HomeMy WebLinkAboutContract 39975-A8CSC No. 39975-A8 AMENDMENT No . � TO CTTY SECRGTARY CONTRACT +Ii,��, the City of E'ort Worth {CITY} and Kimley-Horn and Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 39975, (the COI�7TRACT) which was authorized by M&C C-26903 on the 9th day of February, 2010 in the amount of $1,072,250.00; and +IB,{ , the CONTRACT was subsequently reviseci by Amendment No. 1 in the amount of $46,995.00 which was administratively authorized on March 14, 2014 Amendment No. 2 in the amount of $261,070.00 which was authorized by M&C C- 26903 on August 5, 2014, Amendment No.3 in the amount of $570,100.00 which was authorized on September 20, 2016 anci Amendment No. 4 in the amount of $269,000.00 which was authorized by M&C C-28331 on August 15, 2017, Amendment No. 5 in the amount of $244,300.00 which was authorized by M&C C- 29011 on January 29, 2019 and Amendment No. 6 in the amount of $228,865.00 which was authorized by M&C 19-0387 on December 17, 2019 and Amendment No. 7 in the amount of $20,280.00 which was administratively authorized on October 27, 2020; and ��+ , the CONTRACT involves engineering services for the following project: Cultural District/Will Rogers Area Water and Sanitary Sewer Improvements; and ����, it has become necessary to execute Amendment No.8 to the CONTRACT to include an increased scope of work and revised fee. 1�O�V�`�JE�,��+'O�$,�, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $160,515.00 (Water) . 2. Article TI of the CONTRACT increase in the fee to be paid is amended to Engineer to provide �'or an for all worlc and OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page -1- services per�'ormed under ih� Conl.raci:, as amended, so L-hat L-he total fee paid by the City for a]_1 wor_lc and services shall be an amount of $2,873,375.00. 3. All other provisiony of the Contr�ct, which are not. expressly �ne►ided hercain, shal]. re�nain in tul.l force and effect. I;XECUT�D and EFFECTIV� as of i:he da�e last written by a signat�ry, be].ow. APPROVCD: CNGINEER City of Fort- Worth Kimley-Horn and Ass� tes /1nc. T%rrm B�za�L� � � �-�-- �� Dana Surghdoff Glenn A. Gary, P.E. Assistant Ci.ty Manager Senior Vice-President Jun 2, 2021 c n `� � 1 DATE : DATE : ) .� � •� . � � APPROVAL RECOMIvI�ND�D: CGcNasEah�ies- KaNder �.; <i�.. :i: ; zs, zzi iz za �_, i; Christopher Harder, P.�. Director, Water Departnient Contract Comk�liance blanage� : By si.yning, I aelcnoivledge thaL- I�im L-he ��erson rasi�cn�sibl� for Ciie moniL-oring and :.icLitinisi.rai:ion of L-lii� cuntrlc�, includinc� ensurinq all performance �iid reporting requirements. i - �i: �-, �� ,, �� ✓ �J l� � o'� Liam Con:Lon Tit7.e: P�oject Dianager APPROVGD AS TO L'ORM AND L�GALITY sev�5 Douglas W. Black Senior Assistant City Attorney ATTGST: i � •� Mary J. Kayser City Secretary bA,-cLY-t���' ��(� y�. Q oa° ��OpOo� �� 0 r,� o° o �, 0 �►o° o � ��o o= a o o ° o ° 0 o .c �� �� TEX ASaa E M&C: 21-0351 Date: May 18, 2021 1245 # 2021-723069 OFFICIAL REC�RD Paq� -z� CITY SECRETARY FT. VIIORTH, TX �nr��ey>>� �=����� March 13, 2021 Mr. John Kasavich, P.E. Project Manager City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 Re: Cultural District/Will Rogers Area Water and Sanitary Sewer Improvements Amendment No. 8—Pt. 10 Construction Phase Services KHA No. 061018069 City Project No. 01468 Dear John: The City of Fort Worth (CITY) has requested that Kimley-Horn perform additional services under Amendment Number 8 for the Cultural District/Will Rogers Arena Area Water and Sanitary Sewer project. These services include Construction Phase Services for the Part 10- Westside II Pressure Plane to Westside II I Pressure Plane Project. These improvements are further described as follows: CONTRACT TASK 1— DESIGN MANAGEMENT; (Water$91,300, Sewer$O) ENGINEER will complete an additional eighteen (18) months of Design Management in accordance with the Original Contract for the following: a Part 10 - Water Line and PRV Improvements —$11,300 CONTRACT TASK 6— CONSTRUCTION PHASE SERVICES: (Wafer$949,215, Sewer $0) ENGINEER will complete Construction Phase Services in accordance with the Original Contract for the following: � Part 10 - Water Line and PRV Improvements —$149,215 The following additions apply to the Original Contract: • Attend Preconstruction Conference • Attend Public Meeting • Construction Coordination Meetings and Note Preparation — up to thirty-six (36) • Site Observation Visits — up to thirty-six (36) o Review Shop Drawings and Submittals — up to thirty (30) • Review Contractor's Requests for Information — up to ten (10) e Review Contractor's Change Order Requests — up to two (2) • Review Test Reports We recommend that the City increase the budget by $160,515 for these additional services. The following tables summarize our recommended budget revisions, water and sanitary sewer design fees, and revised contract amount: 817-335-6511 0 g� Ili�� �� �'�� ��11 � Page 2 Descr•iption Water• Sewer Total Tasl< 1 - Design Management $11,300 $0 $11,300 Task 2 -Conceptual Design $0 $0 $0 Tas{< 3 - Preliminary Design $0 $0 $0 Tasl� 4- Final Design $0 $0 $0 Task 5 -Bid Phase Services $0 $0 $0 Tasl< 6- Construction Phase Services $149,215 $0 $149,215 Tasl< 7 - ROW/Easement Services $0 $0 $0 Task 8 - Survey Services $0 $0 $0 Task 9 - Permitting $0 $0 $0 Total $160,515 $0 $160,215 The following table summarizes the Fee per Work Phase breakdown: Work Phase Water Sewer Total 31 $48,155.00 $0.00 $48,155.00 32 $96,309.00 $0.00 $96,309.00 33 $16,051.00 $480.00 $16,051.00 51 $0.00 $0.00 $0.00 The following table summarizes our recommended budget revisions and shows the revised contract amount: Original Amend No. Amend Revised Contract 1-7 No.8 Contract Task 1 $102,500 $168,125 $11,300 $281, 925 Task 2 $125,100 $109,530 $0 $234,630 Task 3 $178,900 $400,755 $0 $579,655 Task 4 $269,600 $597,930 $0 $867, 530 Task 5 $35,200 $58,670 $0 $93,870 Task 6 $72,100 $234,700 $149,215 $456,015 Task 7 $30,300 $32,600 $0 $62,900 Taslc 8 $202,250 $0 $0 $202,250 Taslc 9 $56,300 $38,300 $0 $94,600 Total �1,072,250 $1,640,610 $160,515 $2,873,375 Project �801 Cherry Street, Unit 11, Suite 1300, Ft. Worth, TX 76102 �a�Deya>>���� The following breal<down for water and sewer services is recommended: Water Fee Sewer Fee S�eeey Total Original Contract $611,625 $262,125 $198,500 $1,072,250 Amendment No. 1-7 $1,350,162 $168,748 $121,700 $1,640,610 Amendment No. 8 $160,515 $0 $0 $160,515 Total $2,122,302 $430,873 $320,200 $2,873,375 Page 3 We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORNANDASSOCIATES, INC ./ / � Glenn A. Gary, P.E. Senior Vice President JCK/gag Copy to: Liam Conlon, City of Fort Worth Tony Sholola, P.E., City of Fort Worth Attachments - Level of Effort Spreadsheet - Form 1295 Hkimley-hom1TX_FT4V1F7W UlilifiesW61018069WPP1AmendmenUtB_Pt10�CCA�AmendB-CD_P110.doc �horn:eom' 801 Cherry Street, Unit 11, Suite 1300, Ft. Worth, TX 76102 --.:.- ^t C' "f ,e,! � � l�� � ( �' � / �i, �„; � g � � € �"� . a � � d 4'� � : r"'._ 2"'" k d . P, �a i" — � r � '">r 4 - � "_.� s""� ' a. ¢ �a � �` �° aI � � �� &`�„� ��: � � � ��� � � �� `�.� 3 � � � �_ ¢ � � ,�, ix ��' g: DATE: Tuesday, May 18, 2021 REFEREfUCE NO.: **M&C 21-0351 LOG NAME: 60CDWRWSSP10-CIRCLEC-KHA SUBJECT: (CD 7 and CD 9) Authorize Execution of Amendment No. 8 in the Amount of $160,515.00 to an Engineering Agreement with Kimley-Horn and Associates, Inc. for Cultural District-Will Rogers Area Water and Sanitary Sewer Improvements, Part 10 Project for a Revised Contract Amount of $2,873,375.00, Authorize Execution of a Contract with William J. Schultz, Inc. dba Circle C Construction Company, in the Amount of $7,724,012.25 for the Cultural District-Will Rogers Area Water and Sanitary Sewer Improvements, Part 10 Project, Provide for Total Contract Cost in the Amount of $8,631,556.25, Adopt Resolution Expressing Official Intent to Reimburse Expendifures with Proceeds of Future Debt and Adopt Attached Appropriation Ordinance RECOMMENDATIOIV: It is recommended that the City Council: 1. Authorize execution of Amendment No. 8 to City Secretary Contract No. 39975, an engineering agreement with Kimley-Horn and Associates, Inc., in the amount of �160,515.00 for construction support services for the Cultural DistrictlWill Rogers Area Water and Sanitary Sewer Improvements, Part 10 project for a revised contract amount of $2,873,375.00; 2. Authorize execution of a contract with William J. Schultz, Inc. dba Circle C Construction Company, in the amount of $7,724,012.25 for the Cultural DistrictlWill Rogers Water and Sanitary Sewer Improvements, Part 10 project; 3. Adopt the attached Resolution expressing official intent to reimburse expenditures with proceeds of future debt for the Cultural District/Will Rogers Area Water and Sanitary Sewer Improvements, Part 10 project; and 4. Adopt the attached Appropriation Ordinance adjusting appropriations in the Water and Sewer Commercial Paper Fund by increasing appropriations in the Water and Sewer Commercial Paper Fund in the amount of $8,631,557.00 in the Cultural District/Will Rogers Area Water and Sanitary Sewer Improvements, Part 10 project (City Project No. C01468) and decreasing appropriations in the Unspecified project (City Project No. UNSPEC) by the same amount. _ DISCUSSIOIV: On February 9, 2010, Mayor and Council Communication (M&C C-24094) the City Council authorized an Engineering Agreement with Kimley-Horn and Associates, inc., in the amount of $1,072,250.00 for the Cultural District/Will Rogers Area Water and Sanitary Sewer Improvements. The agreement was subsequently revised by the following amendments: Amendment No. 1 in the amount of $46,995.00 administratively authorized March 17, 2014 provided design for the extension 24-inch water line along Watonga Street from Montgomery Street to the West Side Pump Station at Camp Bowie Boulevard. Amendment No. 2 in the amount of $261,070.00 authorized August 5, 2014 (M&C C-26903) provided for additional engineering services for the replacement of water and sanitary sewer lines in the vicinity of Will Rogers Memorial Coliseum and Cultural District. Amendment No. 3 in the amount of $570,100.00 authorized September 20, 2016 (M&C C-27934) provided for additional engineering services for fhe replacement of water and sanitary sewer lines for the existing Will Rogers facilities, on Montgomery Street, Margaret Street and Crestline Road. Amendment No. 4 in the amount of $269,000.00 authorized August 15, 2017 (M&C C-28331) added the Part 10 scope to the project to provide for water improvements in the Westside pressure plane. Amendment No. 5 in the amount of $244,300.00 authorized January 29, 2019 (M&C C-29011) provided for additional engineering and survey for the Westside II to Westside III pressure plane transfer projecf. Amendment No. 6 in the amount of $228,865.00 authorized December 17, 2019 (M&C 19-0387) provided for design to transfer a portion of the existing Westside 2 Pressure Plane to the adjacent Westside 3 Pressure Plane. Amendment No. 7 in the amount of $20,280.00 adminisfratively authorized November 5, 2020 provided for design of site adjustments for project pressure reducing valves, to accommodate antennas, electrical panels, electrical engineering and SCADA design. The proposed pressure plane transfer and system improvements necessitates the installation of various sized water mains on the following streets or easements: Street �� From Camp Bowie 250 feet east of the Renzel West Boulevard Boulevard/U.S. Highway intersection Camp Bowie 50 feet east of the Brandon West Boulevard Lane/U.S. Highway 80 intersection Chapin Road Renzei Boulevard/Chapin Road intersection Banger Drive Renzel Boulevard/Chapin Road intersection Bangor Drive Cork Place Cherry Lane near Marydean Avenue Cherry Lane near poreen Avenue Cherry Lane near W. Elizabeth Lane Rubv Place Chapin Road Davinport Avenue Olive Place Greenway Road W. Elizabeth Lane st right-of-way lane right-of-way lane right-of-way lane ;amona Drive �onnie Drive/Chapin Road �tersection 25 feet east of the Bonnie irive/Davenport Avenue �tersection :amp Bowie Boulevard/Olive �lace intersection ex Boulevard/Greenway �lace intersection urtis Drive/W. Elizabeth venue intersection To 750 feet west 200 feet north then 100 feet west Bangor Drive Bangor Drive Westerly Road East right-of-way lane East right-of-way lane East right-of-way lane Joyce Drive 125 feet east To U.S. Highway 377 then southerly 200 feet 150 feet north Bigham Boulevard then 800 feet north 250 feet, then 250 feet, then Slocum Avenue ��Ramona Drive Jovice Drive Slocum Avenue Rosewood Drive Easement north of Rosewood Drive Easement across Z Boaz Park �vice Drive osewood Drive property line of Z Boaz Lackland Road East property line of Z Boaz Par{< �st 200 feet arquite Drive �sewood Avenue Boaz Parl< feet north . • '�.• 00 feet south As part of the proposed water improvements, the sewer main on Ruby Place from Ramona Drive to Marquita Drive will be replaced as part of this project. In addition, 7949 feet of cast iron pipe wil be replaced and 10,712 feet of cast iron pipe will be abandoned as part of this project. As part of Amendment No. 8, the engineer will perform construction support services including shop drawings and submittal reviews, change order review and site inspections. Construction of the project was advertised for bid on January 28, 2021 and February 4, 2021 in the Fort Worfh Star-Telegram. On March 11, 2021 the following bids were received. Bidder Total Bid Time of Completion William J. Schultz, inc. dba Circle C$7 �24,012.25 540 Calendar Construction Company Days Fort Worth Civil Constructors, LLC $10,78,533.49 Jackson Construction, Ltd. $11,153,415.25 �— In addition to the contract cost, $507,602.75 (Water: $483,382.75; Sewer: $24,220.00) is required for project management, inspection and material testing and $239,427.00 (Water: $228,418.00; Sewer: $11,009.00) is provided for project contingency. The sewer component of the project is part of the Water Department's Sanitary Sewer Overflow Initiative Program. This project is anticipated to be included in a future revenue bond issue for the Water & Sewer Fund. Available cash within the Water and Sewer portfolio and the City's portfolio along with the appropriation authority authorized under the Callable Commercial Paper Program (CP) will be used to provide interim financing for this project until debt is issued. Once debt associated with this project is sold, bond proceeds will be used to reimburse the Water and Sewer portfolio and the City's portfolio in accordance with the attached reimbursement resolution. Under federal law, debt must be issued within approximately three years in order for these expenses to be reimbursable. Adoption of the attached resolution does not obligate the City to sell bonds, but preserves the ability of the City to reimburse itself from tax-exempt bond proceeds. Appropriations for the Cultural District/Will Rogers Area Water and Sanitary Sewer Improvements, Part 10 are as depicted below. nd II Existing (I Additional II Project Total* (� Appropriations I Appropriations �I I Water Capital $6,794,511.00 $0.00 $6,794,511.00 Fund 59601 Sewer Capital Fund - Legacy $3,234,652.00 $0.00 $3,234,652.00 59607 Water & Sewer 2015A Bond Fund $1,772,417.00 $0.00 $1,772,417.00 56007 Water & Sewer 2017A Bond Fund $695,000.00 $0.00 $695,000.00 56011 Water & Sewer Commercial Paper $2,492,498.00 $0.00 $2,492,498.00 Fund 56016 Water & Sewer Commercial Paper $384,940.00 $0.00 $384,940.00 Fund 56017 Water & Sanitary Sewer $0.00 $8,631,557.00 $8,631,557.00 Commercial Paper Fund 56019 Project Total � $15,374,018.00 $8,631,557.00 $24,005,575.00 *Numbers rounded for presentation. This project will have no impact on the Water Department's operating budget when completed. DVIN: William J. Schultz, Inc. dba Circle C Construction Company is in compliance with the City's Business Equity Ordinance by committing to four percent Business Equity participation and documenting good faith effort. William J, Schultz, Inc. dba Circle C Construction Company identified several subcontracting and supplier opportunities. However, the firms contacted in the areas identified did not respond or did not submit the lowest bids. The City's Business Equity goal on this project is 14 percent. Kimley-Horn and Associates, Inc. DVIN - A waiver of the goal for business equity subcontracting requirements was requested and approved by the DVIN, in accordance with the applicable Ordinance, because the purchase of goods or services is from sources where subcontracfing or supplier opportunities are negligible. The project is located in COUNCIL DISTRICTS 7 and 9. _ _ __ _ FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the UNSPEC project within the W&S Commercial Paper Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds wili be available in the W&S Commercial Paper Fund for the Cultural District - Will Rogers project to support the approval of the above recommendations and execution of the contract and amendment. Prior fo an expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. __ _ _- __ _ _ _ __ _ _ FUND IDENTIFIERS (FIDs1: und) Department �Accounti Projeci �Program!Activity� Budget ( Reference # �mou � — � - -�D-- - � - - �-- -ID � _Year _ � (Char�tf`ield �) � FROM Fund Department Accoun� Project Progr•amlActivity Budget Reference # �Amoun' - I-1- --�D --� -- - i- - ID � - - _ Year _(Chartfield-2)-- � � CERTIFICAl'IONS: Submitted for City Manaqer's Office by: Oriqinatinq Department Head: Additional Information Contact: Dana Burghdoff (8018) Chris Harder (5020) Liam Conlon (6824) ATTACHMENTS 1. 60CDWRWSSP10-CIRCLEC-KHA Circle C Compliance.pdf (CFW Internal) 2. 60CDWRWSSP10-CIRCLEC-KHA FID Table (WCF 04.26.21).xlsx (CFW Internal) 3. 60CDWRWSSP10-CIRCLEC-KHA Form 1295 Circle C.pdf (CFW Internal) 4. 60CDWRWSSP10-CIRCLEC-KHA Form 1295 KHA.pdf (CFW Internal) 5. 60CDWRWSSP10-CIRCLEC-KHA funds avail.docx (CFW Internal) 6. 60CDWRWSSP10-CIRCLEC-KHA Reimb Resolution.docx (Public) 7. 60CDWRWSSPIO-CIRCLEC-KHA SAM-CIRCLEC.pdf (CFW Internal) 8. 60CDWRWSSP10-CIRCLEC-KHA SAM-KHA.pdf (CFW Internal) 9. 60CDWRWSSP10-CIRCLEC-KHA Waiver KHA.pdf (CFW Internal) 10. 60CDWRWSSP10-CIRCLEC-KHA 56019 A021(r4).docx (Public) 11. M& C Map - 60CDWRWSSP10-CIRCLEC-KHA(2).pdf (Public) 12. M& C Map - 60CDWRWSSP10-CIRCLEC-KHA.pdf (Public) � � � � � � � � � � � � � � m m o� a�� m m m� m m m , c� 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N IJ fJ N N f�J N IJ IJ IJ IJ (J O O O O O O O O O O O O O O O O O O O O O O O O O O O O V V V V V V Ol O1 Ql Q1 Q1 Ol 01 Q1 O O O O O O O O O O O O O O A � � A � � ? � � A A � � � W W W W W W W W W W W W W W O O O O O O O O O O O O O O Vt Vl Vl Vl lfl Ul VI lIl VI lfl Ul lfl l71 VI i--` W W F-` V V 1-' W W U7 F' U.1 J V I--� I-� W F' A �P F' F-' W A I--� W P.A O O O O O O O O O O O O O O N w tn i--� o o t-� w tn N N ui o 0 o in o o N r� o u, o 0 0 o N N r o o� o o � o o N r� o 0 0 n n � � n n � � � n n n n n 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N r r r N r N r r� r� r r r .P � A�P A�P A�P A A�P A A�A 00 0o W o0 00 00 0o W W o0 0o w o0 00 m m rn m m m rn m m m rn m rn m nlnln � t�l� nl�ln nln n �In 0 0 0 0 0 0 0 0 0 0 0 0 0 0 r� N N N� r N�� N N�� V V V J�I J V V J�I V V V V 00 00 00 00 00 00 Oo 00 00 00 00 W W Oo Ul .p � O O O Ul -P A O O O O O l0 I lD lD lD lD l0 lD I l0 lD lD I�D lD lD I tD lD l0 lD lD l0 l0 lD lD l0 l0 lO lD lD l� {/T {R {/1 l/T � i/� F' N i/* i/� in F-` N al Vt in ln in i-� 1-' W A lD tn l� O� N I-� 00 W Ql Ql 1-' O lfl V 00 ln 00 O W W .p Ol O O O O N O O O O Ul A �D V W ln Vi O 00 J ln N O N F-' F' N V W ln l!t �D U1 O A �O O l0 ln 0o V O O O O O O O O O O V O O N O O O O O O O O O O ln O O VI `< o o<` o o � o o c� D o 0 r�T -- h � 7 � �_ Q� h (U rF r�F '-F h � N N � 7 N � N N n � Q 7 N 7 S S N (�p � 7 � 6� � � N � D �C O � � "O � O "'� � p n n G� f� � n � N n�i (l �< p p� O 'Y tn C n O r' �^ O � r=r S �^ N � � � rt p � � � � � � .. -: i i L E � � � � � � � � � � � � 0 0 0 0 N N I� fJ O O O O O O O O V V m rn O O O O O O O O w w w w O O O O o z o z �� ��� ai m m m � n � n N N I N � � � „ F� F� .-'� J� A W � � � 4J W N F-� N A .p � w O C� O O O O - �- �1' � � 1 ,��