HomeMy WebLinkAboutContract 43471-CO2 (2)FO RT ��O RT H Clty of For't Worth City Secretary Copy � Change Order Request C1�SEC�'A� �; ,_� � �. � �1 I � `��-� East Side II 54" Water Main Phase I(Unit 1) and East Sitle Pump Station City Sec No. 43471 Project Name Dischar e Header Re lacement Unit 2 Pf0J2Ct NO.�S� P262-608140036983 (Unit 1) and P265-608160036983 (Unit 2) DOE No. 6359 City Pro. No. 00369 Project Description 54-inch Water Main Installation on Beach Street and Avenue B and Discharge Header Replacement at East Sitle Pump Station � m c� m < m 0 � � � 0 � � � S.J. Louis Construction of Texas, Ltd. City Project Mgr.� Susan Schwinger Phone Number: 817-392-6529 Dept Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date e Order Revised Contract Amount Original Funtls Available for Change Orders Remaining Funtls Available for this CO Additional Funding (if necessary) Water (Unit 1) 122,346.00 ,979.00 1,367.00 127,1 2.00 $16,000.00 $16,000.00 $35,313.68 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) JUSTIFICATION change order will provide for the following: • The installation of a 25 feet segment of 54-inch pipe by other than open method instead of by,d � order to avoid conflict with an existing 20-inch jet fuel pipeline on the south side of the West� Tr Crossing. a • The installation of the 54-inch vertical riser pipe by other than open cut method in rive�` a s downstream of river tunnel crossing in order to avoid potential exposure/damage to an existing � h ai • Pavement repair to Hope Church parking lot to restore the pavement surface to the conditio � st construction. �� �o��t • The purchase of 42-inch water pipe as requested by the City to facilitate the construction for anothe��p�Ig�c • Reimbursement of payment made to Oncor Electric by S.J. Louis Construction for expedient relocation�� guy wires at the work entrance into Sycamore Golf Course (Phase 3). • Modifications to the discharge yard piping of the Eastside Pump Station as re uested �at Production. • The deletion of pay item quantities that are no longer needed on the o'ect. ����(;V�� ���� «(i�C� Staff concurs with the contractor's request for 24 additional calendar change order can be processed administratively because the project It is understood and agreed that the acceptance of this Change Order by the contractor co�stitute in full (both time antl money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Comoanv Name Louis Constuction of T Ltd. Contractor Name Pete Stahl Date ��� � , �. ��: M&C Number N/A �" �� � �3 Date _ Change Order # �2 Date: 5/24/2013 City Inspector Raymond Brice Phone Number: 817-392-8452 Water (Unit 2) � . �� ���; �d�s- - ORDER Totals Contract Time (Calendar days 3.442,158,00 260 11 179.00 ,_ ,325. ,000. , 979. ,313, 0.67% $10,552,697.50 260 024 284 ... �aU V ����t�t or� July 10, 2012. , . ��..�a i � ��-� �- visor Water De t a i r.. .' . .� ; (�'} ti � 4 - !� Date � Date Approved N A FORT WORTH Project Name Project No.(s) Project Description Contractor City Project Mgr. City of Fort Worth Change Order Additions East Side II 54" Water Main Phase I(Unit 1) and East Side Pump Station Discharge Header City Sec No. 43471 P262-608140036983 (Unit 1) and P265-608160036983 (Unit 2) DOE No. 6359 City Pro. No. 00369 54-inch Water Main Installation on Beach Street and Avenue B and Discharge Header Replacement at East Sitle Pump Station S.J. Louis Construction of T Susan ADDITIONS 40 41 42 43 44 72" Casingl 54" Bentl- c Existing 54" Cut existing Trim spigot 54" B303 PI 54" CEx54" 54"Gkt x 54 54"Gkt x 54 2" Type D � Cost to Pro Hanson Pip Short Pipe � 42" Dished 24" Cross 24" plug 24" Hymax 20" Hymax 24" Sleeve 24"megaluc 18" megalu roll polvwra on cou cou Lttl. Change Order #�2 Date: 5/24/2013 City Inspector Ra mond Brice �I Liner Plate by Other a new miter into 1 end Pipe-chipping out mortar on the spigot end, 303 Pipe into Bell x Spigot short Pipe sting 54" B303 Pipe Total Modification /BB LL-20" wIEBC (200-17(114)) eewlEllip Plug w/2 Stiffener Rings � x 54" Gkt Tee w/54" x 4" FORF a x 54" Gkt Tee w/54" x 4" FORF w/54" But1 surface course on 6" flex base ncor Utility and immediate check for relocati 42"x C-303 Water line for Timberland & Alta accessories accessories to install changes to yard nent cost to install chanq to DEPT Water (Unit 1 Water (Unit 1 Water (Unit 1 spigot and Water (Unit 1 Water (Unit 1 Water (Unit 1 Water (Unit 1 Water (Unit 1 Water (Unit 1 p Water (Unit 1 Water (Unit 1 �f guy wires Water (Unit 1 ta Water (Unit 1 Water (Unit 1 Water (Unit 1 Water (Unit 2 Water (Unit 2 Water (Unit 2 Water (Unit 2 Water (Unit 2 Water (Unit 2 Water (Unit 2 Water (Unit 2 Water (Unit 2 Water (Unit 2 25.00 LF 25.00 LF 1.00 EA 28.00 EA 2.00 EA 2.00 EA 2.00 EA 2.00 EA 1.00 EA 1.00 EA 3884.00 SY 1.00 LS 106.26 LF 6.00 EA 1.00 EA 1.00 EA 1.00 EA 1.00 EA 1.00 EA 1.00 EA 9.00 EA 1.00 EA 1.00 EA 1.00 LS 1.00 LS Water Water Page 2 of 4 t Cost $444.00 $1,940.00 $1,500.00 $285.00 $432.00 $210.00 $3,540.00 22,420.00 40,280.00 40,710.00 6,040.00 $135.70 $358.80 2,205.70 2,100.00 1,765.00 1,350.00 ,772.00 �250.00 �200.00 ,917.60 ,613.08 s Sub Total otal 11.1i E�1 w, ����.�� $44,840.00 $40,280.00 $40,710.00 $77,680.00 $6,040.00 $14,419.48 $2,152.80 $2,205.70 $2,100.00 $570.00 $1,765.00 $1,350.00 $600.00 $24,948.00 $250.00 $200.00 $9,917.60 $9.613.08 $51,313. $357 FO RT WO RT H Clty of Fort WOrth Change Order Deletions East Side II 54" Water Main Phase I(Unit 1) and East Sitle Pump Station Discharge City Sec No. 43471 P262-608140036983 (Unit 1) and P265-608160036983 (Unit 2) DOE No. 6359 City Pro. No. 00369 54-inch Water Main Installation on Beach Street and Avenue B and Discharge Header Replacement at East Side Pumo Station Project Name Project No.(s) Project Description Contractor � S.J. Louis Construction of Texas, Ltd. City Project Mgr. Susan Schwinger Change Order #�2 Date 5/24/2013 City Inspector Raymond Brice DELETIONS ITEM IDESCRIPTION 1 54" Water Pipe Installetl in Trench 30 12" Gate Valve 31 8" Gate Valve 35 Fire Hydrant 36 1" Water Service 37 2" Water Service 38 6" Water Service 39 Temporary Water Service 40 6" concrete curb and gutter 41 7" Concrete Driveway antl Sidewalk Repair 42 7" Concrete Pavement Repair 43 10' Asphalt Pvmnt Repair inc Striping 45 Temporary Asphalt Paving Repair Inc Striping 59 Water Line Grouting 60 42" Water Abandonment Plug 63 6" Water Abandonment Plug 67 Salvage 36" Gate Valve 69 Remove 8" Water Valve 70 Remove 6" Water Valve 71 Salvage Fire Hydrant m :� Connection to Existinq 8" Water Main Connection to Existing 42" Water Main DEPT Water (Unit 1) Water (Unit 1) Water (Unit 1) Water (Unit 1) Water (Unit 1) Water (Unit 1) Water (Unit 1) Water (Unit 1) Water (Unit 1) Water (Unit 1) Water (Unit 1) Water (Unit 1) Water (Unit 1) Water (Unit 1) Water (Unit 1) Water (Unit 1) Water (Unit 1) Water (Unit 1) Water (Unit 1) Water (Unit 1) Water (Unit 1) Water (Unit 1) Qty Unit 25.00 LF 10.00 EA 8.00 EA 5.00 EA 4.00 EA 7.00 EA 3.00 EA 1.00 LS 741.00 LF 300.00 SY 786.00 SY 100.00 LF 726.00 LF 75.00 CY 2.00 EA 3.00 EA 1.00 EA 1.00 EA 4.00 EA 3.00 EA 3.00 EA 1.00 EA Water (Unit 1) Water (Unit 2) $9,600 $1, $1, $2� m $51 $11 $1,OC $2, $1, $ $ $1, $5, Deletions Sub Total Unit Cost � otal $11,600.00 $20,000.00 $76,800.00 $23,000.00 $3,600.00 $12,600.00 $5,400.00 $2,000.00 $11,115.00 $14,400.00 $42,444.00 $5,100.00 $3,630.00 $8,250.00 $2,000.00 $1,200.00 $2,000.00 $1,000.00 $2,1 $5,900 $259,939, $259,939 Page 3 of 4