HomeMy WebLinkAboutContract 38708-FP1g~Ts:~~~. V ~JD8-H? I
WATER DEPARTMENT
ENGINEERING AND FISCAL SERVICES
NOTICE OF PROJECT COMPLETION
? .?to5 -C03S~
cs 3f '70f
By
DOE . .Nt: 5509
Regarding contract 00352 for 36-Inch Water Main Extension Along Trinity Railway Express ROW as required by
the Water Department as approved by City Council on 1/13/09 through M&C C-23278 the Assistant Director of the
Water Department, upon the recommendation of the Engineering Manager, Water Engineering and Fiscal Services
Division, has accepted the project as complete.
Original Contract Prices:
Amonnt of Approved Change Orders:
Revised Contract Amount:
Total Cost Work Completed:
Less Deductions:
Liquidated Damages:
Other Deductions(see comments):
Total Deduction Amount:
Total Cost Work Completed:
Less Previous Payments:
Final Payment Due
$3,209,344.50
$678,683.14 .Nv 5
$3,888,027.64
$3,887,889.14
$0.00
$3,887,889.14
S3,775,lll.14
$112,778.00
Days @ S2IO.OO/ Day
Recommended for Acceptance Date
Engineering Manager, Water Engineering and Fiscal Services
Division
City Manager
RECEIVED SEP 3 0 201'.i ~ SCANNED
Date
£--Jf?-1s
Date
OFFICIAL RECORD
CITY SECRETARY
T. WORTH, TX
,.. Project Name: DOE .. M,: 5509 36-Inch Water Main Extension Along Trinity Railway Express ROW Comments:
D l~tlsUW~ f\
SEP 1 7 2015 LJ '"P ~115 -oo3s-~
C5 5</10~
City Project Numbers 00352
By
DOE Number 5509
Contract Name 36 INCH WATER MAIN EXTENSION ALONG TRINITY RAILWAY EXP Estimate Number 96
Contract Limits ROW FROM TARRANT MAIN ST TO STATE HWY 360ffRINITY BL VD Payment Number 96
Project Type
Project Funding
Water Improvements
Project Manager Chaubey
Inspectors D Johnson / T urney
Contractor S.J. LOUIS CONSTRUCTION OF TEXAS, LTD
P.0.BOX834
MANSFIELD, TX 76063-0834
For Period Ending 8/15/2015
City Secretary Contract Number 38708
Contract Date 1/13/2009
Contract Time I 750 CD
Days Charged to Date 1435 CD
Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount
Funded
Gross Retainage Net
_1_ dll3= oo35~ 3,ao9 ,3'-4~?° 35;t33.1s tJ7,o'-43~3 11 'J.;z1z3t,o
WATER DEPARTMENT
. ENGINEERING AND FISCAL SERVICES
YES D
Wednesday, August 26, 2015
Total Cost of Work Completed
Less O % Retained
Earned This Period
Retainage This Period
Net Earned
$112,77736
$0.00
Less Liquidated Damages
O Days @ $0.00 / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$3,887,889.14
$0.00
$3,887,888 .50
$0.00
$0.00
$0.00
$3,775,111.14
$0.00
$112,777.36
Page 6 of6
FORT WORTH
~
CITY OF FORT WORTII
FINAL PAYMENT REQUEST
Contract Name 36 INCH WATER MAIN EXTENSION ALONG TRINITY RAILWAY EXPRE
Contract Limits ROW FROM TARRANT MAIN ST TO STATE HWY 360/fRINITY BL VD
Project Type Water Improvements
City Project Numbers 00352
DOE Number 5509
Estimate Number 96 Payment Number 96 For Period Ending 8/15/2015
CD
City Secretary Contract Number 38708
Contract Date
Project Manager Chaubey
1/13/2009
Contractor S.J. LOIBS CONSTRUCTION OF TEXAS, LTD
P.O. BOX834
MANSFIELD , TX 76063-0834
Inspectors D Johnson / Tumey
Wednesday, August 26, 2015
Contract Time I 75(!:D
Days Charged to Date 1435
Contract is 100.00 Complete
Page 1 of6
City Project Numbers 003 52 DOE Number 55 09
Contract Name 36 INCH WATER MAIN EXTENSION ALONG TRINITY RAILWAY EXP Estimate Number 96
Contract Limits ROW FROM TARRANT MAIN ST TO STATE HWY 36 0/TRINJTY BLVD Payment Number 96
Project Type Water Improvements For Period Ending 8/15/20 15
Project Funding
Part 4: Water Improvements
Item Description ofltems Estimated Unit Unit Cost Estimated Completed Completed
No . Quanity Total Quaoity Total
-----------------------------------------
la 36-inch Pre-tensi oned Co ncrete Cylin 6670 LF $220.00 ,46 7,400 .00 6670 1,4 67 ,400 .00
lb 36-lnch D[P (min 200psi working pres 6670 LF $0.00 $0.00
Jc 36-lnch Steel Water Pipe (min 200psi 6670 LF $0.00 $0.00
2a 36-lnch Pre-ten sioned Concrete Cylin 550 LF $1 ,025.00 $563,750 .00 550 $563,750.00
2b 36-lnch DIP (min 200 psi working pres 550 LF $0.00 $0 .00
2c 36-Jnch Steel pipe (min 200psi worki 550 LF $0.00 $0 .00
3a 24-inch Pre-tensioned Concrete Cylin (C0#4)(C0#5) 452 LF $210.00 $94,920 .00 488 $102,480 .00
3b 24-lnch DIP (min 200psi working pres 425 LF $0.00 $0 .00
3c 24-lnch Steel Water Pipe (min 200psi 425 LF $0 .00 $0.00
4a 16-inch Pre-tensioned Concrete Cylin (C0#4) 0 LF $100 .00 $0.00
4b 16-Inch DIP (min 200psi working pre s 25 LF $0.00 $0 .00
4c 16-lnch Steel Water Pipe (min 200psi 25 LF $0.00 $0 .00
5 42-Inch Steel Casing (0.50 " thick) f 12 LF $200 .00 $2,400 .00 12 $2,400.00
6 12-Inch PVC C900 Water Pipe (Includi 20 LF $50.00 $1,000 .00 20 $1 ,000 .00
7 l 0-lnch PVC C900 Water Pipe (Includi 80 LF $40.00 $3 ,2 00.00 50 $2,000.00
8 8-lnch PVC C900 Water Pipe (lncludin (CO #3) llO LF $30.00 $3 ,3 00 .00 110 $3 ,300 .00
9 36-inch Resilient Seat Gate Valve w/ 5 EA $47 ,000 .00 m5,ooo.oo 6 $282 ,000 .00
JO 24-inch Resilient Seat Gate Valve w/(CO #3) 10 EA $22,200 .00 $222,000.00 8 $177 ,600.00
11 Vault for existing 24-lncb Gate Valv EA $6 ,750.00 $6 ,750 .00 $6 ,750.00
12 12-lnch Resilient Seat Gate valve w/ (C0#4) EA $1,800.00 $1,800.00 $1,800.00
13 10-lnch Resilient Seat Gate valve w/(CO #3) 0 EA $1 ,500 .00 $0 .00
14 8-Inch Resilient Seat Gate Valve w/ EA $1,050 .00 $1 ,050 .00 2 $2 ,100.00
15a Furnish & Install Concrete Pressure LS $1.00 $1.00 $1.00
15b Furnish and Install Fittings for Due 35 TN $0.00 $0 .00
15c Furnish and Install Fittings for Ste LS $0 .00 $0.00
16 4-lnch Combinat ion Air & Vacuum Rele 2 EA $20,000.00 $40,000 .00 2 $40,000 .00
17 8-lnch BlowoffValves and 4-foot Dia 2 EA $5,700.00 $11 ,400.00 2 $ll,400.00
18 Remove & Salavge existing 24" Gate Valve (CO #3) 4 EA $3 ,750.00 $15 ,000.00 4 $15,000.00
19 Remove & Salvage existing 10 " Gate Valve 2 EA $750 .00 $1,500.00 2 $1,500 .00
20 Cut & Plug existing IO" Water Line -3 EA $1 ,500.00 $4 ,500 .00 2 $3 ,000 .00
21 Additonal Depth of Water Line -Inst 200 LF $10.00 $2,000.00 200 $2,000 .00
Wednesday, August 26, 2015 Page2 of6
City Project Numbers 00352 DOE Number 5509
Contract Name 36 INCH WATER MAIN EXTENSION ALONG TRINITY RAILWAY EXP Estimate Number 96
Contract Limits ROW FROM TARRANT MAIN ST TO ST ATE HWY 360fTRINITY BL VD Payment Number 96
Project Type Water Imp rovements For Period End ing 8/15/20 15
Project Funding
22 24-Inch Rock Rip Rap (DA-39) -lnsta 580 CY $50 .00 $29 ,000 .0 0 580 $29,000.00
23 Remove & Dispose Existing Concrete B LS $1,500.00 $1,500 .00 $1,500 .00
24 Install and Maintain SWPPP LS $15 ,000 .0 0 $15 ,000 .00 $15 ,00 0.00
25 Pavement -5-Inch Min. Reinforced Co 200 LF $100.00 $20,000.00 190 $19,00 0.00
26 Pavement -2-Inch Min. HMAC on 2/27 20 LF $100.00 $2 ,000 .00 18 $1 ,800 .00
27 Concrete Pavement Repair per TxDO T S 56 SY $75 .00 $4,20 0.00 56 $4,200.00
28 Gravel Drive Repair (6" Flex Base) 80 SY $10.00 $800.00
29 Trench Safety System (CO #3) 7840 LF $0.01 $78.40 7498 $74.98
30 Railroad Flagman (Contractor to cont 20 DY $800 .0 0 $16 ,000 .00 20 $16,000.00
31 Exploratory Excavation (D-Hole) D-51(CO #3) 6 EA $750 .00 $4,500.00 6 $4,500 .0 0
32 Traffic Control -In stall LS $3 ,000.00 $3 ,000.00 $3,000.00
33 Hydromulch Seeding(CO #3) 7440 LF $1.00 $7 ,440.00 7440 $7 ,440.00
34 Cathodic Protection LS $45 ,000.00 $45 ,000.00 $45,000 .00
35 Concrete -Encasement (18" Sewer)-(CO #3) 0 LF $100.00 $0.00
36 Concrete -Type B -Install 20 CY $100.00 $2,000.00
37 Concrete -Type E -Install 20 CY $100.00 $2 ,000 .00
38 Fill Material -Ballast Stone -Inst 100 CY $25 .00 $2 ,500.00
39 Tracking Balls -Install 12 EA $15 .00 $180.00
40 Pipeline Markers -Install 24 EA $35 .0 0 $840.00 24 $840.00
41 Modify existing 2-!nch Air & Vacuum EA $2,000 .0 0 $2 ,000.00 $2 ,000.00
42 Modify exi sting 4-Inch Air & Vacuum 9 EA $2,000.00 $18 ,000.00 9 $18 ,000 .00
43 Demolition of existing Meter Stati on LS $5,000.00 $5,000.00 $5,000.00
44 Meter Station -Site Preparation - G LS $50 ,000 .00 $50 ,000 .00 $50 ,000 .00
45 Meter Station -Vault -Vault Constr(CO #3) 0 LS $65 ,000.00 $0.00
46 Meter Station -Pipe -Yard Piping-(CO #3) 0 LS 6125 ,000.00 $0.00
47 Meter Station -Electrical and Telem (CO #3) 0 LS 6160 ,000.00 $0.00
48 Meter Station -Transfer of Services LS $1.00 $1.00 $1.00
49 Removal of exi sting 30" Storm Drain CO# 1 LS $40,100.50 $40 ,100 .5 0 $40 ,100.50
50 Tracing & deholeing conflicting Sewer Main C0#2 LS $2,000.00 $2,000 .00 $2 ,000 .00
51 Demobilization & Remobilization C0#2 LS $4,000.00 $4,000.00 $4,000 .00
52 lnstal & remove 100' of temp . 42-inch casing botc LS $47,840.00 $47 ,840.00 $47 ,840 .00
C0#2
53 Remove l 00' segment of conflicting Sewer C0#2 LS $52,890.00 $52,890.00 $52,890 .00
45a Meter Station-Revised Const & yard work (CO #3) LS Hl2,000.00 rn2,ooo .oo $112,000 .00
46a Meter Station-Revised yard Piping & vavles (CO #3) LS S305, 100.00 S305 ,100.00 $305,100.00
Wednesday , August 26, 20 15 Page 3 of6
City Project Numbers 00352 DOE Number 5509
Contract Name 3 6 INCH WATER MAIN EXTENSION ALONG TR1NITY RAILWAY E XP Estimate Number 96
Contract Limits RO W FROM TARRANT MAIN ST TO STATE HWY 360/TRINITY BL VD Payment Number 96
Project Type Water Improvements For Period Ending 8/15 /2015
Project F und ing
47a Meter Station-Revised Elect & Telemetry (CO #3) LS f;J68 ,000.00 f; 168 ,000.00 $168,000.00
54 Changes-Crew cost for Elevation, grade, align (CO LS $30,000.00 $30,000.00 $30,000.00
#3)
55 2" Combination ARV (CO #3) EA $16,000.00 $16,000.00 $16,000.00
56 C ut & Plu g Ex isting 24" Water Line (CO #3) 2 EA $2,500 .00 $5,000 .00 2 $5,000.00
57 36" Butterfly Vavle w/vault (CO #3) EA $47,000.00 $47,000.00 $47,000.00
58 Parts fabricated by hanson ship ped to field opps LS $78,446.41 $78,446.41 $78,446.41
(C0#4)
59 T@ 8" Omni Meter (C0#4) EA $7,127.00 $7 ,127.00 $7 ,127.00
60 Remove Damaged & install new meter/ dbl check EA $2 1,568 .77 $21 ,568.77 $21,568.77
(C0#4)
61 New 8' Omni meter in sert (C0#4) EA $7,744.10 $7,744.10 $7,744.10
62 New Double Check Assembly (C0#4) EA $7,360.00 $7,360.00 $7,360.00
63 Revised Connection at Trini ty Blvd (C0#4) EA $19,062.40 $19,062.40 $19,062.40
64 Check to Oncor to In stall Meter Station Elec Serv EA $6,985.00 $6,985 .00 1.005 $7,019.93
(C0#4)
65 Replacem ent of Broken Off-S ite Combo Air EA $1,793.06 $1 ,793.06 $1,793 .06
Rele(C0#4)
Sub-Total of Previous Unit $3,888,027 .64 $3 ,887,889.15
Wednesday, August 26, 2015 Page 4 of6
City Project Numbers 00352 DOE Number 5509
Contract Name
Contract Limits
Project Type
Project Funding
36 INCH WATER MAIN EXTENSION ALONG TRINITY RAILWAY EXP Estimate Number
ROW FROM TARRANT MAIN ST TO STATE HWY 360/I'RINITY BL VD Payment Number
96
96
Water Improvements For Period Ending 8/15/2015
Contract Information Summary
Original Contract Amount
Change Orders
Change Order Number
Change Order Number 2
Change Order Number 3
Change Order Number 4
Change Order Number 5
$3,209,344.50
$40,100.50
$106,730.00
$382,195.90
$129,496.74
$20,160.00
Total Contract Price $3,888,027.64
Date t/ • /7-fl;;
Date <j'-.,-J..v-lS
Total Cost of Work Completed
Less O % Retained
Net Earned
Earned This Period $112,777.36
Retaioage This Period $0.00
Less Liquidated Damages
Days@ /Day
LessPavement Deficiency
Less Penalty
$3 ,887,889.14
$0.00
$3 ,887,888 .50
$0 .00
$0 .00
$0 .00
Date Less Previous Payment $3,775,111.14
Director I Contracting Department Plus Material on Hand Less 15o/o $0.00
Balance Due This Payment $112,777.36
Wednesday, August 26, 2015 Page 5 of 6
FORT WORTH rev 03 /05 /07
WATER ENGINEERING & FISCAL SERVICES
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:_~__.Cf ..... "-----------
NAME OF PROJECT: 36" Water Main Extenson along Trinity Railway Express R..O . W.
PROJECT NO.: P265-605140035287 CONTRACTOR: S .J . Louis Construction
DOE NO.: 5509
PERIOD FROM:08/10/09 TO: 08/15/15 FINAL INSPECTION DATE: 1/26/2015 -------=---=---WORK ORDER EFFECTIVE: 8/10/2009 CONTRACT TIME: 1750 Q WI@ CD
DAYS
DAY OF CHARGED REASON FOR DAYS DAYOF DAYS REASONFORDAYS
MONTH CHARGED CREDITED MONTH DURING CREDITED DURING
]. X 16. X
2. X 17. X
3. X )8. X
4. X 19. X
5. X 20. X
6. X 21. X
7. X 22. X
8. X 23. X
9. X 24. X
10. X 25. X
11 . X 26. X
12 . X 27. X
13. X 28. X
14. X 29. X
15. X 30. X
31. X
RAlN, TOO WET, UTILITIES OTHERS* DAYS
&TOO COLD RELOCATIONS CHARGED
SAT,SUN,
&HOLIDAYS
THIS
PERIOD 0
PREVIOUS
PERIOD 1435
TOTALS
TO DATE 1435
*REMARKS:
~,~ CONT T6R DATE INSPECTOR
WATER ENGINEERING & FISCAL SERVICES
The Ci ty of Fort Worth• 1000 Throckmorton Street• Fort Worth TX 76012-6311
(81 7) 392 -44 77 • Fax: (8 17) 392 -ti°60
I F ICIAL .,ECORD
CITY ~ECRETARY
TOTAL
DAYS
0
1435
1435
DATE
PROJECT NAME:
PROJECT NUMBER:
DOE NUMBER:
PIPE LAID
Water
Water
Water
Water
Water
WATER ENGINEERING & FISCAL SERVICES
PIPE REPORT FOR:
36-Inch Water Main Extension Along Trinity railway Express ROW
P265-605140035287
5509
WATER
SIZE TYPEOFPIPE
36" Concrete Steel Cyl (B303)
24" Concrete Steel Cyl (B303)
12" PVC
10" PVC
8" PVC
LF
7220
488
20
50
110
FIRE HYDRANTS: 0 -----------VALVES (16" OR LARGER) ------=1..:.5 ___ _
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: 37 ----------------------------------NEW SERVICES:
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: NEWSERVIc=E=s=-:-------------------------------
WATER ENGINEERING & FISCAL SERVICES
The City of Fort Worth• 1000 Throckmorton Street• Fort Worth, TX 76012-6311
(817) 392 -4477 • Fax: (817) 392 -8460
FORT WORTH
~
City of Fort Worth, TX
PROJECT:
OWNER:
CONTRACTOR:
ENGINEER:
36 " Water Main Ext . Along TRE R.O.W . Part 4
Citv of Fort Worth Texas
S.J. Lou is Construction of Texas , Ltd .
Tran Systems
Bond Number : 190018868
CONSENTOFSURETYCOMPANY
TO FINAL PAYMENT
PROJECT NUMBER:
00352
18033-10
N/A
The Surety Company, on bond of the Contractor listed above for the referenced project, in accordance with the
Contract Documents, hereby approves final payment to the Contractor, and agrees that final payment to the
Contractor shall not relieve the Surety Company of any of its obligations to the Owner under the tenns of the
Contract and as set forth in said Surety Company's bond.
In witness whereof, the Surety Company has hereunto set its hand this 15th day of September 20.1L_.
Liberty Mutual Insurance Company
Surety Company
By~\k JY\l~
Authorized Representative "--
Title V. Delene Marshall, Attorney-In-Fact
Address :
175 Berkeley Street, Boston, MA 02116
Attach Power of Attorney
C:\Usersle lizabeth i\Desktop\CONSENT OF SURETY COMPANY TO FINAL PAYMENT.DOC
en
G>
.!
THIS POWER OF AITORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND.
This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated
Certificate No . 6901341
American Fi re and Casualty Company
The Ohio Casualty Insurance Company
Liberty Mutual Insurance Company
West American insurance Company
POWER OF ATTORNEY
KNOWN ALL PERSONS BY THESE PRESENTS: That Ame rican Fire & Casualty Company and The Ohio Casualty Insurance Company are corporations duly organized under the laws of
the Sta te of New Hampshire , that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts , and West American Insurance Company
is a corporation du ly organized under the laws of the State of tnd iana (herein colectively called the ·compan ies"), pursuant to and by autho ri ty herein set forth , does hereby name , constitute
and appoinL Don E. Cornell; Kelly A. Westbrook; Lisa M. Bonnot ; Ricardo J. Reyna ; Robbi Morales; Sophinie Hunter; V. Delene Marshall
ail of the city of Dallas sta te of TX each individually if there be more than one named , its true and lawful attorney-in-fact to make, execute, seat , acknQl',iedge
and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds , recogn izances and other surety obligations, in pursuance of these presents and shall
be as bind ing upon the Compan ies as if they have been duly signed by the president and attested by the secretary of the Canpanies in their own proper persons.
IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or officia l of the Companies and the corporate seals of the Companies have been affixed
thereto this 10th day of March 2015
American Fire and Casualty Company
The Ohio Casualty Insurance Company
Liberty Mutual Insurance Company
West merican Insurance Company
C STATE OF PENNSYLVANIA t i COUNTY OF MONTGOMERY
ss
f C) On th is~ day of March ~ before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of American Fire and
CJ G> Cas ualty Company, Liberty Mutual insurance Company, The Ohio Casualty insurance Company, and West American insurance Company, and that he , as such, being authorized so to do,
'o ..:! execute the forego ing instrumen t for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer .
._ CV .! _:: IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my nota rial seal at Plymouth Meeting , Pennsylvania, on the day and year first above written.
~ ~ q,'<-~o:::;~ COMMONWe.:~:ri~:::NNSYLVANIA f1:' ' /) -/-I/
; iii ~ cJ ~), Teresa Pastella , Notary Public By : ~ ~
0
! OF Plymouth Twp ., Montgomery County -=-Te-re_s_a_P_a-st_e_lla-. _N..:.ot..:..a_ry_P_u_b-lic-=-------
-: ._ My Commission Expires March 28, 2017
G> 0
-G> o_
Member, Pennsylvania Auociation of Notaries
c cv Th is Power of Attorney is made and executed pursuant to and by authority of the fol lowing By-laws and Authorizations of American Fire and Casualty Company, The Oh io Casualty Insurance
Gi !: Company, Liberty Mutual Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows :
C)CII ~ f ARTICLE IV -OFFICERS -Sectio n 12. Power of Attorney. Any officer or other official of the Corporation authorized for that pu rpose in writing by the Chairman or the Pres ident, and subject
t:: ,! to such limitation as the Chai rman or the President may prescribe, shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the Corporation to make, execute , sea l,
o .5 acknowledge and deliver as surety any and ail undertakings, bonds , recognizances and other surety obligations. Such attorneys-in-fact, subject to the limitations set forth in their respective
E Gi powers of attorney, shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so :5 e executed , such instru ments shall be as binding as if signed by the Pres ident and attested to by the Secretary. MY power or authority granted to any representative or attorney-in-fact under
:; >, the provisions of this article may be revoked at any time by the Board, the Cha irman , the President or by the officer or officers granting su ch power or autho rity.
~ g ARTICLE XIII -Execution of Contracts -SECTION 5. Surety Bonds and Undertakings . My officer of the Company authorized for that purpose In writing by the chairman or the president,
> ~ and subject to such limitations as the chairman or the president may prescribe , shall appoint such attorneys-in-tac~ as may be necessary to act in behalf of the Company to make, execute, o :::J seal, acknowledge and del ive r as surety any and all undertakings, bonds , recognizance s and other surety obligations . Such attorneys-in-fact subject to the limitations set forth in their
Z c.> respective powers of attorney, shall have full power to bind the Company by the ir signature and execu tion of any such Instruments and to attach thereto the seal of the Company. When so
executed such instruments shall be as binding as if signed by the president and attested by the secretary.
Certificate of Designation -The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attorneys-in-
fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and ail undertakings, bonds, recogn izances and other surety
obliga tions .
Authorization -By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduoed signature of any ass istant secretary of the
Company, wherever appea ring upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be val id and binding upon the Company with
the same force and effect as though manually affixed.
I, Gregory W. Davenpo[L the undersigned , Assistant Secretary, of American Fire and Casualty Company, The Ohio Casualty Insurance Compa ny, Liberty Mutual insurance Company, and
West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said
Companies, is in full force and effect and has not been revoked. {V°'\ Q \ _
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed th e seals of said Compan ies this ~ day of ~'\£,)oo,b l h-d , 20_15__.
By: -~-~L.;1t.'------'--°'.L,__.._ _____ _
Gregory W. Davenport , Assistant Secretary
488 of 500
LMS_ 12873_ 12201 3
FORT WORTH
~
The City of Fort Worth
PROJECT: 36" Water Main Ext . Along TRE R.O.W . Part 4
OWNER: Citv ofFortWorth. Texas
CONTRACTOR: S.J. Louis Construction of Texas Ltd .
ENGINEER: TranSvstems
CONTRACTOR'S AFFIDAVIT
OF RELEASE OF LIENS
PROJECT NUMBER:
00352
18033-10
NIA
The Contractor, in accordance with the Contract Documents, and in consideration for the full and final payment to
the Contractor for all seNices in connection with the project, does hereby waive and release any and all liens, or
any and all claims to liens which the Contractor may have on or affecting the project as a result of its contract(s)
for the Project or for performing labor and/or furnishing materials in any way connected with the construction of
any aspect of the project. The Contractor further certifies and wa"ants that all subcontractors of labor and/or
materials for the Project, except as listed below, have been paid in full for al/ labor and/or materials supplied to , for,
through or at the direct or indirect request of the Contractor prior to, through and including the date of this affidavit.
EXCEPTIONS:
NONE
(If none, write "NONE". The Contractor shall furnish a bond, acceptable to the Owner, for
each exception .)
CONTRACTOR S.J. Louis Construction of Texas, Ltd.
By "4 t/ /Jit,.,,~ Les V. Whitman
Title General Manager
Subscribed and sworn to before me this 14th day of _S=e..cp..::.t=-e.,_,_m.:...:b:::...;e:cr:...._ ___ , 20 j§_
Notary Public: ~(L,c-:,~~
My Commission Expires: Mav 10 2017
FORT WORTH
~
CONTRACTOR'S AFF/DA VIT OF
PAYMENT OF DEBTS AND CLAIMS
City of Fort Worth, TX
PROJECT: 36" Water Ma i n Ext. Along TRE R.0 .W. Part 4 PROJECT NUMBER:
OWNER: :itv of Fort Worth Texas 00352
CONTRACTO 5.J. Louis Construction of Texas Ltd. 18033-10
ENGINEER: lrranSvstems N/A
The Contractor, in accordance with the Contract Documents, hereby certifies that, except as listed below, all
obligations for all materials and equipment furnished, for all work labor, and services performed, and for all known
indebtedness and claims against the Contractor for damages arising in any manner in connection with the
performance of the Contract referenced above for which the Owner or his property might in any way be held
responsible have been paid in full or have otherwise been satisfied in full.
EXCEPTIONS:
NONE
(If none , write "NONE". The Contractor shall furnish a bond, acceptable to the Owner,
for each exception.)
CONTRACTOR S.J. Louis Construction of Texas, Ltd.
BY Cf4 JI 4}/Ji,euv-Les V. Whitman
TITLE __ ...;;G;..;;;e""'n=e'""ra"""l """M"""a""'n=a ... ae ...... r _____________ _
Subscribed and sworn to before me this 14th day of -"S=e=p=te=-m.:..;,;be=r ______ , 20 ~.
NotaryPublic: ~~~
My Commission Expires:_M_a_y_1_0~,~2~0~1_7 _______ _
WATER ENGINEERING & FISCAL SERVICES
PERFORMANCE EVALUATION OF CONTRACTOR
I) CONTRACTOR & PROJECT DATA
Name of Contractor Project Name
REV : 02/20/07
S. J. Louis Construction of Texas 36" Water Main Extension Along Trinity Railway Exn ROW
Water Engineering Inspector DOE Number
William Tumey/ David Johnson 5509
Waler Engineering Inspeclor Project Manager
0 WaterE] Waste WaterO Storm DrainageD Pavement Rakesh Chaubey
Initial Contract Amount Project Difficulty
$3,209,344.50 0 Simple @ Routine 0 Complex
Final Contract Amount Date
$3,887,889.14 8/17/2015
II) PERFORMANCE EVALUATION
0 -Inadequate I -Deficient 2 -Standard 3 -Good 4 -Excellent
ELEMENT WEIGHT( X) APPLICABLE (Y / N) RA TING (0 -4) MAX SCORE SCORE
1 Submission of Documents 2 y 2 8 4
2 Public Notifications 5 y I 20 5
3 Plans on Site 5 y 2 20 10
4 Field Supervision 15 y 1 60 15
5 Work Performed 15 y 2 60 30
6 Finished Product 15 y 2 60 30
7 Job Site Safety 15 y 2 60 30
8 Traffic Control Maintenance 15 y 2 60 30
9 Daily Clean Up 5 y 1 20 5
IO Citizen's Complaint Resolution 5 y 3 20 15
11 Property Restoration 5 y I 20 5
12 After Hours Response 5 y 2 20 10
13 Project Completion 5 y 20
TOTAL ELEMENT SCORE (A) ___ 18_9 __
BONUS POINTS (25 Maximum) (B) ____ _
TOTAL SCORE (fS) ___ J8_9 __
III) CONTRACTOR'S RA TING
Maximum Score (MS)= 448 QI sum of applicable element score maximums which= 448
Rating ([TS/ MSJ * 100%) 189 / 448 = 42%
Performance Category _s_tan_dar_d _________ _
<20% = Inadequate 20% to <40% = Deficient 40% to <60% = Standard 60% to <80% = Good "?.80 % = Excellent
Inspector's Comments (INCLUDING EXPLANATION OF BONUS POINTS AW ARD ED)
Signature Inspector
WAIBR ENGINEERING & FISCAL SERVICES
The City of Fort Worth• 10001brockmorton Street• Fort Worth, TX 76012-6311
(817) 392 -4477 • Fax: (817) 392 -8460
WATER ENGINEERING AND FISCAL SERVICES
CONTRACTOR'S EVALUATION OF CITY
I) PROJECT INFORMATION Date: 117-Sep-15
Name o/Contractor Project Name
REV : 02122/07
S. J. Louis Construction of Texas 36" Water Main Extension Along Tminity Railway Exo ROW
Water Engineering Inspector Project Manager
William Turney/ David Johnson Rakesh Chaubey
DOE Number I Project Difficu/Jy Type o/ConJract
5509 0 Simple @ Routine 0 Complex 0 Water0 Waste Water[] Storm DrainagE(]
Initial Contract Amount Final Contract Amount
$3,209,344.50 $3,887,889.14
II) PERFORMANCE EVALUATION
0 d -Ina equate I Defi . -ctent 2S dd 3Gd 4E 11 -tan ar -00 -xce ent
ELEMENT
INSPECTION EVALUATION
l Availability of Inspector
2 Knowledge of Inspector
3 Accuracy of Measured Quantities
4 Display Of Professionalism
5 Citizen Complaint Resolution
6 Performance -Setting up Valve Crews, Labs
ADMINISTRATION
l Change Order Processing Time
2 Timliness of Contractor Payments
3 Bid Ooening to Pre-Con Meeting Timeframe
III) COMMENTS & SIGNATURES
COMMENTS
Signature Contractor
Signature Inspector
Signature Inspector's Supervisor
INSPECTOR'S COMMENTS
RATING ELEMENT
(0 -4)
PLANS & SPECIFICATIONS
l Accuracy of Plans to Existing Conditions
2 Clarity & Sufficiency of Details
3 Aoolicability of Specifications
4 Accuracy of Plan Quantities
PROJECT MANAGER EVALUATION
l Knowledge And/Or Problem Resolution
2 Availability of Project Manager
3 Communication
4 Resolution ofUtility Conflicts
Water Engneering and Fiscal Services
The City of Fort Worth• 1000 Throckmorton Street• Fort Worth, TX 76012-6311
(817) 392 -4477 • Fax: (817) 392 -8460
Pavement
RATING
(0-4)
'
August 27, 2015
S.J . Louis Construction of Texas, LTD
P.O. Box834
Mansfield, TX 76063-0834
Re: Acceptance Letter
FORT WORTH
Project Name: 36-Inch Water Main Extension Along Trinity Railway Express ROW
Project Type: Water
Project N!1: P265-605140035287
D.O.E. N2: 5509
Contract N2: 00352
Gentleman:
Dated: 1/13/2009
On January 26, 2015 a final inspection was made on the subject project. There were no punch list items
identified at the time. The final inspection indicates that the work meets the City of Fort Worth specifications and
is therefore accepted by the City. The warranty period will start on January 26, 2015, which is the date of final
inspection and will extend for (2) years in accordance with the Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at (817) 392-6054
y~il:Jl
Tony Sholola, P.E., Engineering Manager
MP/
cc: John Carmen, P.E., Water Department
Andy Cronberg, P.E., Assistant Director, Water Department
Captain Michael Skains, Fire Department
Roger Hauser, Field Operations Superintendent, Water Department
Bill Lundvall, Field Operations Superintendent, Waste Water Department
Rakesh Chaubey, P.E., Project Manager
Joseph Masterson, P.E., TranSystems, Consultant
S.J. Louis Construction of Texas, LID, Contractor
David R. Johnson, Inspection Supervisor, Water Department
William Tumey/ David Johnson, Inspector, Water Department
File
WATER DEPARTMENT
ENGINEERING AND FISCAL SERVICF.S
THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102
817-392-8240 * FAX 817-392-8195
0 Printed on recycled paper