HomeMy WebLinkAboutContract 55849Received Date: 06/15/2021
Received Time: 11:51 a m
Developer and Project Information Cover Sheet:
Developer Company Name: SSR Carwash LP
Address, State, Zip Code: 4532 Cloudview W., Fort Worth, TX, 76109
Phone & Email:
Authorized Signatory, Title: Daniel Rhea
Project Name:
Brief Description
Project Location:
Sully's Car Wash
Water, Sewer
Plat Case Number: FS-20-0237
Mapsco:
CFA Number: CFA21-0052
2020 Sycamore School Rd.
Plat Name: Hamrick Commercial Addition
Council District:
City Project Number: 103197
City of Fort Worth, Texas
Standard Community Facilities Agreement with City Participation
Rev. 4/2/20
�FFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City Secretary Number: �����
STANDARD COMMUNITY FACILITIES AGREEMENT
WITH CITY PARTICIPATION
This COMMUNITY FACILITIES AGREEMENT ("Agreement") is made and entered into by
and between the City of Fort Worth ("City"), a home-rule municipal corporation of the State of Texas,
acting by and through its duly authorized Assistant City Manager, and SSR Carwash LP ("Developer"),
acting by and through its duly authorized representative. City and Developer are referred to herein
individually as a"party" and collectively as the "parties."
WHEREAS, Developer is constructing private improvements or subdividing land within the
corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as Sully's Car
Wash ("Project"); and
WHEREAS, the City desires to ensure that all developments are adequately served by public
infrastructure and that the public infrastructure is constructed according to City standards; and
WHEREAS, as a condition of approval of the Project, Developer is required to bear a portion of
the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as
described in this Agreement ("Community Facilities" or "Improvements"); and
WHEREAS, as a condition of approval of the Proj ect, Developer is required to meet the additional
obligations contained in this Agreement, and Developer may be required to make dedications of land, pay
fees or construction costs, or meet other obligations that are not a part of this Agreement; and
WHEREAS, the City desires to participate in this Agreement in an amount not to exceed
$99,737.74 for the extension of water and wastewater mains in accordance with the City's Installation Policy
and Design Criteria for Water, Wastewater, and Reclaimed Water Infrastructure ("City Participation"); and
WHEREAS, the City Participation includes payments to the Developer in an amount not to exceed
$99,737.74 for construction costs; and
WHEREAS, the City Participation does not include any payment by the City for material testing,
inspection fees, administrative material testing fees, or water lab testing fees; and
WHEREAS, the Developer and the City desire to enter into this Agreement in connection with
the collective Improvements for the Project;
NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein,
the City and the Developer do hereby agree as follows:
1.
�FFICIAL RECORD
City ot'Fort Worth, Texas CITY SECRETARY
Standard Community Facilities Agreement with City Participation FT. WORT�..�, T�(
Rev. 4/2/20
CFA Ordinance
The Community Facilities Agreements Ordinance ("CFA Ordinance"), as amended, is incorporated
into this Agreement by reference, as if it was fully set forth herein. Developer agrees to comply with all
provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this
Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in
connection with the work performed by the contractors. If a conflict exists between the terms and conditions
of this Agreement and the CFA Ordinance, the CFA Ordinance shall control.
2.
Incorporation of Engineering Plans
The engineering plans for the Improvements that have been approved by the City ("Engineering
Plans") are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide
at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to
construct the Improvements required by this Agreement.
3.
Description of Improvements; Exhibits and Attachments
The following exhibits describe the general location, nature and extent of the Improvements that
are the subject of this Agreement and are attached hereto and incorporated herein by reference:
� Exhibit A: Water
X❑ Exhibit A-1: Sewer
� Exhibit B: Paving
❑ Exhibit B-1: Storm Drain
❑ Exhibit C: Street Lights & Signs
The Location Map and Cost Estimates are also attached hereto and incorporated herein by
reference. To the extent that Exhibits A, A-1, B, B-1, C, the Location Map, or the Cost Estimates
conflict with the Engineering P1ans, the Engineering Plans shall control. If applicable, Attachment 1—
Changes to Standard Community Facilities Agreement, Attachment 2— Phased CFA Provisions, and
Attachment 3— Concurrent CFA Provisions, are attached hereto and incorporated herein for all
purposes.
4.
Construction of Improvements
Developer agrees to cause the construction of the Improvements contemplated by this Agreement
and that said construction shall be completed in a good and workmanlike manner and in accordance with
all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the
Improvements, and this Agreement. Developer acknowledges that City will not accept the Improvements
until the City receives affidavits and lien releases signed by Developer's contractors verifying that the
contractors, and all subcontractors and material suppliers, have been paid in full for constructing the
Improvements, and consent of the surety on payment and performance bonds provided for the
Improvements.
5.
Financial Guarantee
City of Fort Worth, Texas Page 3 of 17
Standard Community Facilities Agreement with City Participation
Rev. 4/2/20
Developer has provided the City with a financial guarantee in the form and amounts set forth in
this Agreement which guarantees the construction of the Improvements and payment by Developer of
all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee").
Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall
not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the
CFA Ordinance.
6.
Completion Deadline; Extension Periods
This Agreement shall be effective on the date this Agreement is executed by the City's Assistant
City Manager ("Effective Date"). Developer shall complete construction of the Improvements and
obtain the City's acceptance of the Improvements within two (2) years of the Effective Date ("Term").
If construction of the Improvements has started during the Term, the Developer may request that this
Agreement be extended for an additional period of time ("Extension Period"). All Extension Periods shall
be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement.
In no event shall the Term of this Agreement plus any Extension Periods be for more than three years.
7.
Failure to Construct the Improvements
(a) The City may utilize the Developer's Financial Guarantee to cause the completion of the
construction of the Improvements if at the end of the Term, and any Extension Periods, the
Improvements have not been completed and accepted by the City. If the Improvements are not
completed at the end of the Term, and any Extension Periods, there will be no further obligation
for City Participation to be paid to the Developer.
(b) The City may utilize the Developer's Financial Guarantee to cause the completion of the
construction of the Improvements or to cause the payment of costs for construction of the
Improvements before the expiration of the Term, and any Extension Period, if the Developer
breaches this Agreement, becomes insolvent, or fails to pay costs of construction.
(c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers
are not paid for construction costs or materials supplied for the Improvements the contractors and
suppliers may place a lien upon any property which the City does not have an ownership interest
that is the subject of the Completion Agreement.
(d) Nothing contained herein is intended to limit the Developer's obligations under the CFA
Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's
contractors, or other related agreements.
8.
Termination
If Developer desires to terminate this Agreement before Developer's contractors begin
constructing the Improvements, Developer agrees to the following:
(a) that Developer and City must execute a termination of this Agreement in writing;
City of Fort Worth, Texas Page 4 of 17
Standard Community Facilities Agreement with City Participation
Rev. 4/2/20
(b) that Developer will vacate any final plats that have been filed with the county where the Project
is located; and
(c) to pay to the City all costs incurred by the City in connection with this Agreement, including
time spent by the City's inspectors at preconstruction meetings.
9.
Award of Construction Contracts
(a) Developer will award all contracts for the construction of the Improvements and cause the
Improvements to be constructed in accordance with the CFA Ordinance.
(b) Developer will employ construction contractors who meet the requirements of the City to construct
the Improvements including, but not limited, to being prequalified, insured, licensed and bonded to
construct the Improvements in the City.
(c) Developer will require Developer's contractors to provide the City with payment and performance
bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent
(100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and
performance bonds shall guarantee construction of the Improvements and payment of all
subcontractors and material suppliers. Developer agrees to require Developer's contractors to
provide the Ciry with a maintenance bond naming the City as an obligee, in the amount of one
hundred percent (100%) of the cost of the Improvements, that guarantees correction of defects in
materials and workmanship for the Improvements by the contractor and surety for a period of two
(2) years after completion and final acceptance of the Improvements by the City. All bonds must
be provided to the City before construction begins and must meet the requirements of the City's
Standard Conditions, Chapter 2253 of the Texas Government Code, and the Texas Insurance Code.
(d) Developer will require Developer's contractors to provide the City with insurance equal to or in
excess of the amounts required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City must be named as an additional
insured on all insurance policies. The Developer must provide the City with a Certificate of
Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's
insurance provider, which shall be made a part of the Proj ect Manual.
(e) Developer will require the Developer's contractors to give forty-eight (48) hours' advance notice
of their intent to commence construction of the Improvements to the City's Construction Services
Division so that City inspection personnel will be available. Developer will require Developer's
contractors to a11ow construction of the Improvements to be subject to inspection at any and a11
times by the City's inspectors. Developer will require Developer's contractors to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives
consent to proceed, and to allow such laboratory tests as may be required by the City.
(fj Developer will not allow Developer's contractors to begin construction of the Improvements until
a notice to proceed to construction is issued by the City.
(g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and
water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and
service lines have been completed to the satisfaction of the City.
City of Fort Worth, Texas Page 5 of 17
Standard Community Facilities Agreement with City Participation
Rev. 4/2/20
(h) Developer shall ensure the contractors are paid the City's wage rates in effect during construction
of the Improvements.
10.
Utilities
Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project;
and (2) to construct the Improvements required herein. City shall not be responsible for payment of any
costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict witb
any of the Improvements to be constructed pursuant to this Agreement.
11.
Easements and Rights-of-Way
Developer agrees to provide, at its expense, all necessary rights-of-way and easements required for
the construction and dedication to the City of the Improvements provided for by this Agreement.
12.
Liability and Indemni�cation
(a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND
HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY
PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES
SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT.
(b) THE DEVELOPER COVENANTS AND AGREES TO, AND BY THESE PRESENTS DOES
HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS
OFFICERS, AGENTS AND EMPLOYEES FROM ALL SUITS, ACTIONS OR CLAIMS OF
ANYCHARACTER, WHETHER REAL OR ASSERTED, BROZIGHT FOR OR ONACCOtINT
OFANYINJURIES OR DAMAGESSUSTAINED BYANYPERSONS, INCLUDINGDEATH,
OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE
CONSTRUCTION, DESIGN, PERFORMANCE OR COMPLETION OF ANY WORK TO BE
PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS,
OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO
PROPERLYSAFEGUARD THE WORK, OR ONACCOUNT OFANYACT, INTENTIONAL
OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS
CONTRACTORS, SUB-CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES,
WHETHER OR NOT SUCHINJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE
OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS
OFFICERS, SERVANTS, OR EMPLOYEES.
(c) DEVELOPER WILL REQI�IRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND
HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM
AND AGAINST ANY AND ALL CLAIMS, SUITS OR CALISES OF ACTION OF ANY
NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON
ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY,
INCLUDING DEATH, RESULTING FROM, OR INANY WAY CONNECTED WITH, THE
CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER
OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN
PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS
City of Fort Worth, Texas Page 6 of 17
Standard Community Facilities Agreement with City Participation
Rev. 4/2/20
OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE
ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY
FOR ANY LOSSES, DAMAGES, COSTS OR EXPENSES SUFFERED BY THE CITY OR
CAUSED AS A RESULT OF SAID CONTRACTORS' FAILURE TO COMPLETE THE
WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE
MANNER, FREE FROM DEFECTS, IN CONFORMANCE WITH THE CFA ORDINANCE,
AND IN ACCORDANCE WITH ALL PLANS AND SPECIFICATIONS.
13.
Right to Enforce Contracts
Upon completion of all work associated with the construction of the Improvements, Developer will
assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its
contractors, along with an assignment of all warranties given by the contractors, whether express or implied.
Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City
the right to enforce such contracts as an express intended third party beneficiary of such contracts.
14.
Estimated Fees Paid by Developer; Reconciliation
Prior to execution of this Agreement, Developer has paid to the City the estimated cost of
administrative material testing service fees, construction inspection service fees, and water testing lab fees
in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the
construction of the Improvements, the City will reconcile the actual cost of administrative material testing
service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid
by Developer. If the actual costs of the fees are more than the estimatedpayments made by the Developer,
the Developer must pay the difference to the City before the Improvements will be accepted by the City. If
the actual costs of the fees are less than the estimated payments made by the Developer, the City will refund
the difference to the Developer. If the difference between the actual costs and the estimated payments made
by the Developer is less than fifry dollars ($50.00), the City will not issue a refund and the Developer will
not be responsible for paying the difference. The financial guarantee will not be released by the City or
returned to the Developer until reconciliation has been completed by the City and any fees owed to the City
have been paid by the Developer.
15.
Material Testing
The City maintains a list of pre-approved material testing laboratories. The Developer must
contract with material testing laboratories on the City's list. Material testing laboratories willprovide copies
of all test results directly to the City and the Developer. If the Improvements being constructed fail a test,
the Developer must correct or replace the Improvements until the Improvements pass all retests. The
Developer must pay the material testing laboratories directly for all material testing and retesting. The City
will obtainproof from the material testing laboratories that the material testing laboratories have been
paid in full by the Developer before the City will accept the Improvements.
16.
Notices
All notices required or permitted under this Agreement may be given to a party by hand-
delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be
City of Fort Worth, Texas Page 7 of 17
Standard Community Facilities Agreement with City Participation
Rev. 4/2/20
deemed to have been received when deposited in the United States mail so addressed with postage
prepaid:
CITY:
Development Coordination Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
With copies to:
City Attorney's Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
and
City Manager's Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
DEVELOPER:
SSR Carwash LP
4532 Cloudview W
Fort Worth, TX
76109
Or to such other address one party may hereafter designate by notice in writing addressed and
mailed or delivered to the other party hereto.
17.
Right to Audit
Developer agrees that, until the expiration of three (3) years after acceptance by the City of the
Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to
examine any directly pertinent books, documents, papers and records of the Developer involving
transactions relating to this Agreement. Developer agrees that the City shall have access during normal
working hours to all necessary Developer facilities and shall be provided adequate and appropriate
workspace in order to conduct audits in compliance with the provisions of this section. The City shall give
Developer reasonable advance notice of intended audits.
Developer further agrees to include in all contracts with Developer's contractors for the
Improvements a provision to the effect that the contractor agrees that the City shall, until the expiration of
three (3) years after final payment under the contract, have access to and the right to examine any directly
pertinent books, documents, papers and records of such contractor, involving transactions to the contract,
and further, that City shall have access during normal working hours to all of the contractor's facilities, and
shall be provided adequate and appropriate work space in order to conduct audits in compliance with the
provisions of this section. City shall give Developer's contractors reasonable advance notice of intended
audits.
City of Fort Worth, Texas Page 8 of 17
Standard Community Facilities Agreement with City Participation
Rev. 4/2/20
18.
Independent Contractor
It is expressly understood and agreed that Developer and its employees, representative, agents,
servants, officers, contractors, subcontractors, and volunteers shall operate as independent contractors as to
all rights and privileges and work performed under this Agreement, and not as agents, representatives or
employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement,
Developer shall have the exclusive right to control the details of its operations and activities and be solely
responsible for the acts and omissions of its employees, representatives, agents, servants, officers,
contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat
superior shall not apply as between the City and its officers, representatives, agents, servants and
employees, and Developer and its employees, representatives, agents, servants, officers, contractors,
subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the
creation of a partnership or joint enterprise between City and Developer. It is further understood that the
City shall in no way be considered a co-employer or a joint employer of Developer or any employees,
representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer.
Neither Developer, nor any officers, agents, servants, employees or subcontractors of Developer shall be
entitled to any employment benefits from the City. Developer shall be responsible and liable for any and
all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents,
servants, officers, contractors, subcontractors, and volunteers.
The City, through its authorized representatives and employees, shall have the sole and exclusive
right to exercise jurisdiction and control over City employees.
19.
Applicable Law; Venue
This Agreement shall be construed under and in accordance with Texas law. Venue shall be in
the state courts located in Tarrant County, Texas or the United States District Court for the Northern
District of Texas, Fort Worth Division.
20.
Non-Waiver
The failure of the City to insist upon the performance of any term or provision of this Agreement
or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent
of City's right to assert or rely on any such term or right on any future occasion.
21.
Governmental Powers and Immunities.
It is understood that by execution of this Agreement, the City does not waive or surrender
any of its governmental powers or immunities.
22.
Headings
The paragraph headings contained herein are for the convenience in reference and are not intended
to define or limit the scope of any provision of this Agreement.
City of Fort Worth, Texas Page 9 of 17
Standard Community Facilities Agreement with City Participation
Rev. 4/2/20
23.
Severability
In the event that any clause or provision of this Agreement shall be held to be invalid by any
court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the
remaining provisions hereof.
24.
Review of Counsel
City and Developer, and if they so choose, their attorneys, have had the opportunity to review
and comment on this document; therefore any rule of contract construction or interpretation that would
normally call for the document to be interpreted as against the drafting party shall not apply in
interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be
construed solely on the basis of the language contained therein, regardless of who authored such
language.
25.
Prohibition on Boycotting Israel
Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,
the City is prohibited from entering into a contract with a company with 10 or more full-time employees
that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City for
goods or services unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The term "boycott Israel" has
the meaning ascribed to it by Section 808.001 of the Texas Government Code. The term "company" has
the meaning ascribed to it by Section 2270.001 of the Texas Government Code. To the extent that Chapter
2270 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer
certifies that Developer's signature provides written verification to the City that Developer. (1) does not
boycott Israel; and (2) will not boycott Israel during the term of this Agreement.
26.
Immigration and Nationality Act
Developer shall verify the identity and employment eligibility of its employees who perform work
under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon
request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility
documentation for each employee who performs work under this Agreement. Developer shall adhere to all
Federal and State laws as well as establish appropriate procedures and controls so that no services will be
performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER
SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER,
DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written
notice to Developer, shall have the right to immediately terminate this Agreement for violations of this
provision by Developer.
27.
Amendment
City of Fort Worth, Texas Page 10 of 17
Standard Community Facilities Agreement with City Participation
Rev. 4/2/20
No amendment, modification, or alteration of the terms of this Agreement shall be binding unless
the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer.
28.
Assignment and Successors
Developer shall not assign or subcontract all or any part of its rights, privileges, or duties under this
Agreement without the prior written consent of City. Any attempted assignment or subcontract without the
City's prior written approval shall be void and constitute a breach of this Agreement.
29.
No Third-Party Beneficiaries
The provisions and conditions of this Agreement are solely for the benefit of the City and
Developer, and any lawful assign or successor of Developer, and are not intended to create any rights,
contractual or otherwise, to any other person or entity.
30.
Compliance with Laws, Ordinances, Rules and Regulations
Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply
with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed
and understood that, if City calls to the attention of Developer any such violation on the part of Developer
or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately
desist from and correct such violation.
31.
Signature Authority
The person signing this Agreement on behalf of Developer warrants that he or she has the legal
authority to execute this Agreement on behalf of the Developer, and that such binding authority has been
granted by proper order, resolution, ordinance or other authorization of the entity. The City is fully entitled
to rely on this warranty and representation in entering into this Agreement.
32.
Counterparts
This Agreement may be executed in multiple counterparts, each of which will be deemed an
original, but which together will constitute one instrument.
33.
Entire Agreement
This written instrument, together with any attachments, exhibits, and appendices, constitutes the
entire understanding between the City and Developer concerning the work to be performed hereunder, and
any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall
be void.
City of Fort Worth, Texas Page 11 of 17
Standard Community Facilities Agreement with City Participation
Rev. 4/2/20
34.
City Participation; Fiscal Funding Limitation
(a) The City shall reimburse Developer in an amount not to exceed $99,737.74 for construct costs after
presentation of proper documentation by Developer to the City that the Improvements have been
constructed and accepted by the City and all contractors and material suppliers have been paid. The
City shall not make any payment for material testing, inspection fees, administrative material
testing fees, or water lab testing fees.
(b) In the event no funds or insufficient funds are appropriated and budgeted or are otherwise
unavailable by any means whatsoever in any fiscal period for payments due under this Agreement,
then the City will immediately notify Developer of such occurrence and this Agreement shall be
terminated on the last day of the fiscal period for which appropriations were received without
penalty or expense to the City of any kind whatsoever, except to the portions of annual payments
herein agreed upon for which funds shall have been appropriated.
[REMAINDER OF PAGE INTENTIONALLY BLANK]
City of Fort Worth, Texas Page 12 of 17
Standard Community Facilities Agreement with City Participation
Rev. 4/2/20
35.
Cost Summary Sheet
Project Name: Sully's Car Wash
CFA No CFA21-0052 IPRC No. IPRC21-0046
Items
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
3. Paving Water
4. Paving Sewer
Water and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
4. Signals
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
City Project No.: 103197
Developer's Cost City's Cost Total Cost
$ 24,395.19 $ 22,295.81 $ 46,691.00
$ 111,834.30 $ 27,655.70 $ 139,490.00
$ 12,108.12 $ 21,140.88 $ 33,249.00
$ 82,014.27 $ 28,645.35 $ 110,659.62
$ 230,351.88 $ 99,737.74 $ 330,089.62
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ 230,351.88 $ 99,737.74 $ 330,089.62
Estimated Construction Fees:
C. Construction Inspection Service Fee
D. Administrative Material Testing Service Fee
E. Water Testing Lab Fee
Total Estimated Construction Fees:
TOTAL PROJECT COST
Financial Guaranfee Opfions, choose one
Bond = 100%
Completion Agreement = 100% / Holds Plat
Cash Escrow Water/Sanitary Sewer= 125%
Cash Escrow Paving/Storm Drain = 125%
Letter of Credit = 125%
City of Fort Worth, Texas
Standard Community Facilities Agreement with City Participation
Rev. 4/2/20
$12,500.00 $12,500.00
$1,470.00 $1,470.00
$300.00 $300.00
$ 14,270.00 $ - $ 14,270.00
$ 244,621.88 99737.74 $ 344,359.62
Choice
Amount Mark one
$ 330,089.62 x
Page 13 of 17
The City Participation has been calculated as follows:
Project Item Informarion- IRPC21-O�a6 CP� 10i19?
200 Linear Foot Sen�er G�edir- C F\� 3?.OS? o DES' 6:92!b-Sen ery 100Qro- \i�atee B�dd�r's Proposal C FR' Low��u bid
BidItem S;+e:incx¢oa L"mtof ���:n �_._,
`:o. Secnon �Co. ?.feawe B�d Quantin� Cut A�ce Bxi �'alue L"mt Pnce �id','a�-.:a Pm�rtcipa!ion
3'.084•o CFl\ S.witai� Se� er
2 33D1.G�G� POST-CCT:' IP�SPECTIOPd 33 01 31 LF `72 1.00 5572.00 51.95 51.11 °�.40 $572.00
3 33o1.o1D1 MaNHOLE':ACUUM TESTING 33 01 30 EA 9 $220.00 51.980 00 5174.87 51.573.83 $L°�73.83
4 3305.O1D9 TRENCH SaFETY 33 OS 10 LF 572 51.00 5572 00 51 12 5640.64 $°�72.00
; 33D5.0113 7REPJCH'�h'ATERSTOPS 330515 EA 4 $1,64d75 56.579.00 5464.61 51.858.44 $1.858.44
9 3331.4115 8' Se✓uER PIaE 33 31 ?0 LF 430 $91.00 $39.130.00 549.38 521,233.40 $21.233.40
10 3331.4116 8' SE'h'ER PIPE, CSS BACKFILL 33 11 10 �F 90 $107.00 59.630 00 554.27 54.88430 $4,8&4.30
3339.1001 4' Mt+NHOLE 333570/
1� 333520 EA 9 55,350-00 $48.150.00 53.849.35 534,644.15 $34.644.15
12 3339.OD01 EPDXY MANHOLE LINER 33 35 60 VF 20 $314.00 56.280 00 5207.80 54.156 00 $4.15fi.00
3339.1DD3 4' E�7RA DEPTH MANHOLE 333510 �
14 333y2p `'F 26 Sfi7C 00 $17.420 00 5195.76 55.0897b $5.089.70
�y T�-�7qL .. - - . . . �
Parin� Sc�er
� 0241.61 �C REMO'iE _`•I�E'NALK 0� 41 13 gF 100� 54 40 $4,40$.80 52.84 52.�345 08 $2.845.6p
2 024LC3:G REh10`rE ADA RAMP 0= 41 13 EA 1 $748.00 5748.00 5574.57 S574 `_�7 $574.57
3 0_^41.C�aC� REMO`iE CONC DRI'lE 0^_ 41 13 SF 455 54 90 52.229 50 52.66 SL210 30 $1210.30
5 0241.1GC�G REMO`�ECONC P':+MT 0241 15 SY 635 $41-00 $2b.035.00 515.84 510,058.40 $10,05$.40
7 32Di.D616 CONC P'dMT REPAIR. ARTERIAL 3^_ 13 13 SY 635 80.00 $°�0.800 00 5105A2 566,687J0 $50.800.00
$ 3�13.C�3Q1 4' CONC �IDE'h'ALK 3= 1320 SF 1002 57 20 57.214 40 55.41 55.420 82 $5.420.82
y 3'13.D1�1 6' CONRETE DRI'dEVr'AY 3^_ 13 13 SF 459 58.25 53.786.75 59.45 54.337.55 $3.78675
�p 3213.DSOa B:.RRIER FREE RAMP, TYPE M-^ 3^_ 13 ^0 EA 1 57.373.55 51.373 55 51.509-10 51.509 10 $1.373.55
11 3�91.01DD TOPSOIL 3251 75 CY '__' $47.00 51.034.00 522.66 5458.52 $498.52
12 329�.01D� BLOCK SOD PLACEMENT 3? 52 73 SY 44 $32.00 51.408.00 55.85 5257.40 $257.40
13 3441.1302 14 AWG LOOP DETECT CABLE 34 41 70 LF 226 0.34 $76 84 51 OD 5226.00 $76.84
14 3aa�.�soi GROUND BOX, SMALL, W! LID 3a ai io ea, t 350.00 5350.00 5401.13 S4D1.13 $350.00
SS PAVIIlG T�"�TAL '�,t`LE:: : "r�'d :�- :���:.�'-4=� i�=
1004ro CFI�� R�ater
1 D^_41.1118 4'-12" PRESSURE PLUG 0^_ 41 14 Eq 2 767.50 51.535 00 51.153.26 52.306 52 $L535.00
2 33DS D1D5 TRENCH SaFETY 33 OS 70 LF 183 53-00 55d9.00 51.12 5204.96 $204.46
3 3311.C�eei DUCTILE IRON'NATER FITTIPJGS 33 11 11 TON 075 $6,100.00 54.575.00 55.562.47 54.171.85 $4.171.85
5 3311.D�51 8' DIP wArER 33 11 12 LF 25 $103 00 52.576 00 578.52 51.963 00 $1.963.00
0 3311.0261 8' P': C',h'ATER PIPE 33 11 1= LF 149 $61 00 59.089.00 546.54 Sb.934.46 $6.934.46
7 3311.D�54 8' DIP',b'ATER, CLSM BACKFILL 33 11 72 LF 9 96.00 5864.00 5111.65 51.004.85 $864.00
$ 3311.D'64 8' P':'C'f:ATER PIPE, CLSM BACKFILL 33 11 72 LF 13 $78.00 51.404.00 553.55 5963.90 $963.4p
14 331'_.3D03 8' GATE`;AL'iE 33 1^_?0 Ep, 4 $1,861.00 57.444.00 51.414.66 55.658.64 $5.658.64
WATEF TOTAL S22.255.81 CFW 10��°a $22,295.81
Paving Water
1 0�41.O1D� REMO':'E SiDE'h'ALK 0^_ 4i 13 SF 152 54.40 5668 80 52.84 5431 _68 $431.68
z p241.1DD0 REMO`rE CONC P'•;MT D241 15 �Y 1&a $41-00 57.544.00 $15.84 52.914.56 $2.914.56
3 3'D1.�656 CONC P';MT REPAIR. HES. ARTERIAL 3= 13 13 SY 1&4 590.00 $16.560 00 S121 62 522,378.08 $16.560.00
4 3�13.63C�1 a' CONC SIDE'h'ALK 3^_ 13 ^0 SF 152 5720 51.094 40 55.41 5822-32 $822.32
5 325LG1L�D TOPSOIL 3=51 75 CY 12 $4Z00 5564.00 522.66 5271.92 $271.92
h '•^9�.C1CG BLC�K�ODPL::�E'dEflT 324^_13 SY _'4 53200 j?hAp045.85 514040 $140A0
W'ATER - I i'�l :- I I_ [FJJ 1,tia; :�1.14�_ �-c�.
Fundin R uest Amount Sewer J7.08'/. Water-100'/. S99 737.7
City of Fort Worth, Texas Page 14 of 17
Standard Community Facilities Agreement with City Participation
Rev. 4/2/20
IN WITNESS WHEREOF, the City and Developer have each executed this Agreement by their
duly authorized signatories to be effective on the date executed by the City's Assistant City Manager.
CITY OF FORT WORTH
�� �3�.��LL
�a„a�u,�hdo��,��,�,4.�0� �o35��T�
Dana Burghdoff
Assistant City Manager
Date: J u n 14, 2021
Recommended by:
�w..�,rw:.��►�
Evelyn Robe s(Jun 1Q 202122:16 CDT)
Evelyn Roberts/Jennifer Ezernack
Project Assistant
Development Services Department
Approved as to Form & Legality.•
��
li�i�hard A. M�Cracken (Jun 1�.20211s'.15 CD I I
Richard A. McCracken
Sr. Assistant City��Attorney
M&C No. N
Date:
Form 1295:
ATTEST:
�� � ��
,d4��a�
pb� E�R�����
N�q p�� F00000000a�L d�
0
o d
�
a
��� °�-1dd
�vo °=A
0
o A
�� � �o 0o i��
�O000000° d
���� �EXA`'�dbQ'.o�
Mary J. Kayser/ Ronald Gonzales
City Secretary / Assistant City Secretary
City of Fort Worth, Texas
Standard Community Facilities Agreement with City Participation
Rev. 4/2/20
DEVELOPER
SSR Carwash LP
By: Sully's Car Wash LLC
It's General Partner
�-�'l
B�7; Danlel Rhea (Jun 1Q 20211726 CDT)
Name: Daniel Rhea
Title: Managing Member
Date: J u n 10, 2021
Contract Compliance Manager:
By signing, I acknowledge that I am the person
responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
`�rurie `ewis ah beH�rlf of
Lauric Lewis on bchalf of (Jun 14, 202114:09 CDT)
Janie Scarlett Morales
Development Manager
�FFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
The following attachments are incorporated into this Agreement. To the extent a
conflict exists between the main body of this Agreement and the following attachments, the
language in the main body of this Agreement shall be controlling.
Included Attachment
� Attachment 1- Changes to Standard Community Facilities Agreement
❑ Attachment 2— Phased CFA Provisions
❑ Attachment 3— Concurrent CFA Provisions
X❑ Location Map
� Exhibit A: Water Improvements
❑ Exhibit A-1: Sewer Improvements
❑ Exhibit B: Paving Improvements
❑ Exhibit B-1: Storm Drain Improvements
❑ Exhibit C: Street Lights and Signs Improvements
❑ Cost Estimates
(Remainder of Page Intentionally Left Blank)
City of Fort Worth, Texas Page 16 of 17
Standard Community Facilities Agreement with City Participation
Rev. 4/2/20
ATTACHMENT "1"
Changes to Standard Community Facilities Agreement
City Project No. 103197
None
City of Fort Worth, Texas Page 17 of 17
Standard Community Facilities Agreement with City Participation
Rev. 4/2/20
0o az oa
aar am rxoros�u,
Page I of 4
secrioN oo a2 aa
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
Bidder's Application
ProjeM Item InFormauon Bjddet'g proposa]
Bidlist Item �riphon Spaifitation Umt of Q�hty Unit Price Bid Velue
No. Section No Measure
UNIT I: WATER IMPROVEMENT8
1 0241.1118 4"-12" PRESSURE PLUG 02 41 14 EA 2 $767.50 $1,535.�0
2 3305.0109 TRENCH SAFEIY 33 QS 10 LF 183 $3.00 $549.06
3 3311.0001 DUCTILE IRON WATER FITTINGS 33 11 11 TON 0.75 $fi,1U0.00 $4,575.D0
4 3311.0111 6' PVC WATER PIPE 33 11 90133 11 LF 5 $34.20 $171.00
5 3311.0254 $" DIP WATER 33 1i 12 LF Q5 �103.00 $2,575.00
B 3311.0261 S" PVC WATER PIPE 33 11 12 LF �q9 $81.00 $9,089.00
7 33'11.0254 S" plP WATER, CLSM BACKFILL 33 11 12 LF 9 �98.OQ �864.00
8 3311.0284 8' PVC WATER PIPE, CLSM BACKFILL 33 11 12 LF 18 $78.00 $1,404.00
9 3312.U001 FIRE HYDRANT 33 12 40 EA 1 $5,736.00 $5,736.00
10 3312.U117 CONNECTION TO EXlSTING 12" WATER MAIN 33 12 25 EA 1 $4,328.00 $4,328.00
'!1 3312.2003 1" WATER SERVICE 33 12 10 EA 2 $7,929.00 $3,858.00
12 3312.2203 2' WATER SERVICE 33 12 10 F�4 1 $2,949.00 $2,949.00
13 3312.30U2 6" GATE VAZVE 3312 20 EA 1 $1,6fA.00 $1,614.00
14 3312.30D3 8' GATE VALVE 33 12 2� � 4 $1,861.00 $7,444.00
TOTAL UNIT I: WA7ER INlPROVEMENTS y46,691.06
C[TY OF FOflT WORTH
STANDARD CONSTRUCTION SPIiCIF1CAT10N DOCUML•fJ'[5 �EVt1APER AWARDED PROJECCS
Form Versiae May 22, �oi9 00 42 43 Bid Pmposal Forrn.xlsx
00 42 43
DAP HID PROpOSAL
Page ] of 4
SECTION 00 42 43
Devaloper Awarded Projects - PROPOSA� FORM
UNIT PRICE BID
Bidder's Application
Project Item Informatian Bidde�s P�oposal
Bidlist Item Specificahon Unit of Bid
No. ��pti0° Settton Na. Measure Q�tity Uput price B�d Value
UNIT II: SAWITARY 5�INER IMPRQVEM�NTS
1 0241.2201 REMOVE 4' SEWER MANHOLE 02 41 14 EA 1 $1,895.00 $1,895.00
2 3301 0002 POST-CCN INSPECTION 33 U1 31 LF 572 $1.00 $572.00
3 3301.0101 MANHOLE VACUUM TESTING 33 01 30 EA 9 $220.00 $1,980.00
4 3305.U709 7RENCH SAFETY 33 05 10 LF 572 $9.00 $572.00
5 3305.0113 TRENCH WATER STOPS 33 05 15 EA 4 $1,644,75 $6,579.00
6 3331.3101 4" SEW�R SERVICE 33 34 50 EA 1 �1,463.00 $1,463.0�
7 3331.3311 4' SEWER SERVICE, RECONNECTION 33 3i 54 E4 1 a1,168.OD $1,168.00
8 3331.4108 B"SEWERPIPE 331110/333112 LF l8 $73.00 $1,168.OD
9 3331.4115 S' SEYVER PIPE 33 31 20 LF q3U $91.00 a39,130.Q0
10 3331.4116 8' SEWER PIPE, CSS BACKFILL 33 11 10 LF 90 $107.00 $9,630.00
11 3339.1DOi 4' MANHOLE 33391�! 333920 EA 9 $5,350.OD $48,150.00
12 3339.0001 EPDXY MANHOLE LINER 33 39 fi0 VF 20 $314.00 $6,280.00
13 3339.00D3 WAST�WATER ACCESS CHAMBER 33 39 40 EA 1 �3,483.00 $3,483.00
34 3339.1003 4' EXTRA D�PTH MANHOLE 333930 ! 333920 VF 28 $6T0.00 $17,420.00
TpTAL UNI7 p: SANITARY SEWER iMPROVEMENTS $139,490.00
�irr oF eoRr wox'rt3
STANDARD CONSTRUC7[ON SPNCIFICATfON DOCUMEN'IS - DEVE[APER AWAROIiD PRQ1�Ci5
Fo�m vnsioo May 22, 20i9 00 42 43 Bid Proposal Form.xlsx
00 42 4;
PAP HIP PROPOSAL
Psae 3 of 4
SECTION 00 42 43
developer Awarded Projects - PROP05AL FORM
UNIT PRICE BID
Bidder's Application
�;� �« �Fe�uoo e���s ���►
s�a� �un, s����arion u�c or B�a
No. DacriptioA Sectiaa No. Mcasure Quantity Unit Price Bid Value
UNIT IIIA: PAVING tMPROVEMEMTS ATER
1 0241.0100 REMOVE SiDEWA�K 0241 13 SF 152 $4.40 sBfi8.8fl
2 U241.10D0 REMOVE CONC PVMT 0241 15 SY i84 $41.OU $7,544.00
3 3201.0656 CONC PVMT REPAIR, HES, ARTERIAL 32 1313 SY 1g4 $90.00 $16,560.00
4 3213.0301 4' CONC SIDEWALK 32 13 20 SF 152 $7.20 $1,094.40
fi 3291.0100 TOPSOIL 32 91 19 CY 12 $47.00 $564.OD
6 3292.0100 BLOCK SOD PLACEMENT 32 92 13 5Y yq $32.00 $768.00
7 3471.0001 TRAFFIC CONTROL 39 T1 13 MO 2 $3,fl24.90 $6,049.8D
TOTAL UNfT IIIA: PAVING IMPROVEMENTS ATER $33,249.00
UNIT IIIB: PAVING IMPROVEMENTS SEWER
1 0241.0100 REMOVE SIDEWALK 02 41 13 SF 10Q2 $4.40 $4,4U8.80
2 0247.0300 REMOVE ADA RAMP 02 41 13 EA 1 $748.00 $T48.00
3 0241.04Q1 REMOVE CONC DRIVE Q2 41 13 SF 455 $4.90 $2,229.5D
4 0241.0900 REMQVE MISC CONC STRC (GROUND BOX) 02 41 13 EA 1 $1,078.00 $1,078.OU
5 0241.1000 REMOVE CONC PVMT 02 41 15 SY 635 $41.00 $26,035.00
6 2695.3019 2" CONDUIT PVC 5CN 40 26 05 33 LF �pq $T.fi1 $76f.00
7 3201.0616 CONC PVMT REPAIR, ARTERIAL 3213 i 3 SY 635 $80.00 $50,800.Op
B 3273,0301 4' CONC SIDEWA�K 32 73 2fl 5F 1002 $720 $7,214.40
9 3213.04D1 fi' CONRETE DRIVEWAY 321313 SF q5g $8.25 $3,786.75
10 3213.05U4 BARRIER FREE RAMP, TYPE M-2 32 13 20 EA 1 $1,373.55 $1,373.55
11 3291.0100 TOPSOIL 329119 CY 22 a47.00 $1,634.00
12 3292.0100 BLOCK SOD PLACEMENT 32 92 13 SY qa �32.00 $1,408.00
13 34p1 13D2 14 AWG LOOP D�TECT CABLE 34 a1 40 LF y26 $0.34 $76.84
14 344i.15U1 GROUNDBOX,SMALL,WFLIQ 34411Q EA 1 $350.00 $350.00
15 3477 0001 TRAFFIC CONTROL 34 71 13 MO 2 $3,sn,00 $7,7'S4.00
16 9999.0001 2" CONOUIT REMOVAL LF 100 $13.69 $1,369.OQ
17 9999.0002 ELECTRICRL CON�UCiOR R�MOVAL LF 226 $1.63 �232.78
TOTAL UNIT IIIB: PAVING IMPROVEMEN7S S�V1►ER $110,659.62
CITY OF FORT W00.TH
STANDARD CONSTRUCCION SPEC[FICATION DOC4'MENTS DkVBIAPER AWARi]!�D PROlECTS
Form Vcrsron Msy 22. 2019 OU 42 43 Bid Propasal Foms.xlsx
00 42 41
DAP - Bm PROPOSAL
Page 4 of 4
sec�ioN oo az aa
Daveloper Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
Bidder's Applica#ion
Pcojectltem Lnforq�a400 Bidde�s Proposel
Bidlist [tem Specsflcarion Unit of Bid
x� Description Sadon No. Meesure Q�se�Ury Unit Price Bid Value
nia
UNIT II: SANITARY SEWER IMPROV
UNIT IIIA: PAVING I�VIPROVEMENTS
UNIT IIlB: PAVING IMPRpVEMENTS
This Bid is submitted by the entity named below:
Total Construction Bld
BIDDER: Bl c JU511i1 lerm
Ridgemont Commercial Construction ��____—��
1520 W. Walnut Hill Lane
Irving, TX 75038 TITLE: P,f onstructian Engineer
DATE: 06l03/2021
Contractor a�rees lo complete WORK tor FINAL ACCEPT'ANCE withlu 40 workio� daya after the dafe wheu !he
CONTRACI' commeoces to run ae provided In tbe Genernl Coodldon�.
END OF SEGTION
CITY OF FORT WORTH
STMI�ARn CONS7RUCTION SPEC[FICAT[ON DOCUMENfS � 6�VEIAPIi.R AWAROEU PRO1NC15
Form Veraion May 22 2019 00 42 43 8id Proposal Form.xlsx
B.M. & C.C. HAMRICK
VOL. 8492, PG. 1244
LOT 1, BLOCK 1
�
EX 12"W �z,� EX 1
SYCAMORE POINTE
ADDITION
BLOCK 1, LOT BR2R2
B.M. & C.C. HAMRICK
VOL. 8492, PG. 1244
LOT 2 BLOCK 1
SYCAMORE SCHOOL RD.
(VARIABLE WIDTH ROW)
--------------
EX 12"W -- --- -- EX 12
SYCAMORE POINTE
ADDITION
BLOCK 1, LOT BR2R1
I�[����I_1���I►1�.y_1:7�:311�1►1��•�Y���:l�:����l�y�l►1�][�L�1��a
LEGEND
PROPOSED WATER LINE
EX 12��w EXISTING WATER LINE
� PROPOSED CONCRETE PAVING
X��������� PROPOSED SIDEWALK PAVING
CPN: 103197
EXHIBIT A — WATER
� WATE R
o N°RTH 40' IMPROVEMENTS
SULLY'S CAR WASH
GRAPHIC SCALE DATE:06/09/2021
OWNER:
SULLY'S CAR
WASH LLC
2020 SYCAMORE SCHOOL RD,
FORT WORTH. TX 76134
'�": PELOTON
II LAND SOLUTIONS
600 W 6TH ST, SUITE 175
FORT WORTH, TX 76102
PHONE: 817-562-3350
B.M. & C.C. HAMRICK I
VOL. 8492, PG. 1244
LOT 1, BLOCK 1 I
I
B.M. & C.C. HAMRICK
VOL. 8492, PG. 1244
LOT 2 BLOCK 1
�
� I
� �
CROWLEY CHEVRON
ADDITION
I BLOCK A, LOT 1 0
- _ ��
8" SSWR
SYCAMORE SCHOOL RD.
(VARIABLE WIDTH ROW)
_ �
SYCAMORE POINTE
ADDITION
BLOCK 1, LOT BR2R1
�
_
SYCAMORE POINTE
ADDITION I
BLOCK 1, LOT BR2R3 I
�
NOTE: ALL LINES ARE 8" UNLESS OTHERWISE INDICATED.
LEGEND
PROPOSED SANITARY SEWER LINE
Exs��ss EXISTING SANITARY SEWER LINE
PROPOSED SIGNAL CONTROL WIRING
PROPOSED CONCRETE PAVING
�����X��QX� PROPOSED SIDEWALK PAVING
CPN: 103197
EXHIBIT A1 — SEWER
� SEWER
o N°RTH �oo' IMPROVEMENTS
SULLY'S CAR WASH
GRAPHIC SCALE DATE:06/09/2021
OWNER:
SULLY'S CAR
WASH LLC
2020 SYCAMORE SCHOOL RD,
FORT WORTH. TX 76134
EX 8"55
�
O
.�
� _
� �
} p
J �
� W
OJ
� m
U Q
�
Q
>
'�": PELOTON
II LAND SOLUTIONS
600 W 6TH ST, SUITE 175
FORT WORTH, TX 76102
PHONE: 817-562-3350