HomeMy WebLinkAboutContract 43471-CO2 (2)FO RT ��O RT H Clty of For't Worth City Secretary Copy
� Change Order Request C1�SEC�'A� �; ,_�
� �. � �1 I � `��-�
East Side II 54" Water Main Phase I(Unit 1) and East Sitle Pump Station City Sec No. 43471
Project Name Dischar e Header Re lacement Unit 2
Pf0J2Ct NO.�S� P262-608140036983 (Unit 1) and P265-608160036983 (Unit 2) DOE No. 6359 City Pro. No. 00369
Project Description 54-inch Water Main Installation on Beach Street and Avenue B and Discharge Header Replacement at East Sitle Pump
Station
�
m
c�
m
<
m
0
�
�
�
0
�
�
�
S.J. Louis Construction of Texas, Ltd.
City Project Mgr.� Susan Schwinger
Phone Number: 817-392-6529
Dept
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
e Order
Revised Contract Amount
Original Funtls Available for Change Orders
Remaining Funtls Available for this CO
Additional Funding (if necessary)
Water (Unit 1)
122,346.00
,979.00
1,367.00
127,1
2.00
$16,000.00
$16,000.00
$35,313.68
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%)
JUSTIFICATION
change order will provide for the following:
• The installation of a 25 feet segment of 54-inch pipe by other than open method instead of by,d �
order to avoid conflict with an existing 20-inch jet fuel pipeline on the south side of the West� Tr
Crossing. a
• The installation of the 54-inch vertical riser pipe by other than open cut method in rive�` a s
downstream of river tunnel crossing in order to avoid potential exposure/damage to an existing � h ai
• Pavement repair to Hope Church parking lot to restore the pavement surface to the conditio � st
construction. �� �o��t
• The purchase of 42-inch water pipe as requested by the City to facilitate the construction for anothe��p�Ig�c
• Reimbursement of payment made to Oncor Electric by S.J. Louis Construction for expedient relocation��
guy wires at the work entrance into Sycamore Golf Course (Phase 3).
• Modifications to the discharge yard piping of the Eastside Pump Station as re uested �at Production.
• The deletion of pay item quantities that are no longer needed on the o'ect.
����(;V�� ���� «(i�C�
Staff concurs with the contractor's request for 24 additional calendar
change order can be processed administratively because the project
It is understood and agreed that the acceptance of this Change Order by the contractor co�stitute
in full (both time antl money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's Comoanv Name
Louis Constuction of T
Ltd.
Contractor Name
Pete Stahl
Date
��� �
,
�. ��:
M&C Number N/A
�" �� � �3
Date _
Change Order # �2 Date: 5/24/2013
City Inspector Raymond Brice
Phone Number: 817-392-8452
Water (Unit 2)
� . �� ���; �d�s- -
ORDER
Totals Contract Time
(Calendar days
3.442,158,00 260
11
179.00
,_
,325.
,000.
, 979.
,313,
0.67%
$10,552,697.50
260
024
284
... �aU V
����t�t or� July 10, 2012.
,
. ��..�a i � ��-� �-
visor Water De t
a
i
r.. .' . .� ;
(�'}
ti
� 4 - !�
Date
�
Date Approved N A
FORT WORTH
Project Name
Project No.(s)
Project
Description
Contractor
City Project Mgr.
City of Fort Worth
Change Order Additions
East Side II 54" Water Main Phase I(Unit 1) and East Side Pump Station Discharge Header City Sec No. 43471
P262-608140036983 (Unit 1) and P265-608160036983 (Unit 2) DOE No. 6359 City Pro. No. 00369
54-inch Water Main Installation on Beach Street and Avenue B and Discharge Header Replacement at East Sitle Pump
Station
S.J. Louis Construction of T
Susan
ADDITIONS
40
41
42
43
44
72" Casingl
54" Bentl- c
Existing 54"
Cut existing
Trim spigot
54" B303 PI
54" CEx54"
54"Gkt x 54
54"Gkt x 54
2" Type D �
Cost to Pro
Hanson Pip
Short Pipe �
42" Dished
24" Cross
24" plug
24" Hymax
20" Hymax
24" Sleeve
24"megaluc
18" megalu
roll polvwra
on
cou
cou
Lttl. Change Order #�2 Date: 5/24/2013
City Inspector Ra mond Brice
�I Liner Plate by Other
a new miter into 1 end
Pipe-chipping out mortar on the spigot end,
303 Pipe into Bell x Spigot short Pipe
sting 54" B303 Pipe Total Modification
/BB LL-20" wIEBC (200-17(114))
eewlEllip Plug w/2 Stiffener Rings
� x 54" Gkt Tee w/54" x 4" FORF
a x 54" Gkt Tee w/54" x 4" FORF w/54" But1
surface course on 6" flex base
ncor Utility and immediate check for relocati
42"x C-303 Water line for Timberland & Alta
accessories
accessories
to install changes to yard
nent cost to install chanq
to
DEPT
Water (Unit 1
Water (Unit 1
Water (Unit 1
spigot and Water (Unit 1
Water (Unit 1
Water (Unit 1
Water (Unit 1
Water (Unit 1
Water (Unit 1
p Water (Unit 1
Water (Unit 1
�f guy wires Water (Unit 1
ta Water (Unit 1
Water (Unit 1
Water (Unit 1
Water (Unit 2
Water (Unit 2
Water (Unit 2
Water (Unit 2
Water (Unit 2
Water (Unit 2
Water (Unit 2
Water (Unit 2
Water (Unit 2
Water (Unit 2
25.00 LF
25.00 LF
1.00 EA
28.00 EA
2.00 EA
2.00 EA
2.00 EA
2.00 EA
1.00 EA
1.00 EA
3884.00 SY
1.00 LS
106.26 LF
6.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
9.00 EA
1.00 EA
1.00 EA
1.00 LS
1.00 LS
Water
Water
Page 2 of 4
t Cost
$444.00
$1,940.00
$1,500.00
$285.00
$432.00
$210.00
$3,540.00
22,420.00
40,280.00
40,710.00
6,040.00
$135.70
$358.80
2,205.70
2,100.00
1,765.00
1,350.00
,772.00
�250.00
�200.00
,917.60
,613.08
s Sub Total
otal
11.1i
E�1
w, ����.��
$44,840.00
$40,280.00
$40,710.00
$77,680.00
$6,040.00
$14,419.48
$2,152.80
$2,205.70
$2,100.00
$570.00
$1,765.00
$1,350.00
$600.00
$24,948.00
$250.00
$200.00
$9,917.60
$9.613.08
$51,313.
$357
FO RT WO RT H Clty of Fort WOrth
Change Order Deletions
East Side II 54" Water Main Phase I(Unit 1) and East Sitle Pump Station Discharge City Sec No. 43471
P262-608140036983 (Unit 1) and P265-608160036983 (Unit 2) DOE No. 6359 City Pro. No. 00369
54-inch Water Main Installation on Beach Street and Avenue B and Discharge Header Replacement at East Side
Pumo Station
Project Name
Project No.(s)
Project Description
Contractor � S.J. Louis Construction of Texas, Ltd.
City Project Mgr. Susan Schwinger
Change Order #�2 Date 5/24/2013
City Inspector Raymond Brice
DELETIONS
ITEM IDESCRIPTION
1 54" Water Pipe Installetl in Trench
30 12" Gate Valve
31 8" Gate Valve
35 Fire Hydrant
36 1" Water Service
37 2" Water Service
38 6" Water Service
39 Temporary Water Service
40 6" concrete curb and gutter
41 7" Concrete Driveway antl Sidewalk Repair
42 7" Concrete Pavement Repair
43 10' Asphalt Pvmnt Repair inc Striping
45 Temporary Asphalt Paving Repair Inc Striping
59 Water Line Grouting
60 42" Water Abandonment Plug
63 6" Water Abandonment Plug
67 Salvage 36" Gate Valve
69 Remove 8" Water Valve
70 Remove 6" Water Valve
71 Salvage Fire Hydrant
m
:�
Connection to Existinq 8" Water Main
Connection to Existing 42" Water Main
DEPT
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Qty Unit
25.00 LF
10.00 EA
8.00 EA
5.00 EA
4.00 EA
7.00 EA
3.00 EA
1.00 LS
741.00 LF
300.00 SY
786.00 SY
100.00 LF
726.00 LF
75.00 CY
2.00 EA
3.00 EA
1.00 EA
1.00 EA
4.00 EA
3.00 EA
3.00 EA
1.00 EA
Water (Unit 1)
Water (Unit 2)
$9,600
$1,
$1,
$2�
m
$51
$11
$1,OC
$2,
$1,
$
$
$1,
$5,
Deletions Sub Total
Unit Cost
�
otal
$11,600.00
$20,000.00
$76,800.00
$23,000.00
$3,600.00
$12,600.00
$5,400.00
$2,000.00
$11,115.00
$14,400.00
$42,444.00
$5,100.00
$3,630.00
$8,250.00
$2,000.00
$1,200.00
$2,000.00
$1,000.00
$2,1
$5,900
$259,939,
$259,939
Page 3 of 4