HomeMy WebLinkAboutContract 43492 /�,.r
I W
i
���
i� .ant„r� m w�, �I � � "
y
/�
P,6� � ��
"III � I; ,;
,,
F � J p
r ��
W�
,�
/,,.
i
� I � i
d„�
1
�� � I
I
I I � I j �
I
i
v��rr
V �'
a � r
„�,
�N k�,',,
� � � �a v
�{ �
Y �
� A+
m
�� ��"
>,,�
��yl��i
r//
Y
i
�'
1, �I�
,.ii � ( ��( i � �it
"„
I,,; ;s "�� ,I,,,F. ;,
„�' YY
�. � � ��.
i �..
� �
I., is i
i
�,
I� i
I
i
i
�I
i � `, � I �.
�. � � '.
I
i i I I ', i
i
i j
i
Ii I i i
i
i
i i
� �
I I i I i
,,�
I
„� �
��
„,,
�� I�
i � i � i i I
�,
i
�i � i i
i I
�i
I
� i � i i i �
i t
.y i ,,� ',.. � «w� I � gar
� i � ,� i � �
i �:
„�
i
� �
i I � I m�
m�+
�� W
i
1 I i
� � i
! � �
,.
,.
,,
��
^` t=
,,,,
,�,,
I
i � "
i I�
1
005243--1
Agnement
M, Page I of 4
SECTION 00 52 43
V, AGREEMENT
3
4 THIS AGREEMENT, authorized on Jully 17, 2 12 is made by and between the City of Forth
5 Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager,
6 ` ity" , and B CONTRACTING, 1.LC authorized to do bus mess in Texas, acting by and
7 throe *i s duly authorized representative, ("'Contractor").
8 City d Contractor, in consideration of the mutual covenants hereinafter set forth, agree as
follows
Article 1.WORK
It Contractor shall complete all Work as specified or indicated 'in the Contract Documents, for the
12 Project identified herein.
3 Ar c e 2.PROJECT
The project for which the Work under the Contract:Documents may be the whole or only a part is
15 generally described as follows:.
16 A.
17 HMAC SURFACE OVERLAY.,(2,012-16
19 01926
1,, 2
22 Article 3,CONTRACT
23 3.1 Time is of the essence.
24 All, time limits for Milestones, if any, and Final Acceptance as stated in the Contract
25 Documents are of the essence to this Contract.
)°
26 3.2 Final Acceptance.
27, The Work will be complete for Final Acceptance within 1.20 Calendar dais after the date
2 provided Paragraph 2.03 of the General.
when the Contract Time commences to run as
29 Conditions.
30 3.3, Liquidated damages
1 Contractor recognizes that time is of the essence of this Agreement a nd that C1 ty mill
32 suffer financial loss if the Work is not completed within the times specified in Paragraph
r 3 �,2 above, plus any extension thereof allowed in accordance with Article 12 of the
4 General Conditions. The Contractors also recognizes the delays, expense and difficulties
35 involved in proving in a legal proceeding the actual loss suffered by the City if the ''work
p time. Accordingly, instead of requiring any such p actor
��� �s not completed on � � roof, Contractor
agrees that as liquidated da n.ages for delay (but not as a penalty), Contractor shall pay
38 City Four Hundred and Twenty Dollars ($42.00) for each day that expires after the tie
specified in paragraph 3.2 for Final Acceptance until the City issues the Final Letter of
Acceptance..
' CITY OF FORT WO
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
0 926
Revised Novembeir 9,2011.
PIP
00524_ 2
Agreement
Page 2 of 4
41 Article 4., CONTRACT PRICE
in �4 City agrees to pay Contractor for performance of t e Work � the Contract
43 Documents an amount in current funds of NI NF HUNDRED SIXTY SIX THOUSANDl ON
44 EIGHTEEN DOLLARS AND VENT FIVE CENTS($L66.2118,2n*
45 Article 5. CONTRACT DOCUWNTS
46 5.1 CONTENTS:,
A. The Contract Documents which comprise the entire agreement between City and
48 Contractor concerning the Work consist of the following:
49 L This Agreement.
50 2. Attachments is to this Agreement.-
51 a. Bid Foy
5 . Proposal For
53 2 Vender Compliance to State Law Non-Resident Bidder
54 3 Prequ .l ificativn Statement
55 4 State and Federal documents(projeerspecific)
56 b. Current Prevailing Wage e to Table
Insurance ACORDl Form(s)
a
d. Payment Bend
5 e. Performance Bond
60! f. Maintenance Bend
61 g. Power of Attorney for the Bonds
I/Pp 62 h. Workers Compensation Affidavit
3 1. MVVBE Comm it ent Form
64 1 General Conditions.
PIP
65 4. Supplementary Conditions.
66 5. Specifications specifically made a part of the Contract Documents by attachment
67 or, if not attached, as incorporated by reference and described in the Table of
68 Contents of the Project's Contract Documents.
ir
69 6. Drawings..
70 7. addend ..
71 8. Documentation submitted by Contractor prior to Notice of Award.
72 9. The following which may be delivered or issued after the Effective ate of the
r�
73 Agreement and, if issued, become an incorporated Part of the Contract Documents:
4
a. Notice to Proceed.
75 b. Field Orders.
76 c. Change Orders.
77 d. Letter of Final Accep ee.
78
CITY OF FORT WORTH HMAC SURFACE OVERLAY(201246)
STANDARD CONSMUCI,ION SPECIFICATION DOCUMENTS 0192
Revised November 9.2011
F
i
Agreement
Page 3 of 4
Article 6,, 1"EMNIFICATION
film 80 6.1 Contractor covenants and agrees to indemnify, bold harmless and defend, at its own
1 expense, the city, its officers, se a is and employees, from and against any and all
8,2 claims ansing out of, or alleged to arise out o�f, the work and services to be performed
1;,,1 83 by the contractor, its officers,s, agents, employees, subcontractors.,,ctors, licenses or invitees
under this contract. This indemnification provision s I cciflcall intended to o cratre
5 and be effective even if it allSged,or proven that all or some, of the dam, �es being
souaht were doused In whole or in curt l an act onrl��lon or nee lui �ence of the ci .
This indemn rove . # include, without limitation, 'indemnity for
costs,expenses and legal fees incurred by the city in defending against such claims and
causes of actions.
90
91 6.2 Contractor covenants and agrees to indemnify and bold harmless, at its own expense,
P IM 2 t city,its office ,servants and employees,from and against+e puny and all loss',damage
3 or destruction of property of the city,arising out of or,alleged to,arise out of the wort
and services, to be performed by the contractor, its officers, agents, employees,
O
subcontractors, licensees or invitees under this
contract. This indemnification
96 Provision pus � cif call intended to o � �e Fund he effective even 'f t s a�le +ed or
97 proven that all or some of the damaM being soujaht were caused in who or il art
by any act omission or n ll per cue of the cityl
loo Article 7. .f C L FOB'S
f 101 7.l Tenns.
102 Terms used in-this Agreement which are defined in Article l of the General Conditions will
103 have the meanings indicated in the General Conditions.
104 7.2, Assignment of "ontract.
105 This, Agreement, including all of the Contract Documents may not he assigned by the
lip, 106 Contractor wit out the v unced express ittcn content of the City.
107 7.3 Successors and Assigns.
108 City'' and Contractor each hinds itself, its partners, successors, assigns and legal.
109 representatives to the other party hereto, in respect to all covenants, agreements and
110 obligations'contained in the Contract Documents.
11.1 7.4 Scvcrability.
112 Any provision or part of the Contract Documents held to be unconstitutional, void or
11 uanenforceable by a court of competent Jurisdiction shall be deemed stricken and all
114 remaining provisions shall, continue to be valid and binding upon CITY and
115 CONTRACTOR.
116 7.5 Governing Law and Venue.
11 This Agreement, incluuding all of the Contract Documents is perfo able n the State of
118 Texas. venue shall be Tarrant County, Texas, or the United States District Court for the
119 Northern District of Texas,Fort Forth Division.
r
CITY OF FORT WORI`H ffM,AC SURFACE OVERLAY(2012-16'
STANDASUD CONSTRUCTION PECIFfC '",rION DOCUMENI S
01926
Revised November 9,2011
005243-4
Agreement
120 7.6 Other Provisions.
121 The Contractor agrees to pay at least minimum wage per hour for all ah r as the, same pus
1.22 classified, promulgated and set out by the City, a copy of which is attached hereto mid
123 made a part her of the same as if t were copied verbatim herein.
u 124 7.7 Authon*ty to Sign.
125 Contractor shall attach evidence of authority to sign Agreement, if other than duly
126 authorized signatory of the Contractor.
1
128 IN SS WHEREOF, City and Contractor have executed this, Agreement in. multiple
129 counterparts.
1
131 This Agreement is effective as of the last date signed by the Parties("Effective,Date").
1
Contractors City f Fort Worth
c c , LLB
By*7 ............
Fernando Costa
Assistant City Manager
(Signature)
Date
ao
jamPC_ H, inh Nt
"�`
,W'W"I V Nmr 1W 'Wool a F
Attest..--
Name per, ,
City Secretary %,L-
0 0
Seal P
0
Title: Ad 0
Ad dress: `0 O0 4(
M
ICY
Date.-
r
City/State/zip Approved to,Form and Legality
VLA W
Date D1 olug1 s W. Black
Assistant City Attorney
133
134
y!
135 AP w RECOMMENDED:
137 OFFICIAL RECORD
138
1,39 ,
140 DIRECli,
IT 1
141
Transportation and Pubilic W Vks
14
CITE'OF FORT WORTH HMAC SURFACE OVERLAY 2012.16
STANDARD CONSTRUCTION SPECIFICATION 13O�.UMNTS 01926
Revised November 9,2011.