Change Order Request
Project N
Project No.
Project Description
East Side II 54" Water Main Phase I(Unit 1) and East Side Pump Station Discharge ICity Sec No.
Header Replacement (Unit 2)
P262-608140036983 (Unit 1) and P265-608160036983 (Unit 2) DOE No. 6359 City Proj. No.
43471
00369
54-inch Water Main Installation on Beach Street antl Avenue B and Discharge Header Replacement at East Side Pump Station
Contractor S.J. Louis Construction of Texas, Ltd.
City Project Mgr. Susan Schwinger
Phone Number: 817-392-6529
Dept. � Water (Unit 1)
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
IAmount of Proposed Change Order
Revised Contract Amount
Original Funtls Available for Change Ortlers
Remaining Funds Available for this CO
Atltlitional Funding (if necessary)
122,346.00
��
��
19,812.00
319,
$16,
CHANGE ORDERS to DATE (INCLUDING THIS ONEJ AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTR,4CT COST+ 25%)
JUSTIFICATION
ORDER
158.00
-0.49%
$10,552,697.50
he change ordei• will provide for the deletion of the pay items for the proposed 42-inch water main on Scott �
venue and the addition of the necessaiy pay items for the extra footage of 54-inch watet• pipe that is needed on
�is contract. �,y
['he overall project scope of the Eastside II 54-inch water main consists of Phase I(54-inch water main), Phase II
new East Side Pump Station) and Phase III (54-inch water main).
project, Phase I, consists of the installation of a 54-inch water main north and south of I.H. 30 at Beach Street �
the installation of a 42-inch water main on Scott Avenue to connect the proposed 54-inch main to an existing (
:r main on Beach Street. a;
north
venue
��ward of the Phase 1 Contract, it was determined that the expected Summer 2013 �
����v�if�;��:�%� ���� additional footage of 54-inch water main from future Phase
;�}e.;�Dl , der to satisfy the projected demand and that the 42-inch c�
`�''l ; ���>�;,,� � i l� ,
d nee�o be d'e��t��• m the contract in order to install the additional footage. �
G�1�� U���(i;(�II�(���� II��� �
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and sati
(both time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's Comaanv Name
Contractor Name
S.J. Louis Construction of Texas, Ltd. � Justin Whitman �, � �, �,'; .: �
Water (Unit 2)
Change0rder# � Date: 1/10/2013
City Inspector Raymond Brice
Phone Number: 817-319-7943
Totals
�
Contract Time
, �,
260
F�RT WORTH
City of Fort Worth
Change Order Additions
East Side II 54" Water Main Phase I(Unit 1) and East Side Pump Station Discharge Header 43471
Project Name Replacement (Unit 2) City Sec No.
Project No.(s)
Project
Description
Contractor
City Project Mgr.
P262-608140036983 (Unit 1) and P265-608160036983 (Unit 2) DOE No. 6359 City Proj. No. 00369
54-inch Water Main Installation on Beach Street and Avenue B and Discharge Header Replacement at East Side Pump
Station
S.J. Louis Construction of Texas, Ltd. Change Order # 01 Date: 1110/2013
Susan Schwin er City Inspector Ra mond Brice
ADDITIONS
Unit Unit Cost
1a 3311.1174 54" Concrete AWWA C303 Water Pipe (PC 200) Installed in Trench Water (Unit 1)
2a 3305.2012 54" Concrete AWWA C303 Water Pipe (PC 200) Installed in Tunnel Water (Unit 1)
or Casinq Pipe
7a 3311.0871 36" Concrete AWWA C303 Water Pipe (PC 200) Installetl in Trench Water (Unit 1)
18 3305.1207 72" Casin /Tunnel Liner Plate B Other Than 0 en Cut Water (Unit 1)
53 0330.0001 Flowable Fill Encasement Water (Unit 1)
56 0241.1024 Remove 54" Water Line Water (Unit 1)
79 3312.0110 Connection to Existin 36" Water Main Water (Unit 1)
81 3312.0113 Connection to Existin 54" Water (Unit 1)
83 3331.4115 8" Sewer Pi e Water (Unit 1)
3311.1174 54" Concrete AWWA C303 Water �ipe (PC 200) Installetl in Trench Water (Unit 1)
86 (over 25%)
�
::
:�
1.0771 30" Concrete AWWA C303 Water Pipe (PC 200) Installed in Trench� Water (Unit 1)
3312.5003 54" AWWA Butterfly Valve & Vault (Smaller Vault)
3312.5003 54" AWWA Butterfly Valve & Vault (Thrust Restraining Vault)
3312.5001 42" AWWA Butterfly Valve, w/ Vault (Smaller Vault)
3312.3010 36" AWWA Butterfly Valve w/ Vault (Smaller Vault)
3312.3010 36" AWWA Butterfly Valve Direct Bury
3312.3009 30" AWWA Butterfly Valve Direct Bury
3201.0137 10' Asphalt Pvmt Repair includinq striping - Arterial
3201.0203 Asphalt Pavmt Repair Beyond Defined with inclutling striping -
0241.1020 Remove 30" Water Line
3312.0109 Connection to Existing 30" Water Main
3331.4201 10" Sewer Pipe
3339.1001 4' Manhole including Vacuum Test and Conc Collar (no lining)
3339.1002 4' Drop Manhole including Vacuum Test and Conc. Collar (no
100 Ilini
Cathodic Protection Svstem for Lines
Water (Unit 1
Water (Unit 1
Water (Unit 1
Water (Unit 1
Water (Unit 1
Water (Unit 1
Water (Unit 1
Water (Unit 1
Water (Unit 1
Water (Unit 1
Water (Unit 1
Water (Unit 1
Water (Unit 1)
Water (Unit 1)
560.00 LF $ 464.00 $ 259,840.00
61.00 LF $ 444.00 $ 27,084.00
45.00
61.00
250.00
50.00
1.00
2.00
40.00
LF
0
723.00 � $ 32,535.00 �
LF
CY
LF
EA
EA
LF
809.00 I LF
60.00
LF
8.00
1.00
6.00
4.00
1.00
2.00
1240.00
400.00
330.00
1.00
86.00
1.00
EA
EA
EA
EA
EA
EA
LF
SY
LF
EA
LF
EA
1.00 EA
1.00 LS
0
0
�
�
1,940.00 $ 118,340.00
69.00 $ 17,250.00
15.00 $ 750.00
4,400.00 $ 4,400.00
6,400.00 $ 12,800.00
81.00 $ 3,240.00
718.00 $ 580,862.00
766.00 � $ 45,960.00
$ 87,000.00
$ 87,000.00
$ 57,000.00
$ 53,000.00
$ 30,000.00
$ 27,000.00
$ 63.00
$ 57.00
$ 15.00
$ 4,400.00
$ 85.00
$ 3,000.00
Q
0
0
0
696,000.00
87,000.00
342,000.00
212,000.00
30,000.00
54,000.00
78,120.00
22,800.00
0
0
�
7,310.00
$ 4,000.00 � $
Unit
Unit
8,000.00
Sub Total
4,000.00
8,000.00
6.641.00
2,656,641.00
Page 2 of 4
FORT VVORTH
Project Name
Project No.(s)
Project Description
City of Fort Worth
Change Order Deletions
East Side II 54" Water Main Phase I(Unit 1) and East Side Pump Station Discharge Header
Replacement (Unit 2)
P262-608140036983 (Unit 1) and P265-608160036983 (Unit
2)
DOE No. 6359
City Sec No.
City Proj. No.
43471
00369
54-inch Water Main Installation on Beach Street antl Avenue B and Discharge Header Replacement at East Side Pump Station
Contractor S.J. Louis Construction of Texas, Ltd. Change Order #�1 Date 1/10/2013
City Project Mgr. Susan Schwinger City Inspector Raymond Brice
ITEM IDESCRIPTION
4a I3311.0971 42" Concrete AWWA C303 Water Pipe (PC 200) Installed
in Trench
5a 3305.201 42" Water Carrier Pipe (PC 200) Bar Wrapped Concrete
Cylinder Pipe installetl in Tunnel or Casing Pipe
10a I3311.0681 24" Concrete AWWA C303 Water Pipe (PC 200) Installetl
in Trench
3305.2007 24" Water Carrier Pipe AWWA C303 (Pressure Class
11 a 200) Bar Wrapped Concrete Cylinder Pipe Installed in Tunnel or
Casing Pipe
12a �3305.2007 24" Bar Wrapped Concrete Cylinder Pipe C303 Fittings
14 3311.0441 12" Water Pipe
15 3305.200412" Water Carrier Pipe
16 3311.0241 8" Water Pipe
17 3311.0141 6" Water Pipe
19 3305.1010 60" Steel Casing by Open Cut
22 3305.1201 36" Casing/Tunnel Liner Plate by Other Than Open Cut
23 3305.1104 20" Casing By Other Than Open Cut
24 3305.1004 20" Casing By Open Cut
25 3305.100216" Casing By Open Cut
26 3312.5003 54" AWWA Butterfiy Valve, w/ vault and by-pass
27 3312.5001 42" AWWA Butterfly Valve, w/ vault and by-pass
28 3312.3010 36" Gate Valve w/ Vault & by-pass
29 3312.3008 24" Gate Valve wl Vault & By-Pass
33 3312.1004 4" Water Air Release Valve & Vault
34 3312.6003 8" Blow Off Valve
DELETIONS
DEPT Qty
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 11
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
Water (Unit 1)
1604.00
20.00
360.00
120.00
1.00
710.00
135.00
1300.00
30.00
20.00
120.00
120.00
20.00
25.00
6.00
10.00
8.00
2.00
1.00
1.00
Unit Unit Cost
LF $
LF $
LF $
LF $
LS $
LF
LF
LF
LF
LF
LF
LF
LF
LF
EA
EA
EA
EA
EA
EA
��
��
��
��
��
��
��
��
��
��
��
��
��
��
��
1�
Sub Total
Total
426.00 $
420.00 $
234.00 $
228.00 $
1.00 $
64.00
74.00
50.00
50.00
394.00
716.00
520.00
53.00
45.00
89,000.00
60,000.00
50,500.00
27,900.00
9,700.00
10,500.00
�
�
�
0
0
0
0
0
0
0
0
0
0
�
�
683,304.00
8,400.00
84,240.00
27,360.00
`1[iIi]
45,440.00
9,990.00
65,000.00
1,500.00
7,880.00
85,920.00
62,400.00
1,060.00
1,125.00
534,000.00
600,000.00
404,000.00
55,800.00
9,700.00
10,500.00
$2,697,620.00
$2,697,
Page 3 of 4
Page 4 of 4