HomeMy WebLinkAboutContract 43471-CO7 (2)FO RT WO RT H City of Fort Worth
_ Change Order Request
Project Name East Sitle II 54" Water Main Phase 1(Unit 1) and East Side Pump Station
P�OjeCt N0.(S) P262-608140036983 (unit 1) P265-608160036983 (unit 2) DOE No. 6359
Project Description
City Project Mgr
j - r�= 's;;l.i - '=t�
t ' �.�r:L "c .1:'.yi � �'� .__ �_..:r
City Sec No. 43471
City Pro. No. 00369
54-Inch Water Main Installation on Beach Street and Avenue B antl Discharge Header Replacement at East Side Pump
Station
S.J. Louis Construction of Texas, Ltd.
Susan Schwinger
Phone Number: 817-392-6529
Dept. � Water (Unit 1)
Original Contract Amount
Extras to Date
Cretlits to Date
Pending Change Ortlers (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funtls Available for Change Orders
Remaining Funtls Available for this CO
Additional Funding (if necessary)
8,122,346.00
$177,329.85
$40,979.00
1,186,524.20
9,445,221,05
$244,000.00
$107,649.15
1,078,875.05
Change Order # �7 Date: 3/5/2014
City Inspector Raymond Brice
Phone Number: 817-392-8452
Water (Unit 2)
9,812.00
1,313.68
2,176.00
$16,000.
1,592,00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%J
JUSTIFICATION
The change order will provide for the following:
main in Avenue B.
ORDER
Totals
$8,442,158.00
$228,643.53
$63,155.00
$8,607,646.53
$1,398,116.20
$10,005,762.73
$260,000.00
$107,649.15
$1,290,467.05
18.52%
$10,552,697.50
Contract Time
(Calendar Days)
260
30
290
197
Realignment of existing 36-inch water main discharge header to properly align with the project's 54-inch water
Replacement of the old cast iron tees connecting to the discharge header.
Lowering of the existing 8-inch sanitary sewer main in Avenue B to satisfy TCEQ separatio
between water and sanitary sewer mains.
��
��
• The installation of a looped 8-inch water main to replace the existing main connected to e� �
«�o
—_----tf"r�cherge hea er. °
���Q�Q�r��4���� �� placement of the conflicting 16-inch main on Beach Street at Avenue A. ��'
- • 4�'
���i�,��� f the suction head piping and valves on the Holly pressure plane side of the ea�t,
���� ��:� � � e
, � ,- , � �' /' ! /.� /}. �
' _Sj .�14�n�r ���4 � �
� �, �. �:��� ��, � �� __
.
e contractors request for 197 additional calendar days
�
�
�
�
�
�
�
-:.:
�
J.
�.:
' �.;
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time antl money) for all costs arising out of, or incidental to, the above Change Order.
Fc�► �. �r �o x�r° �
----.,,,�.,.----
c�ty of Fo�t wo�tn
Change Order Additions
Project Name East Side II 54" Water Main Phase 1 Unit 1 and East Side Pum Station
Project No.(s) P262-608140036983 unit 1 P265-608160036983 unit 2 DOE No. 6359
Project
Description
Contractor
City Project Mgr
City Sec No.
City Pro. No.
43471
00369
I54-Inch Water Main Installation on Beach Street and Avenue B and Discharge Header Replacement at East Side Pump (
Station
S.J. Louis Construction of Texas, Ltd. Change Order #�7 Date: 3/5/2014
Susan Schwin er City Inspector Ra mond Brice
ADDITIONS
Page 3 of 5
FO RT WC� RT H
Project Name
Project No.(s)
City of Fort Worth
Change Order Deletions
East Sitle II 54" Water Main Phase 1(Unit 1) antl East Sitle Pump Station
City Sec No.
P262-608140036983 (unit 1) P265-608160036983 (unit 2) DOE No. 6359 City Pro. No
43471
00369
Project Description 54-Inch Water Main Installation on Beach Street antl Avenue B and Discharge Header Replacement at East Side I
Pump Station
Contractor S.J. Louis Construction of Texas, Ltd. Change Order #�7 Date 3I512014
City Project Mgr. Susan Schwinger City Inspector Raymond Brice
DELETIONS
Page 4 of 5
M&� Review
Page 1 of 3
Official site of the City of Fort Worth, Texas
CITY COUNCIL AGENDA
COUNCIL ACTION: Approved As Corrected on 3/4/2014
DATE:
CODE:
3/4/2014
:�7
Net Amount
REFERENCE
NO..
TYPE:
FORTV4'URTfI
-�'t`'--
60ES54P1 ESPSRC07-
SJLOUIS
�
SUBJECT: Authorize Execution of Change Order No. 7 to City Secretary Contract No. 43471 with S.J.
Louis Construction of Texas, Ltd., in the Amount of $1,398,116.20 for Water Main Phase I
and East Side Pump Station Discharge Header Replacement on Beach Street, Scott
Avenue and Avenue B for a Revised Total Contract in the Amount of $10,005,762.73
(COUNCIL DISTRICT 8)
RECOMMENDATION:
It is recommended that the City Council authorize Change Order No. 7 to City Secretary Contract No.
43471 with S.J. Louis Construction of Texas, Ltd., in the amount of $1,398,116.20 for Water Main
Phase I, and East Side Pump Station Discharge Header Replacement, for a revised total contract in
the amount of $10,005,762.73.
DISCUSSION:
On July 10, 2012, (M&C C-24715) the City Council authorized a contract with S.J. Louis Construction
of Texas, Ltd., in the amount of $8,442,158.00 for Water Main Phase 1 and East Side Pump Station
Discharge Header Replacement. The contract was subsequently revised by five change orders (to
facilitate current and future water system operations and maintenance) with a net total of $165,488.53
that are further described as follows:
Change
Order No.
1
f�:
3
►�
($40,979.00)
$97,146.66
176.0
C-26701
NON-
CONSENT
Date Reason
Approved
Deletion of 42-inch connection on
2/16/13 Scott Avenue and installation of
additional footage of 54-inch water
main on Beach Street
5/30/13
7/15/13
LOG NAME:
PUBLIC
HEARING:
Installation of two 54-inch vertical risers
north and south of the West Fork
Trinity River tunnel crossing to avoid
damaging an existing 42-inch water
main on the north and an existing 20-
inch high pressure gas main on the
south. In addition, modifications were
made to the discharge piping at the
Eastside Pump Station
item unit price revision
Installation of two 96-inch diameter
$74,650.00 08/8/13 access manholes and two 2-inch
combination air release and vacuum
alves
C05 was voided and
http://apps.cfwnet.org/council�acket/mc review.asp?ID=19527&councildate=3/4/2014 3/5/2014
M&(: Review
Page 2 of 3
Change Order No. 7 will provide increased and additional pay item quantities on the project for
additional improvements as described below that are necessary to rehabilitate the 1949 East Side
Pump Station including replacement of the suction piping.
The 54-inch water main constructed under this contract and the East Side 54/inch Water Main Phase
III contract (M&C C-25982, November 12, 2012), will help to meet water demands to the north from
the Rolling Hills Water Treatment Plant. It was originally planned to build the Phase II I pipeline and a
new larger Eastside Pump Station ($10 Million estimated cost) at a later date to meet water demands
in the east from the Holly Water Treatment Plant, however, updated water demand projections
indicate the Phase II I pipeline is needed now but the new pump station can be deferred. Change
Order No. 1 modified this contract to delete the 42-inch connecting pipe segment on Scott Avenue,
which was no longer required, and added 54-inch pipe segments in Avenue B and Beach Street to
connect the Phases I and II I work. The additional work in Change Order No. 7 will allow the existing
East Side pump station to continue operations and eliminates replacing it at a different site. In lieu of
replacement, the existing pump station will be rehabilitated by upgrading the old electrical service and
equipment and replacing the suction piping and valves. Water Production staff will perform the
electrical upgrade and replace pumps and piping inside the pump station to expand the capacity from
32 MGD to 41 MGD and improve reliability. It is anticipated that the useful life of the pump station will
be extended by at least 15 years and a cost savings of $8,400,000.00 will be realized by rehabilitating
the existing pump station as opposed to constructing a new pump station. Rehabilitation must be
completed by May in order to satisfy peak 2014 summer demand. Both Phases I and III pipelines are
under construction.
In addition to replacing the suction piping, the change order will allow for the replacement of the
existing 36-inch water main that was encountered at a different location than depicted on existing
records, the replacement of the deteriorated cast iron tees connecting to the discharge header and
aligning the discharge piping with the proposed 54-inch water main in Avenue B. Additional site
piping necessitates the lowering of the existing eight-inch sanitary sewer main on Avenue B to satisfy
Texas Commission on Environmental Quality (TCEQ) separation requirements. A new eight-inch
water line is required for service to an adjacent apartment complex.
M/WBE Office - S.J. Louis Construction of Texas, Ltd., agrees to maintain its initial M/WBE
commitment of 13 percent that it made on the original contract and extend and maintain that same
M/WBE commitment of 13 percent to all prior change orders up to and inclusive of this Change Order
No. 7. Therefore, S.J. Louis Construction of Texas, Ltd., remains in compliance with the City's
M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous
M/WBE Commitment form executed by an authorized representative of its company.
The project is located in COUNCIL DISTRICT 8, Mapsco 78J.
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that funds are available in the current capital
budget, as appropriated, of the Water Capital Projects Fund.
http://apps.cfwnet.org/council�acket/mc review.asp?ID=19527&councildate=3/4/2014 3/5/2014
M&G Review
TO Fund/Account/Centers
Page 3 of 3
FROM Fund/Account/Centers
P265 541200 608140036983 $1,398,116.20
Submitted for City Mana�er's Office bv: Fernando Costa (6122)
Originating Department Head: S. Frank Crumb (8207)
Additional Information Contact: Susan Schwinger (6529)
ATTACHMENTS
60ES54WPIESPSRC07-SJLOUIS MAP01 R.pdf
SJLOUIS MAP02R.pdf
http://apps.cfwnet.org/council�acket/mc review.asp?ID=19527&councildate=3/4/2014 3/5/2014
Contractor's Modification Request
...._ ---- PraporolNa Ihrre ..._
e II 54" Water Mam- Phase i E(evcrt� 01l07/14
Reqntred By Tiansmitted I3y � /
y Sholola, P.E. - - - - Pct� Stah! !e�- I- -: � ;''_ � --
ort Worth Department of Enginecrin�__ Ama 7v1an er \
roclanorton Sirect, Fort Wortb. Te�sas 76107 -- - --�- -
�n s must oe
must be
wmpiea th
rohl amount
East Side Pump Station Suction Fieader Replacement (Phase 1, Unit 2)
Itent
l Lf % i-(New}
2-(2-t)
3-(2-2)
� k'$ 4-(New)
5{2-3)
/ � 6-(New)
7-(1-54)
g-(2-4)
l S 4 9-(Newl
�sl
�sz
l53
/SY
ISS
1SG
]0{2-�
� �{NBW�
,12{2-10)
t3-(Ncw)
14{New)
15{2-1 i)
16{2-17)
l7{2-I8)
18{2-19)
19{I-05)
20{2-21)
>_ 1 {New)
/ S 7 26{New;
27{2-27J
28{i-�
29{I-0)
30{2-29)
31{2-30)
( S � 32-(Ncw)
33{2-31)
/ 5 q 34-(New)
35{I-79)
l40 36-(New)
�(� / 37{rrew)
�Gz 3s-�xcW�
39{t-37)
�(! 3 ' 40-(New)
� (� cf 41-(New)
42{2-33)
43{I-28)
�4 5 aa-(N�w)
45{1-49)
46{ �-74)
Descripaon
Remove IO" Water Line
Remove 16" WatcrI.ine
Remove IS" WaterLine
Remove ZO" Wazer Line
Removc 24" WaterLinc
Remove 30" Water Lino
Remove 36" Water Line
"kemove Asphatl Pavement
Rclocate Light Stnndard
Remov6Curli `8� Gtiiter'
$8�V8g1.' 2�� W8}Cf LIOC ,
Salvagc 24' Water Linc
Safvege 30" Watcr Linc
Remove IQ" Watet Va�,ve
Remove Conctete Water Vault
6" Conc Curb & Guttcr
6' Chain Link, Stxl Fence
Setding Hydromulch
Temporary Asphalt Pavement Repair
Trcnch Safety
Ducdlc Iron Water Fittin6s from t6" to 30"
Duc6te Iron Water Fittings Crreater than 30"
]0'DIP Water
16' DIP Water
18` DIP Watcr
20' DIP Water
24' DIP Water
36' DIP Water
42' DIP Water
Councetion to existing 16' Water Mnin
Connection co existing 18' Wacer Main
Conncccion w cxisting 20' Watcr Main
Connection to existing 24" Water Ivlain �
Connection [o e�cisting 30" Water Main
Connxtion tn existing 36" Water Main
Connxtion ro 20" pipe line inside PS
Wall panetretion fof20" WL
I" Air Release Vatve
2" Watcr Scrvice
10" Cr.�te Valve
20' Gate Valve wNault
24" Gate Valve wNault
36" Gste Va1ve wNault
az^ sFv ana Manho�e
Exptoratory Excavation of Existing Utilitites
Importcd Bacl�ll, GT;SM (Ilowable Fill)
Imponcd Embedmcnt Backfilt, Crushed Stonc
7Lb e6in�ew�wiD�requirc�aii�iddi6udp[�1D6.'cIIlende'�dapi�days
f � _. . _ .
pleut provide an anthor'vatioa
Units Quantity UnuPiice
LF
I.F
L�F
1.F
�
LF
l.k'
SY
EA
I.F
EA
EA
En
EP�
EA
LF
�
SY
I.F
I.F
TON
TON
�.�
LF
LF
�
I.F
�
LF
EA
EA
EA
FA
�A
i:A
Pvl
IiA
EA
TA
EA
EA
EA
IiA
EA
EA
CY
CY
65 v'—
55 �"
I S �'
I S v�
415 ��
45 I�
16 ✓
200 �
t✓
30 �
2 ✓
3 �.
i�
2 ✓
7 `�
30 �
40 �""
1550 �
180'V'�
590 �" ~
7.32 �
12.8? �
70 �`
10�
S '�
65 ✓
3I2 �
37 ✓
91 �`
I�
l�
2 �
/114f
I�
1�
3 "`�
3 �",
1 �✓�
1 �'���^
2 �/
5 �
4 rr.
7 �
2 �
�
1 QO t�
I50 �
TOTAL COST
below and ret¢ra one (1) mpy to onr office.
P.Q Baz d3!
Man�eld, Tems �6063
520.00
524.00
525.00
525.00
526.00
526.00
St5.00
55.00
S6,Q00.00
55.00
52.a00.00
5700.00
sToo.00
5700.00
S1,400.00
SI5.00
520.00
50.30
55.00
50.20
59,869.00
S 17,244.00
stso.00
518Z.00
5210.00
5240.00
S242.00
5723.00
S426.00
52,200.00
S3,100.00
53,500.00
53,800.00
54,300.00
54,400.00
53,500.00
53,000.00
S 14,000.00
31,800.00
S 1,800.00
524,000.00
S2d,500.00
SS0,500,00
543,700,00
S 1.00
S60,00
520.00
�$
Cas7
S I,:
31,3
S3
S3
S I0,7
Sl,l
, S2
51,0�
S6,Oi
Sl:
S4,Oi
52,1(
sn
S L4(
Sil
372,24
S221,99
SI2,6a
SI,82i
S 1,051
S 15,601
536,751
538,766
53,1
S14
SI
543,7C
SI
898,491.71
' /' ".� �. 'rJ1 ! 'r'/ :� �',!l/,
uject Name C.. e9i R. - P�oposa! Nn. 1}ate
�ast Side II 54" Water �2ain- Phase 1 C:�Ii2 - � Reviscd June 6, Z�l,i
Respolrse Reqttired 6y Tra+asntitted Ry
\ir.'I'ony Shotola, E'.�. Justin Whitman
City of 1'ort Worth. `['exas Pr�ject Manager
llcp�vtmeni of F;nginccring Sig�eature
1000 Thraclunorton Street
r ort t�tTorth, T� '761 �2
tlescriptio�r of Work
This prapasal rcpresents tlie pricing rcquested by '!'h� C:ity of I�ort �Vorth and Frecsc & Nichots for the scopc of work
described belaw. Per your requesl, the foilowing pricing ecnmpasses the scope of �vork fletaileci on sheet 87 of 8H afthe
cor�struction drawings f�r the abov� referenced projeci. This includes tNe 3G' 1}uctiie Iroi� I'ipe waterline section.
'I'he pay items as listed below include all maierial, (abor, and equipment to provide the City of Fort Worth with ail applicable
dct�3ils ot�tlincd on the ahove mentioned plan sheets compl�te in place.
Pfe�rse not�, �rte tn !he curre�tt seJaeclyde of nurnfpe crews, tle�s prop�srrf l�as heera prepctred bas�rl an usiitg tltc crew �fia! is
on-sii� Tftisprice/�ro�nsa! is baset! oji receiving your ap�rovat no i�rter tTean t/te e�zd of l/ee dny t�Ionday, Ji�ne 10, 2013.
Ifyour �rcceptunce is nc>t receiverl by tl�is tirt:e, we will revi.re tlee pronosal ro er:ctude an rrdriitiar:ai rnahii�xatio��
Let us knoiv if you have any questions. Please revie�r• this proposal as soon as possible and let i�s know ho�i� you �i�ould likc us
to praceed.. .
Sreakdow�a ajPrvposul
Cify ai ]Fort Worth, Texas
�astside iI 54" Watermain 1'hase I
Item riescription U»its Quantit}� G'�:it /'rice Gnst
113 36" I)IP (Non-Restrained) Wateriine �v/ C•low Fill Encasement LF Y 112 $830.0tS $92,9GO.U0 �
i Ifi 24" D1P (Idon-Itestrained) ti'atedme w! Plow Pill Lncesement LF �" 29 A898,QU $2G,042.0� '
I 17 2d" Gate Valve (Direct Bury) £A � 1 $1 R,6�O.OP $l8,GUU,Ut1
79 Conncct [o Existing 36" WL GA 1/1 $4.400,00 $�i,1()().UD
-- - -
118 Conriect to Existing 24" WL GA n' 1 �3,800.00 $3,ti00.00
I 19 I2emnve and Salvagc F.xisting �6" I3IP Watcr T,inc I.F `� 100 $72.Q0 $7,200.00
54 Grout PilllAbandonment �f iizisting Water Line CY v' 17 511Q.00 $l,S7Q00
12d Rensove and Sslvage Existing 24" Gatc Vatve EA r 1 $bOQ.O(; $6UQ,OU
121 [�emovc and Sah�age Lxisting 20" Ciate Valve LA � 3 $500A0 $1,5U0.(}U
122 Cut & Plug Existing 20° Watcr Linc (Pressurc Plu�; EA � 4 $1,2QO.UU $�,RpU,00 �`
I 23 'Cemporary Pavcment Patch (2" Aspiiait �it 6" Plexbese) SY 3t1(? $30.OD $9,{)Oi).()G
_ _
4� D-Hole (E�ploratory Exaatiation) Pe;quires speciat handling i;ot coveced rt`� 1 �1.00 $1.4U
I�teti Cha�ge: $17Q,fi73AU
if accspt:tble, piease �rovide ttn aathorizatio;� si„nature Uelow and rettErn one (I) ¢apy to our once.
This cdraf�g� wiI! elso rcqairc r�x cx�errsiorr of a!l miles7o�re cltttec trnd evntrn�f tnne Gp 4S dt�t�s.
xc: S.J. t�ouis Yro'ect No. 21217 Pro"c�ct Pilc
�
?b`�
_�.,...,_.
� U �� `�
S.J. LouisConsiruction of't'e.rns-LtrL
520-A S'. fith Av�tue
Man.sfreld, Tezas 7bOb3
($17J 477-03Z0 Ojfice (817} 477-(lSS2 F�ix
C`ontractor's .l�odificatir�n R�q�aest - Pro,�nsal
Prr�ju! Nume' C:bI.R. - Proposuf �Va Dptc
Gast Side tI 54" Water Main- Phase I CtvS�Z - t3 June 6, 20 3 3
Respur,se Rc+ruired I3y 7ransmilted Xv
Mr. Tony Sholota, P.F,. Justin Whitman
C:ity of I'art \�Vorth, Texas Project Manager
Department of Eaginccring S�rra�ure
[000 Tlirockmorton Strect
rort Worth,'i'x 7G102
neuription ojt3'o�k
'fhis proposal represents thu pricing requesied By "Ctte City of Port WcsrQl and Frecse & Niohols for the scope of �r•ork
descri�nd below. Per your requcst, the foifowing pricing ecompass��s tite iwo seperate scopes ai �rork as detailed �n pages 7b
nf 89 �nci 88 of 8� of the construction drawici�s for the abave referenced project. This inclu�cs the 8" YVC 1�+aterline section
and ali appurtenance,, and the 8° PVC Sanitary Sewer �vith all apgurtcnances.
'Che pay iteins 8s Iisted bel��v include all maierial, iabor, nnd equipment to provide the City of Port Worfh ��rith aIl npplicable
details oudined nn the above mentioned plan shee�,ti camplete in placc.
Nlcase revicw this proposal <�s soon as pnssible and let us know }mw you t�bul�i like as to proceed..
Rrvakda�wi of Fropam!
Cily of Fort 14'orih,l'csas
Eastside tI S4" Watea•main Phase I
ftem n�•scripHun ['nits �t�axiity UnilPrire Gosf
124 8" G906 DRtd PtiG 1H'ntcr Ltne I.F Y' 379 5175.G0 $tiG,?25.00
125 36" x 8" Ta�t�ing Sieeve and Vaivc LiA � 3 SI I,(H72tH7 $22,G60.Op
1^6 Fire Hpdrnnt Assemnly GA .✓ t �i,640.0U 53,6(}U,ix}
127 5' Gate Vah•o EA ✓ I $�.00 3900.IN1
128 1"BuliHeadlV.terSuviceAssembiv EA ✓ 8 51300.()t} SIQ,A00.(Hl
129 2'1YaterServic^.AssranUly L''A "� 2 St,700.0� $3,4()6.t;0
I30 I" Water Service P;pe l.r ✓ f�h 530.00 $1,92U.UU
l3i 2" Watcr Servicc Ytpc LF ��1S S40.00 S1.920.(M>
132 tia C-90011R25 PVC San�t..ry Se�ver Line LF 3p3 St 65.00 E49,995.OD
133 fiuwabteFetl[iitenszmznto(SewerLine CY +/12 570.�I9 SS40.W
t3A 4' Diameter Hydreulic Slide Manhole {0'-6' dep:h) GA 1/ 1 SS,70Q.(Hl $>,7tlo t7ti
t(W 4' piameu-r prop Manhala fiA S4,OOO.GR $S,dOU OU
135 4'llCametcrExfraDepthManhpic VF / t3 $ISQ.PO S1,9�0.OQ
336 Cspoxy Lining of4' Oiameter Manholc V�' r 31 �]40.00 �4,340.OD
id4 Concrcre Collnr �:A 3 SSQ�.04 S1,5D0.00
145 VacmunTest L`h 3 $100.00 S3t1�.iX7
t37 Pre-TV Inspecuon LF "="�500 SiA(? S4(%0.0�
1�8 Past-TVinspection Lr' `�303 SitYO 3303.Od
134 Removc Existing �inn};otes F.A ✓' d S:t,S00A4 SG,OOO.ti6
t�70 Remove E�;ist�r,g [ 6" Samtary Sc�a•er I,r �✓3t33 $Z5.00 S7,i7S.00
141 A' Wide Asphatt Pavcment Repair, Industrial LF 45 �59-t10 S5,605,!?Q
44 Asphalt pavement Repair Eles�ond Defired li'idth, Indus�friel SY ✓ 3� 546.OQ Si,38U,(H)
� 123 Tempotary Pa��ement Fatcii (a" ns>>hate wt c+° Fiexbnse) SY 76T. 330.00 $23,010.OG
d0 Curla and Guttcr Rcptascmcn[ Li� ✓RO SI5.00 Sf,200.(Yl
49. U-Hale (Exploratory Exc:avetaon) AccEuires special hanviiag not cavered F.A 2 $I.UO 52.00
142 Bypass Pumping for Sanitary 5cwcr T,S 7 1 St3,U0QOf7 $12,qD0.U0
14.; 7'renchWaterSiop EA 1 S1.000.00 $1.000,(10 '
t44 CanorcteCollnr - �1 3 SSISU.O� SI,SCQ.ii;;
lA5 VlcuumTest GA SfOQ.OD $300.00
t46 Sueciat shoriag at Sanieap� Sewer line S4� 4+U7,44 8c Sta 5 t02.s8 N:A z �,995.00 �7,990 00
S� �itr
so.�o
1'teY �itategc,: �25i,3�.�'i.eDU`
ifncecptA6lc pler+se Qrovide nn Authnrixation signature 6elow and refurn one{I) copy Io nur o�ce.
This ahan�e �vilr a(a'n re.quire un �tensiat� ojv!( uulestone daler and coxtrncl ll:ne hy q3 du}'s
xc: S.11.ouis i'ro'ect No. 21217 Pro'ect File
S.J. Cauis Canstruetir�n njTexas l,�d
i20-�1 S. bth Ai�em�z
IrJaii��ld, Ti xas�GOG,i
(A77) 477-d.i20 O�ce (8t 7) d77-0552 I�ha
� �' � �� ! / ' � �� � /l / �
P'roject Name GM.R. - Propnsa! N� Date
_ _-- _ - - �___ _ - -- _ .�__ . _ - -- -- - — -
21217 - East 5ide II 54" Water Main - Phase I
_..______ . _- --- _..�.__--- - Twelve Jan 26 2Q14
City of Fort Worth —��F _ uary ,
Response Required By T���� gy
_.. _ �____ _ - _-----_ _ _-----_- _
Mr. Daniel Stoutenberg 1r•, P.E. _� _��,,1Cod Sears
— - --- - - _--�. -- --�` ----
Freese and Nichols Project Coordinatar
- -- _. . __. . �. ___ _ _______ _
_ _ _� _ __ ___ ___
4455 Infemational Piaza, Suite 200 Sign�nure
.. �... _ _------ _ _ _____ _ -- ___.-- __ _ - _ _ _
Fort Worth, TX 76109-4$95 � ,, ,
- - __ - _._T._
Via Email
- -- _ __ _ _ _.� - -- ----
cc: Mr. Tony Sholala, P.E: w/ COFW (via email
Description af Wark
CMR No.12 - Dated 1 26.-2014 IncIudes the following:
S.J. Louis acknowledges receipt of email dated 12-16-2013 for Line BB ai Station 3+75 - 36" Bk'V Vault modifications regarding
conflict with 4" gas line. Structure details were included with a wali and roof step down. Special shoring needs required the
existing 16" water lie temporary removed and replaced. the structure detail revisions also required the per plan operator on the
butterfly valve be movsd to the apposite side of the valve as well. The below unit price breakdown includes all the above work
for the total amount of $ 17,696.49.
Please process a project change order so these costs can be reimbursed.
Breakdown of Prvp�sa!
East Side II 54" Water Main Yhase I
-- _ . _.____.. _ _ __ _____.____-- - - -_______ _____ —
Remova[ & Replacement of E�sting 1G" at Be�c6 Street and Avenue A
Item Descriplion Units Qrrantity Unil Price Cost
New - 1 Removai & Replacement �f existing I6" line at �3each St. and Ave. A LS i $15,9G1.65 515,961.65
New - 2 Rotate Worm Gear on 36" Butterfly Vfllve t,S 1 $7,734.84 $ I,734.84
$0.00
$0.00
$0_OU
$OAO
I I I Net Change: $17,696.49
Additional Time to be :Added tu Contract (Calendar Days): 7 i9�ys
If acceptabte, piease provide an authorization signature below and return one (1) co[ry to our office.
S.J. Louis Construction Action.
xc; S.J. Louis Pro'ect No. 21217 i'ro'ect File
S.J. Couis Conayruciioir of T'e.xas �,id
520-A'S. 6ih Avenr�e
Ma�tsfield, Texas i6063
(SI7) 477-0320 Of, f�ce