HomeMy WebLinkAboutContract 47707-A1CSC No. 47707-A1
AN�NDN�NT No . 1
TO CITY SECRETARY CONTRACT No. 47707
WHEREAS, the City of Fort Worth (CITY) and Multatech Engineering,
Inc., (ENGINEER) made and entered into City Secretary Contract No. 47707,
(the CONTRACT) which was authorized by M&C C-27724 on the 17th day of May,
2016 in the amount of $ 950,000.00; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Keller Hicks Road From Lauren Way to East ROW of Katy Road; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $47,780.00. (See Attached Funding
Breakdown Sheet, Page -4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $997,780.00.
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
City of Fort Worth
Professional Services Agreement Amendment Template
Revised: March 9, 2020
Page 1 of 4
OFFICIAL REC�RD
CITY SECRETARY
FT. VIlORTH, TX
APPROVED:
City of Fort Worth
�'�lGl' I�GL�GIGlG�D�
Dana Bur�2, 2� OS CDT)
Dana Burghdoff
Assistant City Manager
DATE : J u n 2, 2021
ENGINEER
Multate�i E.ngi�ering, Inc.
� ' ���
F� . �'��
Paul L� Padilla, P.E.
Vice President, C00
DATE: 4-15-2021
APPROVAL RECOMMENDED:
���
W Johnson (Ma 24, 2021 10:P CDT)
William M. Johnson:
Director, Transportation and Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
��\��
Chad A. Allen, P.E., C.F.M.
Senior Project Manager
City of Fort Worth
Professional Services Agreement Amendment Template
Revised: March 9, 2020
Page 2 of 4
OFFICIAL REC�RD
CITY SECRETARY
FT. VIlORTH, TX
APPROVED AS TO FORM AND LEGALITY:
1�=�1
DBlack (May 28, 202113:03 CDT)
Douglas W. Black
Assistant City Attorney
ATTEST:
�y�� ���
Mary J. Kayser
City Secretary
City of Fort Worth
Professional Services Agreement Amendment Template
Revised: March 9, 2020
Page 3 of 4
�- u
aoFoF�Rr��a
oa 0 �
�� a o �,
�� o
0 0
�o o=
�o 0
o �
o �
0
���o o ��
� oo �
��� �EXASa�'a
M&C: N/A
Date:
OFFICIAL REC�RD
CITY SECRETARY
FT. VIlORTH, TX
FUNDING BREAKDOWN SHEET
City Secretary No. 47707
Amendment No. 1
Department Fund-Account-Center Amount
TPW 34018-0200431-5330500-100146-002330-18010199 $47,780.00
Total: $47,780.00
City of Fort Worth
Professional Services Agreement Amendment Template
Revised: March 9, 2020
Page 1 of 1
Amendment Purnose Statement:
This engineering amendment is necessary to provide for additional design and ROW acquisition services
needed to modify the original design, incorporate project phasing changes, design associated drainage
improvements and create additional ROW acquisition documents. This project is being designed in
phases and in coordination with the City of Keller. The project also includes coordination with an
adjacent developer. As the project progressed, phasing of the project evolved and changes had to be
incorporated into the design plans. Also, additional drainage improvements were required in order to
accomplish the final phasing. Finally, a 10-foot sidewalk along both sides of Keller Hicks Road was
incorporated into the project as a scope change and required additional ROW acquisition documents to
be created to allow construction of the project. These additional design and ROW acquisition services
are being paid for and provided with this Amendment No. 1 to the Professional Services Agreement.
ATTACHMENT "A"
SCOPE OF WORK
Keller Hicks Road
Lauren Way to Katy Road City Project
Amendment 1
No.100146
City of Fort Worth, Texas
Attachment A
PMO Release Date: 05.19.2010
ATTACHMENT "A"
Scope for Engineering Desiqn Related Services for Street Improvements
Additional Services Amendment 1
The scope set forth herein defines the work to be performed by the ENGINEER in completing
the project. Both the CITY and ENGINEER have attempted to clearly define the work to be
performed and address the needs of the Project.
OBJECTIVE
The purpose of this task order is to provide for additional services for the completion of
complete construction documents and to provide Bidding and Construction Services for the
upgrading of Keller Hicks Road from Katy Road to Lauren Way in the City of Fort Worth. The
City of Keller is also preparing construction plans (under separate agreement) for the upgrading
of Keller Hicks Road from Katy Road to US -377. For the purposes of design work the project is
broken down into segments as follows:
• Segment 1-East Right of Way Line of Katy Road to US 377 (under separate agreement
with City of Keller)
• Segment 2-East Right of Way Line of Katy Road to Lauren Way (City of Fort Worth)
For the purposes of construction, the project will also be broken into two different segments:
• Segment 1-West Right of Way Line of Katy Road to US 377
• Segment 2-West Right of Way Line of Katy Road to Lauren Way
The existing roadway is currently a two-lane asphalt roadway with narrow shoulders and open
ditch drainage. There are numerous drives and businesses along this portion of Keller Hicks
including one major intersections; Katy Road.
This section of roadway is identified in the City of Fort Worth Master Thoroughfare Plan as a
Commercial Collector with the following future designation, one lane (each direcfion), no transit
facility, 2-way continuous left turn lane, no parking, off street side path within an 80 foot right of
way- CCO-L 1-TO-TWLT-PO-BOP (80').
WORK TO BE PERFORMED
T-��L 7 (`.,.,..o.,fi �-�I I'lo�i..., Co...,�,o.�,+ 7/.,.o��i.,� ��.I�� .�� �+h.,ri�o.J h�� T.��.L (1r.Jor � 1
T-��L � �rol�.,-,�.,.�.-.� I'lo�-�..., Co...,-,o.,+ 7/.,.o���.,� ��.I�� -�� �+h.,.��o.J h�� T-��-L �l..Jo. �\
-r-�rJrry .
Task 4. Final Design Segment 2
T-��L � (`.,.,�. ., �h-��-�, Con�' C + 7
�"avrc'��vvrrs�l C�F6m-�cQcrvFC�'S"���n��rc
Task 7. ROW/Easement Services Segment
o.,,.o.,+�„n „f i o oi n c� �o�
T-��L � �o.-.,�,�++�.,.. Co...,�,o.,+ 7
�--avr� .
T.,�L 4!1 �I.,., .,.,.J C��h.v,h+�l /'`h.,..Lli�+�
■ II 11
\ \
\ \ � \ \ �
� �l
11
i� � �
�
1 s1 i�srw{, fT7T�:f,
■ ��
� � �
.
■�
. . .
� ■
�. � ■�
�� �� � . � .
� . .
� � �
�_ �
� . �
�':"� _ � _ :•"""'� � ' :""':`�7'
■ �
� nn„n�� � ,-+�
v�T :r-r v�rc��
C �A.,.,+hl�� �A/\A/QC �o.,.,.+ C.,..,-, .��-,.J C�.,.�I C� �.,-,.,�,.�n� D-���.,-,o.,+ �o.,.,�-+ C.,..,�,
(_ �I-�., C� �h.,�,���'ai-vr'Tc�{� �cc-ra�rr-rv7
TASK 4. FINAL DESIGN Segment 2(90 PERCENT) AND FINAL CONSTRUCTION
DOCUMENTS (100 PERCENT).
#e�4e��
0
�.h.�ll ho �.� �h.,�,i++�,.J +., ('ITV ., . +h., -� .,.-1 Dr.,io..+ C.�h.�.J� �lo
.srr � .
0
�
�cih.v,�+ C�.,.,I DI.,.,� /�!1l10%\+�.,� /'`ITV .,�-+h., .J �rl,�c..�CQ�.,•J��ccrcri�€u�l I•'",
�r t�c,�p ���,--�� �,
, , .
0 0
+t��
• The initial Phase 1 for this project began and Lauren Way and concluded east of the
intersection of Katy Road and included the improvements to Katy Road. Phase 2 began just
east of the Katy Road intersection and concluded at US -377. Plans were advanced to 90%
including specifications, and OPCC.
• It was later determined that Phase 1 should terminate just west of the Katy Road intersection
and no Include the Katy Road improvements. Phase 2 would then begin Just west of Katy
Road and extend to US 377 and include the Katy Road improvements.
• In addition to revising the sheet layouts, cross section sheets this change required revisions
to the specifications and the OPCC for each phase. The removal of Katy Road Improvements
from Phase 1 required an interim drainage solution for Katy Road.
• Multatech prepared a hydrologic and hydraulic analysis of upstream improvements and
coordinated this with the developer. This included HECRAS models for upstream
improvements and downstream channel improvements.
• Changes were made to the drainage patterns upstream which required a significant change
to the HECRAS analysis downstream and at the upstream face of the box culvert installation.
These changes cascaded into storm sewer connections and phasing.
ASSUMPTIONS
• 3 sets of 11" x 17" size drawings and 2 specifications will be
delivered for the 90% Design package and uploaded to BIM360 in PDF format
• A DWF file for the 90% Design will be created from design CAD drawings and will be
uploaded to the project folder in BIM360.
• 3 sets of 11" x 17" size drawings and 2 specifications will be delivered
for the 100% Design package and uploaded to BIM360 in PDF format.
• A DWF file for the 100 % Design will be created from design CAD drawings and will
be uploaded to the project folder in BIM360.
. -.-
. ..�
,„
..�
. ._
.
. . _.
, , .
, ,
. - �
. ,
�
. .
.
, ,
.
, , -
- -- -- - -- - ---- - - -- -- -- - -- -- - --- -
-- - -- - - - - - -- -- - - - -- - - --
. ,
, , -
.
.
.
, ,
.
.
� ■ �
■_ ■
■_ ■ . . .
� . , -■
■ � .■ •.
•■ ■ � � •■ ■ .
.■
. .
•■ ■ �
z��:.,:��-P�..:�
« » « »•
« »
, _
r,l-�., +���» h.�ll ho �i�.�l r, .v,ho .,f nh.,.,+n ' +h'n f'lo
pn�rrvc� �rrarrv� ccc�-irrmiTm�
��L�:!t:1 G�1���iTiL3e�Tl: Se7:T. F�1:r: t!tiTe7i7��Tl.ti��:T. F�
r
_ ' 0":"'�0 ' '
. ., ■
- -�1
-■ ■ � . .
■�
■ , ■ �
■.
-, � -■ . ■�
. � .
. .
, �:e�rr.�*.r - ■ ■ �
�
�
■_ . .
. �.
■_ - �
. .
R� ���� fl,r .,I.,., h.,I.J.,.-� .,.,.Jll,r �. ., +., .,I.,., �
�� o+�. .,f ...,.�,�.+r� �..+i.,.�, .J.,..� �.,-,o.,+�. �.�ill ho ., �-,+o.J .�.,.J .,-,-�.Jo -� �il.�hlo f.,r
r�� �.-..h.���, h�i .�,I.,., h.,I.J.,r� .,.,.J/., ., +l, .,I.�., .
��� .�S-i����rr 'ZA" .,I.,.,� .,.,.J � ..�F�...,+�1,.,� /..l,.,fl,r.v,l,.J �f .,.,.,I�l..,hll,\
�
.��II ho .Jol���o.o.J +., +ho (`ITV
� �I'lC I'l\A/C .�.,.J I'l\A/(_ filo�. �.�ill ho �.,I.,.�.Jo.J +., Q� ����.-��.�
� •
. �
C (`C\A/ I'1.�+-� C.,ro-�.J�.hoo+
., ., .
, ,
. .
. , , -
. .
- - --- - -- -- - -- ---- -- - -- -
. . �
, . -
. � , .
, , -
. ■
, , -
■
.
-_ „
-_ „
. .
.
� JO ' _ '
� � ■
. �
. � �
. �
■
. , -
, , ■
�. ■ . . �
-�r,:....�;."�._,..�.:.�;�.e� -
� ■ . . ■
� ■ � �■
■� •� •■ ■�
. •■ ■ �
■ ■
•■ ■ �
, . .
r
^���47'��'�;-q�t�t$#��;-„a,;,pe�s�sk�e���� ;;�-;;;�
��L� :! t:1 G� 1�� �iTiL3e� T!: Se7 :T. F�1: r: �!tiTe7i7�� Tl.ti� �:T. F�
r
_ ' 0":"'�0 ' '
• ■ ■ • � ■
_ �r_�rl
�i:� . �:!�s=t�R:�:r.E%��:Ei�i:��t� _�eiir.:�:���si' -
■_ - �
. •.
■_ - �
. .
.
.
.
.
� n.,o ,. „f f� �n � o i����.,�n ��� ,Y,.,i�.� ,.,�ii ho ,�oi�„o,-o,� +„ +ho ('ITV
n �o�n„n�o +„ r,,.,+..,,.+,,.�� oo,.� �o�+ f,,. inf,,,-,Y,.,+�„n
�.
��G��4 „f r h � o n,-,� ��
�r�-rl�c r+�r-�arT^cr�r��-Ft�'��
TASK 7. ROW/EASEMENT SERVICES. Segment 2
ENGINEER will support and perform activities related to ROW and land as outlined below, per
scoping direction and guidance from the CITY's Project Manager.
,
�K
7.2. Right-of-Way/Easement Preparation and Submittal.
� Tho CAIr'IAICC� �h-�II ., o o .J.,..��.,�,.,�-,+�. +., ho � o.J +., .,h+.�i.�, r..h+ .,f �. .,.J
e
• ROW documents were prepared for the proposed Keller Hicks Road improvements
which did not include a 10 foot shared path for the entire south side of Keller Hicks
Road. It was later decided to include the 10 foot shared path along both the north and
south side of Keller Hicks. This required addition of permanent ROW acquisition
documents. The downstream improvements of the RCB installation were modified
several times to accommodate the changes in discharges and water surface elevations
(see below for discussion on H&H revisions).
7.3. Temporary Right of Entry Preparation and Submittal
, ,
-�ffo..+o.J h�� +ho ., o..+ -��-,.J .�, o.�,+ ��. r.,rl +.. o�-,+or +ho�r ., o�-+��
� Tho .J.,..� �.,-,o„+.�+i.,., �h-�II ho ., ��i.Jo.J i .,.�,f.,..,-,-�.�,..o �.�i+h +ho ..ho..Lli�-+�- -�.,�-1
e
Temporary easement documents were prepared for the proposed Keller Hicks Road
improvements which did not include a 10 foot shared path for the entire south side of
Keller Hicks Road. It was later decided to include the 10 foot shared path along both
the north and south side of Keller Hicks. This required the revision of the temporary
easement along the south ROW. The downstream improvements of the RCB
installation were modified several times to accommodate the changes in discharges
and water surface elevations.
ASSUMPTIONS
Right-of-Way research includes review of property/right-of-way records based on
current internet-based Tarrant Appraisal District (TAD) information available at the
start of the project and available on-ground property information (i.e. iron rods,
fences, stakes, etc.). It does not include effort for chain of title research, parent track
research, additional research for easements not included in the TAD, right-of-way
takings, easement vacations and abandonments, right-of-way vacations, and street
closures.
DELIVERABLES
A. Easement exhibits and metes and bounds provided on CITY forms.
B. Temporary Right of Entry Letters
. . . .
, ,
._
, , .
, .
- -- -- --- -- - - -- -- - -- - - - - - - -- -
� Tho .,�, o .,f.,.-.,-,-�fi.,., +., ho ��i.Jo.J .,., +ho .,I-�.,�. �.h.�ll i ..I� �.Jo +ho
�
� � ' ��
i��
■�
r � � . ! � � ■ ` � .
■
■�
- � - ■ - - - -
. ■ . „
. . . „
,
. .
. , , .
-
r_se�.�:�r. �ra� � r„rs� �:►�:►�r:r.�
. . .
. .
�
-
.
.
F�'.ri �Se•,-�hrrunry=-'uac•'•+-��.,-�hlo fr.,.,�, ��i i�s�i"vic��
I
/�l� n n+rl 1/�� � il Y1
�FC�
\ \
� �
� �
\ \ �
♦ � � ■ � .
\ \ �
1 \ \ �
o.J�-�+ol�� . .,.J +., .. .,�.fi.,.,�. fr.,.,�, +ho f�ol.J
�i � ,
� �
■ .
�
" ' � ' ' ' ' " " ' "" " ' " ' " " . ' '
■
TACII A R�L711AITTIAIf_`
r�tvrcv. �crm-r-rn-r�
� �
C�Ti t�TT.}:!11��GSlT! �TI R[l�:� �77�1�:[l�:� �CI:1
� �� ■ �
� ... � ��
� � i� ��
� � � � � �
•
�..�� �:... �_.:.:
�TTTJ:FI:E[7R:�fi77�C�7if7:!t�l�T�7:T��! .Rl�T.!ff:Tffi7T7�1:1:LT.!TT.I
�
����' �- �
.,.J /.,. ., .,�, �+�.
-
. .
,,. .
����
���
_ � � � �
�.
� ����
�
�
Y,+ -�.�,rl/.,. ., .,�,�+�.
� (`.,.,-,.,lo+�.,.. -�II f.,..,�,�/-�.,.,I�..-�+�.,.�,�. .,o
� C� �h.,-,�++�.,.. fl,.-.v,�/.,.,.,I�...,+�.,.,� F.,r ('ITV r
.,-,�+/�.1 ., r.,.J1
r
r.4 �r,rJl..r r� mi4n
� (`.,.,-,.,lo+�.,.. -�II f.,..,�,�/-�.,.,I�..-�+�.,.�,�. .,o 0
� C� �h.,-,�++�.,.. fl,.-.v,�/.,.,.,I�...,+�.,.,� F.,r /'`ITV .,.,.J T..I'lllT r
�.—t�T�., �r-ct��i�ic
e
r�4 .,r�.J/�r r, mi4e�
� C� �h.,-,�++�.,.. fl,.-.v,�/.,.,.,I�...,+�.,.,� F.,r /'`ITV r
� C� �h.,-,�++�.,.. .o o.J f.,. �. f.,. -� o 0 0
._
. ■_ ■
. .
.
.
■ -
■
.. , ■
._ � . � . ._
� �
�
.
,� � ,
•��eet+��s ���s��ec�►r+t� � � �o o �sr t#���., ����;;,�a�
�
�
TACII 4A �LAA1 CI IQMITTAI �`LI�`Ill ICTC_C p� + 7 GAOL C p� + 2 2AOL
Tf1VTTT�r 7Tf' TCGf{TT'V—Q r�TT�r� 1� r�TT�r� 1�J�V-7II
i-,�
� .. -�� . � „ .
c�? `"�
�a#� �a#fiE �a€€ie
�TA}a....� } ��A+� ,� 4PL'RCT 4PL'RCT � � CN,—ry;„^ +';^" `�O'7Q O�/Q �O'7Q
_..'...�:.." "J
LU�mTftttt
� � � � ���`�[]7 ``� p����
� 1'tG44
cvniz,? i� i� i� i� i� i� i� i� i�
s� � � � � ii
�� � � � �
*
... ., . . , . , . . . , .• . -
--._.� .,_--- -� --- --•-- -� - -, —•---_.�,--- --•-- _, ----� � .,_--- .�-.
Additional Services not included in the existinq Scope of Services — CITY and
ENGINEER agree that the following services are beyond the Scope of Services described
in the tasks above. However, ENGINEER can provide these services, if needed, upon the
CITY's written request. Any additional amounts paid to the ENGINEER as a result of any
material change to the Scope of the Project shall be agreed upon in writing by both parties
before the services are performed. These additional services include the following:
• Negotiation of easements or property acquisition.
• Services related to development of the CITY's project financing and/or budget.
• Services related to disputes over pre-qualification, bid protests, bid rejection and
re-bidding of the contract for construction.
• Construction management and inspection services
• Performance of materials testing or specialty testing services.
• Services necessary due to the default of the Contractor.
• Services related to damages caused by fire, flood, earthquake or other acts of
God.
• Services related to warranty claims, enforcement and inspection after final
completion.
• Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by the CITY.
• Performance of miscellaneous and supplemental services related to the project as
requested by the CITY.
ATTACHMENT "B"
COMPENSATION
Keller Hicks Road
Lauren Way to Katy Road City Project
Amendment 1
No.100146
ATTACHMENT B
Keller Hicks Road
Park Vista Boulevard to Katy Road
City Project No. 47707
Time and Materials with Rate Schedule Project
I. Compensation
a. The ENGINEER shall be compensated for personnel time, non-labor expenses, and
subcontract expenses in performing services for Task Orders up to $950,000.00 unless
amended. CITY and ENGINEER will agree upon compensation for each Task Order prior
to starting work. Each Task Order shall be time and materials.
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Cate�ory Rate for the ENGINEER's team member performing the work and
includes all direct salaries, overhead, and profit.
Labor Category Rate as presented in the rate schedule table below is the rate
for each labor category performing the work and includes all direct salaries,
overhead, and profit.
LABOR CATEGORY RATE ($/HOUR)(2014-2015)
Principal $235
Project Manager $200
Senior Engineer $170
Engineer $140
Senior Designer $135
CAD $90
II. Non-Labor Expenses. Non-labor expenses shall be reimbursed as Direct Expenses at invoice
or internal office cost.
Direct Expenses (Non-labor) include, but are not limited to, mileage, travel and lodging,
expenses, mail, supplies, printing and reproduction services, other direct expenses associated
with delivery of the work; plus applicable sales, use, value added, business transfer, gross
receipts, or other similar taxes.
III. Subcontract Expenses. Subcontract expenses and outside services shall be reimbursed at cost
to ENGINEER plus a markup of ten percent (10%).
IV. Budgets. ENGINEER will make reasonable efforts to complete the work within the budget and
will keep the City informed of progress toward that end so that the budget or work effort can
be adjusted if found necessary.
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be adjusted,
nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services that the PROJECT cost
presented in Article 2 of this Agreement will be exceeded, whether by change in scope of the
project, increased costs or other conditions, the ENGINEER shall immediately report such fact
to the City and, if so instructed by the City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER'S excess costs expended prior to such
increase will be allowable to the same extent as is such costs had been incurred after the
approved increase.
The Engineer shall be paid monthly payments as described in Section II — Method of Payment.
II. Method of Payment
a. The ENGINEER shall be paid by the City based upon an invoice created on the basis of
statements prepared from the books and records of account of the ENGINEER, based on
the actual hours and costs expended by the ENGINEER in performing the work.
b. Each invoice shall be verified as to its accuracy and compliance with the terms of this
Agreement by an officer ofthe ENGINEER.
c. ENGINEER shall prepare and submit invoices in the format and including content as
presented in Exhibit B-1.
d. Payment of invoices will be subject to certification by the City that such work has been
performed.
III. Progress Reports
a. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and schedules in
the format required by the City.
IV. A Summary of Task Order Fees shall accompany each Task Order.
Summary of Total Project Fees
Firm Primary Responsibility Fee Amount %
Prime Consultant
MULTATECH Design, Management 16,920.00 35.41
Engineering, Inc.
Proposed MBE/SBE Sub-Consultants
Shield Engineering Survey & Right-of-Way $18,260.00 38.22
Group
The CK Group Traffic Engineering 0.000
RLG Consulting Utility Engineering
Engineers $12,600.0 26.37
Non-MBE/SBE Consultants
TOTAL $47,780.00 100%
Project Number & Name Total Fee MBE/SBE Fee MBE/SBE
%
Keller Hicks 60% Design Task Order 1 $409,971.00 $129,537.00 31.60%
Keller Hicks 100% Design Task Order o
2 $540,029.00 $76,785.00 14.22 /o
Keller Hicks Amendment 1 47,780.00 30,860.00 64.59%
Total both Task Orders and Amend 1 $997,780.00 $237,182.00 23.77%
City MBE/SBE Goal =20.00% Consultant Committed Goal 20%
ATTACHMENT "B-2"
Level of Effort
Keller Hicks Road
Park Vista Boulevard to Katy Road
Amendment -1
City Project No. 100146
City of Fort Worth, Texas
Attachment B
PMO Release Date: 05.19.2010
Page 1 of 1
�
O
�
�
d
Z c
L O �
t
�' w a
-o C
R Y '
m Q y �
u
a w ._ c
v� � > a,
m
c
� j c y
W Q p��
o � O Q
N
J H �
O
�
N
Y
V
2
`w
v
Y
��
��
"' � -
�a
z
3 = � a - m � .a U
N m m W o
a '� v
u � � � a � a o
� F U=i � W 6
a w w m r
m m = m o
�n �n� wf
ww�m
m m �
� �
z°
EN
p N
t/1 O
L W
m W A
O �
F N
� J —
�' �
fL —
OC
LL E O
—`—_°g
�¢a