HomeMy WebLinkAboutContract 43793 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. L13___7 ri 5
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project"'), an
addition to the City of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this "Agreement" in
connection With the Improvements.
Developer Information:
Developer Company Name: Fossil Ridge II,LP
Address, State,Zip Code: 4733 College Park, Ste. 200, San Antonio TX 78249
Phone, E-Mail: (210) 530-0090 1 manish@versadevco.com
Authorized Signatory/Title: Manish Verma, Member
Project Name: Sedona Ranch Apartments
Project Location: S of Western Center Blvd., W of Old Denton Rd. (Sedona Ranch Lots 1& 2, Blk 1)
Plat Case No.: FS-012-015 Plat Name: Sedona Ranch
Mapsco: 35X Council District: 2 City Project No: 01888
CFA: 2012-05 8 DOE: 6825
To he completed by t
Received by: Date:
rOFFICIAL RECORD Y SECRETARY Tx T.WORT I
NOW, THEREFORE,KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein,the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder and to cause
all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section 11, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the infrastructure. Developer further acknowledges that said
process requires the contractor to submit an Affidavit of Bills paid signed by
its contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub-contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City-
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (
Sewer (A-1} Paving (B) , Storm Brain (B-1) X Street Lights &
Signs (Q.-
2
E. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be administered
in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contracts), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured, licensed and
bonded to do work in public streets and/or prequalified to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastructure, and a maintenance bond
in the name of the City for one hundred percent(100%) of the contract price
of the infrastructure for a period of two (2) years insuring the maintenance
and repair of the constructed infrastructure during the term of the
maintenance bond. All bonds to be furnished before work is commenced
and to meet the requirements of Chapter 2253,Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer-awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's insurance provider and bound in the
construction contract book.
3
iv. To require its contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, and not to install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre-Construction Meeting. The submittal
should occur no less than 10 working days prior to the desired date of the
meeting. No construction will commence without a City-issued Notice to
Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the improvements required herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
4
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers, agents
and employees from all suits, actions or claims of any character, whether real
or asserted, brought for or on account of any injuries or damages sustained by
any persons (including death) or to any property, resulting from or in
connection with the construction, design, performance or completion of any
work to be performed by said Developer, his contractors, subcontractors,
officers, agents or employees, or in consequence of any failure to properly
safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said DEVELOPER, his contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or
dams es are caused, in whole or in part, by the alleged negligence of
the City of Fort Worth, its officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and
all claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, whether or not such
in'cries, death or damages are caused, in whole or in part by the
alleged n e ligen ce of the City of Fort Worth, its officers, servants, or
employees. Further, Developer will require its contractors to indemnify, and
hold harmless the City for any losses, damages, costs or expenses suffered by
the City or caused as a result of said contractor's failure to complete the work
and construct the improvements in a good and workmanlike manner, free from
5
defects, in conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated by the
city
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce
such contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in the
cost of the community facilities shall terminate if the facilities are not
completed within two (2) years; provided, however, if construction of the
community facilities has started within the two year period, the developer
may request that the CFA be extended for one year. If the community
facilities are not completed within such extension period, there will be no
6
further obligation of the City to participate. City participation in a CFA
shall be subject to the availability of City funds and approval by the Fort
Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the community
facilities if at the end of two (2) years from the date of this Agreement the
community facilities have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause the
payment of costs for construction of same before the expiration of two (2)
years if the Developer breaches this Agreement, becomes insolvent or fails
to pay costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLAND)
7
Cost Summary Sheet
Project Name: Sedona Ranch Apartments
CFA No.: 2012-058 DOE No.: 6825
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 53,508.00
2.Sewer Construction $ 42 582.00
Water and Sewer Construction Total $ 90,090.00
B. TPW Construction
1.Street $ -
2.Storm Drain $ 24,938.00
3.Street Lights Installed by Developer $ -
TPW Construction Cost Total $ 24,938.00
Total Construction Cost(excluding the fees): $ 121,028.00
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 1,921.80
D. Water/Sewer Material Testing Fee(2%) $ 1,921.80
Sub-Total for Water Construction Fees $ 3,843.60
E. TPW Inspection Fee(4%) $ 997.52
F. TPW Material Testing(2%) $ 498.76
G. Street Light Inspsection Cost $ -
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 1,496.28
Total Construction Fees: $ 59339.88
Choice
Financial Guarantee Options,choose one Amount ck one
Bond=100% $ 121,028.00
Completion Agreement=100%/Holds Plat $ 121,028.00
Cash Escrow Water/Sanitary Sewer=125% $ 12D 112.50
Cash Escrow Pain /Storm Drain=125% $ 31 172.50
Letter of Credit=125%w/2yr expiration period $ 151,285-00
S
IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager,attested by its City
Secretary,with the corporate seal of the City affixed, and said Developer has executed this
instrument in quadruplicate, at Fort Worth,Texas this day of
20�
CITY OF FORT WORTH-Recommended by:
Water Department Transportation&Public Works Department
Wendy C -Babulal, EMBA, P.E. Dougla W.Wiersig,P.E.
Developm nt Engineering Manager Director
Approved as to Form &Legality: Approved by City Manager's Office
Douglas W.Black Fernando Costa
Assistant City Attorney Assistant City Manager �
M&C No.
Date:
000 0 °
ATTEST: p ��a��
c
y
Mary J.Kays �� nn dd
City Secret O°OOOOOOO° �q
ATTEST: Fossil Ridge II,LP
By its General Partner
Fossil Ridge II GP,LLC
Signature Si nature
(Print)Name: Print Name:
Title: �� �'�
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
9
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
z Location Map
® Exhibit A: Water Improvements
® Water Estimate
® Exhibit A-1: Sewer Improvements
® Sewer Estimate
❑ Exhibit B: Paving Improvements
❑ Paving Estimate
® Exhibit B-1: Storm Drain Improvements
® Storm Drain Estimate
❑ Exhibit C: Street Lights and Signs Improvements
❑ Street Lights and Signs Estimate
(remainder of Page Intentionally Left Blank)
to
WESTERN CENTER BLVD
(WATAUGA)
PROJECT
35W
0 0
LOCATION 81 C�UBGAjE
z
3 �
1 a W sw
EETWO 287
0
I � CHADWICK ,9 z 2
1 McADOO ��r-� z Q
1 �
DANCY
C. NTRELI r
0
SAMSOM
FORT
Q
3
Q
OR T�i
820
j•8+�
LOCATION MAP
N.T.S.
MAPSCO NO."*4'R35x
I
i
I I
n�
rT I -A
tI]G
-�
1 can c
�� I
17rl n
Ln
z 1
� I
C
r-
� I �
1 c�
c
co `"
m
Q0
r�
Lr 4 ��
r'J Z
C.I'1 C
I �
r,-, ,
TKS DGCUABNT IS NMEASM FOR IM Pl1RPOSE
OF REVS ONLY,,UNDER W AU'TFIDR"
z , OF DAVID L BROWL PZ 4a=ON
ff 113 WT Oc OR PERINT PURPOSIM FOR BN IOr CONSTRUCIM
�CD
z
00 10 LOTT & BROWN
CONSULTING ENGINEERS
t\D a = I rams =IMP"rMfArA=X fr"Y-W45
R I CML ENGINEERING.WDROLO(MCONSTRUCTION MANAODAENT
IM a 8303 REED i AICE DRIVE
Im I WWTON.7EXAS 77M4 (281)402-2
PROPOSED WATERLINE
1 EXHIBIT A
I D° SHEET 1 OF 3
° SEDONA RANCH LOTS I &Z
o m �N _
m r- C, BLOCK I
:R ! � I IN THE
—� M RICHARD MORRIS SURVEY. A--1 036
< TARRMT COMM TE]GkS
I SUM MI). LB.C.E. DESIGNED BY: DLB
• I SCALE: 1" 40' DRAWN BY: DLB
Z o
I DATE: JULY 2012
N M- SURVEY BY: CITY DING NO:
• y
Q F B NO:
CJ MA i CHLINE
u)X
• SHEET 2 OF 3 SHT. NAME: C/2012/SEDONAVILLAGE/CFAEXHIBIT.DWG
t I MATGHLINE
SHEET I OF 3
I
I � I
i rn
� � a
10
^ z
I ! >
I �
I m >
C�
II I I
t �
�. ok Ex; !
Swr I
! I 0 I �
cl�D
m
CC) l I I � rn i I x
L
I I lc+
I W
o
CAD 4 I m = 7M DOCUMENT IS RELEASED FOR W PURPOSE
I - d OF WOW ONLY,UK)EN I E AU7HOWW
C/�N
OF OAVD L 8RC1NN,P.E,4S282 ON
u I z I I m R 6 NOT 70 BE USED FAR 00DWO,WNS7RUC T M
::E rn OR PERk9T PURPOSES`
, lc+ SQ
3
z II z LOTT & BROWN
ms =�t0 aNPraJ MZhTaM f"P-M45
, ++
CIVIL ENGINEERING,HYOROLOGY.CONSTRUCTION MANAGEMENT
} I 1 9303 REIO LAKE DRIVE
HOUSTON,7DM 77084 (281)492-2354
I I �'X I* -u
G]0 =0
c-v I PROPOSED WATERLINE
} ! I EXHIBIT A
SHEET 2 OF 3
I �
I I SEDONA RANCH,LOTS 1 &2
BLOCK 1
IN., RICHARD MORRIS SURVEY. A-1 036
i TARRANT COUNTY.TEXAS
i � + SUBM TED: L.B.C.E. DESIGNED BY: DLB
I SCALE: 1' = 40` DRAWN BY: DLB
4 I DATE: JULY 2012
I I SURVEY BY: CITY DWG No:
F B NO:
MATCH' INE
SHEET 3-OF 3 sHT• NAME: C/2012/SEDONAVILLAGE/CFAEXHIBIT.MG
MATCHL4NE L�' ` � BROWN
4- SHEET 2 of 3 CONSULTING ENGINEERS rJr rAS Mrsra"D MIA M -1 6
46
m CML ENGINEERING.WMROL0GY.CONSTR X-WN
MANAGEMENT
J I I n 9303 ROD LAKE DRIVE
}I y HOUSTON.TEXAS 77064 (281) 492-2W4
n
1 c-)
PROPOSED WATERLINE
- x EXHIBIT A.
7-1 z z SHEET 3 OF 3
:::9F m -� I
z r R `+
o ff A o l a SEDONA RANCH, LOTS 1 &2
v ) BLOCK 1 cc rN THE
rq
Q0 RICHARD MORRIS SURVEY, A-1036
TARRANT COUNTY. TEXAS
o 4 -D
3 m SUBMITTED: L.B.C.E. DESIGNED BY: DLB
l 0 SCALE: 1" = 40' DRAWN BY: DLB
f
I "Q 3 Cc DATE: JULY 2012
Z SURVEY BY: CITY DWG NO:
ll
Cp } m I F B No:
� f '3
o I SHT. NAME: C/2012/SED0NAVIUME/CFAUHIBR DWG
� I �
2
i f t I TEAS DOCL&NNT IS RELEASED FOR THE Pl1RPOSE
} OF REVIEW MY,IN=7HE AUIHMW
' ' V OF DMID L BRCV1.P.E.4a=ON
IT IS NOT 70 HE USED RR 89000.
y 4 4 OR PERWT PURPOSES
CD f
it o I
Ff 7
I I I
� I �°
I 50' GAS EASEMENT
CAB. "A", SLIDE NO. 11976, T.C.M.R.
I '
p� 20' BUILDING LINE
CAB. 'A", SLIDE NO. 119761, T.0 .R.
I C Exist. 16" Oncor Gas Line
co
i
Exist. iw an. Sew-�
Ile-
p- CONCRETE 16"DI San. Sewer
I c PAVEMENT
arm
r-7 66 RCP Storm Sewer
r z; ASPH LT
G7� 16"DI Water Line
OVERHEAD POWER 101
C
r
OLD DENTON RDS c: �
0" R.O.W.(8 )
SEDONA RANCH
Waterline Estimate of Probable Cost
NO. ITEM QTY. UNIT„ UNIT TOTAL
1 12" DIP, 350 PSI, Restrained Joint Waterline
, Including DI Fittings and Skids Installed in
Casing Pipe 70 LF $120.00 $8,400.00
2 12"C-900 PVC Waterline, Including Fittings,
Cleaning, Pigging, Marking, Disinfection and
Hydrostatic Testing 760 LF $20.00 $15,200.00
3 4"C-900 PVC Waterline, Including Fittings,
Cleaning, Pigging, Marking, Disinfection and
Hydrostatic Testing 15 LF $12.00 $180.00
4 6"C-goo PVC Waterline, Including Fittings,
Cleaning, Pigging, Disinfection and
Hydrostatic Testing 85 LF $16.00 $1,360.00
5 Fire Hydrant 3 EA $400.00 $1,200.00
6 6"Gate Valve 3 EA $240.00 $720.00
7 12"Gate Valve 1 EA $960.00 $960.00
8 16"x12"Tapping Sleeve&Valve w/Box 1 EA $4,000.00 $4,000.00
g 20"Steel Casing Pipe(0.375 Wall), Including
End Seals & Backgrouting 70 LF $160.00 $11,200.00
10
Vault for 4"Water Meter, Including All Vault
Piping Required and All Connections(Meter
Purchased from the City) Complete In Place 1 LS $8,000.00 $8,000.40
11 2"Water Service for Irrigation, Including
Meter Box, 2" Service Line, Tap&Tapping
Saddle, Stops and All Fittings, complete In
Place 2 EA $400.00 $800.00
12 Trench Safety Systems 860 LF $0.80 $688.00
13 Traffic Control for Waterline Construction,
Including Set-up, Maintenance and Removal,
Complete 1 LS $800.00 $800.00
Total Price Waterline Items $53,508.00
i
+ I r
� n �
c�............
cn
cn o
IYl
c�
ti�wl
—
1\q\
co
� I
r
� r
r
Q3
-L4'
FT I
� r cn r �
03 I __Q
2-11 u
CAD
o
U,� I
C
0 mI
C"
m z�1 1 THS T IS RELEAM FOR 7HE PURPOSE
�C OF REllEw ONLY.WVQER 7FE AUTHORITY
z } > OF DAVID L■ROWI L P.L 48M ON
IT IS NOT TO BE USED FOR BKXXWG.CONSTRICTION
1 OR PERkIrT PURPOSES.
lL Rl >
�r
cc) () LCTT & BROWN
t\D > TZXAS M&TSM AMINAMM FIM F-1646
CONSULTING ENGINEERS
I I CML ENGINEERING.HYDROLOGY.CONSTRUCTION MANAGMENT
i 8303 ROD LAKE DRIVE
m I HOUSTON,TOGAS"0" (WI)402-2354
v
' PROPOSED SANITARY SEWER
r EXHIBIT A-1
r -°� I SHEET 1 OF 3
zCD
SEDONA RANCH, LOTS 1 &2
r"j'
in I BLOCK I
Z
r IN THE
r RICHARD MORRIS SURVEY, A-1036
TARRAN'T COUNTY.TEXAS
_ SUBM17ED: LB.C.E. DESIGNED BY: DLB
r
I SCALE: 1' = 40' DRAWN BY: DLB
� I
I DATE: JULY 2012
I SURVEY BY: CITY DWG NO:
I` B No:
MATCHLINE
SHEET 2 OF 3 SHT. NAME: C/7012/SEDBNAVILLAGE/CFAEXHIBIT.DWG
MATCHLINE
SHEET I OF 3
V) I
�.
z
X
�0
g
rrl *-
' I �
X CF)
C 0
r co y I
Z Z
a
I�
+ m >
IZ
I =
a
.,
i I I
Elk I
I
124 -trio
cc swr I
I Q0
� I I ol I �
13 13 8
I I
v
v
I x
I ? Ln
<+
o ll m
W 2
� o
('k., 2 c 714S DOCLAMT IS RELEAM FOR THE PLWIOK
d OF REVIEW ONLY.L%M THE AUTHORITY
➢NJ OF DAVID L W01 ft NE 48282 ON
I m R fS NOT TG BE IJ.fD FOR BKOM CONSTRUCTION
A y C-) OR PERMIT PURPOSEL
-i v)
rr,
r� 3
�� c/') 2
I I _
I m I LOTT & BROWN
CONSULTING ENGINEERS
rZZAS xr MSJM ZMAM RrM Pl"PL-N45
J J
CIVIL ENGINEERING,HYDROLOGY.CONSTRUCTION MANAGEMENT
I 1 I 9303 KID LAKE DRIVE
I I HOUSTON,TEXAS 77064 (2131)402-2354
J PROPOSED SANITARY SEWER
EXHIBIT A-1
I SHEET 2 OF 3
I �
J SEDONA RANCH, LOTS 1 &2
o
BLOCK 1
77 7"
IN THE
RICHARD MORRIS SURVEY. A-1 036
I TARRANT COUNTY, TE7M
II I I
I SUBMITTED: L.B.C.E. DESIGNED BY. DLB
^' SCALE: 1" = 40' DRAWN BY: DLB
I I DATE: JULY 2012
=10 SURVEY BY: CITY DWG NO:
4 I I• :
MATCHLINE F B NC
SHEET 3 OF 3 SHT• NAME: C/2012/SEDONAVILLAGE/CFAEXHIerr.DWG
MATCHLINE
I ' SHEET 2 of 3 LGTT & BROWN
CONSULTING ENGINEERS
+ T"Al AWP"-rRRD lAWllilj'"M FIRM P-4645
{ cnnL MGINEI=RING,HYnROLocY CONSTRUCTION
MANAGEMENT
I 0303 RI]D LAKE DRIVE
I n HOUSTON,TEXAS 77054 (2131) 492-2354
m z � I PROPOSED SANITARY SEWER
,� - EXHIBIT A-1
l�I � ' z x SHEET 3 OF 3
l �
zr
z SEDONA RANCH LOTS 1 &2
-c rn 7 ' o BLOCK 1
M 11 z + 00 IN THE
-p d RICHARD MORRIS SURVEY, A-1036
0 I �] TARRANT COUNTY.TEXAS
O t p 70
Ln rq� 1 i �+ m SUBMITTED: L.B.C.E. DESIGNED BY: DLB
W z ! I I cj)
NJ I 1 0 SCALE: 1" = 4p' DRAWN BY: DLB
I
++ I 3 � DATE: JULY 2012
I ! (A -Q
> v SURVEY BY: CITY DWG NO:
CSI } FBNO:
m
o I SFIT. NAME: C/2012/SEDONAVILLAGE/CFAEXHIBIT.DWG
' C
I THIS DOCLAIENT IS R EASED
FOR THE PURPOSE
OF REVIEW ONLY,UNDER 7FE AIJINOWrY
OF DAVID L BROWN„P.E 48M ON 07 id 942M 2.
IT 1S NOT TO BE USED FOtt BK M4 CONS�Rt1C110N
OR PERIA I PURPOSES.
CD
I �
C�
I1 �
_ I
• A x 4 0m m ,
1 r� I �� 50 GAS EASEMENT
I z a cn O ,:
m GAB. "A"', SLIDE NO. 11976, T.C.M.R.
' I X
m r 20' BUILDING LINE
-- I z Ln CAB. "A", SLIDE NO. 119769 T.0 .R.
�z I W
Im �`� Exist. 16" Oncor Gas Line
X I i �� I
r
F
4
Exist. 1 " an. Sew �� F m O �9�'�
Q —� �C.c 16 DI San. Sewer
I c+ (A
fo >
orm ewer 66 RCP Storm Sewer
r �
16"Di Water Line
OVERHEAD POWER
� C
OLD DENTON RD. c: C-)
801( R.O.W.
SEDONA RANCH
Sanitary Sewer Estimate of Probable Cost
NO. ITEM TY. UNIT UNIT TOTAL
1
8" PVC, SDR 26 Sanitary Sewer,All Depths,
Including Marking and Mandrel and Low
Pressure Air Testing, Installed Complete 836 LF
$32.80 $27,224.00
2
6" PVC, SDR 26 Sanitary Sewer, All Depths,
Including Marking and Mandrel and Low
Pressure Air Testing, Installed Complete 40 LF $16.00 $540.00
3 6"Sanitary Sewer Cleanout, installed
Complete 1 EA $200.00 $200.00
4 Remove 10"Sanitary Sewer and Replace
with 10"D.I.P., Thk. Cl. 53, Including
Connections, Installed Complete 18 LF $75.00 $1,350.00
5 4' Diameter, Standard Sanitary Sewer
Manhole,All Depths, All Types, Installed
Complete 3 EA $1,200.00 $3,600.00
6 4' Diameter, Shallow Sanitary Sewer Manhole
on Existing 10"Sanitary Sewer, Installed
Complete 1 EA $2,416.00 $2,416.00
7 Vacuum Testing for Proposed Sanitary Sewer
Manholes 4 EA $392.00 $1,568.00
8 Post Construction CCTV Inspection 870 LF $1.60 $1.392.00
9 Trench Safety Systems 870 EA $0.80 $696.00
10 Remove Existing Concrete Pavement,
Including Sawed Joint and Disposal,
Complete 35 SY $8.00 $280.00
11 Reinforced Concrete Pavement Repair,
Including Reinforcing Steel and Pavement
Joints, Complete In Place 35 SY $41.50 $1,456.00
12 Traffic Control for Sanitary Sewer
Construction, Including Set-up, Temporary
Detour Pavement, Maintenance and
Removal, Complete 1 LS $1,760.00 $1,760.00
Total Price Sanitary Sewer Items $42,582.00
I
LOTT & BROWN
CONSULTING ENGINEERS
TRZAS MWIMIND MCIMSKM RM r--rs46
I CML ENGINEERING.HYDROLAI"Y,CONSTRUCTION iMMWA MENT
9=REID LAKE DRIVE
n HOUSTON.TEXAS 77064 (251) 497-2354
n
to n
-� m z I PROPOSED STORM SEWED
n � ��
C3 � I
_ I X Fri B-1
c SHEET 1 OF 1
z r z I -o SEDONA RANCH LOTS
1 &Z
�r? F o BLOCK 1
I z it ' Q R IN THE
(CHARD MORRIS SURVEY, A-1036
d
-+ I TARRANT COUNTY. MAS
o M L I -0
3 m SUBMITTED. L.B.C.E. DESIGNED BY: DLB
to CIT-1
�
Z I �� 0 SCALE: 1" = 40' DRAWN BY: DLB
I 3 DATE: JULY 2012
cloll N&
SURVEY BY: CITY DWG NO:
CAD F B NO:
o I SHT. NAME: C/2012/SEDONAVILLAGE/CFAUHI8IT.DM
I
I I ' TM DOCUMENT 15 RELEASED FOR 7HE PURPOSE
CAD of R ON
EVIEW LY,IN=THE AUTFIORITY
V OF DAM L BROWK PX 4e2e2 ON
' IT IS NOT 70 BE USED FOR BOOM OONS7RUCTION
V I I I OR ITT PURPOSES:
� I
1 � Q
I �
0)
j 4 �01m�
o c- a 50' GAS EASEMENT
rn
CAB. A.�, SLIDE NC. 11976, T.C.M.R.
a � m
o
� I �
I o r-z-U.
< -u z ;u
Q
L14 X. _
20' BUILDING LINE
. _ CA8. A", SLIDE NC. 11976, T.0 M.R.
I m Exist. 16': Oncor Gas Line
X
Exg - C
-u
a n m-A 4[0
Exist. 1 an. Sew p -om; ~I: -� -9� m
1p
z ,I ��c• 6"DI San. Sewer
I orm Sewer 6 Storm ewer
r Xmm
x"-o I`C`I x
a 0) VFp-WDI Water Line
OVERHEAD POWER �0D a�.
]C z I-r- �] �
OLD DENTON RD. mV0
rz-u ..�
(80' R.O.W. z co a K
SEDONA RANCH
Storm Drainage Estimate of Probable Cost
NO. ITEM TY. UNIT UNIT TOTAL
1 Remove Existing 24" RCP Storm Sewer 35 LF $240.00 $8,400.00
2 5'x3'Rein. Conc. Box Storm Sewer, Including
Marking, Complete in Place 35 LF $120.00 $4,200.00
3 Remove Existing Manhole on Existing 24"130"
Storm Sewer, Including Disposal and Safety
Systems 1 LS $750.00 $750.00
4 Remove Existing Manhole on Existing 66"
Storm Sewer, Including Disposal and Safety
Systems 1 LS $2,204.00 $2,200,00
5
Proposed 6'x6'Storm Sewer Junction Box
Over Existing 66"Storm Sewer, Including
Connection of 5'x3' Box Sewer and Existing
66"Storm Sewer, Complete in Place 1 LS $2,654.00 $2,664.00
6 Proposed 6'x6'Storm Sewer Junction Box
Over Existing 30"Storm Sewer, Including
Connection of 5'x3' Box Sewer, 36" Storm
Sewer and Existing 30"Storm Sewer,
Complete in Place 1 LS $1,200.00 $1,200.00
7 Post Construction CCTV Inspection 1 LS $400.00 $400.00
8 Trench Safety Systems 35 LF $0.84 $28.00
g Erosion Control, Including Set-up,
Maintenance and Removal, Complete 1 LS $1,600.00 $1,600.00
10 Remove Existing Concrete Pavement,
Including Sawed Joint and Disposal,
Complete 35 SY $8.00 $280.00
11 Reinforced Concrete Pavement Repair,
Including Reinforcing Steel and Pavement
Joints, Complete In Place 35 SY $41.60 $1,456.00
12 Traffic Control for Storm Sewer Construction,
Including Set-up, Temporary Detour
Pavement, Maintenance and Removal,
Complete 1 LS $1,760.00 $1,760.00
Total Price Waterline Items $24,938.00