HomeMy WebLinkAboutContract 42657-CO1 (2) FORT WORTH. City of Fort Worth CITY SECOTARY
_ Change Order Request CONTRACT NO.42. 6-7-00
Project Namel Bridge Repair at Seven Locations Contract 2011-22 City Sec# 1 42657
Client Project Ns)l GG01-539590-0202003 (DOE 6777)
Project Description Various repairs to be done at the following locations;South University Drive(North Bound and South Bound),East
Seminary Drive West Boundand East Bound),Ridgmar Meadow Drive,Conner Ave,Carswell Acess Rd.
Contractor Vendigm Construction,LLC Change Order# L� Date 3/8/2012
City Project Mgr.1 Tariqul Islam City Inspector I Jacob Gibson
Dept. TPW Water Sewer Totals Select Day Type
Original Contract Amount $294,630.00 $294,630.00 120 CD
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $294,630.00 $294,630.00 0
Amount of Proposed Change Order 17,300.00 0.00 0.00 $15,300.00
Revised Contract Amount $309,930.00 $309,930.00 0
Original-Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding(if necessary) $15,300.00 $15,300.00
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 5.19%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $368,287.50
JUSTIFICATION(REASONS)FOR CHANGE ORDER
A request was made from Dean Kuhn with TRWD to extend the drainage pipe coming off the Carswell acess bridge deck to the center portion
of bridge deck and into the river.TRWD specifically requested metal pipe in order to be less susceptible to breaking if freezing occurs.Vendigm
agreed to provide pricing for pipe and installation using metal straps.Price per linear foot includes:
•Connect new 4"cast iron pipe drains to existing 4"PVC drains
•Drill and anchor every 8'minimum to the underside de 1�l ettal strap to girders
•Extend each drain to spout into creek at a 45 d 6060
•Includes boom lift to install from underside o �i 0000000
Ff 0 oo��
A by ? �0 4
o Qo
/yy/,2
' Mind
aaQIt is understood and agreed that the acceptance of t� the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of, ental to,the above Change Order.
Contractor's Company Name Contractor Name ontr Si n ture Date
Vendi m Construction, LLC o v►R ,-j
In ectortl s 'on Su r r Da Pro Man erlPr am Managqr Date
21,1 r) — —
Assl a Date Dkdor,Con6actiing 19partirrient Dept) Date
4-z-I z (J, t,-) Nil, 4
s ' C' N%ey Date Assi t City Manager Date
�N
Council Action if required) OFFICIAL
M&C Number IM&C Date Ap4o8M5&iMkY 'V
FT- WORTH, TX ®'�'
0
/
cli
cliLO
# � Cl) a
8 -
C/) C/)
� k
� e
2 §
0 /
cu # \ .
Li
m 2 6
0 \ /
�\ k /CL
■ a e Z 2
/6 o
2
Z a)
§ � z t
� 2 / \ ¥ J
U. '0 / & In �
0 9 _E %O
® E
g % $ f m
U § \ of /
/ & / /
rw -call
g o £ .
a) G 8
$ 2 f .
/ CZ) / / /
I cy)
0
& k § o aES- $
m / > ƒ J §
° ® § / &
) b 7 § > B
f ± / /
r Z3 0 3
�
0 0 0
0 0 0 CD
CAM tn �
Cl)
cu
Q
) cu
O
E,
N
4-
0
N
N
OO
m
d
N
C
O
i.+
Q
N
N
t1D
C
m
t
U
m
w °
/
± 7
# ca /
E -
U U)
� /
7 e
3 §
0 /
# /\
\ of 7
m 6 C14
k \ � � �
�\ / / &
c k u v a
t2 : a 21 W) §
% k q »
D k k CL)
_ § c
2 °
❑
02 / 2o on
_ g \ g c
U 2 u F/
U / � f k
§ / f �. � ® 2 0
/ ° G
§ 2 / 2
C w \
\ R ® = t
k k b
� ) � k E
& 8 q - 5 E
$ ƒ ƒ /
\ u : 0
f 0 a_ cn / �
■ E � �
2 a-
�
0 0 0
0 0 0
0 0 0
�s e»
0
a>
CO
0
S,
N
4-
O
N
0)
00
N
d
N
C
O
aJ
0
v
'a
0
v
00
C
m
L
u
MIWBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
Co# DATE AMOUNT
Total $0.00
c
0
w N
J
U
W > o
W _ .�
, o L
a) cn
c
VN C O O O O U
Q O 4 Q coCU
co M (D M a
a N iQ �"' 'i 9 F
4m Qs O
O N N M cu
O u, a)
N
C j fA fA fA fA fA 64 fA 64 fA l j
>,
W s a�i N
QU ca iii U
L Lo `m >,
a m v m
y o 0
O a) 4) o
C N N O) -0 Q
a) N (D C L a)
of N cu 0CD
L
pQ Q � CO ci U a
mazzU E U .
z 0 Q U z
L a) L vim)
a) O O a) v)
a)
0 a) cu U cu c
a � cua0 0 ova cna �,
u1 wc �. rn �. o c c
g U m cu c Q cu c
a o o z o
U •° •° . .
a) w .�
c
L-
c >,
o c w O cCa) a) a) a) Q O a)OUa a
(n (n a w U cU C 7 '� O
7 7 O 0 % o f a) O a) p
ammUU6 < 0 UaQ� Una
FORT WORTH® City of Fort Worth �a co 1
Change Order Request
Project Name I Bridge Repair at Seven Locations Contract 2011-22 City Sec#. 42657
Client Project#(s)l GG01-539590-0202003 (DOE 6777)
Project Descriptio Various repairs to be done at the following locations;South University Drive(North Bound and South Bound),East
Seminary Drive(West Boundand East Bound),Ridgmar Meadow Drive,Conner Ave,Carswell Acess Rd.
Contractorl Vendigm Construction,LLC Change Order# 0 Date 3/8/2012
City Project Mgr.I Tariqul Islam City Inspector I Jacob Gibson
Dept. TPW Water Sewer Totals Select Day Type
Original Contract Amount $294,630.00 $294,630.00 120 CD
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $294,630.00 $294,630.00 0
Amount of Proposed Change Order $15,300.00 $0.55 $0.00 $15,300.00
Revised Contract Amount $309,930.00 $309,930.00 0
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding(if necessary) $15,300.00 $15,300.00
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 5.19%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $368,287.50
JUSTIFICATION(REASONS)FOR CHANGE ORDER
A request was made from Dean Kuhn with TRWD to extend the drainage pipe coming off the Carswell acess bridge deck to the center portion
of bridge deck and into the river.TRWD specifically requested metal pipe in order to be less susceptible to breaking if freezing occurs.Vendigm
agreed to provide pricing for pipe and installation using metal straps.Price per linear foot includes:
•Connect new 4•cast iron pipe drains to existing 4'PVC drains
•Drill and anchor every 8'minimum to the underside deck or metal strap to girders
•Extend each drain to spout into creek at a 45 degree angle
•Includes boom lift to install from underside of bridge
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Company Name Contractor Name ntr i n re Date
Vendigm Construction, LLC /`
In ector/Ins ection Supe4Qr 4 pate, Pro M na er/P o am na Date
—77
I/Assis Date D� tor,gntractng D artment Dept Dale
i
ssi Ci Att Date Assis Ci Mana er Date
Council Action if required) � A
M&C Number ' M&C Date Approved • �s
r ,�
41
FORT WORTH® City of Fort Worth
Change Order Request
Project Namel Bridge Repair at Seven Locations Contract 2011-22 City Sec#. 1 42657
Client Project#(s)l GG01-539590-0202003 (DOE 6777)
Project Descriptio Various repairs to be done at the following locations;South University Drive(North Bound and South Bound),East
Seminary Drive(West Boundand East Bound),Ridgmar Meadow Drive,Conner Ave,Carswell Acess Rd.
Contractor Vendigm Construction,LLC Change Order# Date 3/8/2012
City Project Mgr.1 Tadqul Islam City Inspector Jacob Gibson
Dept. TPW Water Sewer Totals Select Day Type
Original Contract Amount $294,630.00 $294,630.00 120 CD
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $294,630.00 $294,630.00 0
Amount of Proposed Change Order $15,300.00 $0.00 $0.00 15,300.00
Revised Contract Amount $309,930.00 $309,930.00 0
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding(if necessary) $15,300.00 $15,300.00
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 5.19%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $368,287.50
JUSTIFICATION(REASONS)FOR CHANGE ORDER
A request was made from Dean Kuhn with TRWD to extend the drainage pipe coming off the Carswell acess bridge deck to the center portion
of bridge deck and into the river.TRWD specifically requested metal pipe in order to be less susceptible to breaking if freezing occurs.Vendigm
agreed to provide pricing for pipe and installation using metal straps.Price per linear foot includes:
•Connect new 4"cast iron pipe drains to existing 4"PVC drains
•Drill and anchor every 8'minimum to the underside deck or metal strap to girders
•Extend each drain to spout into creek at a 45 degree angle
•Includes boom lift to install from underside of bridge
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Company Name Contractor Name ontractSi na re Date
Vendi m Construction, LLC �—
Ins ctor/Inspection SuperyiCor gate Pro'ec ManageriPrograrn Manager 1 4DateiDate Di or,Contracon D artment D t
ssis i LftMey Date Assist City Manager Date W �j
Council Action if required)
M&C Number M&C Date Approved �'1
x1 f
FORT WORTH® City of Fort Worth
� 1111 f Change Order Request
Project Namel Bridge Repair at Seven Locations Contract 2011-22 City Sec#. 42657
Client Project#(s)l GG01-539590-0202003 (DOE 6777)
Project Descri Various repairs to be doge at the following locations;South University Drive(North Bound and South Bound),East
Seminary Drive(West Boundand East Bound),Ridgmar Meadow Drive,Conner Ave,Carswell Mess Rd.
Contractorl Vendigm Construction,LLC Change Order# Date 3/8/2012
City Project Mgr.1 Tariqul Islam City Inspector FJacob Gibson
Dept. TPW Water Sewer Totals Select Day Type
Original Contract Amount $294,630.00 $294,630.00 120 CD
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $294,630.00 $294,630.00 0
Amount of Proposed Change Order $15,300.00 0.00 0.00 $15,300.00
Revised Contract Amount $309,930.00 $309,930.00 0
Original Funds Available for Change Orders
Remaining Funds Available for this CO $0.00
Additional Funding(if necessary) $15,300.00 $15,300.00
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 5.19°%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+2061) $368,287.50
JUSTIFICATION(REASONS)FOR CHANGE ORDER
A request was made from Dean Kuhn with TRWD to extend the drainage pipe coming off the Carswell acess bridge deck to the center portion
of bridge deck and into the river.TRWD specifically requested metal pipe in order to be less susceptible to breaking if freezing occurs.Vendigm
agreed to provide pricing for pipe and installation using metal straps.Price per linear foot includes:
•Connect new 4"cast iron pipe drains to existing 4"PVC drains
•Drill and anchor every 8'minimum to the underside deck or metal strap to girders
•Extend each drain to spout into creek at a 45 degree angle
•Includes boom lift to install from underside of bridge
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
CzntraMes Company Name Conm Name Contract Signature Date
Vendigm Construction, LLG
In0ector/Inspection Supe sor Date Prgjp t Manager/Program Manager Date
el
Assistant Director(Dept) Date Director,Contracting Department(Dept) Date
5
Assistant City Attomey Date Assistant City Manager Date
Council Action if required) n
M&C Number M&C Date Approved �9r
0 ,