HomeMy WebLinkAboutContract 43075-CO2 (2)�6TY SECi�ARY/ �, , . e FORT «C�RTH City of Fort Worth �j��T��� °�, !� �� �G' � Change Order Request Project Name Water and Sanitary Sewer Relocation in State Highway 114, Part 1 City Sec No. 43075 Project No.(s) P253-602170151583 and P258-702170151583 DOE No. 6485 City Pro. No. 01515 Project Description Water and Sanitary Sewer main relocation on state Highway 114 from Championship Parkway to IH-35W to accommotlate TXDOT roatl widening project of State Highway 114 from Blue Mound Roatl to IH-35W Contractor Wright Consrtuction Company, Inc. City Project Mgr. Robert Sauceda Phone Number: 817-392-2387 Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proaosed Chanae Order Original Funds Available for Change Orders Remaining Funds Available for this CO Atltlitional Funding (if necessary) Water 1,149, 568.84 $43,679.58 1,193,248.42 $17,989.00 1,211,237.42 $35,000.00 $17,989.00 Sewer Water Alt A Totals 110 100 $43,679 11 6,000.00 6,000.00 38,273.50 CHANGE ORDERS to DATE (INCLUDING THIS ONEJ AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $1,447,846.92 210 $20,927.50 $1,468,774.42 210 $41,000.00 $6,000.00 $20,927.50 4.60% $1,755,209.18 The Change Order will provide increased and additional pay item quantities of topsoil, 10-inch gate valve, sod, fence, 24-inch PVC water pipe and concrete water vault removal that were necessary to complete the project. .� � '. i �'' � �, ; i �, �. .- _ , � m � m � m 0 CJ'J � � � "� f�J C1 s> � Change Order # �2 Date: 9/14/2013 City Inspector Paul Gieger Phone Number: 817-392-8371 Contract Time It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incitlental to, the above Change Order. FORT WORTH c�ty of Fo�t wo�tn Change Order Additions Project Name Water and Sanita Sewer Relocation in State Hi hwa 114, Part 1 City Sec No. 43075 Project No.(s) P253-602170151583 antl P258-702170151583 DOE No. 6485 City Pro. No. 1515 Project Water and Sanitary Sewer main relocation on state Highway 114 from Championship Parkway to IH-35W to accommodate Description TXDOT road widening project of State Highway 114 from Blue Mountl Road to IH-35W Contractor City Project Mgr Wri ht Consrtuction Com an , Inc. Change Ortler #�2 Date: 9/14/2013 Robert Saucetla City Inspector Paul Gie er ADDITIONS i 7 � 10" Gate Valve 22 Remove Concrete Water Vault 26 Topsoil 27 Block Sotl Replaceme 28 Remove French Drain 29 Barbetl Wire Fence, N 1-A 24" PVC G905 Water Water Water Water Water Water Alt A 1.� 447.00 LF 958.00 SY 112.00 LF 112.00 LF 18.00 LF it Cost $1.00 $6.50 $3.00 $4.00 $19.00 163.25 Total $447.00 $6,227.00 $2,874.00 $448.00 $2,128.00 $2,938.50 Water $17,989.00 Sewer Water Alt A $2,938.50 Additions Sub Total $20,927.50 Page 2 of 4 Breakdown Previous Change Orders Co# DATE AMOUNT Total $0.00 � � �•� CITY SECRE?AR�f o �.