11/wilp PROJECT MANUAL,
FOR
THE CONSTRUCTION OF
Jr HMAC SURFACE OVERLAY (2012-,8)
At Various Locations
W/
City Project No. O�190�6
r
r
lr�'/pr Betsy Price Tom Higgins
Mayor Oty Manager
Doug,las W. Wiersig, P.E.
Director, Transportation and Public Works Department
Prepared by
The City of Fort Worth
TRANSPORTATION AND PUBLIC WORKS
2012
r
r
I
... . .................. ........
005243- I
Agreement
Page I of 4
SECTION 00 52 43
2 AGREEMENT
3
4 TMS AGREEWNT, authorized on July 10, 2012, is made by and between the City of Forth
1011p, 5 Worth, a Texas home rule municipality, acting by and through "Its duly authorized City Manager,
6 ("City"')�, and Advanced Paving Acguisitl'on,,Ltd.,,, authorized to do business in Texas, acting, by
7 and through its duly authorized representative, ("Contracto�r").
WTI 8 City and Contractor, in Consideration of the mutual covenants hereinafter set forthl agree as
9 follows.
10 Article 1. WORK,
-nplete all Work as specified or indicated in the Contract Documents, for the
1.1 Contractor shall cot
12 Project identified herein.
13 Article 2.PROJECT
14 The project for which the Work under the Contract Documents may be the whole or only a part is
1,51 generally described as follows:
16 A.
17 HMAC SURFACE OVERLAY,('2012-8),
18
19 0 1906
20
2 1
22 Article 31. CONTRACT TIME
pip 23 31.1 Time is of the essence.
24 All time lirnits, fo�r Milestones,, if any, and Final Acceptance as stated in the Contract
25 Documents are of flie essence to this Contract.
26 3.2 Final Acceptance.
27 The Work wili be complete for; Final. Acceptance within, 90 Calendar days afterthe date
28 when the Contract I ime commences, to run as provided in, Paragraph 2,.03 of the General
29 Conditions.
3�O 3.3 Liquidated damages
31 Contractor recognizes that time is of the essence of this Agreement and that City wil
32 suffer; financial lo�ss, if the Work is not completed within the times specified in, Paragraph
33 3.2 above, plus any extension thereof allowed in accordance with Article 12 of the
34 General Conditions. The Contractor also, recognizes the delays, expense an,d difficulties
35 involved in proving in a legal proceeding the actual loss suffer�ed by-the City if the Work
36 is not completed on time. Accordingly,, instead of requiring any such proof, Contractor;
37' agrees that as liquidated damages, for delay �(but not as a penalty), Contractor shall pay
38 City Three Hundred an.d Fifteen J$315.00), for each day that expires after the time
39 specified In Paragraph 3.2 for Final Acceptance until, the City issues, the Final Letter of
40 Acceptance.,
PIP
CITY'OF FORT WORTH HMAC SUR-FACE OVERLAY(2012-8)
STANDARD CONSI`RUC`FION SlIECIFICATION DOCUMENI'S 019,06,
Revised November 9,2011
P",
M,,R
005243-2
Agreement
Page 2 of 4
41 Article 4. CONTRACT'PRICE
42 City agrees to pay Contractor for performance of the Work in accordance with the Contract
43 Documents an amount in cuffent funds of SIXHUNDRED THIRTY TWO THOUSAND
44 THREE,HUND:RED: .FIEFTY DOLLARS AND TWENTY CENTS,,($63.2,3
low,
45 Article 5�. CONTRACT DOCUMENTS
46 51.1 CONTENTS-.
101 PIP
47 A. The Contract Documents which comprise the entire agreement between City and
48, Contractor concerning the Work consist of the following:
49 1.. 'This Agreement.
-yreement:
50 2. Attachments to this Ag
51 a. Bid Form
52 1) Proposal Fon-n
53 2) Vendor Compliance to State Law Non-Resident Bidder
54 3) Prequalification Statement
55 4) State and Federal documents(project specific)
56 b Current P�reval ling Wage Rate Table
57 c. insu rance ACOR-D- Fon-n(s),
5,8 d. Payment Bond,
59, e. Performance Bond
60, f. MaintenanceBond
61 g. Power of Attorney for the Bonds
612 h. Worker's Compensation Affidavit
63, i. MWB,E Commitment Form
64 3. General Conditions.
65 4. Supplementary Conditions,.
6,6 5. Specifications specifically made a part of the Contract Documents by attachment
1� * -
67 or if not attached, as incorporated by reference and described in the Table of
68 Contents of the! Project's Co�ntract Documents.
619 16. Drawings.
70 7. Addenda.
71 8. Documentation submitted by Contractor prior to Notice of Award.
72 9. The following which may be delive�red or issued after the Effective Date of the
73 Agreement and, if issued, become an incorporated part of the Contract Documents:
74 a. Notice to Proceed.
75 b. Fie!ld Orders.
7'6 c. Change Orders.
77 d. Letter offinal Acceptance.
78
CITY OF FORT WORTH HMAC SURFACE OVERLAY(2012-8)
STANDARD CONsTRUCTION SPECIFICATION DOCUMENJ S 01906
Revised Nolve!mb�e�r 191 2011
005243-3
Agreement
Page 3 of 4
79 Article 6. INDEMNIFICATION
80 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own
81 expense, the city, its officers, servants and employees, from and against any and all
812 claims arising out of, or alleged to arise out of, the work and services to be performed
83 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees
ffically i op
84 tinder this contract. Thl*s: indemnification provision is sped ntende�d to _erate
815 and be effective even if it is allMed or en that all, or some of the damages being
86 son 0 a
-ght were caused, in whole or in i)art, by any act, omission or negligence of the ci
"M a
87 This indemnity provision "is intended to 'Include, without Himitation, indemnity for
a
88 costs, expenses and legal feesincurred by the city in defending against such claims and
89 causes of actions.
IM I I
90
91 6.2 Contractor covenants and agrees to 'indemnify and hold harmless, at 'its own expense,,,
"M 9�2 the city,its officers,servants,and employees,,from and, against any and all loss,damage
93, or destruction of property of the city,arising out of,or alleged to arise out of., the work
94 and services to be performed by the contractor,, its, officers, agents, emp�loyeesi,
A
95 subcontractors, licensees or invitees under this contract. Thi's indemnification
96 provision is,,specifficalty intended to operate and be effective even 'if 'it is alleged or
97 proven that all or some of the damages being sought were caused, in whole or in part,
0 a
98 by any act,,omission or neeligence of the
99
100 Article 7. MISCELLANEOUS
1,01 7.1 Terms.
1.02 Terms used in this Agreement which are defined in Article 1 of the General Conditions will
103 have the meanings indicated 'in the General Conditions.,
104 '7.2 Assignment of Contract.
1,05 This Agreement, including all of the Contract Documents may not be assigned by the
106, Contractor without the advanced express written,consent of the City.
107 7.3 Successors and Assigns.
108 City and Contractor each binds itself, its partners, successors, assigns and legal
109, representatives to the! other party hereto, in respect to all covenants, agreements, and
H 0 obligations contained 'in the Contract Documents.
1,1. 7.4 Severabi'lity.
112 Any provision or part of the Contract Documents held to be 'unconstitutional, void or
143 unenforceable by a court or comp,ete!nt jurisdiction shal�l be deemed stricken and all
H 4 remaining provisions, shall, continue to be valid and bm' ding upon CITY and
1,15 CONTRACTOR.
116 7.5 Governing Law and Venue!.
117 This Agreement, including all of the Contract Documents is perfomiab�le in the State of
118 Texas. Venue shall be Tarrant County', Texas, or the! United States District Court for the
11.9 Northern District of Texasjort Worth Division.
CITY OF FORT WORTH HMAC SURFACE OVERLAY(2012-8)
STANDARD CONSTRUCTION SPECMICATION DOCUMENTS 01906
Revised',November 9,,2011
F",
00 5i2 43-4
Agreement
Page 4 of 4
120 7.6 Other Provisions.
121 The Contractor agrees to ay at least minimum wage per hour for all labor as the sarne is
p
122 classified, promulgated and set out by the City, a copy of which is attached hereto and
123 made a, part hereof the same as if it were coIp,ie!d verbatim herem.,
'124 7.7 Authority to Sign.
12l5 Contractor shall atta-ch evidence oIf authority to sign Agreement, if other than duly
Imp, 126 authorized signatory of the Contractor.
427
128 IN WITNFAIlSS WIE-AEOF1 City and Contractor have executed this Agreement in niultiple
1,29 counterparts.
130
131 This Agreement is effective!as of the last,date signed by the Parties("Effect i ve Date!"').
132
ntractor: City of Fort Worth
111111111 10ill
ON By.
41"M ----------------
Fernando Costa
"0
I
0100
B Assistant City Manager L
Sig-nature)
:6c a
Date 4c;r 100(>00 1C)OO
0 As i
ell 0 00
�0j
Attest.* �4
(Printed Namile) M�ry ser,,
C i 'ecretairy
0
(S,eal) 0000000
Ask.
-W
0
09
10l
Title.
VA.
Address.
M&C
7'�
Date: bl, 1 Z-
1,01 Approved as to Form and Legality:
Ci /'State/Zip.
0,1
e
lop
............
I"M Date Douglas W. Black
A I or�ney
ss*stant City Att
133
134
"IR
'135 APPROVAL RECOMMENDED:
136
137 X1. "HIN.CNIII' �AJI
138
1111 r11 I
139 JU IV,1115�1 HMSAIL Douglas&. Wiersig,P,.E.
140 Ho 0 3H WMIJAO DIRECTOR,,
141 Transportation and Public Works
1 M-1 142
OPP CITY OF FORT WORTH HMAC SURFACE OVERLAY(2012-8)
STANDARD CONSTRUCTION SPECtFICATION DOCUMENTS 01906
Revised November 91,2011
11 WR