NOTICE OF PROJECT COMPLETION
CSC No. 51954-FP1
S9�o�-I�O�'7�
C S �' ) q S�
DOE. Ns: N/A
Regarding contract 51954 for Crowley Relief Interceptor M-325 Part 3 as required by the Water Department as
approved by City Council on 1/15/19 through M&C G29014 the Director of the Water Department, upon the
recommendation of the Sr. Capital Projects Officer, Capital Projects Delivery, Water Department, has accepted the
project as complete.
Original Contract Prices:
Amount of Approved Change Orders:
Revised Contract Amount:
Total Cost Work Completed:
Less Deductions:
Liquidated Damages:
Other Deductions(see comments):
Total Deduction Amount:
Total Cost Work Completed:
Less Previous Payments:
Final Payment Due
� '4 �� �� '--" - �' �
Recommended for Acceptance
Assistant Director, Water Department
� ��i � � i i
Accepted
Director, Water Department
$3,420,821.00
Ns 0
$3,420,821.00
$3,169,787.00
Days @ $630.00/ Day
' ' $0.00
$3,169,787.00
$2,859,012.65
$310,774.35
� I � � =�
Date
Date
�'`/Gt [�GL�GIGlG�D�
Dana Burghdoff IJu�8; 2021�
City Manager Date
OFFICIAL REC�RD
CITY SECRETARY
FT. VIIORTH, TX
Project Name: Crowley Relief Interceptor M-325 Part 3 DOE. Ns: N/A
Comments:
�v r c�s19
�Q��p�- yvzog c�17/2� }�
City Project Numbers 100276
Contract Name Crowlcy Relier Interceptor M-325 For Village Creek Basin Part 3
Contracf Limits Council District 6
Project Type Sewer
s����- �Uo �'7�
c s s-� q �-<l
DOE Number t270
Estimate Number 3�
Payment Number 30
ForPeriad Ending 11/11/2620
Project Funding
Project Manager Fu
Inspectors .Tohnson / Brice
Contractor CIRCL� C CONSTRUCTION COMPANY
PO BOX 40328
FORT WORTH, TX 76140
City Secretary Contract Number 51954
Contract Date 1/15/2019
Contract Tirne 365 CD
Days Charged to Aate 373 CD
Contract is .000000 Complete
CITY OF FORT WORTH
SUNIMARY OF CfIARGES
Line Fund Acconnt Center Amount Gross Retainage Net
Funded
0 S��t�— ��-��1� �31z�,�z�.v� .�d G 2 �� -�- �►�,�d�c.d.�s � ,� ,, ,� .3<-
- ���a=
Total Cost of Work Completed
Less o % Retained
Net Earned
Earned 'I'his Period $310,77435
Retainage This Period $0.00
Less Liquidated Aamages
� Days @ $0.00 / Day
LessPavement Aeficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$3,169,787.00
$0.00
$3,169,787.00
$0.00
$0.00
$0.00
$z,gs9,012.65
$0.00
$310,77435
Tuesday, May 11, 2021 Page 5 of 5
F�RT V��RT`H
CITY OF FORT WORTH
FIl�AL PAYMENT REQUEST
Contract Name Crowley [Zelier Interceptor M-325 For Village Creek Basin Part 3
Contract Limits Covncil District 6
Project Type Sewer
City Project Numbers 100276
DOE Number 1270
Estimate Number 3� Payment Number 3� For Period Ending 11/11/2020
CD
City Secretary Contract Number 51954
Contract Date 1/15/20I9
ProjectManager Fu
Contractor CIRCLE C CONSTRUCTION COMPANY
PO BOX 40328
FORT WORTFI, TX 76140
Inspectors Johnson / Brice
Contract Time 36�D
Days Charged to Date 373
Contract is 93.000 Complete
Tuesday, May 11, 2021 Page 1 of 5
City Project Numbers 100276
Contract Name Crowley Relier Interceptor M-325 For Village Creek Basin PaR 3
Contract Limits CounciI District 6
Project Type Sewer
Project Funding
DOE Number 1270
Estimate Number 30
Payment Number 30
For Period Ending 11/i l/2020
Sewer
Item Description of Items Esrimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
-- - ------ ---- ---- -- ------
7 3331.4307 20" DTP Sewer w/ Protecto 242 LF $200.00 $48,400.00 222 $44,400.00
8 3331.4231 18"DIPSewerw/Protecto 120 LF $120.00 $14,400.00 120 $14,400.00
9 3331.4214 12" DIP Sewer w/ Protecto 74 LF $120.00 $8,880.00 74 $8,880.00
10 3331.4206 10" DIP Sewer w/ Protecto 25 LF $120.00 $3,000.00 25 $3,000.00
11 3331.4210 12" Sewer Pipe, Select Ba 15 LF $95.00 $1,425.00 15 $1,425.00
12 3331.4117 8" Sewer Pipe, Select Bac 40 LF $95.00 $3,800.00 40 $3,800.00
13 3339.1101 5' Manhole 26 EA $6,000.00 $156,000.00 26 $156,000.00
14 3339.1103 5' Extra Depth Manhole 321 VF $200.00 $64,200.00 319.69 $63,938.00
15 3339.2001 Sanitary Sewer Junction St I LS $53,000.00 $53,000.00 1 $53,000.00
F6 33392001 Sanitary Sewer Junction St 1 LS $50,000.00 $50,000.00 1 $50,000.00
17 3305.0109 Trench Safety 8041 LF $1.00 $8,041.00 8232 $8,232.00
18 3305.0207 Lmported EmbedmentBackfi 540 CY $150.00 $75,000.00
19 3305.0116 Concrete Encasement for U 50 CY $150.00 $7,500.00
20 3305.0103 Bxploratory Excavation of 1 EA $2,000.00 $2,000.00 1 $2,000.00
21 3305.0110 Utility Markers (Buried M 1 LS $2,040.00 $2,000.00 1 $2,000.00
22 3305.0110 Utility Markers (Surface 16 EA $200.00 $3,200.00 16 $3,200.00
23 3305.0113 Trench Water Stops 8 EA $2,500.00 $z0,000.00 8 $20,000.00
24 3305.0112 Concrete Collaz 26 EA $450.00 $11,700.00 26 $11,700.00
25 3339.0001 Epoxy Manhole Liner (Warr 477 VF $300.00 $143,100.00 475.69 $142,707.00
26 3301.0002 Post-CCTV Inspection 8535 LF $5.00 $42,675.00 8416 $42,080.00
27 3301.0101 Manhole Vacuum Testing 28 EA $200.00 $5,600.00 28 $5,600.00
28 3339.0002 Epoxy Structure Liner (War 3020 SF $25.00 $75,500.00 3020 $75,500.00
29 3201.0616 Conc Pvmt Repair, Arteria 895 SY $125.00 $111,875.00 327 $40,875.00
30 3211.0112 6" Flexible Base, Type A, 1745 SY $25.00 $43,625.00 1650 $41,250.00
31 3213.0302 5" Conc Sidewalk 50 SF $18.00 $900.00 50 $900.00
32 3216.0102 7" Conc Curb and Gutter 255 LF $40.00 $10,200.00 255 $10,200.00
33 3231.0301 4' Gate, Steel (16' Wide) 5 EA $2,500.00 $12,500.00 5 $12,500.00
34 3292.0400 Seeding, Hydromulch 34600 SY $2.00 $69,200.00 34600 $69,200.00
35 3471.0001 Traffic Control 12 MO $2,000.00 $24,000.00 12 $24,000.00
36 3125.0101 SWPPP >_ 1 acre 1 LS $25,000.00 $25,000.00 1 $25,000.00
37 3110.0102 6"-12" Tree Removal 125 EA $500.00 $62,500.00 125 $62,500.00
Tucsday, May 11, 2021 Page 2 of 5
City Project Numbers 100276
Contract Name Crowley Relier Interceptor M-325 For Village Creek Basin Part 3
Contract Limits Council District 6
Project Type Sewer
Project Funding
DOE Number 1270
Estimate Number 30
Payment Number 30
Tor Period Ending 11/11/2020
38 3110.0103 12"-18" Tree Removal 13 EA $1,000.00 $13,000.00 13 $13,000.00
39 3110.0104 I8"-24" TreeRemoval 8 EA $1,500.00 $12,000.00 8 $12,000.00
40 3I10.0105 24" and Larger Tree Remov 8 EA $2,500.00 $20,000.00 8 $20,000.00
41 0171.0101 Gonstruction Staking 1 LS $10,000.00 $10,000.00 1 $10,000.00
42 0171.0102 As-Built Survey (Red-Line 1 LS $5,000.00 $5,000.00 I $5,000.00
43 9999.0001 Metering Station (Includi❑ 1 LS $475,000.00 $475,000.00 1$475,000.00
44 9999.0002 Sanitary Sewer Manhole Ve 7 EA $5,000.00 $35,000.00 7 $35,000.00
45 9999.0003 Type III Barricade 1 LS $5,000.00 $5,000.00 1 $5,000.00
46 9999.0004 Tree Protection far the Co 1 LS $35,000.00 $35,000.00 1 $35,000.00
47 9999.00Q5 ConstructionAllowance 1 LS $100,000.00 $100,000.00
1.A 3331.4307 20" DTP Sewer w/ Protecto 5377 LF
1.B 3331.4303 20" Fiberglass Sewer Pipe 5377 LF
1.0 3331.4310 21" PVC ASTM F679 Sewer P 5377 LF $150.Q0 $806,550.00 5443 $816,450.00
2.A 3331.4305 20" DII' Sewer w/ Protecto 1998 LF
Z.B 3331.4301 20" Piberglass Sewer Pipe 1998 LF
2.0 3331.4308 21" PVC ASTM F679 Sewer P 1998 LF $125.00 $249,750.00 1998 $249,750.00
3.A 3331.4306 20" D1P Sewer w/ Protecto 150 LF
3.B 3331.4302 20" FiberglassSewerPip 150 LF
3.0 3331.4309 21" PVC ASTM F579 Sewer P 150 LF $200.00 $30,000.00 100 $20,000.00
4 3305.I 106 36" Casing By Other Than 494 LF $700.00 $345,800.00 494 $345,800.00
5 33053009 21" SewerCacrierPipe 40 LF $150.00 $6,000.00 40 �$6,000.00
6 33053008 20"DIPSewerCarrierPip 454 LF $250.00 $113,500.00 494 $123,500.00
Snb-Total of Previous Unii $3,420,821.00 �3,169,787.00
Tuesday, May 11, 2021 Page 3 of S
City Project Numbers 100276
Contract Name
Contract Limits
Project Type
Project Funding
Crowley Relier Interccptor M-325 For Village Creek Basin Part 3
Council District 6
Sewer
Contract Information Summary
Original ContractAmount
Chan�e Orders
��-�'� � �� vate 5/11/21
Coniractor
��-�^— Date-S// �/
Inspection Supervisor
/
/f� � ^ �- f . ; r � 1
-�-f'�� � � �`� �%�l' '� Date � , f _ L ;
Project Manager �
� ) � Date
Asst. Director/'I'PW
�'��t,o�.� ;vs/��
,��sm� o�H��a ;,��z�oziienscoi, Date
Airector / Coniracting Department
Total Contract Price
DOE Number 1270
Estimate Number 30
PaymenE Number 30
For Period Ending 11/I 1l2020
$3,420,821.00
$3,420,821.00
Tofal Cost of Work Completed g3,169,787.00
Less 0 % Retained $0.00
NetEarned $3,169,787.00
Earned This Period $310,77435
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Aay
LessPavement Deficiency
Less Penalty
Less Previous Payment
Pius Material on Hand Less 15%
Balance Aue This Payment
$0.00
$o.00
$0.00
$2,859,012.65
$0.00
$310,7743 5
Tuesday, May I 1, 2021 Page 4 of 5
FoRT W�R�°�
WA']CE�2 ENGINEERING & FISCAL SERVdCES
FF10T.AL STATEMENT OF CONT�tACT 'I'I1VYE
rev 03/OS/07
FINAL STATEMEN�' N�.: 30
NAME OJF PRO.AECT': Crowiey Relief Interceptor M-325 for Villager Creek Part 3
PROJECT NO.: 100276 CONTRACTOR: Circle C
CTTY PROJECT 100276
PERTOD FROM:07/16120 TO: 11/11/20 FINAL INSPECTION DA'TE: 11/I l/2020
WORK ORDER EFFECTNE:1/l5/2019 CONTRA.CT �'�ME: 365 Q WD Q CD
DAY OF DAYS �AS�N FOR �7AYS �AX OF DAXS gEASON FOR DAYS
MONTgI DU�I2ING �12�I)IB'�Y) MO1�T'Y'di ���G CREDITED
1. 16.
2. a �.
3. 18.
4. 19.
5. 20.
6. 21.
7.
8.
9.
10.
11.
12.
13.
14.
15.
THIS
PER.IOD
PREVIOUS
TOTALS
TO DATE
*REMARKS:
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
RAIN, TOO WET, UTILITIES
& TOO COLD RELOCATIONS
OTHERS* DAYS
CHARGED
80
293
373
TOTAL
DAYS
80
293
373
CON�TOR ��E� DATE JINS�OR � DA E�/
5AT, SUN,
& HOLIDAYS
Capital Pxojects Deliveiy, Water Department
The City of Fost Worth • 1000 Throckmoxton Street • Fort Worth, TX 7G012-6311
(817) 392 - 4477 • F'a}c: (81'� 392 - 8460
PROJECT NAME:
PROJECT NUMBER:
DOE NUMSER:
PIPE LAID
FIRE HYDRANTS:
PIPE ABANDONED
FOR.T VVORTH
WATER ENGINEERING & FISCAL SERVICES
PIPE REPORT FOR:
Crowley Relief Interceptor M-325 far Villa�e Creek part 3
100276
N/A
SIZE
SIZE
WATER
TYPE OF PIPE
VALVES (16" OR LARGER)
TYPE OF PIPE
DENSITIES:
NEW SERVICES:
PIPE LAID
Sewer
SEWER
SEWER
SE WER
SEWER
SIZE
21"
��,�
18"
ro��
12"
SEWER
TYPE OF PIPE
PVC
DIP
DIP
DIP
DIP
PIPE ABANDONED
DENSITIES:
NEW SERVICES:
SIZE
TYPE OF PIPE
]LF
LF
LF
LF
5443
2??
120
25
15
WATER ENGINEERING & FISCAI, SERVICES
The Ciry of Fort Worth • 1000 Throckmorton Street • Fort Worth, T�i 76012-6311
(817) 392 - 4477 • Fax: (817) 392 - 8460
FORTWORTH
Capital Projects Delivery, Water Department
PERFORMANCE EVALUATTON OF CONTRACTOR
n CONTRACTOR & PROJECT DATA
Name of Contractor
Circle C
YYater Engineering Inspector
7esse Reed
YYater Engineering Inspector
❑ Water ❑� Wasfe Water ❑ Storm Drainage ❑ Pavement
Iniiia( Contract tlmount
$3,420,821.00
Final Conlract Amount
$3,169,787.00
In PERFORMANCE EVALUATION
0- Inadequate 1- Deficient Z- Standazd 3- Good
3
4
5
6
7
S
9
10
11
12
13
Sabmission of Documents
Public Notificarions
Plans on Site
Field Supervision
Work Performed
Finished Product
Job Site Safety
Tr�c Control Maintenance
Daily Clean Up
Citizen's Complaint Resolution
Properiy Restoration
Af�er Hours Response
4 - Excellent
[T ( X ) AP]
2
5
5
15
15
15
15
15
5
5
5
5
5
Name
DOE Nctmber
100276
Project Manager
Scott Taylor
Praject Drffrculty
� Simple
Date
5/11/2021
Y
Y
Y
Y
Y
X
Y
Y
Y
Y
Y
Y
Y
Q Routine
/ N) RATING (0 - 4) Iv1AX SCORE
4 8
3 20
4 20
4 60
4 60
3 60
3 60
3 60
3 20
3 20
3 20
3 20
3 20
TOTAL ELEMENT SCOFtE (A)
BONUS POINTS (25 Maximum) (D)
TOTAL SCORE (TS)
IIn CONTRA.CTOR'S RATING
Maximum Score (MS) = 448 br-sum of applicable element score maximums which = 448
Rating ([TS / MS] * 100%) 373 / 448 = 83%
Performance Category Excelient
<20% = Inadequate 20% to <40% = Defzcient 40% to <60% = Standard 60% to <80% = Good >80% = Excellent
Inspector's Comments (INCLUDING �XPLANATION OT BONiJS POINT'S AWARD�D)
REv: �2,2�,��
Q Camplex
SCORE
8
15
20
60
60
45
45
45
15
15
15
15
15
373
373
Si ature Ins ector Si ����' ��/��Q�"�Y
gn p gnature Contractor
Signature Inspector's Supervisor
CONTRACTOR'S COMMENTS
Capital Projects Delivery, Watei Department
The City of Fort Worth • 1000 Thsockmoxton Street • Fort Worth, TX 76012-6311
Creek part 3
(817) 392 - 4477 • Fax: (817) 392 - 8460
FORTWORTH
Capital Projects Delivery, Water Depax�tment
CONTRACTOR'S EVALUATION OF CITY
n PROJECT INFORMATION Date: 11-Mav-21
Narne of Con�ractor
Circle C
Water Engineering Inspector
Jesse Reed
DOE Number Praject Di�culty
100276 0 Simple �Q Routine
Initial Contract Amotmt
$3,420,821.00
In PERF'ORMANCE EVALUA'TION
0- Inadequate 1- Deficient 2- Standard
ELEMENT
INSPECTION EVALUATION
1 Availability of Inspector
2 Knowledge of Inspector
3 Accuracy of Measured Quantities
4 Display Of Professionalism
5 Citizen Complaint Resolution
6 Performance - Setting up Valve Crews, Labs
ADMINISTRATION
1 Change Order Processing Time
2 Timliness of Contractor Payments
3 Bid Opening to Pre-Con Meeting Timeframe
IIn COMMENTS & STGNATURES
CONIMENTS
Signature Contractor
Signature Inspector
Signature Inspector's Supervisor
INSPECTOR'S COMMENTS
PLANS & SPECIFICA'I'IONS
1 Accuracy of Plans to Existing Conditions
2 Clarity & Sufficiency of Details
3 Applicability of Specif'ications
4 Accuracy of Plan Quautities
PRO.)ECT MANAGER EVALUA'TION
1 Knowledge And/Or Problem Resolution
2 Availability of Project Manager
3 Communication
4 Resolution of Utilitv Conflicts
%�� � �'.����
.�-�—
� Compfex
REV: �2,22,��
Project Name
Crowley Relief Interceptoz M-325 for Village Creek Part 3
Praject Manager
Scott Taylor
Type ofContract
❑ Water Q✓ Waste Water ❑ Storm Drainage ❑ Pavement
Final Contract Amounl
$3,169,787.00
3 - Good 4 - Excellent
RAT'ING ELEMENT
rn _ a�
RATING
rn _ a�
�
0
Capital Piojects Delivery, �Uater Departrnent
The City of Fort Woxth • 1000 Throckmoxton Street • Fort Worth, 'I� 76012-6311
(817) 392 - 4477 • Fax: {817) 392 - 8460
CONSENT OF SURETY
TO FINAL PAYMENT
A7.4 Document G707
Bond Na. TXC611146
TO OWNER:
City of Fort Worth
1000 Throckmorton Street
Fort Worth, TX
PROJECT:
(name, address)
Crowley Retief Interceptor M-325 for Village Creek Easin, Part 3
in the City of Fort Worth, TX
OWNER
ARCHITECT
CONTRACTOR
SURETY
OTI�R
ARCHITECT'S PROJECTNO.:
City Project No. 100276
CONTRACT FOR: Utilities
CONTRACT DATED:
��
■
■
■
■
In accordance with the provisions of the Contract behveen the Owner and the Contractor as indicafed above, the
(Insert name and address ofSurery)
Merchants Bonding Company (MutuaI)
6700 Westown Parkway
West Des Maines, IA 50266 , SURETY
on bond of
(Insert name and address ofContractorJ
William J. Schultz, Inc., dba Circle C Construcfion Company
P. O. Box 40328
Fort Worth, TX 76140 , CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor sball not relieve the Surety
of any of its obligations to
(Insert name and address of Owner)
Cify of Fort Worth
1000 Throckmorton Street
Fort Worth, TX 76102 , OWNER,
as set forth in the said Surety's bond.
IN WTINESS WIiEREOF, the Surety has hereunto set its hand this date: May 11, 2021
(Insert in writing the month jollowed by the numeric date and year.)
"��: Witness as to Su[ety_
i�1' �;; __
, _� .
.�:._. _7 = �:.--r= � -
John A. Miller '
Merchants Bondinr Campan�- (\�Iutual)
(Sureg') /
.�'"" �"~� �-- -,`' ��: � ��''�-� -
. x.�
�Signarure oJcruthorird representaiiveJ
Shervl A. HIutts, Attorne��-in-Fact
(Pr:nted name and title)
NOte: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND
CLAIMS, Current Fdition
AIA DOCUMENT' G707 � CONSENT OF SURET'Y COMPANY TO FINAL PAYMENT fr Apri] 1970 Edition � AL4� One Page
01970 • THE fiivIERICAN INSTITUT'E OF ARCHITECTS, 1735 New York Ave., NW, Washingron, D.C. 20006
�.ERCHANT_S�
BONDING COMPANYTM
POWER OF ATTORNEY
Know All Persons By These Preserrts, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDIfVG, INC.,
both being corporations of the State of lowa (herein collectivety qlled the "Campanies") do hereby make, consfitufe and appoint, individualfy,
John A Miller; John R Stockton; Sheryl A Kiutts
their true and lawful Attomey(s�in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings,
contracts and other written insfruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity
of persons, guaranteeing the perfortnance of contracts and execuiing or guaranteeing bonds and undertakings required or pertnittad in any
actions or proceedings allowed by law.
This Power-of-Attomey is granted and is signed anci sealed by facsimile under and by authority of the foilowing By-Laws adopted by the Board
of Directors of Mercha�rts Bonding Company (Mutual) on April 23, 201� and amended August 14, 2013 and adopted by the Board of Directors
of MerchantsNational Bonding, Inc., on October 16, 2075.
'The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority
to appoint Attomeys-in-Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bands and
undertakings, recognizances, contracts of indemnity and otherwritings obligatory in the nature thereof."
"The signature of any authorized officer and the seal of the Company may be afiixed by facsimile or electronic transmission to any Power of Attomey
or Certfication thereof authorizing the execution and delivery of any bond, undertaldng, recognizance, or other suretyship o 6ligations of fhe
Company, and such signature and seal when so used shall have the same force and efiect as though manually ficed."
In connection with obllgations in favor of the Florida Deparhnent of iransportation only, it is agreed that the power and aut hority hereby given to the
Attomey-in-Fact inGudes any and all consents for the release of retained percentages and/or final estimates on engineering and construcSon
contracts required by the State of Florida Department of TranspoRation_ It is fully understood that consenting to the State ofFlorida Department
of Transportation making payment of the final estimate to the Contractor and/or its assignee, shafl not relieve this surety company of any of
its obliga6ons under its bond.
!n cannection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given
to the Attomey-in-Fad cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner-
Department of Highways of the CommonweaRh of Kentuoky at least thirty (30) days prior to the modification or revocation,
In Wrtness Whereof, tFie Companies have caused this instrument to be signed and sealed this 11th day of February , 2020
�n.....,� .
•`tlONq''• .••�'••.
'�•�sA'. PO `1 �•': ; 'ap\N•..�O,hA..
� GJ :'QR Rq'; O r • �-'�F�P� 4• MERCHANTS BONDlNG COMPANY (MUTUAL)
'�= G �' =Z � • 0•V� g'9j�.y�; MERCHANTS NATIONAL BONDING, INC.
:2:2 -O- v:�' :►"'-:�2 tn: '
:� : 2003 ;�p ' : a'' 1933 �" �' By �
. �d�. . a` . yJb acy � �
: �
. �•••........:� �� '.�•��......••l1 .
•.��'••..�.,�.••�. . • . � . • • •' President
STATE OF IOWA
COUNTY OF DALLAS ss.
Dn this 19th day of February 2020 before me appeared Larry Taylor, to me personally known, who being by me duly swom
did say that he is President uf MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the
seals affixed to the foregoing instrument are the Corp�rate Seals of the Companies; and that the said instrument was signed and sealed in 6ehalf
of the Companies by authority of iheir respective Boards of Directors.
,���s POLLY MASON ,
� a a� Commission Number 750576 � ��p..`,
. . N1� Commission Expires �-
���. January p7, 2023
Afotary Public
(Expiration of notary's commission
does not irrvalidate this instrument)
I, William Warner, Jr., SecreFary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do he2by
certify that the abo�e and foregoing is a true and correct copy of the POWER-OF ATTORIVEY executed by said Companies, which is still in full
force and efFect and has not been amended or revoked.
In Witriess 1Nhereof, 1 have hereunto set my hand and affixed the seal of the Companies on this 11th day aF May, 2021.
,........... .••""•.
�.�Pq10Nq�'•., . p\NG Cp�•.
� .�EiPB/T ��: 'O�• �PO 'Oq• � j.
ry ,q-. o . m: •o A,y-. y.
`2:ZG �' :Z: ;�, c� �:,� .
:Q: -o- p=�: •�':_ -o- �' . 6c� �.ip.s�s�/��,
� j:` 2003 ' Z� a' '` 1933 ��C; Secretary
::��` .y . �r.
. J'•.
'•.;���-•........•;3a�. '••?',��••� •-•`;�d�
POA 0018 (1/20) •�'"••�••••••' '•••••••
AFFIDAVIT
STATE OF Texas
COUNT'Y oF Tarrant
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Teresa S Skelly,
President Of William J Schultz Inc dba Circle C Construction Company,
known to me ta be a credible person, who being by me duly sworn, upon
his oath deposed and said;
That a11 persons, firxns, associations, cozporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury andJor
property damages;
On Contract described as;
Crowley Relief Interceptor M-325 Part 3
City Project Number 100276
BY �� ��
President
Subscribed and sworn before me on this date 11 of May, 2021.
1 � � 1,CiY'��.5
Notary Public
Tarrant, Texas
,,o,�ar ^�a;,, MICHELE S LANKFOR
a, o Nosary Public
A�,��%*' 3TA'CE OF 7EXAS
--,sTF aF ?�� Notary fD � 1175946-6
_ ,,x n AIY COmrt1. Exp. OctODer 7. 2023
FORTWORTH
May 11, 2021
William J. Schultz dba. Circle C Construction Co.
PO Boz 40325
Fort Worth, T�i 76140
Re: Acceptance Letter
Project Name: Crowley Relief Interceptor M-325 for Village Creek Part 3
Project Type: Se�ver
Project No: 100276
D.O.E. Ns: N/A
Contract Ns: 51954 Dated: 1/29/2019
Gentleman:
On November 11, 2020 a final inspection was made on the subject project. There were no punch list items
identified at the time. The fmal inspection indicates that the �vork meets the City of Fort Worth specifications and
is therefore accepted by the City. The warranty period will start on November 11, 2020, which is the date of final
inspection and �vill eztend for (2) years in accordance �vith the Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at (817) 392-60�4
Yours Truly,
�--- �y �
� ,. , �� `; :� � _ ,
Tony Sholola, P.E., Assistant Director Water Department
MI' /
cc: Chris Harder, P.E., Director, Water Department
Laura Wilson, P.E., Deputy Director, Water Department
Captain Michael Skains, Fire Department
Cesar Zavala, Field Operations Superintendent, ��later Department
B?ll Lundvall, Field Operations Superintendent, Waste Water Department
Scott Taylor, P.E. , Project Manager
Brenda Ustasio, P.E., Teau�e Nall and Perl�ins , Consultant
William J. Schultz dba Circle C Constiliction Campany, Contractor
David Johnson, Inspection Superoisor, Water Engineering and Fiscal Services
Raymond Brice, Inspector, Water Engineering and Fiscal Services
File
WATER DEPARTMENT
ENGINEERING AND FISCAL SERVICES
THE CITY OF FORT WORTH * lOOO THROCKMORTON STREET * FORT WORTH, TEXAS %F)LOZ
817-392-8240 * F.aY 817-392-8195
`� Printed on recycled paper