HomeMy WebLinkAboutContract 43075-CO1 (2)FORT WORTH Clty Of FOrt WOrth ��� ��������� �,�''�`;: Change Order Request �����T ��° p` r' ��'� �+ U `7�T�s Project Name Water and Sanitary Sewer Relocation on State Highway 114, Part 1 City Sec No. �96� ' ""�5• Project No.(s) PW77-60770140600 DOE No. 6485 City Proj. No. 01515 Project Description: Water and sanitary sewer main relocation on State Highway 114 from Championship Parkway to IH-35W to accommodate TxDOT road widening project of State Highway 114 from Blue Mound Road to IH-35W Contractor: Wright Construction Company,lnc. Change Order: �1 Date: 1/10/2013 City Project Mgr. Roberto C. Sauceda City Inspector: Paul Gieger Phone Number: 817-392-2387 Phone Number: 817-223-2258 Dept. Original Contract Amount Extras to Date Cretlits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Adtlitional Funding (if necessary) Water Sewer ,149,568.84 $116,325.00 $43,679.58 ,193,248.42 $116,325.00 $35,000.00 $6,000.00 $35,000.00 $6,000.00 $8,679.58 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER The change order will provide additional pay item quantities for the following: • The removal and replacement of an existing 42-inch storm drain and a 10 foot storm drain that were encountered in direct conflict during construction. • The removable and replacement of concrete encasement that was encountered during the connection of the 24-inch transmission main to the existing main. • The repair of a break on the existing 24-inch transmission main during construction in order to maintain water to a Customer City and Texas Motor Speedway. ___ ��i.e- an existing 30-inch steel casing pipe to extend beyond new T�OT right of way. ���'I��Ju�thien�l �''-�a existing 24 inch gate valve vault that was encountered during construction. �� �i 1( ��>f�'( ��'i ;'r��1f��Z�( �, contractors request for 100 additional calendar days on this change order. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord antl satisfaction and i in full (both time and money) for all costs arising out of, or incitlental to, the above Change Order. Contractor's Com an Name Contractor Name Contractor Si nature Wright Construction Company,lnc. Jim RipKa ___ �� ��,�; ��, � . ` Date .�,[Ll �lr.. �. ��,j �(�� t Date ' ,� 1� �. Date : � .� c�_-�: , _ ���> . M&C Number N/A �.?� � Man�age�� . � = r ,.�- Su M&C Date Approved N A Totals Contract Time (Calendar days) 1,265,893.84 110 1,265 $41, $41, 3.45% $1,582,367.30 110 100 210 ,� � resen� paymer� Date �, -������ Date �', . ._��s Date !r . ' Date 3 l� �3 �IV�D �fA� � 5 `lUi�" FC�RT WORTH City of Fort Worth Change Order Additions Project Name Water and Sanitar Sewer Relocation on State Hi hwa 114, Part 1 City Sec No. 23966 Project No.(s) PW77-60770140600 DOE No. 6485 City Proj. No. 01515 Project Water and sanitary sewer main relocation on State Highway 114 from Championship Parkway to IH-35W to accommodate Description TxDOT road widening project of State Highway 114 from Blue Mound Road to IH-35W Contractor Wri ht Construction Com an ,Inc. Change Order: �1 Date: 1I10/2013 City Project Mgr. Roberto C. Sauceda City Inspector Paul Gie er ADDITIONS an st g 4z-incn 5torm urain ripe ana : backfill on existina water main : that blew off Pipe Valve Vault nlet Water Water Water Water Water DEPT 1.00 1.00 1.00 1.00 1.00 LS LS LS LS Sewer $15,535.77 $5,048.51 $13,604.17 $7,903.67 $7, 659.96 Total 15,535.77 $5,048.51 13,604.17 $7,903.67 $7,659.96 Page 2 of 4 �Additions Sub Total �$49,752.08 FnRT WORTH Project Name Project No.(s) City of Fort Worth Change Order Deletions Water and Sanitary Sewer Relocation on State Highway 114, Part 1 PW77-60770140600 City Sec No. 23966 DOE No. 6485 City Proj. No. 01515 Project Description Water and sanitary sewer main relocation on State Highway 114 from Championship Parkway to IH-35W to accommodate I TxDOT road wideninq prolect of State Hiqhway 114 from Blue Mound Road to IH-35W Contractor Wright Construction Company,lnc. Change Order: �1 Date 1/10/2013 City Project Mgr. Roberto C. Sauceda City Inspector Paul Gieger DELETIONS ITEM IDESCRIPTION 17 �24" Water Abandonment Plug DEPT Water Unit 3.50 I EA Unit Cost $1,7 $6,072.50 $6,072.50 Page 3 of 4 �Deletions Sub Total � $6,072.50 Page 4 of 4