HomeMy WebLinkAboutContract 43406-CO2 (2)F4RT WORTH
City of Fort Worth
Change Order Request
'�:;��a �s����'�� (�
�_.`,���GT �AJ� _,� �� [ �Q�����
Project Name Clear Fork Drainage Basin M-210 Sewer Improvements, Part 2 City Sec No. 43406
Project No.(s) P275-703170102287 DOE No. 6807 City Proj. No. 1022
Project Description:l Country Club Circle.
Contractor:l North Texas
Inc.
City Project Mgr. Roberto C. Sauceda
Phone Number: 817-392-2387
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
h_ �� . . , . i• • , • • ,[y� .'FTi�T:��IT[�'i
sanitary sewer une on �o
Sewer
Totals
708.20
708.20
Revised ContractAmount $1,075,988.20
Original Funds Available for Change Orders $31,000.00
Remaining Funtls Available for this CO $31,000.00
Atltlitional Funding (if necessary) $15,280.00
main m
Change Order: � Date: 9/15/2015
City Inspector: Raymond Brice
Phone Number: 817-223-2269
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTR.4CT
MAXALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%J
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Contract Time
(Calender days)
180
$1,029,708.20 180
$46,280.00 090
$1,075,988.20 270
$31,000.00
$31,000.00
$15,280.00
4.49°/a
$1,287,135.25
The change order will provide for additional pay item quantity of 52 inch concrete reinforced storm drain
pe to extend it to Clear Forlc Trinity River as required by the USCOE and Tarrant Regional Water District.
xtending the pipe will prevent erosion the south side of the river. The change order will �Iso allow fot_ the
�letion of pay item quantities that are no longer necessary on the project. �,'�= �.
��.
Staff concurs with the contractois request for 90 additional calendar days on this
! ;� �, .
�� ,a.
:-.� ;,F�
���
1..,..
, fi11Y0FFORTVVOR':rl �>
, r,��lS�GBE.TARY ���;/
E.
�
R�GEIV�D
SEP 2 3 2015
� '.
�: �
� r :?'�
� � =, -�.�.
�. .
'� �?yA�,'�"�x '�'?r
����
- � a
""� „�
n�
0
�
o°
n �,
�a,o;
�i;`��
; .
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accortl and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
FORT WORTH
City of Fort Worth
Change Order Additions
Project Name Clear Fork Drainage Basin M-210 Sewer Improvements, Part 2 City Sec No. 43406
Project No.(s) P275-703170102287 DOE No. 6807 City Proj. No. 1022
Project
Description
Contractor
City Project Mgr
Installation of 1,400 feet of 36-inch sanitary sewer line on Colonial Parkway and 2,110 feet of eight-inch water main in
Country Club Circle.
North Texas Contracting, Inc. Change Order: �1 Date: 9/15/2015
Roberto C. Sauceda City Inspector Raymond Brice
ADDITIDNS
III, per linear
Sewer
DEPT
Q Unit
150.00 LF
Unit Cost
$500.00
Total
5,000.00
$75,000.00
Page 2 of 4 �Additions Sub Total �$75,000.00
FORT WORTH
Project Name
City of Fort Worth
Change Order Deletions
Clear Fork Drainage Basin M-210 Sewer Improvements, Part 2
Project No.(s) P275-703170102287
Project Description
Contractor
City Project Mgr.
DOE No. 6807
City Sec No.
City Proj. No.
43406
1022
Installation of 1,400 feet of 36-inch sanitary sewer line on Colonial Parkway and 2,110 feet of eight-inch water main
in Country Club Circle.
DELETIONS
North Texas Contracting, Inc. Change Order: �1 Date 9/15/2015
Roberto C. Sauceda City Inspector Raymontl Brice
ITEM DESCRIPTION DEPT
21 Topsoil
23 Seeding, Hydromulch
25 Shrubs
26 4" Conc. Sidewalk
33 6" Concrete, Curb and Gutter
Sewer
Sewer
Sewer
Sewer
Sewer
Qty Unit
120.00 CY
1200.00 SY
20.00 EA
1980.00 SF
800.00 LF
r
Unit Cost
$30.00
$1.00
$200.00
$4.00
$15.00
Total
$3,600.00
$1,200.00
, 920.00
2,000.00
$28,720.00
Page 3 of 4 �Deletions Sub Total �$28,720.00
•,:. . . .
Previous Change Orders