 FT DUCTIL 50 LF $75.00 $3,750.00 56 PIPE-SEWER-12 INCH-10 TO 12 FT DUCTI 50 LF $80.00 $4,000.00 57 PIPE-SEWER-12 INCH-12 TO 14 FT DUCTI 50 LF $85.00 $4,250.00 58 PIPE-SEWER-12 INCH-14 TO 16 FT DUCTI 50 LF $95.00 $4,750.00 59 PIPE-SEWER-12 INCH-16 TO 18 FT DUCTI 50 LF $110.00 $5,500.00 60 PIPE-SEWER-12 INCH-18 TO 20 FT DUCTI 50 LF $125.00 $6,250.00 61 PIPE-SEWER-16 INCH-0 TO 6 FT DUCTILE 50 LF $80.00 $4,000.00 62 PIPE-SEWER-16 INCH-6 TO 8 FT DUCTILE 50 LF $82.00 $4,100.00 63 PIPE-SEWER-16 INCH-8TO 10 FT DUCTIL 50 LF $85.00 $4,250,00 64 PIPE-SEWER-16 INCII-10 TO 12 FT DUCTI 50 LF $90.00 $4,500.00 65 PIPE-SEWER-16 INCH-12 TO 14 FT DUCTI 50 LF $95.00 $4,750.00 Friday,May 15,2015 Page 3 of 9 City Project Numbers 01681 DOE Number 6729 Contract Name Sewer Main Replacements Estimate Number 12 Contract Limits Contract 2011A @ Various Locations Payment Number 12 Project Type SEWER For Period Ending 5/15/2015 Project Funding 66 PIPE-SEWER-16 INCH-14 TO 16 FTDUCTI 50 LF $105.00 $5,250.00 67 PIPE-SEWER-16 INCH-16 TO 18 FT DUCTI 50 LF $120.00 $6,000.00 68 PIPE-SEWER-16 INCH-18 TO 20 FT DUCTI 50 LF $130.00 $6,500.00 69 PIPE-SEWER-6 INCH-0 TO 6 FT SDR26 PI 75 LF $34.00 $2,550.00 70 PIPE-SEWER-6 INCH-6 TO 8 FT SDR26 PI 75 LF $36.00 $2,700.00 71 PIPE-SEWER-6 INCH-8 TO 10 FT SDR26 P 75 LF $38.00 $2,850.00 72 PIPE-SEWER-6 INCH-10 TO 12 FT SDR26 50 LF $42.00 $2,100.00 73 PIPE-SEWER-8 INCH-0 TO 6 FT SDR26 PI 750 LF $42.00 $31,500.00 81 $3,402.00 74 PIPE-SEWER-8 INCH-0 TO 8 FT SDR26 PI 1000 LF $44.00 $44,000.00 160 $7,040.00 75 PIPE-SEWER-8 INCH-8 TO 10 FT SDR26 P 1000 LF $46.00 $46,000.00 28 $1,288.00 76 PIPE-SEWER-8 INCH-10 TO 12 FT SDR26 400 LF $50.00 $20,000.00 8 $400.00 77 PIPE-SEWER-8 INCH-12 TO 14 FT SDR26 100 LF $55.00 $5,500.00 78 PIPE-SEWER-8 INCH-14 TO 16 FT SDR26 100 LF $60.00 $6,000.00 79 PIPE-SEWER-8 INCH-16 TO 18 FT SDR26 100 LF $75.00 $7,500.00 80 PIPE-SEWER-10 INCH-0 TO 6 FT SDR26 P 100 LF $45.00 $4,500.00 81 PIPE-SEWER-10INCH-6 TO 8 FT SDR26 P 100 LF $48.00 $4,800.00 82 PIPE-SEWER-10 INCH-8 TO 10 FT SDR26 100 LF $52.00 $5,200.00 83 PIPE-SEWER-10 INCH-10 TO 12 FT SDR26 50 LF $58.00 $2,900.00 84 PIPE-SEWER-10 INCH-12 TO 14 FT SDR26 50 LF $62.00 $3,100.00 85 PIPE-SEWER-10 INCH-14 TO 16 FT SDR26 50 LF $70.00 $3,500.00 86 PIPE-SEWER-10 INCH-16 TO 18 FT SDR26 50 LF $95.00 $4,750.00 87 PIPE-SEWER-12 WCH-0 TO 6 FT SDR26 P 50 LF $50.00 $2,500.00 88 PIPE-SEWER-12 INCH-6 TO 8 FT SDR26 P 50 LF $52.00 $2,600.00 89 PIPE-SEWER-12 INCH-8 TO 10 FT SDR26 50 LF $55.00 $2,750.00 90 PIPE-SEWER-12 INCH-10 TO 12 FT SDR26 50 LF $60.00 $3,000.00 91 PIPE-SEWER-12 INCH-12 TO 14 FT SDR26 50 LF $70.00 $3,500.00 92 PIPE-SEWER-12 INCH-14 TO 16 FT SDR26 50 LF $80.00 $4,000.00 93 PIPE-SEWER-12 INCH-16 TO 18 FT SDR26 50 LF $95.00 $4,750.00 94 PIPE-SEWER-15 INCH-0 TO 6 FT SDR26 P 50 LF $60.00 $3,000.00 95 PIPE-SEWER-15 INCH-6 TO 8 FT SDR26 P 50 LF $65.00 $3,250.00 96 PIPE-SEWER-15 INCH-8 TO 10 FT SDR26 50 LF $70.00 $3,500.00 97 PIPE-SEWER-15 INCH-10 TO 12 FT SDR26 50 LF $75.00 $3,750.00 24 $1,800.00 98 PIPE-SEWER-15 INCH-12 TO 14 FT SDR26 50 LF $85.00 $4,250.00 99 PIPE-SEWER-15 INCH-14 TO 16 FT SDR26 50 LF $95.00 $4,750.00 Friday,May 15,20I5 Page 4 of 9 i City Project Numbers 01681 DOE Number 6729 Contract Name Sewer Main Replacements Estimate Number 12 Contract Limits Contract 2011 A @ Various Locations Payment Number 12 Project Type SEWER For Period Ending 5/15/2015 Project Funding 100 PIPE-SEWER-15INCH-16 TO 18 FT SDR26 50 LF $120.00 $6,000.00 101 SEWER SERVICE-4 INCH-BORE&JACK DI 50 LF $100.00 $5,000.00 102 PIPE-SEWER-6 INCH-BORE&JACK DI W/P 50 LF $120.00 $6,000.00 103 PIPE-SEWER-8 INCH-BORE&JACK DI W/P l00 LF $400.00 $40,000.00 99 $39,600A0 104 PIPE-SEWER-10 INCH-BORE&JACK DI W/ 100 LF $400.00 $40,000.00 105 PIPE-SEWER-12 INCH-BORE&JACK DI W/ ]00 LF $400.00 $40,000.00 106 PIPE-SEWER-16 INCH-BORE&JACK DI W/ 100 LF $500.00 $50,000.00 107 INSPECTION-PRE-CONSTRUCTION CLEANING 500 LF $5.00 $2,500.00 1282 $6,410.00 108 INSPECTION-POST-CONSTRUCTION CLEANIN 1500 LF $3.00 $4,500.00 1951.5 $5,854.50 109 TRENCH SAFETY SYSTEM>5 FT DEPTH 2O00 LF $2.00 $4,000.00 1262 $2,524.00 110 SEWER-CUT&PLUG EXIST MAINS ALL SIZ 5 EA $1,000.00 $5,000.00 8 $8,000.00 III DEHOLE-0 TO 5 FT DEPTH 5 EA $1,000.00 $5,000.00 3 $3,000.00 112 DEHOLE-5 TO 10 FT DEPTH 5 VF $1,500.00 $7,500.00 8 $12,000.00 113 DEHOLE-10 TO 20 FT DEPTH 5 EA $2,000.00 $10,000.00 4 $8,000.00 114 MOBILIZATION-JOB MOVE IN 40 EA $1,000.00 $40,000.00 15 $15,000,00 115 MOBILIZATION-EMERGENCY SITUATION JOB 20 EA $2,000.00 $40,000.00 2 $4,000.00 116 MANHOLE-STD.4 FT DIA.(TO 6 FT DEPT 40 EA $3,000.00 £120,000.00 13 $39,000.00 117 MANHOLE-STD.4 FT DIA_-ADDED DEPTH( 20 VF $150.00 $3,000.00 18.33 $2,749.50 118 MANHOLE-DROP-STD.4 FT DIA.(TO 6 FT 20 EA $3,500.00 $70,000.00 2 $7,000.00 119 MANHOLE-DROP-STD.4 FT DIA.-ADDED DE 10 VF $200.00 $2,000.00 16.8 $3,360.00 i 120 MANHOLE-EXTERNAL DROP INTO EXIST MAN 10 EA $600.00 $6,000.00 1 $600.00 121 MANHOLE-ADD'L DEPTH OVER 6 FT OF EXT 10 VF $200.00 $2,000.00 122 MANHOLE-PAINT&COATING-INTERIOR PRO 10 VF $185.00 $1,850.00 42.3 $7,825.50 123 MANHOLE-SHALLOW STD.4 FT DIA.(SHAL 20 EA $2,000.00 $40,000.00 1 $2,000.00 { 124 SEWER-WASTEWATER ACCESS DEVICE(ALL 5 EA $800.00 $4,000.00 125 MANHOLE-TYPE A 5 FT DIA.(TO 6 FT DE 5 EA $5,000.00 $25,000.00 126 MANHOLE-TYPE A 5 FT DIA.-ADDED DEPTH 5 VF $200.00 $1,000.00 I 127 MANHOLE-FIBERGLASS 4 FT DIA.(TO 6 F 5 EA $2,900.00 $14,000.00 128 MANHOLE-FIBERGLASS 4 FT DIA.-ADDED D 5 VF $150.00 $750.00 129 MANHOLE-VACUUM TEST 40 EA $150.00 $6,000.00 16 $2,400.00 130 COLLAR-MANHOLE(5 FT X 5 FT) 80 EA $300.00 $24,000.00 15 $4,500.00 131 MANHOLE-WATERTIGHT INSERT(30"PLAST 80 EA $50.00 $4,000.00 5 $250.00 132 MANHOLE-WATERTIGHT INSERT-LOCKING ST 10 EA $250.00 $2,500.00 133 MANHOLE-ADJUSTMENT&SEAL EXIST 10 EA $500.00 $5,000.00 MANH i Friday,May l5,20 t 5 Page 5 of 9 City Project Numbers 01681 DOE Number 6729 Contract Name Sewer Main Replacements Estimate Number 12 Contract Limits Contract 2011A @ Various Locations Payment Number 12 Project Type SEWER For Period Ending 5/15/2015 Project Funding 134 MANHOLE-REMOVE EXIST SEWER MANHOLE 40 EA $500.00 $20,000.00 6 $3,000.00 135 MANHOLE-REMOVE EXIST MH CONE SECT& 40 EA $600.00 $24,000.00 136 MANHOLE-ABANDON EXIST SEWER 10 EA $600.00 $6,000.00 5 $3,000.00 MANHOLE 137 SEWER SERVICE-4 INCH SERVICE TAP 60 EA $300.00 $18,000.00 23 $6,900.00 138 SEWER SERVICE-6 INCH SERVICE TAP 40 EA $400.00 $16,000.00 1 $400.00 139 SEWER SERVICE-8 INCH SERVICE TAP 20 EA $400.00 $8,000.00 3 $1,200.00 140 SEWER SERVICE-4 INCH-SDR26 S.S.SERV 250 LF $30.00 $7,500.00 354 $10,620.00 141 SEWER SERVICE-6INCH-SDR26 S.S.SERV 100 LF $33.00 $3,300.00 436 $14,388.00 142 SEWER SERVICE-8 INCH-SDR26 S.S.SERV 100 LF $35.00 $3,500.00 10 $350.00 143 SEWER SERVICE-4 INCH-2 WAY CLEANOUT 100 EA $150.00 $15,000.00 30 $4,500.00 144 SEWER SERVICE-6 INCH-2 WAY CLEANOUT 100 EA $175.00 $17,500.00 10 $1,750.00 145 SEWER SERVICE-8 INCH-2 WAY CLEANOUT 100 EA $250.00 $25,000.00 1 $250.00 f 146 SEWER SERVICE-4 INCH CAST IRON S.S. 100 EA $150.00 $15,000.00 7 $1,050.00 147 SEWER SERVICE-6 INCH CAST IRON S.S. 100 EA $175.00 $17,500.00 I 148 SEWER SERVICE-8 INCH CAST IRON S.S. 100 EA $185.00 $18,500.00 149 SEWER PLUMBING-PLUMBING PERMIT FOR S 1 EA $22.50 $22.50 8 $180.00 150 SEWER PLUMBING4INCH-SCH 40 S.S.PR 100 LF $55.00 $5,500.00 1025.5 $56,402.50 151 FILL MATERIAL-FLOWABLE FILL,IN LIEU 100 CY $100.00 $10,000.00 849.5 $84,950.00 I 152 SUBGRADE-CRUSHED LIMESTONE FOR MISC 25 CY $1.00 $25.00 18 $18.00 153 CONCRETE-TYPE B(#2500) 50 CY $1.00 $50.00 154 CONCRETE-TYPE E(91500) 50 CY $1.00 $50.00 155 RIPRAP(CONCRETE) 20 CY $150.00 $3,000.00 156 RIPRAP-12 INCH ROCK 20 CY $100.00 $2,000.00 157 RIPRAP-18 INCH ROCK 20 CY $150.00 $3,000,00 158 RIPRAP-24 INCH ROCK 20 CY $200.00 $4,000.00 159 GRASS-HYDRO MULCH SEEDING 50 LF $5.00 $250.00 372 $1,860,00 160 GRASS-SOD 50 LF $10.00 $500.00 417 $4,170.00 161 CONCRETE-CONCRETE ENCASEMENT 50 LF $50.00 $2,500.00 162 PAVEMENT-CONCRETE SIDEWALK 450 SF $8.00 $3,600.00 542 $4,336.00 i REPLACEME 163 PAVEMENT-CONCRETE DRIVEWAY 450 SF $8.00 $3,600,00 3203.5 $25,628.00 REPLACEME i 164 PAVEMENT-CONCRETE CURB&GUTTER 50 LF $25.00 $1,250.00 114 $2,850.00 REPL i S Friday,May 15,2015 Page 6 of 9 City Project Numbers 01681 DOE Number 6729 Contract Name Sewer Main Replacements Estimate Number 12 Contract Limits Contract 2011A @ Various Locations Payment Number 12 Project Type SEWER For Period Ending 5/15/2015 Project Funding 165 PAVEMENT-CONCRETE CURB ATTACHED TO 50 LF $20.00 $1,000.00 C i 166 PAVEMENT-REPLACE PAVING IN PARKING A 100 LF $25.00 $2,500,00 986 $24,650.00 167 PAVEMENT-CONCRETE PAVEMENT ON 2:27 C 300 LF $55.00 $16,500.00 110 $6,050.00 168 PAVEMENT-CONCRETE REPLACEMENT ON 1000 SF $8.00 $8,000.00 68 $544.00 EXI 169 PAVEMENT-PAVER ON REINFORCED 100 LF $70.00 $7,000.00 CONCRET 170 PAVEMENT-2 INCH MIN HMAC ON 2:27 CON 1000 LF $38.00 $38,000.00 5444 $206,872.00 171 PAVEMENT-2 INCH MIN HMAC 1000 SF $6.00 $6,000.00 7529.5 $45,177.00 REPLACEMENT 172 PAVEMENT-2 INCH HMAC ON 2:27 CONCRET 100 LF $38.00 $3,800.00 173 MIN.1-1/2 INCH HMAC ON REINFORCED C 100 LF $50.00 $5,000.00 174 PAVEMENT-2 INCH HMAC ON 6 INCH FLEX 100 LF $12.00 $1,200,00 175 PAVEMENT-TRAFFIC PERMIT FOR UTILITY 50 EA $75.00 $3,750.00 3 $225.00 176 TRAFFIC CONTROL PLAN DESIGN&INSTAL 50 EA $200.00 $10,000.00 4 $800.00 177 8"C900(0-6) 0 LF $46.00 $0.00 330 $15,180.00 178 PRESSURE GROUT EXIST PIPE 0 CY $125.00 $0.00 11.5 $1,437.50 i 179 PIPE-SEWER 18"(8-10) 0 LF $65.00 $0.00 18.7 $1,215.50 180 PIPE-SEWER 18"(10-12) 0 LF $70.00 $0.00 140 $9,800.00 191 ENG REPAIR 8"SEWER IN SYCAMORE CREEK 0 LS $31,626.44 $0.00 1 $31,626.44 W/BY PASS PUMPING 182 REMOVE WASTE WATER ACCESS DEVICE 0 EA $300.00 $0,00 8 $2,400.00 183 RECLAIM FLUSH POINTS 0 EA $68,909.33 $0.00 1 $68,909.33 184 36"WOODEN BOX CULVERT&GROUT 0 LF $450.00 $0.00 89 $40,050.00 1 185 BYPASS PUMPING 0 LS $800.00 $0.00 1 $800.00 186 TYPE A S DIA MH&IT SHAFT W/8"EXT DROP 0 LS $23,750.00 $0.00 1 $23,750.00 187 DYE TEST 0 LS $150.00 $0.00 5 $750.00 188 LOADER W/1 OPERATOR&1 LABORER 0 HR $125.00 $0.00 21 $2,625.00 { 189 BYPASS PUMPING @ JOEL EAST 0 LS $4,500.00 $0.00 1 $4,500.00 Sub-Total of Previous Unit $1,617,472.50 $958,426.17 Friday,May 15,2015 Page 7 of 9 City Project Numbers 01681 DOE Number 6729 Contract Name Sewer Main Replacements Estimate Number 12 Contract Limits Contract 2011A @ Various Locations Payment Number 12 Project Type SEWER. For Period Ending 5/1512015 Project Funding Contract Information Summary Original Contract Amount $1,000,000.00 Change Orders Total Contract Price S1,617,472.50 Date l Total Cost of Work Completed $958,426.17 Gkt.J�S Contrapwr Less %Retained $0.00 Net Earned $958,426.17 oat /v J InspectioOlupervisor �. Earned This Period $0.00 Retainage This Period $0.00 Date ��i Less Liquidated Damages Project Man Q Days @ /Day S0.00 Date LessPavement Deficiency $0.00 Asst or/VW--Infrastructure esign and.Corutrull. „ Less Penalty 50.00 J / &, Date q �' i S Less Previous Payment S958,426.17 rector/Contracting Dep ent Plus Material on Hand Less 15% S0.00 Balance Due This Payment S0•00 Friday,May 15,2015 Page 8 of 9 j W E 0 ID AUG 2 4 2015 City Project Numbers 01681 DOE Number 6729 Contract Name Sewer Main Replacements Estimate Number 12 Contract Limits Contract 2011A @ Various Lo Payment Number 12 Project Type SEWER For Period Ending 5/15/2015 Project Funding Project Manager LopezA City Secretary Contract Number 42610 Inspectors GREGORY / WATSON Contract Date 11/15/2011 Contractor CIRCLE C CONSTRUCTION COMPANY Contract Time 365 CD PO BOX 40328 Days Charged to Date 571 CD FORT WORTH, TX 76140 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $958,426.1 7 WATER DEPARTMENT Less %Retained $0.00 ENGINEERING AND FISCAL SERVICES Net Earned $958,426.17 Contact Person- Berdena Dig ' - Ext.8429 Earned This Period $0.00 en A ov gnat f Retainage This Period $0.00 DEPARTMENT CHECK PICK-UP t_1 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $958,426.1 7 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $0.00 Friday,May 15,2015 Page 9 of 9 FORTWORTH rev 03/05/07 TRANSPORTATION& PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO. 12 NAME OF PROJECT: Sewer Main Replants PROJECT NO.: 1681 CONTRACTOR: Circle C DOE NO. 6729 PERIOD FROM 11/15/11 TO: 05/14/15 FINAL INSPECTION DATE: 1-Jan WORK ORDER EFFECTIVE 11/15/2011 CONTRACT TIME 365 O woo m DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS* DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS THIS 0 0 0 580 0 580 PERIOD PREVIOUS 0 0 0 0 571 571 PERIOD TOTALS 0 0 0 580 571 1,151 TO DATE *REMARKS: CONTRA& OR DATE INSPECTOR DATE ENGINEERING DEPARTMENT The City of Fort Worth•1000 Throckmorton Street•Fort Worth,70FFIC�,IAL (817)392-7941 •Fas(817)392-7845 IRECORDCRETARIf a FT.WORTH,TX FORTWORTH TRANSPORTATION AND PUBLIC:WORKS PIPE REPORT FOR: PROJECT NAME: Sewer Main Replacement PROJECT NUMBER: 1681 DOE NUMBER: 6729 WATER PIPE LAID SIZE TYPE OF PIPE LF Sewer 8" PVC 494.5 Sewer 15" PVC 513.2 Sewer 8" Ductil 61 Sewer 8" SDR26 0 to 6FT 81 Sewer 8" SDR26 6 to 8FT 160 Sewer 8" SDR26 8 to LOFT 28 Sewer 8" SDR26 10 to 12 8 Sewer 15" SDR26 10 to 12 24 FIRE HYDRANTS: VALVES(16"OR LARGER) PUPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: SEWER PIPE LAUD SIZE TYPE OF PIPE LF PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845 FORTWORTH TRANSPORTATION AND PUBLIC;WORKS PIPE REPORT FOR: PROJECT NAME: Sewer Main Replacement PROJECT NUMBER: 1681 DOE NUMBER: 6729 WATER PIPE LAID SIZE TYPE OF PIPE LF Sewer 8" DI-Bore 99, FIRE HYDRANTS: VALVES(16"OR LARGER) PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: SEWER PIPE LAID SIZE TYPE OF PIPE LF PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: I TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845 FORTWORTH REV:02/20/07 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR CONTRACTOR&PROJECT DATA Name of Contractor Project Name Circle C Construction Sewer Main Replacement DOE Inspector DOE Number Donald Watson 6729 DOE bupector Project Manager ❑ Water p Waste Water❑ Storm Drainage❑ Pavement Adolfo Lopez Initial Contract Amount Project Difficulty $1,000,000.00 O Simple OO Routine O Complex Final Contract Amount Date $958,426.17 8/11/2015 In PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT x APPLICABLE Y/ RATING 0-4 MAX SCORE SCORE 1 Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 Y 4 20 20 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 4 60 60 5 Work Performed 15 Y 4 60 60 6 Finished Product 15 Y 4 60 60 7 Job Site Safety 15 Y 4 60 60 8 Traffic Control Maintenance 15 Y 4 60 60 9 Daily Clean Up 5 Y 3 20 15 10 Citizen's Complaint Resolution 5 Y 4 20 20 11 Property Restoration 5 Y 4 20 1 20 12 After Hours Response 5 Y 4 20 1 20 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 443 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 443 EW CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which= 448 Rating([TS/MS]*100%) 443 / 448 Performance Category Excellent <20%=Inadequate 20%to<40%=Deficient 40%to<60'1=Standard 600A to<80%=Good >_80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) f Signature DOE Inspector Si ature Contractor Signature DOE Inspector's Supervisor ` CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth-1000 Throckmorton Street-Fort Worth,Tx 76012-6311 0 (817)392-7941 -Fax:(817)392-7845 FoRTWORTHRE 02/22/07 r TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY 1)PROJECT INFORMATION Date: 8/11/2015 Name of Contractor Project Name Circle C Construction Sewer Main Replacement DOE Inspector Project Manager Donald Watson Adolfo Lopez DOE Number Project Doiicull), Type of Contract 6729 O Simple OO Routine O Complex ❑ Water 0 Waste water El Storm Drainage❑ Pavement Initial Contract Amount Final Contract Amount $1,000,000.00 $958,426.17 M PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT RATING ELEMENT RATING 0-4 0-4 INSPECTION EVALUATION IPLANS&SPECIFICATIONS 1 Availability of Inspector I 1 Accuracy of Plans to Existing Conditions 2 Knowledge of Inspector 12 Clafity&Sufficiency of Details 3 Accuracy of Measured Quantities 3 Applicabili of Specifications 4 Display Of Professionalism 4 Accuracy of Plan Quantities 5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs I Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager 1 Change Order Processing Time 13 Communication 2 Timliness of Contractor Payments 14 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe III)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS Q) The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941•Fax:(817)392-7845 CONSENT OF SURETY OWNER TO FINAL PAYMENT ARCHITECT ❑ AIA Document G707 CONTRACTOR ❑ SURETY ❑ OTHER ❑ good No.TXC"Ift TO OWNER: ARCHITECT'S PROJECT NO.: Sewer#P258-701170168183;DOE No.6729 City of Fort Worth 1000 Throckmorton Street CONTRACT FOR: Utility Improvements Fort Worth,TX CONTRACT DATED: PROJECT: (name,address) Sewer Main Replacements Contract 2011A Fort Worth,TX In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the (overt name and address of Surety) Merchants Bonding Company(Mutual) 2100 Fleur Drive Des Moines,IA 50321-1158 ,SURETY on bond of (Evert name and address of Contractor) William J.Schultz,Inc.,dba Circle C Construction Company P.O.Boa 40328 Fort Worth,TX 76140 'CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety of any of its obligations to (Evert name and address of Owner) City of Fort Worth 1000 Throckmorton Street Fort Worth,TX 76102 ,OWNER, as set forth in the said Surety's bond. IN WITNESS WHEREOF,the Surety has hereunto set its hand this date: June 30,2015) (Insert in writing the month followed by the numeric date and year.) Merchant, "ndina Company(Mutual) (Surety) 3,, :....: ... (Signature of authorize r esentative) Attest: fitness as to Surety: Sheryl A.Klutts,Attorney-in-Fact (Seal): dal, name and title) John A.Miller Note: This form is to be used as a companion document to AIA DOCUMENT G706,CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Cunent Edition AIA DOCUMENT G707•CONSENT OF SURETY COMPANY TO FINAL PAYMENT o April 1970 Edition 0 AIA® One Page 01970 9 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 New York Ave.,NW,Washington,D.C.20006 MERCHANDT k BONDING COMPANY. POWER OF ATTORNEY Know All Persons By These Presents,that MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING, INC.,both being corporations duly organized under the laws of the State of Iowa(herein collectively called the"Companies'), and that the Companies do hereby make,constitute and appoint,individually, John A Miller; John R Stockton; Sheryl A Klutts of Fort Worth and State of Texas their true and lawful Attorney-in-Fact,with full power and authority hereby conferred in their name, place and stead,to sign,execute,acknowledge and deliver in their behalf as surety any and all bonds, undertakings, recognizances or other written obligations in the nature thereof,subject to the limitation that any such instrument shall not exceed the amount of: TEN MILLION($10,000,000.00)DOLLARS and to bind the Companies thereby as fully and to the same extent as if such bond or undertaking was signed by the duly authorized officers of the Companies,and all the acts of said Attorney-in-Fact, pursuant to the authority herein given,are hereby ratified and confirmed. This Power-of-Attomey is made and executed pursuant to and by authority of the following By-Laws adopted by the Board of Directors of the Merchants Bonding Company(Mutual)on April 23,2011 and adopted by the Board of Directors of Merchants National Bonding,Inc.,on October 24,2011. "The President,Secretary,Treasurer,or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attomeys-in-Fact,and to authorize them to execute on behalf of the Company,and attach the seal of the Company thereto,bonds and undertakings,recognizances,contracts of indemnity and other writings obligatory in the nature thereof. The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond,undertaking,recognizance, or other suretyship obligations of the Company,and such signature and seal when so used shall have the same force and effect as though manually fixed." In Witness Whereof,the Companies have caused this instrument to be signed and sealed this 13thday of August , 2014. `.+�'f;1Ofi4� .,,� •.���t1G.COCA•. MERCHANTS BONDING COMPANY(MUTUAL) �}r pa�4j Qp', ep0•'p�P�9,� �Z; MERCHANTS NATIONAL BONDING,INC. 1933 c; B STATE OF IOWA ..... .......... p *���`` ••• •• COUNTY OF POLK ss. .°".'...""r'N •'••• President On this 13thday of August . 2014,before me appeared Larry Taylor,to me personally known,who being by me duly sworn did say that he is President of the MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING,INC.;and that the seals affixed to the foregoing instrument is the Corporate Seals of the Companies;and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. In Testimony Whereof,I have hereunto set my hand and affixed my Official Seal at the City of Des Moines,Iowa,the day and year first above written. IV-11IA<s WENDY WOODY v 0 Commission Number 784654 T My Commission Expires • rowP June 20 2017 Notary Public,Polk County,Iowa STATE OF IOWA COUNTY OF POLK ss. I, William Warner,Jr.,Secretary of the MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING,INC., do hereby certify that the above and foregoing is a true and correct copy of the POWER-OF-ATTORNEY executed by said Companies, which is still in full force and effect and has not been amended or revoked. In Witness Whereof,I have hereunto set my hand and affixed the seal of the Companies on this 30th day of June 2015 4u co To it a' 1933 :C• Secretary :.O• .y�. �ti: POA 0014(7/14) .Jd� •,���e ,,• •.•6��.. .•`.d•. AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me,the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Teresa S Skelly, Vice President Of Circle C Construction, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations,or other i organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Sewer Main Replacements Contract 2011 A BY Vi esident c_. Subscribed and sworn before me on this date 3rd of July,2015. *$ Notary public Notary Public ="qT:_ -;rP STATE OF TEXAS 1 Tarrant, Texas F of�e, My Comm Exp.Ocmtrer 7 2015 f