_ Change Order Request
�roject Name East Side II 54" Water Main Phase 1(Unit 1) and East Side Pump Station
PfOjeCt P262-608140036983 (Unit 1) P265-608160036983 (Unit 2) DOE No. 6359
Nro�ect East Side II 54" Water Main Phase 1(Unit 1) and East Side Pump Station Discharge Heatler Replacement (Unit 2)
Description
.�:1
r�—i�
�--,�
re�r.
�
��
�
�:�
�i
�
�
�
S.J. Louis Construction of Texas, Ltd.
� Project Mgr.� Susan Schwinger
one Number: 817-392-6529
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Ortlers (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revisetl Contract Amount
Original Funds Available for Change Order
Remaining Funds Available for this CO
Additional Funding (if necessary)
Water (Unit 1)
$8,122,346.00
$120,482.98
$40,979.00
$8,201,849.98
1
Change Order # G�,�' Date: 10/29/2013
City Inspector Raymond Brice
Phone Number: 817-392-8452
Water (Unit 2)
$51,313.68
$22,176.00
949.68
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%J
TION
CHANGE ORDER
,:' ;.-• �'1��,:1 � ,.
� � t�
, ..
- • � 11 .•
Totals
3,442,1
$171,7
$63.1
Contract Time
(Calendar Days)
260
28
::
m
.�
�
1.96%
$10,552,697.50
This change order (No. 6) replaces and supersedes change order No. 5 in its entirety. Subsequent to
approval of change order No. 5, it was determined that a$22,176.00 deduction on change order No. 3
was not credited to Unit 2 as depicted above. Change order No. 6 rectifies that error.
The change order will allow for the replacement of an old defective leaking double disc gate valve that
was encountered during construction in Sycamore Park. Since the valve cannot be shut off, Water Field
Operations requested that the valve be replaced via this contract.
Staff concurs with contractor's req
,�
�
�: ,
� ._�,
It is understood and agreed that the acceptance of this"�
navmant in full (both time and monevl for all costs arisinq o
M&C Number
. �.�.
me
N/A
al days on the change order.
.;,.� — --;
� � ii '` { �
` - +� `1 :1:
�'� � r -- - -
.,
.� .rt1
ii�= � • � • � � . � • � - � -
• .�• �- • �-
/0'�9-i 3
D e
,�
D e
r r --�--►3
Council Action
7
��
M&C Date Approved
< �� �,
Date
`�'/�-%✓!3
___=ate
�Ij��,i�, � ,.i/;�' �� .�' "
� ,.
��., ,�;�;";
in�� � Date � Proiect Manager � Date �
FORT WORTH
Project Name
Project No.(s)
Project
Description
Contractor
City Project Mgc
City of Fort Worth
Change Order Additions
II 54" Water Main Phase 1(Unit 1
11P265-608160036983
Side Pump Station City Sec No. 43471
�it 2) DOE No. 6359 City Pro. No. 00369
East Side II 54" Water Main Phase 1(Unit 1) and East Side Pump Station Discharge Header Replacement (Unit 2)
S.J. Louis Construction of Texas, Ltd. Change Order # 0 Date: 10/2912013
Susan Schwin er City Inspector Ra mond Brice
nnrnTinrus
FoR�r woR�rr3
Project Name
Project No.(s)
City of Fort Worth
Change Order Deletions
East Side II 54" Water Main Phase 1(Unit 1) and East Side Pump Station
City Sec No.
P262-608140036983 (Unit 1) P265-608160036983 (Unit 2) DOE No. 6359 City Pro. No
43471
00369
Project Description I East Side II 54" Water Main Phase 1(Unit 1) antl East Side Pump Station Discharge Header Replacement (Unit 2) I
Contractor S.J. Louis Construction of Texas, Ltd. Change Order #�6 Date 10/2912013
City Project Mgr. Susan Schwinger City Inspector Raymontl Brice
DELETIONS
ITEM IDESCRIPTION
DEPT � Qty
� � r �
«;Il i!'1� �E�C�RET/�6�Y
�
Unit �Unit Cost �Total
Water (Unit 1)
Water (Unit 2)
s Sub Total
,
Breakdown
Order
;i' � ;� � �
� ,�. •,�
$ �; `
City of Fort Worth
Departmental Request for Waive�r
Of MBE/SBE Subcontracting/Suppl3er Goal
Water Department � 58,846.87 10/17/13
DEPARTME�IT NAME: ESTIMATED COST / PROPOSAL DATE
NAME OF
/�ID:
/' 6529
EXTENSTON
pOE 8369, CPN: OD369
DOE/PROJECI' NO.
10/17/13
DATE
N1GP CODE
ior to advertisement, the contracting%managing department shall determine whether the bid/proposal is one which MBE/SBE
�uirements should not be applied. MBE/SBE requirements may be waived upon written approval of the M/WBE Manager. If one
the conditions listed below exists, the contracting/managing department shall notify the Manager via this form, stating the specific
ison [s) for repuesCinQ a waiver.
1f the contracting/managing department and #he Manager are in conflict over the granting of a waiver, either
may appeal to the City Manager, or designee, and his/her decision is final.
Please Cheek Applicable Reason:
...�..�1. MWBE Qifice: A wa.iver of the goa! for MBE/SBE subcontracting requirements was requested
by th�e Department and approved by the MWBE OfCice, in accordance �rvith the M f WBE or BDE
Ordinance, because the public or administrative emergency exists which requires the goods or
services to be provided with unusual immediacy; or
��. MWBE �ffice: A waiver of the goal for MBE f SBE subcontracting requiremer�ts was requested
by the Department and agprdved by the MWBE Office, in accordance with the M/WBE or BDE
Ordinance, because the purchase of goods or services from source(s) where subcontracting or
supplier opportunities are negligible; or
C. MWB� Office: A waiver of the goal for MBE/SBE subcontracting requirements was requested
by the Department and approved by the MWBE Of�ce, in accordance with the M/W�E or BDE
Ordinance, because the application of the provisions of this ordinaziCe wil] impose an econornic
risk on the City or unduly dela�y acquisition of the goods or services; or
x D. MWBE Qf�ce: A waiver of the goal for MBE/SBE subcontracting requirements was requested
by the Department and approved by the MWBE Offiee, in accordance with the M/1NBE or BDE
Ordinance, because the MWSE Waiver is solicited based on ihe sole soy_ree information
provided to the MWBE Office by the managing department's project manager.
Justifp Coinxnadity or Serviae 'GVaivsr Request:
At the City's request the eontractor replaced an old leaking 36-inch gate valve with a new 38-inch gate valve• The Water Departrnent provided
lhe gate valve and ihe �ontractor utflized its torces to instaA (t.
Approved
Nat Approved
1) and East Slde Pump Siation
Ptease use additional sheets, if needed
. '�Gs-
Sigr,ature of BE Authorized Personnel
Signature of M/WBE Authorized Personnel
�
�� •�i � �� �.,_�'. �-!�t1_ � .a.,,�sl
,��s , r�
� � �
1 �° �g 3
Date
Date
R�v. 2•TO-13
i �; • , ,
East Side II 54" Water Mafn Phase 1