HomeMy WebLinkAboutContract 38708-CO4FORT WORTH •• City of Fort Worth
Change Order Request
Project Name! 36 " Water Main Extension Along TRE Right-o f-Way , Pa rt 4
Project No .(s)!P265-605140035287 DOE No . 5509
City Sec No . 38708 ~--------'
City Pro . No . 00352 ~--------'
Project Description 36" Water Main Along Trinity Railway Express ROW From Tarrant Main Street to State Hwy 360/Trinity Blvd . Interse ction
Contractor! S.J. Louis Construction of Te xas , Ltd . Change Order # 1~_4_~ Date :
City Project Mgr .! Rackesh Chaubey
Phone Number:! 817-392-6051
City Inspector I David Johnson
Phone Number:! 817-392-8455
Dept. Water
Original Contract Amount $3 ,209 ,344 .50
Ext ras to Date $529 ,026.40
Credits to Date
Pend ing Change Orders (in M&C Process)
Contract Cost to Date $3 ,7 38 ,370 .90
!Amount of Proposed Change Order $129,496.74
Revised Contract Amount $3,867,867.64
Original Funds Available for Change Orders $100 ,000 .00
Remaining Funds Available for this CO
Additional Funding (if necessary) $129,496 .74
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUST1FICAT10N (REASONS) FOR CHANGE ORDER
The change order will provide compensation for the following:
Totals
$3,209,344 .50
$529,026.40
$3 ,738,370 .9 0
$129,496.74
$3 ,867 ,867.64
$100,000.00
$129,496.74
1/28/2015
Contract Time
(Calendar Days)
270
1500
1770
1770
• Unused 24-inch concrete pipe, fittings and valves that are no longer needed on the job due to differing si
conditions encountered during construct ion. The material will be delivered to Field Operations .
• Removal and replacement of 8-inch meter, 8-inch double check, and gate va lve s that were damaged due to
blow out at meter station to City of Grand Prairie. 6036WP4C04-SJL M&C6036WP4C04-SJL M&C
es that are no Jon
FT. WORTH, TX
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and sat isfact io n and represents payment
in full (both time and money) for all costs arising out of , or incidental to , the above Change Order .
Contractor's Com an Name Contractor Name Date
S.J. Louis Construction ofTexas , Ltd. Pete Stahl
Date
T · (,;.
Date
2,/J IS
M&C Number C-27160 1/27 /2015
Cl
UJ
> -UJ
(...)
UJ a::
-, FORT°WORTH • City of Fort Worth
Change Order Additions
Project Name I 36 " Water Main Extension Along TRE Right-of-Way , Part 4 City Sec No.
Project No .(s) I P265-605140035287 DOE No .! 5509 I City Pro . No .
Project
Description 36" Water Main Along Trinity Railway Express ROW From Tarrant Main Street to State Hwy 360/Trinity Blvd . Intersection
Contractor
City Project Mgr .
S.J. Louis Construction ofTexas , Ltd.
Rackesh Chaubey
ADDITIONS
II t:M Ut:::i\,mr I IUN
58 Parts Fabricated by Hanson Shipped to CFW Field Opps
59 T2 8" Omni Meter
60 Remove Damaged and Install new meter insert and Double Check
61 New 8" Omni meter insert
62 New 8" Double Check Assembly no Vault
63 Revised Connection at Trinity Blvd
64 Check to Oncor for Installation of Meter Station Electrical Service
65 Replacement of Broken Off-Site Combination Air Release Valve
Page 2 of 4
Change Order # CI] Date : I 1/28 /2015
City Inspector David Johnson
DEPT Qty Unit Unit Cost
Water 1.00 LS $78,446.41
Water 1.00 EA $7 ,127 .00
Water 1.00 EA $21 ,568.77
Water 1.00 EA $7,744.10
Water 1.00 EA $7 ,360.00
Water 1.00 EA $19 ,062.40
Water 1.00 EA $6 ,985 .00
Water 1.00 EA $1,793 .06
Water
Additions Sub Total
38708
00352
Total
$78,446.41
$7,127 .00
$21 ,568.77
$7,744 .10
$7 ,360 .00
$19 ,062.40
$6 ,985 .00
$1,793 .06
$150 ,086.74
$150 ,086.74
-FORTWORTH City of Fort Worth , • Change Order Deletions
Project Name!..-_3_6_" W-a-te_r_M_a-in-E-xt-en-s-io_n_A_lo-ng_T_R_E_R-ig-h-t-o-f--W-a-y,-P-a_rt_4--------~ City Sec No . 38708
Project No .(s) j P265-605140035287 DOE No . 5509 City Pro . No. ::===================================------======--_..:.._ ___ .=::::==:----'
00352
Project Descript ion 36" Water Main Along Trinity Ra ilway Express ROW From Tarrant Main Street to State Hwy 360/Trinity Blvd .
Intersection
Contractor S.J. Louis Construction of Te xas , Ltd . Change Order #[D Date! 1/28/2015
City Project Mgr. Rackesh Chaubey City Inspector I David Johnson
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
3A 24" Pre-Tensioned Concrete Cylinder Pipe C-303 Water 69.00 LF $210 .00 $14,490 .00
4A 16" Pre-Tensioned Concrete Cylinder Pipe C-303 Water 25.00 LF $100.00 $2 ,500 .00
12 12 " Resilient Seat Ga te Valve with Cl Bo x and Lid Water 2.00 EA $1,800 .00 $3 ,600 .00
Water $20 ,590.00
Deletions Sub Tota l $2 0,590 .00
Page 3 of 4
-,
M/WBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
-,
..,M&C Review Page 1 of 2
Official site of the City of Fort Worth, Texas
CITY COUNCIL AGENDA FORT\VORTH ---...,..,-
COUNCIL ACTION: Approved on 1/27/2015
DATE: 1/27/2015 REFERENCE NO.: **C-27160
CODE: C TYPE: CONSENT
LOG NAME:
PUBLIC
HEARING:
6036WP4C04-SJ L
NO
SUBJECT: Authorize Execution of Change Order No. 4 to City Secretary Contract No . 38708 with S.J.
Louis Construction of Texas , Ltd., in the Amount of $129,496 .74 for a Revised Contract
Amount of $3,867 ,867.64 for Thirty-Six Inch Water Main Extension Along Trinity Railway
Express Right-of-Way from Tarrant Main Street to the State Highway 360/Trinity Boulevard
Intersection (COUNCIL DISTRICT 5)
RECOMMENDATION:
It is recommended that the City Council authorize execution of Change Order No. 4 with S.J. Louis
Construction of Texas, Ltd ., in the amount of $129,496.74 for 36-inch water main extension along
Trinity Railway Express right-of-way from Tarrant Main Street to the State Highway 360/Trinity
Boulevard Intersection , thereby increasing the contract amount to $3 ,867 ,867 .64.
DISCUSSION:
On January 13 , 2009 , (M&C C-23278) the City Council authorized the execution of a contract with
S.J . Louis Construction , of Texas , Ltd., in the amount of $3 ,209 ,344 .50 for 36-inch water main
extension along Trinity Railway Express (TRE) right-of-way from Tarrant Main Street to the State
Highway 360/Trinity Boulevard Intersection (TRE Water Main). The contract was subsequently
revised by three change orders totaling $529,026.40 (Change Order No. 1: $40 ,100.50, M&C C-
23949 , December 8 , 2009 , Change Order No . 2 : $106,730 .00, M&C C-24350 , July 20 , 2010 , and
Change Order No. 3 : $382 ,195.90 and M&C C-26409 , August 20 , 2013).
Change Order No . 4 will provide compensation for the following :
Additional pipe and fittings for the connection at Trinity Boulevard due to conflict between the TRE
water main and existing franchise utilities.
Replacement of eight-inch meter, eight inch double check and eight inch gate valve due to blow
out at the meter station to feed the City of Grand Prairie due to water hammer in the line.
Acquisition of 24-inch concrete pipes, fittings and valves for a portion of the project that could not
be constructed as designed due to differing site condition.
M/WBE Office - A waiver of the goal for MBE/SBE subcontracting requirements was requested by the
Department and approved by the M/WBE Office, in accordance with the M/WBE or BOE Ordinance ,
because the purchase of goods or services from source(s) where subcontracting or supplier
opportunities are negligible.
The project is located in COUNCIL DISTRICT 5 .
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that funds are available in the current capital
budget , as appropriated , of the Water Capital Projects Fund .
TO Fund/Account/Centers FROM Fund/Account/Centers
P265 541200 60514003528 3 $129,4 96 .7 4
http ://apps.cfwnet.org/council packet/me review.asp?ID=20681 &council date= 1/27/2015 1/28 /2015
,
..M&C Review
Submitted for City Manager's Office by:
Originating Department Head :
Additional Information Contact:
ATTACHMENTS
6036WP4C04-SJ L MAP. pdf
Fernando Costa (6122 )
Andy Cronberg (5020)
Rakesh Chau bey (605 1)
http://apps.cfwnet.org/council_packet/rnc _review.asp?ID=20681 &council date= 1/27/2 015
Page 2 of2
1/28 /2015