Interlocal Agreement
This agreement is entered into between Tarrant County, Texas, hereinafter
referred to as COUNTY, and City of Fort Worth, hereinafter referred to as CITY, and
collectively referred to as the parties, for the purpose of funding a needed
transportation project within the boundaries of both parties which the Commissioners
Court and the governing body of the CITY find serves a public purpose and serves the
public welfare of the citizens of Tarrant County.
The COUNTY and the CITY make the following findings of fact:
1. This agreement
Government Code;
is made pursuant to Chapter 791 of the Texas
2. To the extent necessary the parties will use current revenues to pay
obligations in this agreement;
3. The project
project;
benefits the public in that it is a needed transportation
4. The COUNTY and the CITY each has the legal authority to perform its
obligations in this agreement; and
5. The division of costs provided in this agreement constitute adequate
consideration to each party.
I.
PRO7ECT DESCRIPTION
This project will provide for new sidewalks and sidewalk extensions, storm drain inlets,
a trafFic signal, curb and gutter, accessibility ramps and the demolition of existing curbs
and sidewalks along East Rosedale at the Texas Wesleyan University site, all within the
context of a larger, concurrent East Rosedale reconstruction project.
Interlocal Aqreement Transportation Bond 2006-2007
��� � ' � �
�
����
1
� i ��
�IOZ � - Nlil� 0�/Il����y
II.
SCOPE OF SERVICES PROVIDED BY CITY
The services to be provided by the CIIY shall include, but are not limited to, the
following:
A. All as-built total project costs including all construction cost, right-of-way
acquisition, planning, engineering, surveying and governmental approval
cost (collectively referred to as "Costs'�;
B. Construction agreement administration, site review, permitting and
inspection;
C. Interagency cooperation;
D. A monthly progress report documenting the percent complete for each
major component of the project shall be provided to the COUNTY;
E.
F.
CITY will notify the COUNTY on completion of the project; and
CIIY will include the following language on all on-site public notice
signage:
"This project is funded by the City of Fort Worth and the Tarrant County
Commissioners Court through the 2006 Tarrant County Bond Program"
III.
TERM
This agreement will conclude with the ending of the current fiscal year unless
terminated sooner per Section XI of this agreement.
IV.
COST
COUNTY agrees to reimburse CITY $375,000 from the COUNTY'S 2006
Transportation Bond Program Commissioner Discretionary funds. Attachment A
incorporated into this agreement by reference sets forth the funding schedule for this
reimbursement. However, in the event that the schedu
excused from paying until the successful completion of
project as reasonably determined by the COUNTY. The
signed by the CFO or authorized official that the work has
funds being requested have been expended.
CITY understands that CITY will be responsible for
Interlocal Aqreement Transportation Bond 2006-2007
le is delayed, the COUNTY is
the scheduled phase of the
CITY will provide certification
been completed and that the
any other expenses incurred
.�
by CITY in performing the services under this agreement.
V.
AGENCY-INDEPENDENT CONTRACTOR
Neither COUNIY nor any employee thereof is an agent of CITY and neither CITY
nor any employee thereof is an agent of COUNTY. This agreement does not and shall
not be construed to entitle either party or any of their respective employees, if
applicable, to any benefit, privilege or other amenities of employment by the other
party.
CITY and COUNTY agree that the COUNTY will have no right to contro) the
manner or means of construction of the project.
VI.
ASSIGN M E NT
Neither party may assign, in whole nor in part, any interest it may have in this
agreement without the prior written consent of the other party.
VII.
THIRD PARTY BENEPICIARY EXCLUDED
No person other than a party to this agreement may bring a cause of action
pursuant to this agreement as a third party beneficiary. This agreement may not be
interpreted to waive the sovereign immunity of any party to this agreement to the
extent such party may have immunity under Texas law.
VIII.
AUDIT OF RECORDS
CITY's records regarding this project shall be subject to audit by the COUNTY
during the term of this agreement and for two years after the completion of the project.
IX.
ENTIRE AGREEMENT
This agreement represents the entire understanding of and between the parties
and superseded all prior representations. This agreement may not be varied orally, but
must be amended by written document of subsequent date duly executed by these
parties. This agreement shall be governed by the laws of the State of Texas and venue
for any action under this agreement shall be in the district courts of Tarrant County,
Texas.
Interlocal Agreement Transportation Bond 2006-2007 Page 3
X.
SCHEDULING
CITY agrees that the COUNTY retains control over the COUNTY funding
disbursement schedule identified in Attachment A. COUNTY agrees to notify CITY of
any changes to the funding disbursement schedule 30 days in advance. Such
notification will be in the form of written correspondence delivered by regular mail.
XI.
TERMINATION
Until funded by the COUNTY as described in Paragraph IV this agreement may
be terminated by either party by providing written notice to the other party at least
thirty (30) days prior to the intended date of termination. Any notice or other writing
required by this agreement, shall be deemed given when personally delivered or mailed
by certified or registered United States mail, return-receipt, postage prepaid, addressed
as follows:
COUNTY:
County Administrator
Tarrant County
100 E Weatherford St
Fort Worth, Texas 76196
APPROVED on this day the
County.
CITY:
City Manager
City of Fort Worth
1000 Throckmorton Street
Fort Worth, Texas 76102
day of , 20_, by Tarrant
Commissioners Court Order No.
Interlocal Aqreement Transportation Bond 2006-2007
.�
CITY
Estiii�+.fb L�.—�
rnando Costa
sistant City Manager
Commissioner, Precinct 1
t
APPROVAL RECOMMENDED:
�� W
�
Dougla�U. Wiersig, P.E. U
Di recto r �,�.��.a��
Transportation and Public Worlc,�,�, ��
/ ��Qop000��
,�.a �
ATTEST: } ��'�°°
C
�
'�
APPROVED AS TO FORM AND LEGALT
�
� �
Douglas Black, Assistant City Attorney
gi�C
G-'2�866
�
�
� �° -�
000
�
� _.�.�
�i�ZS�. �Z
Interlocal Agreement Transportation Bond 2006-2007
�._�— ;
OFFIC��L �E��DI��
CIiY SECRE"�'Ai��
�'R;, M���a `� 9e 5
TARRAIVT COUNTY
STATE �F TEXAS
j % � C� � c.) �/,�
CERTIFICA TION OF A l/,4ILABLE FUNDS I/V THE AMOUNT OF $ '
Certification of Funds Available as follows:
Fiscal year ending September 30, 2007
Fiscal year ending September 30, 2008
Fiscal year ending September 30, 2009
Fiscal year ending September 30, 2010
Fiscal year ending September 30, 2011
Fiscal year ending September 30, 2012
Fiscal year ending September 30, 2013
$
$
$
$
$
$
$375,000�
All future vears fundinq is contingent on future debt issuance
and renewal of this contract
Fiscal year ending September 30, 2014
Fiscal year ending September 30, 2015
Fiscal year ending September 30, 2016
��' ,�. , , � � ;' : A � i
� � • �
APPROVED
�
District
OfFice*
$
$
$
---------------------
$375,000
*By law, the District Attorney's Office may only advise or approve agreements or legal documents on behalf of
its clients. It may not advise or approve a agreement or legal document on behalf of other parties. Our review
of this document was conducted solely from the legal perspective of our client. Our approval of this document
was offered solely for the benefit of our client. Other parties should not rely on this approval, and should seek
review and approval by their own respective attorney(s),
Interlocal Aqreement Transportation Bond 2006-2007 Page 6
ATTACHMENT A
Proiect Information
City:
Project Name
Proposed Proiect Schedule
Design;
ROW Acquisition:
Utility Relocation:
Construction:
City of Fort Worth
Installation of sidewalks, drainage, curb and gutter and a traffic
signal on E. Rosedale at Texas Wesleyan University
Sta��t Date
Mar-2013
Duration (mo) End Date *
20 Nov-2014
* COtINTY payments by completed phase are contingent upon the COUNTY'S
reasonable determination that the work regarding the project phase for which payment
is expected is successfully completed, as determined by the COIINTY. COLTNTY
plans to issue debt for all phases of this project, therefore payment remains contingent
on debt issuance in accordance with applicable law.
Once Construction commences, COtTNTY payment shall be made by fiscal quarter
prorated over the life of the construction but contingent upon reasonable progress in
construction as may be determined by the COIINTY.
Proposed Countv Pavment bv Phase
Design: $
ROW Acquisition:
Utility Relocation:
Construction:
County Funding
Total:
0
$
$375,000
$375,000
Pronosed County Payment by Calendar Quarter (SUBJECT TO CHANGE)
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
lst Quarter 2nd Quarter 3rd Quarter 4th Quarter
$ $ $
$ $ $ $
$ $ $ $
$ $ $ $
$ $ $ $
$ $ $ $
$ $ $375,000 $
$ $ $ $
$ $ $ $
$ $ $ $
Interlocal Agreement Transportation Bond 2006-2007 Page 7
Interlocal Aareement Transportation Bond 2006-2007 Page 8
M&C Review
! � � �� �.
Page 1 of 2
t)(ficial site oF the City of Fork 4Varth, Texas
�C��T'��Q RT11
�� � �,����_.. ������:������������M����.��.=r�. �.,�.���.:������,������,,�.�������,��:.���,..�.���,
COUNCIL ACTION: Approved on 9/25/2012 - Ordinance No. 20418-09-2012
., :�---��:�-���,�k� ����.��v�,����,�������.���-:�,��.�-�����������-��� _�� - .�:��. ���� ��.� v� �a-��
DATE:
CODE:
9/25/2012
C
20TWU ROSEDALE
REFERENCE **C-25866 LOG NAME: SUSTAINABLE
NO.: DEVELOPMENT PROJECT
TYPE:
CONSENT PUBLIC NO
HEARING:
SUBJECT: Authorize Execution of an Interlocal Agreement with Tarrant County in the Amount of
$375,000.00 for the County's Participation in the Construction of Streetscape
Improvements Along East Rosedale Street from Nashville Avenue to Collard Street and
Adopt Appropriation Ordinance (COUNCIL DISTRICT 8)
� �_ � �.__��
_ .� ��� �, _ . _- : �-_���, - . _ _ _ . __���
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the execution of an Interlocal Agreement with Tarrant County in the amount of
$375,000.00 for the county's participation in the construction of streetscape improvements along East
Rosedale Street from Nashville Avenue to Collard Street; and
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in
the Grant Capital Projects Fund in the amount of $375,000.00.
DISCUSSION:
Execution of this Interlocal Agreement in the amount of $375,000.00 allows for Tarrant County
funding participation which the City will use as the local match towards Regional Toll Revenue (RTR)
funds in the amount of $1,500,000.00 for a total project amount of $1,875,000.00. The streetscape
project includes a traffic signal, sidewalk improvements, storm drain inlets and pedestrian amenities
in the Texas Wesleyan University (TWU) area along East Rosedale Street from Nashville Avenue to
Collard Street under a context sensitive approach to enhance the corridor.
On March 20, 2012, (M&C C-25508) the City Council authorized the execution of an Engineering
Agreement with Freese and Nichols, Inc., in the amount of $1,598,450.00 for the Design of East
Rosedale Street from U.S. 287 to Miller Avenue, which includes the TWU area along East Rosedale
Street from Nashville Avenue to Collard Street.
On June 26, 2012, a Memorandum of Understanding (MOU) was executed between the Texas
Department of Transportation, North Central Texas Council of Governments, Tarrant County and the
City of Fort Worth to outline an Agreement regarding the funding, implementation strategy, roles and
responsibilities and project timing for East Rosedale Street reconstruction from U.S. 287 to Stalcup
Road. The project is divided into three segments: East Rosedale Street from U.S. 287 to west of
Miller Avenue, East Rosedale Street from west of Miller Avenue to Stalcup Road and East Rosedale
Street Sustainable Development from Nashville Avenue to Collard Street in the Polytechnic/TWU
area. This action allows the East Rosedale Street from U.S. 287 to Miller Avenue and Sustainable
Development Streetscape segments to move forward using solely local funds. The City of Fort Worth
will manage the implementation of these two segments. The Texas Department of Transportation will
manage the implementation of the East Rosedale Street segment from west of Miller Street to
Stalcup Road.
The Transportation and Public Works Department will be responsible for the collection of funds from
Tarrant County.
http://apps.cfwnet.org/council�acket/mc review.asp?ID=17407&councildate=9/25/2012 6/7/2013
M&C Review
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that upon approval of the above
recommendations and adoption of the attached appropriation ordinance, funds will be available in the
current capital budget, as appropriated, of the Grant Capital Projects Fund.
TO Fund/Account/Centers
�
GR74 451970 006302597000
�
GR74 541200 006302597083
$375,000.00
$375.000.00
Submitted for Citv Manager's Office by;
Oriqinating Department Head:
Additional Information Contact:
ATTACHMENTS
FROM Fund/Account/Centers
Fernando Costa (6122)
Douglas W. Wiersig (7801)
Jim Walker (8009)
David Jodray (8702)
20TWU ROSEDALE SUSTAINABLE DEVELOPMENT PROJECT A012.doc
Ma� East Rosedale Street at Texas Weslevan University.pdf
http://apps.cfwnet.org/council�acket/mc review.asp?ID=17407&councildate=9/25/2012
Page 2 of 2
6l7/2013