Loading...
HomeMy WebLinkAboutContract 53393-AR2CSC No. 53393-AR2 FORT WORTH�a City of Fort Worth \��� Construction Allowance Request Project Name HMAC Surface Overlay (2019-6) City Sec # 53393 Client Project #(s) 102098 Project Cement stabilized 8" of existing pavement and add new hot mix asphalt Description Contractor Peachtree Construction Ltd City Project Mgr. Tariqul Islam UNIT or DEPT TPW XX Original Contract Amount $1,079,975.00 Extras to Date Credits to Date Current Contract Amount $1 079 975.00 Amount of Pro osed Allocation $11 836.78 Original Allowance Available to Allocation $25,000.00 Allowance Funds Previously Allocated $11,883.69 Revisetl Allowance Balance $1,279.53 CA # 2 Date 5/19/2021 City Inspector Brian McGill XX � XX � Totals IContractTime IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST, THE CONTRACT SHALL: Furnish all labor antl material as per attached proposed Construction Allowance Request (with attachments):This construction allowance is for milling and hauling 2 inch HMAC at Lagonda Avenue antl Denver Avenue transition to Northside Drive. This transition has concrete base where pulverization is not possible. This Iconstruction allowance also includes mobilization/remobilization of milling and paving crews to the job site, cleaning and applying tac coat for It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Construction Allowance Request. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Peachtree Construction LTD I J Barry Clark �?&�y �k � May za, zou �4���n� ATTEST: �' i��f/LI�C,�-e�� �� �oFOR �' ��a d (J % ' 0 � Mary J. Kayser, City Secretary p� o� o �_o ���� �Vo a=d ���o o�[� � °o oo° /�' �r °000000_ �o' Construction Allowance SUMMARY Page 1 of 4 OFFICIAL REC�RD CITY SECRETARY FT. VIIORTH, TX FORT WORTH:, City of Fort Worth `�s��" Construction Allowance Additions T Project Name HMAC Surface Overla 2019-6 City Sec #� Client Project # 102098 Contractor Peachtree Construction Ltd PM Tariqul Islam Inspector Brian McGill Construction Allowance Submittal # 0 Date � ADDITIONS � � .. � ����� .... .�• �. . � �- � �������� ����� � --��- � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � � --�� � �,i �� �,� �� �,i �� ��� Construction Allowance Additions Page 2 of 4 FORT WORTH�� City of Fort Worth `�—� Construction Allowance Value Project Name HMAC Surface Overla 2019-6 City Sec #� Client Project # 102098 Contractor Peachtree Construction Lttl PM Tariqul Islam Inspector Brian McGill Construction Allowance Submittal # � Date � CONSTRUCTION ALLOWANCE VALUE BEING USED ITEM DESCRIPTION Qty Unit Unit Cost Total 9999 Re radin work erformed on 5th Ave due to water main break 1.00 LS $11,883.69 $11,883.69 Construction Allowance Value 3of4 Previous Construction Allowance Requests CAR # DATE AMOUNT Total $0.00 Construction Allowance MSBE Data Page 4 of 4 MISBE for this Construction Allowance Request County: Item # Quantity: Estimated Time to complete: Estimated Production Rate: Pricing Assumptions: Project: 102098 Days Units / Day Highway: Peachtree Remobilization fee and mobilization of milling crew to Lagonda and Denver Statement of Equipment Statement of Labor Hours Rate Description Hours Rate Amt. Classification and Name Reg. O.T. Reg O.T. Amt. 2015 Bomag CR552 Paver 6.0 227.68 $1,366.08 Asphalt Paving Machine Operator 6.0 0.0 $13.99 $20.99 $83.94 0.0 0.00 $0.00 Asphalt Paving Machine Operator 6.0 0.0 $13.99 $20.99 $83.94 2006 Sakai SW900 Vibratory Roller 6.0 79.16 $474.96 Asphalt Raker 6.0 0.0 $12.69 $19.04 $76.14 2012 Cat C634 Vibratory Roller 6.0 29.72 $178.32 Asphalt Raker 6.0 0.0 $12.69 $19.04 $76.14 2014 Case SV250 Skid Steer 6.0 36.29 $217.74 Broom Operator 6.0 0.0 $11.74 $17.61 $70.44 2015 Superior DT80K Broom 6.0 34.47 $206.82 Asphalt Distributer Operator 6.0 0.0 $15.32 $22.98 $91.92 2014 F550 Crew Cab Flatbed 6.0 31.11 $186.66 Roller Operator 6.0 0.0 $13.08 $19.62 $78.48 2015 F550 Crew Cab Flatbed 6.0 24.92 $149.52 Roller Operator 6.0 0.0 $13.08 $19.62 $78.48 2014 F150 6.0 16.67 $100.02 Roller Operetor 6.0 0.0 $13.08 $19.62 $78.48 0.0 0.00 $0.00 Truck Driver Lowboy Float 6.0 0.0 $14.30 $21.45 $85.80 2012 Peterbilt 6.0 76.68 $460.08 0.0 0.0 $0.00 $0.00 $0.00 2008 Terex Loadking 6.0 19.07 $114.42 0.0 0.0 $0.00 $0.00 $0.00 0.0 0.00 $0.00 0.0 0.0 $0.00 $0.00 $0.00 0.0 0.00 $0.00 0.0 0.0 $0.00 $0.00 $0.00 0.0 0.00 $0.00 0.0 0.0 $0.00 $0.00 $0.00 0.0 0.00 $0.00 0.0 0.0 $0.00 $0.00 $0.00 Direct Equipment Cost = $3,454.62 15% Compensation = $518.19 Total Equipment Cost = $3,972.81 Subtotal Labor = 25% Compensation = 55% Insurance Cost = Total Labor Cost = $803.76 $200.94 $442.07 $1,446.77 Statement of Materials Statement of Subcontracting Description Quantity Unit Price Description Quantity Unit Price - $0.00 TexOp 1.00 $6,000.00 - $0.00 0.00 $0.00 - $0.00 0.00 $0.00 - $0.00 0.00 $0.00 - $0.00 0.00 $0.00 - $0.00 0.00 $0.00 Direct Material Cost = $0.00 25% Compensation = $0.00 Total Material Cost = $0.00 Total Cost = $11,719.58 1 % Bond Cost = $117.20 Grand Total Cost = $11,836.78 Direct Subcontract Cost = $6,000.00 5% Compensation = $300.00 Total Subcontract Cost = $6,300.00 �'���C���'�.�;� C:O�I��S � �.'�, i��C�' � 0� �` ; 58p1 Paelc Vista Cir. • Keller, TX 762�4 •($17) 741-465� • Fax (817) 741-4648 May 13, 2021 City of Fort Worth Attn: Tariqul islanl Re: La�onda and Denver Tie Ins Mr. Islan�, Regardir�g the extra woi•k requested on Lagonda and Denver at their tie in with Northside; thc price for remobilization and milling will be �11,836.78. T�ais cost covers reinobilizing and paving crew, n�obilizing the milling cr�w, inilling 2 incl�es on the cancrete tie ins aild cleanup in preparatio�l of 2' HMAC overlay. The HM�C is to 6e paid under the existing bid item in the contraci. Sincerely, Bz�ea�da�1 Taylar Peaclltree Const�-uction � �� Specializing in HMAC Pavi�g