HomeMy WebLinkAboutContract 44155-A1 (2)_ �sf _ = � ., �.� � t �, :�� FIRST AMENDMENT TO CITY SECRETARY CONTRACT NO. 44155 WHEREAS, on January 8, 2013 (M&C G26051), the City of Fort Worth ("City") and Mario Sinacola & Sons Excavating, Inc. ("Contractor"), collectively the ("Pai-ties"), made and entered into City Secretary Contract No. 44155 (the "Contract") for construction of the North Beach Street Expansion ("ProjecY'); and WHEREAS, the Contractor proposed an alternative to the plans, to wit: full closure of North Beach Street in the Project area in order to increase motorist and worlcer safety and allow for a reduction in work time for the excavation portion of the Project; and WHEREAS, Contractor agreed to increase the liquidated damages found in the Contract and perform certain additional taslcs in exchange for the City allowing the extended road closure; and WHEREAS, on July 9, 2013 (M&C G-17931), the City Council authorized the tempoi•ary closure of North Beach Street fi•om Heritage Glen Drive to Heritage Trace Pai•lcway for roadway construction activities fi•om July 15, 2013 to November 22, 2013. NOW, THEREFORE, the Parties, hereby agree as follows: I. a. Contract No. 44155 is hereby amended to provide that liquidated damages in the amount of $7,500.00 per day shall be imposed far� each day that North Beach Street remains closed to the ti•aveling public beyond November 22, 2013. The Parties agree and acicnowledge that these damages are for delay only and not a penalty. Additionally, this same amount of liquidated damages shall be imposed _._for_ Contracroi�,',.c fail�re. tq constt�uct, an_emergency access ,roacl_with.izi. two, we.e�cs . from the date North Beach Sh�eet is first closed. If adverse weather conditions are the basis for a Claim for additional time, such Claim shall be documented by data substantiating that weather conditions were abnormal for the period of time, could not have been reasonably anticipated and had an adverse effect on the scheduled construction. Likewise, if utility conflicts are the basis for a Claim for additional time, such Claim shall be documented by data substantiating that the utility conflict had an adverse effect on the scheduled consh•uction. b. The Contract is fiu�ther amended to provide that the Worlc shall be complete and ready for Final Acceptance by July 15, 2014 (Agreement, Section 00 52 43, Article 3, Part 3.2). Failure to meet this deadline, absent legitiinately issued extensions of time, shall result in liquidated damages being imposed under the terms of the Agreement, Section 00 52 �3, Articl� 3, Part 3.3, at a rate of eight �;i�- i, �, �� ,,, �[�� CONTRACT AMENDMENT 1 CSC NO. 44155 Mario Sinacola & Sons — N. Beach St Closure �k`u'���'�lz���� ,��,;_, : _. �1�'� ��C��T � � �`�� ���T�9 �., Page 1 R�CEi�E� JAf� 4 �3 ��1� hundred and foi•ty Dollars ($840.00) per day. II. All other terms and conditions of the Conh•act not amended hei•ein remain unaffected and in full force and effect on the Parties. IN WITNESS WHEREOF, the City and the Conti•actor have each executed this First Amendment in multiple counterparts by and through each Party's duly authorized signatory. This First Amendment is effective as of the last date signed by a Party hereto. c�o- :�I��p �jNDuiLl9 �-U�5 �ll. /v/, Ci of Fort Worth � i3' , i- ►1�..�i- z.G��J�c. Title Date: ��—Q /'p��/� �����. Fernando Costa, Assistant City Manager Date: /�z� 4 � � Recommended: �-.J � CJ A./dd�ress: j0 �j SD 1'� cScq i2c l� R/� �P�.~,S(D � � �SQ �� City/State/Zip: CONTRACT AMENDMENT 1 CSC NO. 44155 Mario Sinacola & Sons — N. Beach St. Closure Dougla� W. Wiersig Direct r Transportation and Public W •lcs Approved as to Form and Legality: Black Assistant City Attorney M&C Af�/`� Date: � 0 City Secretary �