HomeMy WebLinkAboutContract 49049-A6CSC No. 49049-A6 AMENDMENT No . 6 TO CITY SECRETARY CONTRACT �R�iAIS, the City of Fort Worth (CITY) and CDM Smith, Inc., (ENGINEER) made and entered into City Secretary Contract No. 49049, (the CONTRACT) which was authorized by M&C C-28213 on the 2"d day of May, 2017 in the amount of $1,570,965.00; and WHI:Ti� , the CONTRACT was subsequently revised by: Amendment No. 1 in the amount of $885,755.00 which was authorized by M&C C-28857 on September 18, 2018, Amendment No. 2 in the amount of $71,993.00 administratively authorized February 7, 2019 and Amendment No. 3 in the amount of $114,939.00 which was authorized by M&C 20-0159 on April 7, 2020 and Amendment No. 4 in the amount of $705,000.00 which was authorized by M&C 20-0346 on May 19, 2020 and Amendment No. 5 in the amount of $699,217.00 which was authorized by M&C 20-0700 on September 22, 2020; and WHI�RI�, the CONTRACT involves engineering services for the following project: Village Creek Water Reclamation Facility Grit Facility and South Influent Pump Station; and WgI�iTi � , it has become necessary to execute Amendment No . 6 to the CONTRACT to include an increased scope of work and revised fee. NOWTH�REFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in the proposal attached hereto and incorporated herein. The cost to City for the additional professional services to be performed by Engineer total $785,500.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $4,833,369.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY Page -1- FT. WORTH, TX EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER CDM Smith, Inc. Dc�nq Su�qh�loff � Dana Burghdoff (`fun 2, 20211720 CDT) —, ��.�� � ��t�.�- Dana Burghdoff Stacy Bar a, .E. Assistant City Manager Associate Jun 2, 2021 DATE: DATE : �� ��, (�J� AFPROVAI� RECOMN�NDED : CGI�/stD,�G�e� tf�a'�� Chnstopher H, rder 1May 26, 202116:56 CD7; Chris Harder, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY: Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. �-����'� - ���-- �� ..._ ,�; 5125f2021 Farida Goderya,P.E. Senior Project Manager �� DBlack (May28, 20211630 CDT) Douglas W. Black Senior Assistant City Attorney ,o,-d-o�u�� a � ATTEST: �,o�'O� FORj���a ������ 0 �,°� 0��1 � o o � �v� °_ 0 Mary J. Kayser �� „� o o*, City Secretary ����� �EXps��,d� M&C: 21-0356 Date: May 18, 2021 1295 #: 2021-741847 OFFICIAL RECORD CITY SECRETARY FT. W�RTH, TX Page -Z- CDM_ Sm�th 801 Cherry Street, Unit 33, Suite 1820 Fort Worth, Texas 76102 [el: 817 332-8727 May 19, 2021 Farida Goderya, PhD, PE Fort Worth Water 200 Texas Street Fort Worth, Texas Subject: Dear Farida: Village Creelc Water Reclamation Facility [VCWRF) Grit Removal Process City Project No. 100075; CSC No. 49049 Amendment No. 6 Proposal - South Flow Lift Station (LS) Construction Phase Services Enclosed is CDM Smith's amendment proposal for construction phase services related to the Village Creelc Water Reclamation Facility South Flow Lift Station Project, City Secretary No. 49049-A1. The total requested amount of this proposed amendment is $785,500. A summary of total contract amount is provided below. Original Contract Amount Approved Amendment No. 1(Lift Station Design) Approved Amendment No. 2(Grit Facility Physical Modeling) Approved Amendment No. 3(Additional Grit Faciliry Design/LS Physical Modeling) Approved Amendment No. 4(Grit Facility Construction Phase Services) Approved Amendment No. 5(Lift Station Redesign, PDR, 30% & 60%) Contract Amount to Date Requested Amendment No. 6(Lift Station Construction Phase Services) Revised Contract Amount Please let me know if you have any questions. Sincerely, ��n�� Amy Robinson, PE, BCEE CDM Smith Inc. cc: Stacy Barna, CDM Smith $ 1,570,965 $ 885,755 $ 71,993 $ 114,939 $ 705,000 $ 699,217 $ 4,047,869 $ 785,500 $ 4,833,369 i�J WATER + ENVIRONMENT +TRANSPORTATION + ENERGY + FACILITIES I I � ioiio�i�atoini000ioi�ioi�iii�vi00�oo0 ��,�, ioiio�omanmomoomio�oi000iiiioi�a0im0�an�no0 ����� � __ _ ._ _�;.__. _ _ _ IIIIIIIIIIIIIIIIIIIIIIII11111IIIII�II�II ��,li IIIIIIII IIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIDII ��,I, -, ioiio�i�o��oninooiooiiiiini�iii�0��iio��io g�,�� I���„��"�1�'lllll'�I I�"11,1���11���1� ���� - � ' � - ��' _ . • i iouo�i�iiioi�iiiiiiiiiiiiiiio�in�i�iiooiiio ��,�� - � 9I�I11 - II��011111111 � -= --��� - � �I'�„��I'�IIII'�III��I'�IIII1II'��,�II��III� �I,�� 10110�1�01��111110110091�111111■111�■�110�1110 �'��■ o�o■��i���on0i�iiio0i�ei�ii■iu��i���ia ����� ono■���n��n���ii�o0i�i�i�ii■��■a■�a�a��i�o ����� .. au0�0��00�a�aoa000��a��o�oo�����m�oo�ao�oa ��� - =1�11�1���1�19�I����I��II�II�I�1�1����1��� : IIDI111111�IDIIIIIIIIIIIIIIIIIIDIIIIII�I011$�� . IIIII11111111111�IIIII�IIIIIIIIIIIIIII�IU�IIII � 1 � � IIIII111111111�III�III�IIIIIII�IIIIIIIIII��IIII g'�, � = . . pl " ' ' ' ' ' . . �II �������������������������� ��������������� �������������������������� ��� ���������������� �� m < Z � � � z p m T m N A � z O C � ? m� � <� D � mm N Z � p O 3 A T Z � D �Z 0 z zm �� o� �� ~ Z m � z n � � z p m T m � p o Zo c � = m� A � .Zl 1 < � � D � O n �Tmm wz N T,7�j 00 _ � C 3 o y A m � D � � 1 � Z O z zm v w � o � `m o � -� � o z AMENDMENT N0. 6 ENGINEERING SERVICES FOR VCWRF SOUTH FLOW LIFT STATION PROJECT CONSTRUCTION PHASE SERVICES CITY PROJECT NO.: 100075�A6 AMENDMENT NO. 6 Scope for Enqineerinq Related Services for Wastewater Treatment Plant Improvements ENGINEERING SERVICES FOR VILLAGE CREEK WATER RECLAMATION FACILITY SOUTH FLOW LIFT STATION PROJECT CONSTRUCTION PHASE SERVICES CITY PROJECT NO.: 100075-A6 The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be perFormed and address the needs of the Project. PROJECT DEFINITION AND BACKGROUND The Fort Worth Water Department's Village Creek Water Reclamation Facility (VCWRF) South Flow Lift Station Project "the Project" includes proposed improvements to the plant's existing infrastructure and construction of additional infrastructure to pump the south influent flow to Box F1 and onto the Headworks Facility. This construction phase services scope is based upon a 21-months construction period and a 2-month post-construction period. The following scope of work clarifies and describes the project tasks completed by the ENGINEER as additional scope of work under Phase II Final Design Phase and tasks to be performed and completed by the ENGINEER as part of Phase III Construction Phase Services for the Project. Upon receipt of notice to proceed, ENGINEER will provide construction administration services during construction. WORK TO BE PERFORMED PHASE II — FINAL DESIGN ENGINEER has previously provided additional necessary services to support the design phase of the Project as follows. 2.1 Surveying ENGINEER's Subconsultant, CP&Y, completed additional scope to prepare an easement document for Oncor electrical power utility relocation underground for the Project. 2.2 Geotechnicallnvestigation ENGINEER's Subconsultant, Alliance Geotechnical Group, completed additional geotechnical investigation confirm preliminary geotechnical recommendations previously provided by Alliance Geotechnical. ENGINEER incorporated recommendations to include exploratory test pits and subgrade conditions into bid documents. Amendment No. 6 Rev1 4/21/2021 Page 1 of 11 AMENDMENT6 ENGINEERING SERVICES FOR VCWRF GRIT REMOVAL FACILITY PROJECT CONSTRUCTION PHASE SERVICES CITY PROJECT NO.: 100075-A6 2.3 Flood Plain Permitting and CDC Modeling ENGINEER completed additional scope of work to address the City of Arlington's (CoA) comments on the CDC Exemption filed by the City of Fort Worth for this Project. ENGINEER revised grading plan design and performed additional steady state and unsteady modeling to satisfy CoA's no-rise request for the area upstream of the project site and within the CoA's jurisdictional boundary. ENGINEER also provided a formal response to the CoA's comments. PHASE III — CONSTRUCTION PHASE SERVICES Task 3.1 Project Management Task 3.2 Construction Administration Task 3.3 Coordination with RPR Task 3.4 Standard Operating Procedures Task 3.5 Floodplain LOMR Task 3.6 Exploratory Test Pit Coordination Task 3.7 Confirmatory Subgrade Test Boring Review Task 3.8 Levee Certification Record Data Collection ENGINEER will support the construction phase of the project as follows. TASK 3.1 PROJECT MANAGEMENT ENGINEER will perform project management duties throughout the Construction Services Phase of the Project based on the construction duration stated above. ENGINEER will manage change, communicate effectively, coordinate internally and externally as needed, and proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. 3.1.1 General Project Management • Lead, manage and direct ENGINEER'S project team activities. • Review project budget and schedule weekly and communicate internally among team members regarding task budget status. • Review project monthly and assess risk, budget, schedule, out of scope items, on- time delivery metrics, submittal review and RFI status. • Task and allocate team resources. 3.1.2 Communications and Reporting • Prepare and submit invoices and progress reports monthly in the format requested by the CITY. • Complete Monthly M/WBE Report Form and Final Summary Payment Report Form at the end of the project. Amendment No. 6 Rev1 4/21/2021 Page 2 of 11 AMENDMENT6 ENGINEERING SERVICES FOR VCWRF GRIT REMOVAL FACILITY PROJECT CONSTRUCTION PHASE SERVICES CITY PROJECT NO.: 100075-A6 TASK 3.2 CONSTRUCTION ADMINISTRATION 3.2.1 Meetings ENGINEER will attend one pre-construction meeting with the CITY, Resident Project Representative (RPR), Contractor, and their Subcontractors. ENGINEER's Project Manager, Construction Coordinator, and one Engineer representing each of the following design disciplines will be in attendance: process mechanical, geotechnical, structural, and instrumentation. ENGINEER assumes pre-construction meeting will be virtual WebEx meeting and 2 hours in duration. ENGINEER will attend monthly construction progress meetings with the CITY, RPR, Contractor and their Subcontractors. ENGINEER's Project Manager and ENGINEER's Construction Coordinator will attend up to 21 monthly progress meetings. One representative each for civil, process mechanical, geotechnical, structural, electrical and instrumentation disciplines will attend up to six monthly progress meetings, with meeting attendance determined by the corresponding work of the forthcoming month. ENGINEER assumes monthly meetings to be 2 hours in duration and virtual WebEx meetings. ENGINEER will attend up to five I&C coordination meetings with PCSS and Emerson. I&C coordination meetings will generally follow the monthly progress meetings. ENGINEER's Project Manager and up to two persons from instrumentation discipline will attend meetings. ENGINEER assumes meetings to be 1 hour in duration and virtual WebEx meetings. Assumptions: ENGINEER assumes RPR will conduct meetings and prepare meeting agenda and minutes. ENGINEER will prepare submittal and RFI log. ENGINEER assumes PCSS and Emerson will conduct I&C coordination meetings and prepare meeting agenda and minutes. 3.2.2 Site Visits and Inspections ENGINEER will make up to six site visits, excluding site visits specified in Tasks 3.6, 3.7, and 3.8, to the project site to observe the progress and quality of various aspects of the construction work for the Project. Site visits shall be up to 2 hours in duration excluding travel time. Limits of Responsibility: The purpose of site visits will be to enable ENGINEER to carry out the duties and responsibilities assigned and undertaken by ENGINEER during the Construction Phase, and, in addition, by the exercise of ENGINEER's efforts as an experienced and qualified design professional, to provide the CITY with a greater degree of confidence that the completed work will conform to the Contract Documents and that the Contractor and its Subcontractors have implemented and maintained the integrity of the design concept of the completed Project as a functioning whole as indicated in the Contract Documents. ENGINEER will not, during such visits or as a result of such observations of the contractor's work in progress, supervise, direct, or have control over the Contractor or its Subcontractor's work, nor shall ENGINEER have authority over or responsibility for the means, methods, techniques, sequences, or procedures of construction selected or used by the Contractor, for security or safety on the Amendment No. 6 Rev1 4/21/2021 Page 3 of 11 AMENDMENT6 ENGINEERING SERVICES FOR VCWRF GRIT REMOVAL FACILITY PROJECT CONSTRUCTION PHASE SERVICES CITY PROJECT NO.: 100075•A6 site, for safety precautions and programs incident to the Contractor's or its Subcontractors work, nor for any failure of the Contractor or its Subcontractors to comply with Laws and Regulations applicable to the Contractor furnishing and perForming the work. 3.2.3 Shop Drawing Submittal Review ENGINEER will review shop drawings, related data submittals, product samples, and 0&M submittals. All shop drawing submittal review comments will be uploaded to City's preferred data management system. ENGINEER will perform technical and functional review of up to 315 shop drawings and other related submittals, 79 resubmittals, and 25 O&M Manuals. ENGINEER will make every effort to review shop drawings and return within 14 days, except where review is delayed for coordination with subsequent submittals. The Contractor's CPM schedule shall include a review duration of 30 days per section 01 33 00. � � . - . •: 00 & 01 — General Requirements 14 4 18 03 - Concrete 41 10 51 05 - Metals 22 6 28 09 - Finishes 4 1 5 22 - Plumbing 1 1 23 - HVAC 18 5 23 26 - Electrical 45 11 6 62 27 — Communications 4 1 5 31 - Earthwork 37 9 46 32 — Exterior Improvements 13 3 16 33 - Utilities 38 10 1 49 40 - Process Interconnections 68 17 12 97 43 — Process Gas and Liquid 3 1 2 6 Handling, Purification and Storage Equipment 44 — Pollution and Waste Control 1 1 2 46 — Water and Wastewater 6 2 3 11 Equipment Total 315 79 25 419 Assumption: ENGINEER will receive submittal notifications from BIM360 and distribute to design team for review. ENGINEER will upload submittal review comments to web based electronic document control and submittal management system. Amendment No. 6 R ev1 4/21 /2021 Page 4 of 11 AMENDMENT6 ENGINEERING SERVICES FOR VCWRF GRIT REh10VAL FACILITY PROJECT CONSTRUCTION PHASE SERVICES CITY PROJECT NO.; 100075•A6 3.2.4 Test Reports ENGINEER will review construction material test reports submitted by the CONTRACTOR that are nonconforming with specifications. ENGINEER assumes up to 50 test reports will be submitted for review. Assumption: ENGINEER assumes RPR will review all test reports submitted by CONTRACTOR and will notify ENGINEER nonconforming test reports to review. RPR or CONTRACTOR will manage web based electronic document control and submittal management system and will distribute test reports to ENGINEER for review. 3.2.5 Request for Information (RFIs) ENGINEER make clarifications and interpretations of the Contract Documents. ENGINEER will respond to up to 100 RFIs with 3-hr per RFI. All RFI responses will be uploaded to BIM 360. Assumption: ENGINEER assumes RPR or CONTRACTOR will manage web based electronic document control and RFI management system and will distribute RFIs to ENGINEER for review. ENGINEER will upload RFI responses to web based electronic document control and submittal management system. 3.2.6 Field Order/Change Orders ENGINEER will review and comment on up to 25 Field Order/Change Orders requested by the Contractor. When clarifications or interpretations result in a change cost or schedule, ENGINEER will review cost estimates and prepare documentation for change orders. When clarifications or interpretations result in a no-cost change order, ENGINEER will prepare documentation for field order changes. Assumption: ENGINEER assumes RPR or CONTRACTOR will manage web based electronic document control and field order/change order management system. Providing services to review or evaluate construction contractor(s) claim(s), supported by causes not within the control of ENGINEER are an Additional Service. Investigations, analyses, studies or design for substitutions of equipment or materials, corrections of defective or deficient work of the contractor or other deviations from the construction contract documents requested by the contractor and approved by the ENGINEER or CITY are an Additional Service. Substitutions of materials or equipment or design modifications requested by the CITY are an Additional Service. 3.2.7 Instrumentation Witness Factory Test and Functional Demonstration Testing ENGINEER will provide instrumentation and control system coordination and witness factory and functional demonstration testing during construction. Testing will include the Witness Factory Tests, Functional Demonstration Tests, and I&C assistance during construction. It is assumed that up to two, 8-hour days of factory testing and one 8-hour day of functional testing will be provided, with one lead instrumentation engineer in attendance. 3.2.8 Start-Up and Operations Amendment No. 6 Rev1 4/21/2021 Page 5 of 11 AMENDMENT6 ENGINEERING SERVICES FOR VCWRF GRIT REMOVAL FACILITY PROJECT CONSTRUCTION PHASE SERVICES CITY PROJECT NO,: 100075�A6 ENGINEER will review Contractor's commissioning, start-up, and testing plan and report to CITY. ENGINEER will provide up to 48 hours of on-site assistance during plant start-up to ensure the Project is functional and operating as designed. 3.2.9 Performance Testing ENGINEER will provide up to 48 hours of on-site assistance by lead design engineer during process performance testing for the lift station. 3.2.10 Substantial and Final Completion Walkthrough ENGINEER will participate in substantial completion and final completion inspections with the CITY and Contractor and assist with preparation of final punch list. Each walkthrough shall be 2-hr duration exclusive of travel time and punch list preparation. 3.2.11 Record Drawings ENGINEER will prepare Record Drawings from information provided by the Contractor depicting any changes made to the Final Drawings during construction. The following information will be provided by the Contractor: • As-Built Survey • Red-Line Markups from Contractor in electronic (PDF) format • Copies of Approved Change Orders and Field Orders, annotated and referenced into the red-line markups ENGINEER will modify the Final Drawings electronically and will place a stamp on the plans indicating that they represent Record Drawings of the project as constructed. The following disclaimer will be included with the Record Drawing stamp: • These Record Drawings were prepared using information provided by others and represent the as constructed conditions to the extent that documented changes were provided for recording. The ENGINEER assumes no liability for undocumented changes and certifies only that the documented changes are accurately depicted on these drawings. ENGINEER will submit a set of Final Drawings, modified and stamped as Record Drawings for record storage. The ENGINEER may keep copies of the information provided by the CITY for their files, but all original red-lined drawings will be returned to the CITY. Record Drawings will also be submitted in Adobe Acrobat PDF (version 6.0 or higher) format. There will be one (1) PDF file for the Project. Each PDF file will contain all associated sheets of the particular plan set. Sinqular PDF for each sheet of a plan set will not be accepted. PDF files will be uploaded to the project's Record Drawings folder in BIM360. Amendment No. 6 R ev 1 4/21 /2021 Page 6 of 11 AMENDMENT6 ENGINEERING SERVICES FOR VCWRF GRIT REMOVAL FACILITY PROJECT CONSTRUCTION PHASE SERVICES CITY PROJECT NO.: 100075•A6 3.3 COORDINATION WITH RESIDENT PROJECT REPRESENTATIVE ENGINEER assumes RPR services will be provided by others under separate contract with City. The CITY's RPR will serve as the project facilitator, coordinating the flow of information between ENGINEER, CITY, and the CONTRACTOR. ENGINEER shall coordinate with the RPR on the following items. - ENGINEER shall make clarifications and interpretations of the Contract Documents to the RPR. - ENGINEER shall coordinate with RPR to review the CONTRACTOR's monthly payment applications. - ENGINEER shall coordinate with RPR to review the CONTRACTOR's monthly progress schedule updates. 3.4 STANDARD OPERATING PROCEDURES (SOPS) ENGINEER shall update existing and prepare new Standard Operating Procedures (SOPs) as applicable and related to the incorporation of the Project. The following existing SOPs will be updated to include the improvements from the Project. Influent Flow: - INFL 01.001 - Influent Flow Process - INFL 02.001 - Flumes - Equipment List - Drawings - Equipment Photos Headworks: - HDWK 01.001 Screening Process - HDWK 02.001 Coarse Screen 1 and 2 - HDWK 02.002.01 Coarse Screen 36 - HDWK 03.001 - Fine Screens 1-5 - HDWK 03.002 - Fine Screen 37 - HDWK 04.001 - Bar Screen 3 Conveyors - HDWK 04.002 - Headworks Conveyor for Coarse Screens - HDWK 04.003 - Headworks Conveyor for Fine Screens - Equipment List - Drawings - Equipment Photos Odor Control: - ODOR 01.001 Odor Control Plan - Equipment List - Drawings - Equipment Photos The following new SOPs will be prepared. - INFL 03.001 - South Flow Influent Pump Station Amendment No. 6 Rev 1 4/21 /2021 Page 7 of 11 AMENDMENT6 ENGINEERING SERVICES FOR VCWRF GRIT REMOVAL FACILITY PROJECT CONSTRUCTION PHASE SERVICES CITY PROJECT NO,; 100075•A6 - ODOR 03.001 - South Flow Influent Pump Station Odor Control The updated and new SOPs will include the following information. - Description of process, including diagrams and equipment list - Operation of south flow lift station pumps - Drawings - Equipment Photos TASK 3.5 FLOODPLAIN LOMR ENGINEER will complete the following to prepare the post-construction Letter of Map Revision (LOMR) based on the following tasks and assumptions. 3.5.1 Kick-Off Meeting — ENGINEER will conduct kick-off meeting with the CITY for this task. 3.5.2 As-Built Data Acquisition and Hydraulic Analysis ENGINEER will complete the following tasks. - Obtain as-built project data - Build terrain model for incorporation into VC(A)-1 and WFTR hydraulic models - Incorporate as-built terrain model changes into VC(A)-1 and WFTR hydraulic models - Analyze impacts of constructed Project on WFTR and VC(A)-1 floodplains and Floodways - Develop floodplain working maps based on as-built models - Technical review of models and maps - Revise models and maps based on technical review 3.5.3 LOMR MT-2 Forms and LOMR Narrative Report Development ENGINEER will complete the following tasks. - MT-2 Form 1— Overview & Concurrence Form - MT-2 Form 2— Riverine Hydrology & Hydraulics Form - MT-2 Form 3— Riverine Structures Form - Community Concurrence Form - Payment Application Form - Develop Draft LOMR Narrative Report - Technical Review of Draft MT-2 Forms and Narrative Report - Finalize MT-2 Forms and Narrative Report - Develop and distribute public and private land ownership notices 3.5.4 LOMR Application Submittal and Revision ENGINEER will complete the following tasks. - Develop LOMR submittal package - Submit draft LOMR submittal package to CITY for review - Revise LOMR submittal package based on CITY comments Amendment No. 6 R ev1 4/21 /2021 Page 8 of 11 AMENDMENT6 ENGINEERING SERVICES FOR VCWRF GRIT REMOVAL FACILITY PROJECT CONSTRUCTION PHASE SERVICES CITY PROJECT NO.: 100075�A6 - Submit revised submittal package to FEMA for review (including application package) - Address FEMA review comments (review cycle 1) - Resubmit LOMR application to FEMA (review cycle 2) Assumptions: - As-built conditions reflect ENGINEER's predictions of water surface elevations (WSE's) developed during the design and do not result in a rise in elevations. - The LOMR addresses the West Fork Trinity River (WFTR) floodway/floodplain only and two LOMRs are not required, one for WFTR and one for VC(A)-1. VC(A)-1 is predicted to have a reduction of 0.2-ft. The trigger point according to FEMA guidance is a reduction of 0.5-ft. If LOMR for VC(A)-1 is required by City of Arlington (CoA), it will be considered additional services. - One Set of MT-2 forms will be required. FEMA guidance states that if more than one drainageway is involved separate forms need to be submitted for each affected drainageways, although the drainageways are covered by a single LOMR. - ENGINEER will pay for application fee. - CoA accepts our CDC Exemption comment responses and has no further concerns. - The FEMA review cycles are kept to two reviews. - CITY and CoA provides assistance with public notification. ENGINEER will identify impacted private landowners, develop the notification letters and newspaper inserts and the CITY and CoA will mail and distribute letters and pay for newspaper ads. TASK 3.6 EXPLORATORY TEST PIT COORDINATION As it pertains to the undocumented obstructions encountered at the site during the geotechnical investigation program, ENGINEER will provide the following services in conjunction with the Contractor's required exploratory test pits: 3.6.1 Exploratory Test Pit Site Visits ENGINEER will make up to 4 site visits to the project site to observe the progress and condition of various unknown buried obstructions within the construction work area for the Project. Site visits shall be 2-hr in duration exclusive of travel time. 3.6.2 Evaluation of Conditions and Direction to Contractor ENGINEER will review the observed conditions exposed in the test pits and evaluate if changes to the Contract Documents are required. ENGINEER will provide direction to the Contractor, as required, including what data will be needed from the Contractor to authorize use of the allocated allowance bid item. TASK 3.7 CONFIRMATORY SUBGRADE TEST BORING REVIEW As it pertains to the specified confirmatory subgrade test borings in Specification 31 20 00, ENGINEER will provide the following services: 3.7.1 Confirmatory Test Boring Site Visits Amendment No. 6 R ev1 4/21 /2021 Page 9 of 11 AMENDMENT6 ENGINEERING SERVICES FOR VCWRF GRIT REMOVAL FACILITY PROJECT CONSTRUCTION PHASE SERVICES CITY PROJECT NO.: 100075•A6 ENGINEER will make up to 3 site visits to the project site to observe the performance of the test boring program and review Contractor's independent testing agency's test boring logs and data acquisition procedures. Site visits shall be 2-hr in duration exclusive of travel time. Assumption: ENGINEER assumes Contractor will combine boring program such that only 3 mobilizations are performed for the 5 test borings. 3.7.2 Review of Test Boring Data and Evaluation of Design Impacts ENGINEER will review the final test boring logs, develop required geotechnical laboratory test assignments, review the laboratory test results (provided by Contractor's independent testing agency) and evaluate if changes to the Contract Documents are required. ENGINEER will provide direction to the Contractor, as required, including what data will be needed from the Contractor to authorize use of the allocated allowance bid item. Within 1 week of receipt of all assigned laboratory test results per test boring mobilization, ENGINEER will provide a technical memorandum summarizing the findings of each testing boring, the laboratory test results and any recommendations impacting the design of the Project. Assumption: ENGINEER assumes only 3 technical memoranda will be required based on the above assumption regarding only 3 test boring mobilizations. TASK 3.8 LEVEE CERTIFICATION RECORD DATA COLLECTION ENGINEER will provide the following services in conjunction with gathering data for future VCWRF levee certification efforts: 3.8.1 Levee Observation Site Visits For the duration of open excavation within 50 feet of the toe of the levee, ENGINEER will provide weekly observations, and monthly thereafter, that the designated As-built levee width has not been penetrated or breached, except as submitted via shop drawings by the Contractor during performance of the work. Provide observations during construction that excavation limits, as shown in the applicable approved shop drawings, have not been exceeded. Provide observations that levee earthen or structural reinforcing elements that have been submitted via shop drawings are implemented during construction to prevent levee breach, and that they remain in- place and are in a visually suitable condition for flood protection. Assumption: ENGINEER assumes up to 30 levee observation site visits to the site will be required. Site visits shall be 2-hr in duration exclusive of travel time. Visits to the site for levee observations in excess of the specified number may be considered ADDITIONAL SERVICES. 3.8.2 Review of Field Reports Confirm that field reports documenting construction upon or under the levee embankment are up to date and of sufficient detail to provide verification of Amendment No. 6 R ev1 4/21 /2021 Page 10 of 11 AMENDMENT6 ENGINEERING SERVICES FOR VCWRF GRIT REMOVAL FACILITY PROJECT CONSTRUCTION PHASE SERVICES CITY PROJECT NO.: 100075•A6 construction activities near the levee. Coordinate with design and construction team on observations and develop plan of action as needed. 3.8.3 Final Report Provide final report summarizing the levee observations collected during construction, including ground surface surveyed elevations (perFormed by the Contractor per Specification 31 09 00) that the levee height and slope, if altered during construction, have been returned to pre-construction elevations. Based on quality of data provided by the Contractor, any additional topographic survey required in addition to the data collected and submitted by the Contractor may be considered ADDITIONAL SERVICES. Provide certification of levee restoration, including as-builts, construction reports, and survey documentation outlining the force main crossing of the levee was designed in accordance with FEMA 44 CFR Part 65.10 and constructed in accordance with the Contract Documents. Amendment No. 6 Rev1 4l21l2021 Page 11 of 11 I. Summary of Total Project Fees Firm Primary Responsibility Fee Amount ' % I Prime Consultant i CDM Smith Inc. � Project Management/Civil, I Architectural, Geotechnical, i Process-Mechanical, Electrical, � Instrumentation Construction Phase Services Proposed SBE Sub-Consultants JQ Infrastructure Structural Construction Phase � Services Alliance Geotechnical Geotechnical I ' Group � I Non-MBE/SBE Consultants Freese & Nichols �� Force Main Construction Phase Services CP&Y Surveying TOTAL $657,200 83.7% ', $35,140 ; 4.5% $14,020 I 1.8% $77,640 I 9.9% $1,500 I 0.2% $785,500 �I 100% Project Number & Name Total Fee MBE/SBE Fee MBE/SBE % 100075-VCWRF Grit Removal Process $785,500 $49,160 6.3% City SBE Goal = 6% Consultant Committed Goal = 6.3% City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, May 18, 2021 REFERENCE NO.: M&C 21-0356 LOG NAME: 60VCWRF SOUTH INFLUENT LIFT STATION- CRESCENT & CDM SUBJECT: (CD 5) Authorize Execution of Amendment No. 6 to an Engineering Agreement with CDM Smith, Inc., in the Amount of $785,500.00, for Village Creek Water Reclamation Facility South Influent Pump-Lift Station, Authorize Execution of a Contract with Crescent Constructors, Inc. in the Amount of $19,993,000.00 for Village Creek Water Reclamation Facility South Influent Pump - Lift Station, Provide for Project Costs for a Project Total in the Amount of $21,743,164.00, Adopt Resolution Expressing Official Intent to Reimburse Expenditures with Proceeds of Future Debt, and Adopt Appropriation Ordinance RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of Amendment No. 6 to City Secretary Contract No. 49049 in the amount of $785,500.00, an engineering agreement with CDM Smith, Inc. for construction support services for Village Creek Water Reclamation Facility South Influent Pump Station project for a revised contract amount of $4,833,369.00; 2. Authorize execution of a contract with Crescent Constructors, Inc. in the amount of $19,993,000.00 for the Village Creek Water Reclamation Facility Grit Facility & South Influent Pump Station project; 3. Adopt the attached resolution expressing official intent to reimburse expenditures with proceeds from future debt for the Village Creek Water Reclamation Facility South Influent Pump Station project; and 4. Adopt the attached appropriation ordinance adjusting appropriations in the Water and Sewer Commercial Paper Fund by increasing appropriations in the Village Creek Water Reclamation Facility Grit Facility and South Influent Pump Station project (City Project No. 100075) for the amount of $21,743,164.00 and by decreasing appropriations in the Unspecified project (City Project No. UNSPEC) by the same amount. DISCUSSION: On May 2, 2017, Mayor and Council Communication (M&C C-28213) authorized an engineering agreement with CDM Smith, Inc., (City Secretary Contract No. 49049), in the amount of $1,570,965.00 to evaluate and design the Grit Removal Process at the VCWRF. The agreement was subsequently revised by Amendment No. 1 authorized September 18, 2018 (M&C C- 28857) in the amount of $885,755.00 for the design of the South Influent Pump Station (PS), associated sewer, force main and ancillary improvements. Amendment No. 2 was administratively authorized February 7, 2019 in the amount of $71,993.00 for physical modeling to investigate and grit facility influent splitter box configuration and the tie-in to the Headworks facility. Amendment No. 3 was authorized April 7, 2020 (M&C 20-0159) in the amount of $114,939.00 for physical modeling for the South Flow Pump Station, additional odor control design and Grit Influent Splitter Box water jet system modifications. Amendment No. 4 was authorized May 19, 2020 (M&C 20-0346) in the amount of $705,000.00 for construction support services for construction of the new grit facility at VCWRF. Amendment No. 5 was authorized September 22, 2020 (M&C 20-0700) in the amount of $699,217.00 for additional services that included screen evaluation and design, odor control evaluation, emergency diversion design, structural rehabilitation design, gate improvements, flood plain permit and geotechnical investigation. As part of Amendment No. 6, the engineer will perform construction support services for construction of the lift station that includes shop drawings and submittals reviews, change order review, record drawings, update plant operational manual, prepare and submit floodplain LOM, prepare and submit levee certification report. Construction of the project was advertised for bid on March 4, 2021 and March 11, 2021 in the Fort Worth Star-Telegram. On April 8, 2021, the following bids were received: Bidder Base Bid Contract Time Crescent Constructors, Inc. $19,993,000.00 Da s alendar Y Archer Western Construction, LLC $21, 518,472.00 Bar Contractors, Inc. $21,837,037.00 Eagle Contracting, LP $23,185,000.00 Thalle Construction Co., Inc. $32,054,500.00 In addition to the contract cost, $564,804.00 is required for project management and inspection and $399,860.00 is provided for project contingency. This project will have no impact on the Water Department operating budget when complete. This project is anticipated to be included in a future revenue bond issue for the Water & Sewer Fund. Available cash within the Water and Sewer portfolio and the City's portfolio along with the appropriation authority authorized under the Callable Commercial Paper Program (CP) will be used to provide interim financing for this project until debt is issued. Once debt associated with this project is sold, bond proceeds will be used to reimburse the Water and Sewer portfolio and the City's portfolio in accordance with the attached reimbursement resolution. Under federal law, debt must be issued within approximately three years in order for these expenses to be reimbursable. Adoption of the attached resolution does not obligate the City to sell bonds, but preserves the ability of the City to reimburse itself from tax-exempt bond proceeds. Funding for the Village Creek Water Reclamation Facility Grit Facility & South Influent PS Project is depicted below: FUND Water & Sewer Bond 2017A Fund 56011 WS Capital Project 2019 Fund 56016 W&S Commercial PaperFund 56017 W&S Commercial PaperFund 56019(Bond 20211 Existing Additional project Total* Appropriations Appropriations $1,870,965.00 $1,035,755.00 $27,552,151. $1,379,389. $0.00�� $1,870,965.00 $0.00�� $1,035,755.00 $0.00��$27,552,151.00 $0.00�� $1,379,389.00 W&S $0.00 $21,743,164.00 $21,743,164.00 Commercial PaperFund 56020 ProjectTotal $31,838,260.0 $21,743,164.00��$53,581,424.00 *Numbers rounded for presentation purposes. Office of Busineess Equity: Crescent Constructors, Inc. is in compliance with City's Business Equity Ordinance by committing to 14 percent Business Equity participation on this project. The City's Business Equity goal on this project is 11 percent. Office of Busineess Equity: CDM Smith, Inc. is in compliance with the City's BDE Ordinance by committing to six precent SBE participation on this amendment. The project is located in COUNCIL DISTRICT 5 VCWRF serves all COUNCIL DISTRICTS. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the UNSPEC project within the W&S Commercial Paper Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Commercial Paper Fund for the VCWRF Grit Fac & S Influent PS project to support the approval of the above recommendations and execution of the amendment to the agreement and contract. Prior to an expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. FUND IDENTIFIERS (FIDs�: TO uFund Department Accoun Project ProgramlActivity Budget Reference # � moun ID � ID ___ �_� Year (Chartfield 2)�___ Fund Department ID CERTIFICATIONS: coun Project Progra ID Submitted for City Manager's Office bv: Oriqinatinq Department Head: Additional Information Contact: Budget Year Dana Burghdoff (8018) Chris Harder (5020) Reference # I�4mou Chartfield 2) I Farida Goderya (8214) ATTACHMENTS 1. 60VCWRF SOUTH INFLUENT LIFT STATION - CDM Compliance Memo.pdf (CFW Internal) 2. 60VCWRF SOUTH INFLUENT LIFT STATION - CDM Form 1295.pdf (CFW Internal) 3. 60VCWRF SOUTH INFLUENT LIFT STATION - CRESCENT CDM FID Table.pdf (CFW Internal) 4. 60VCWRF SOUTH INFLUENT LIFT STATION - CRESCENT Compliance Memo.pdf (CFW Internal) 5. 60VCWRF SOUTH INFLUENT LIFT STATION CRESCENT & CDM Map -.pdf (Public) 6. 60VCWRF SOUTH INFLUENT LIFT STATION- CRESCENT & CDM funds avail.docx (CFW Internal) 7. 60VCWRF SOUTH INFLUENT LIFT STATION- Crescent Form 1295.pdf (CFW Internal) 8. 60VCWRF SOUTH INFLUENT LIFT STATION CRESCENTr2.docx (Public) 9. CDM Smith, Inc SAM.pdf (CFW Internal) 10. CRESCENT & CDM Reimb Resolution.pdf (Public) 11. Crescent Constructors, Inc. SAM.pdf (Public) � 0 � n � � U 0 � -� x � Cr r1r � C" � -� � -� D -� O z � � m � n m z -� � � d � � d -� w � �u