HomeMy WebLinkAboutContract 43471-CO8 (2)Fn RT WO RT H City of Fort Worth ��� ���,��/�l C��, Change Order Request ����� �o Project Name East Side 54" Water Main Phase 1 and ESPS City Sec No. 43471 Project No.(s) P262-608140036983, P265-608160036983 DOE No. 6359 City Pro. No. 0369 Project Description 54-Inch Water Main Installation on Beach Street and Avenue B and Discharge Heatler Replacement at East Side Pump Station City Project Mgr S.J. Louis Construction of Texas, Ltd. Susan Schwi Phone Number: 817-392-6529 Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proposed Change Order Revisetl Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) Water (Unit 1) 1, 363,854.05 40,979.00 $9,445,221.05 -$28,133.73 $9.417.087.32 1.68 Water (Unit 2) 19,812.00 02,905.68 2.176.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) JUSTIFICATION �a � � - �.� - The change order will provide for the following: • 24-inch gate valve on the discharge header at the East Side Pump Station as requested by Water Field Operations. • Level up and asphalt pavement replacement on Ernest Avenue. • 4-inch x 20-inch tapping sleeve for swimming pool meter on Avenue B. • Replacement of damaged 6-ft chain link fence at the swimming pool. • The deletion of pay item quantites that are no lon .���,y,ont he project. t � a i� � Staff recommends an additional 144 calend�r d.�s�r�>�`h� < o , ��� �� �`. � , 1 � �� � s .� a � � 037.00 037.00 FOR , :� I : :•. Change Order # � Date: 12/10/2014 City Inspector Raymond Brice Phone Number: 817-392-8452 . .`. }'� �'yi _., t: � , �- i,. � � �. ; �_�.. �,x�;�. , It is understootl and agreed that the acceptance of this Change Ortler by the conractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Ortler. Contractor's uis � Company Name �u 'on of Texas, Lttl i . � (W�ter Deqt� Contractor Name Pete Stahl � li7L/I'I � ,�a ,� �_..i5..1 Council A M&C Number N/A Totals $8,442,158.00 $1,626,759.73 $63.155.00 Contract Time 260 227 $10,005,762,73 487 •$96.73 0144 $10,005,867.57 631 $28,037.00 18.52% $10,552,697.50 ature �(lka ���o����.r l�� ��ts��,� �a;.t��J`;�,cjts— Cons ruction Supervisor Water Dept Assistant Citv Mana4er M&C Date Approvetl N A Date _,. ,,� Date �"��ll ��f Date lZ/c[��� Date i.�/i.�'/i.a � �"C� R T W� R T H City of Fort Worth Change Order Additions Project Name � East Side 54" Water Main Phase 1 and ESPS Project No.(s) P262-608140036983, P265-608160036983 Project Description City Sec No. 43471 DOE No. 6359 City Pro. No. 00369 54-Inch Water Main Installation on Beach Street and Avenue B and Discharge Heatler Replacement at East Side Pump Station Contractor S.J. Louis Construction of Texas, Lttl. Change Order #�8 Date: 12/10/2014 City Project Mgr. Susan Schwinger City Inspector Raymond Brice ADDITIDNS Unit Cost 169 Ernest Asphalt Pavement Level- 170 Ernest Asphalt Pavement Type I 171 Ernst Crack Joint Sealing 172 Ernst Remove and Reset Existin 18 6" Chain Link Fence 33 24" Gate Valve with Vault minq pool meter on ring and cover Water Water Water Water Water nit 1 nit 1 nit 1 nit 1 nit 1 nit 2 nit 2 1.00 LS 69.00 TN 2060.00 SY 1823.00 LF 3.00 EA 220.00 LF 2.00 EA $200.00 $15.30 $0.41 $363.00 r (Unit 1 r (Unit 2 1 �' � $13,800.00 $31,518.00 $747.43 $1,089.00 $4,400.00 r Page 2 of 4 �Additions Sub Total �$105,639.27 �� FORT WORTH Project Name Project No.(s) Project Description City of Fort Worth Change Order Deletions East Side 54" Water Main Phase 1 and ESPS P262-608140036983,P265-608160036983 City Sec No. 43471 00369 DOE No. 6359 City Pro. No 54-Inch Water Main Installation on Beach Street and Avenue B and Discharge Header Replacement at East Side Pump Station Contractor S.J. Louis Construction of Texas, Ltd. City Project Mgr. Susan Schwinger ITEM 74 94 95 14 15 16 27 31 DESCRIPTION Imported Backfill, CLSM (Flowable fill) 10' Asph Pvmt Repair including stripping Asph Pvmt Repair Beyontl Defiend w/stripe 10" Wide Asphalt Pvmt Repair, Residential Asphalt Pvmt Repair Beyond Defined Width, Residential 8" Cemeent Treatment 24" DIP Water Connection to Existing 24" Water Main Change Order #�8 Date 12/10/2014 City Inspector Raymond Brice DELETIONS DEPT Water (Unit 1) Water (Unit 1) Water (Unit 1) Water (Unit 2) Water (Unit 2) Water (Unit 2) Water (Unit 2) Water (Unit 2) 758.00 277.00 306.00 55.00 25.00 65.00 49.00 2.00 Unit CY LF SY LF SY SY LF EA Unit Cost $60.00 $63.00 $57.00 $51.00 $46.00 $30.00 $242.00 $3,800.00 (Unit 1) (Unit 2) Total $45,480.00 $17,451.00 $17,442.00 $2,805.00 $1,150.00 $1,950.00 $11,858.00 $7,600.00 373.00 363.00 Page 3 of 4 �Deletions Sub Total �$105,736.00