Loading...
HomeMy WebLinkAboutContract 43796 CITY 81CRUARY � CITY SECRkTARY CONTRACT�QRT WORTH N0. � C0NTRA �� ��ca� PROJECT MANUAL C0NSff4X7w1c0SCOPY FOR tUENT DEPARTMENT THE CONSTRUCTION OF VA BEIMYRIVERSIDE URBAN VILLAGE CSJ: 0902 48 826 FEDERAL AID PROJECT NO.DMO 2007(208) CITY PROJECT NO. 00706 DOE: 6059 Betsy Price Tom Higgins Mayor City Manager Douglas W. Wiersig, P.E. Director, Transportation and Public Works Department Prepared for The City of Fort Worth Planning and Development r MAY 2012 i Prepared By Mrs, FREESE N,CHOLS 4055 International Plaza,Suite 200 Fort Worth,TX 76109-4895 Phone: (817)735-7300 Fax:(817)735-7491 FNI Project No. FTW08421 OF F I CIAL RECORD CITY SECRETARY PLEASE DO NOT no WRHI• X DISSASSEMBLE "� 10-24-12 PO4:29 IN M&C Review Page 1 f o 2 - Official site of the City of Fort Worth,Texas WoRm CITY COUNCIL AGENDA Fo RT COUNCIL ACTION: Approved on 10/2/2012 DATE: 10/2/2012 REFERENCE**C-25889 LOG 06BERRYIRIVERSI E Nos: NAME; D URBANVILLAGESTREETSCAPE 4 CODE: C TYPE: CONSENT PUBLIC NO HEARING. SUBJECT: Authorize Execution of a Contract with The Fain Group, Inc., in the Amount of$492,080.46 for the Construction of Pedestrian and Streetscape Improvements in the Berry/Riverside Urban Village on East Berry Street Between Yuma Street and the Sycamore Creek Bridge(COUNCIL DISTRICT 8) RECOMMENDATION: T It is recommended that the City Council authorize the execution of a contract with The Fain Group, Inc., in the amount of$492,080.46 for the construction of pedestrian and streetscape improvements in the Berry/Riverside Urban Village on East Berry Street between Yuma Street and the Sycamore Creek Bridge. DISCUSSION: On September 23, 2008,the City Council authorized the execution of an engineering Agreement with Freese and Nichols, Inc.,to design pedestrian and streetscape improvements in the Berry/Riverside Urban Village(M&C C-23069). Public meetings were held with property owners and stakeholders of the Berry/Riverside Urban Village on two occasions to receive their input on the streetscape elements. Texas Department of Transportation (TxDOT)completed its review of the design plans and approved the project for letting on May 15,2012. This project consists of the following pedestrian and streetscape improvements: construction of new sidewalks, curb and gutter, decoratively stained crosswalks, installation of pedestrian lights, and other decorative pavement treatment in association with public art collage banners and poles at the northeast and southwest comers of the East Berry and Riverside intersection. The estimated construction costs are as follows: IStreetscape Construction $492,080.46 Survey, Material Testing, Inspections, $x7,721.92 etc. Pedestrian Lights $65,838.00 Construction Mana ement $19,604.61 Ten Percent Contingency 9 y $49,20$.05 Total =$684.11463.04 'rhe streetscape construction, survey, material testing, inspections, etc., and the contingency is funded by Federal Highway Administration grant funds in the amount of$599,010.43. The amount for the pedestrian lights will be funded by the City's Street Light and Signal Improvements Fund in the amount of$65,838.00.The estimated construction management fee is funded by the 2004 Capital Improvement Program New Development Fund in the amount of$19,604.61. The design, fabrication, and installation of the public art collage banners and poles, estimated at $50,000.00, is additional to the project and funded by the Fort Worth Public Art Fund. The project was advertised for bids on May 31, 2012 and June 7,2012 in the Fort Worth Star- Te1ogram in compliance with TXDOT requirements. On Jane 28,2012, the following bids for the streetscape construction, stained concrete and http:l lwww.fortwofthgov.orglcouncil_packet/mc review.asp?ID=17458&councildate=l 01... 10/8/2012 000515-1 ADDENDA Page I of 5 1 OF SECTION 00 0515 q lt AW y 1 2 ADDENDUM NO. 1 3 4 a60*i®9.60.&ea®e0somas 0"see 4 SPENCER B. MAXWELL Of ...®...�..®a......o. .-p- . ■ 5 ERR Y RIVERSIDE URBAN ULLA GE J�. *s 0 9 9�16 0 � 0902 48 826 0��,89 6CEN50� �,w 7 FEDERAL AID PROJECT NO. DMO 2007(208) ��s f�����.��e��l� ONAL Z 6/1 8 DOE: 6059 9 10 ISSUE DATE: JUNE 265 2012 EESE AND NICH S, INC. TEXAS REGISTERED 11 ENGINEERING FIRM F-2144 12 This addendum forms part of the Contract Documents referenced above and modifies the original 13 Contract Documents. Acknowledge receipt of this Addendum by signing in the space below and 14 attaching it to the Contract Documents (inside). Note receipt of this Addendum in the Bid 15 Proposal and on the outer envelope of your bid. 16 17 1. GENERAL 18 a. MODIFICATION—Modify the plans and specs from City of Fort Worth 19 project number of 90` to 01833. 20 b. CLARIFICATION—All concrete scoring shall be included in the base bid and 21 shall be subsidiary to the respective concrete bid items. 22 PW 23 2. FLANS 24 a. MODIFICATION--Modify sheet 2 by replacing with the attached sheet 2, 25 titled"Sheet Index". 26 b. ADDITION--Add sheet 26A,FULL DEPTH REPAIR FOR CONCRETE 27 PAYMENT,to this plan set 28 c. ADDITION--Add sheet 8,TRAFFIC CONTROL PLAN STA.. 19+00 TO 29 24+00,to the plans. Sheet 8 is attached to this addendum. 30 d. CLARIFICATION—Sheet 255 Paving Plan Sta. 19+04 to End,the area located 31 Within the intersection shall be paved With 1.5 inches EIMAC,D-GR 32 HM A(MET H)TY-D SAC-B PG 70--22. CITY OF FORT WORTH BERRY RI VERS)DE UJZBAN VILLAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CV. 0902 48 826 Revised June 2I,2012 CITY PROJECT NC.01833, DoE:6059 ADDENDUM ND. 1 PAGE 1 OF 33 000515-2 ADDENDA Page 2 of 5 1 e. MODIFICATION--Modify Skeet 6 as follows: 2 i. Deletion—Delete Item.416,DRILL SHAFT(18 IN), from the Additive 3 Alternate"C"quantity summary table. 4 H. Addition—Add Item 416,DRILL SHAFT(18 IN),to the summary of 5 roadway items quantity summary table. 6 iu. Addition—Add Item 361 (Description Code 2059),FULL-DEPTH 7 REPAIR JRCP (7 IN),measured by the square yard,SY,with a quantity 8 of 10 SY. This item shall be used to pay for the construction of the 9 pavement area required to be removed to construct the irrigation tap into 10 the water main located within the Berry Street pavement parallel to and 11 approximately 1 V south of the curb along the north side of the roadway. 12 iv. Modification—Modify the quantity for Item 104,REMOVING CONC 13 (PAV),from a quantity of 492 SY to 502 SY. The additional removal 14 quantity is to account for pavement removal necessary to construct the is irrigation tap. 16 v. Modification--Modify the quantity for Item 529, CURB AND 17 GUTTER(TYPE II-B),from a quantity of 4.2.310 LF to a quantity of 2233 18 LF. 19 f. MODIFICATION--Modify sheet 64,Electrical Details,by modifying the 20 elevation of the top of the light pole foundation to match the elevation of the 21 bottom of the sideway pavement(i.e. The light pole foundation shall be 4" 22 below the finished grade to allow for a 4"sidewalk to be paved over and across 23 the light pole foundation). The overall length of the light pole foundation shall 24 be as shown in the plans. The sidewalk pavement shall be placed over the entire PM 25 foundation and stained the same as the adjacent concrete. 26 g. MODIFICATION—Modify sheet 60,Electrical Notes&Schedules,by adding 27 the following to the Electrical Service Notes: 28 "3.The pedestal electric service equipment shall be furnished by the City of 29 Fort Worth and installed by the contractor. The contractor shall furnish and 30 install foundation and all associated conduit,conductors and any incidentals 31 necessary to fully install the electrical service." 32 h. MODIFICATION—Modify sheets IR--1 and IR-2 by adding the following note: 33 "All irrigation pipes located under the Berry Street pavement to be installed 34 by boring in accordance with TxDOT spec Item 170." 35 CrrY OF FORT WORTH BFJZRYArVERSLDE URBAN VMUGF STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CSI.•0902 48 826 ■ Revised June 215 2412 CTYY PROJECT NO.01833, DoE:6059 ADDENDUM NO. 1 PAGE 2 OF 33 W05 15-3 ADDENDA Page 3 of 5 1 3. SPECIFICATION SECI'`ION 00 11 13—INVITATION TO BIDDERS 2 a. MODIFICATION—Modify the time bids will be received until 1:30 PM , 3 Thursday,June 28,2012 and bids will be opened publicly and read aloud at 2:00 4 PM. in the Council Chambers to be received until 1:30 PM Central Da li ht 5 Time CDT,),Thursday,June 28,2012, and bids will be opened publicly and read 6 aloud at 2:00 PM CDT in the Council Chambers. 7 8 4. SPECIFICATION SECTION 00 4100—BID FORM(Attached to this addendum) 9 a. MODIEFICATION---Modify the City Project No.: to 01833. 10 b. MODIFICATION---Modify section 3,Prequalifi cation.,by removing I I from the list of work types that must be performed only by 12 prequaiified contractors and subcontractors. 13 14 5. SPECIFICA'T'ION SECTION 00 42 43---PROPOSAL FORM(Attached to this 15 Addendum) 16 a. ADDITION---Add TxDOT Spec Item 361 (Description Code 2059)listed as Bid 17 list Item No. I1-16,FULL-DEPTH REPAIR JRCP(7IN),measured by the square 18 yard,SY,with a quantity of 10 SY. 19 b. ADDITION--Add TxDOT Spec Item 416(Description Code 2001)listed as Bid 20 list Item No. II14,DRILL SHAFT(181N), measured by the linear foot,LF,with W 21 a quantity of 88 LF 22 c. DELETION--Delete Additive Alternate"C"Bid list Item NO. C-2,DRILL 23 SHAFT(l 8IN)with a quantity of 88 LF 24 d. MODIFICATION—Modify the quantity for Additive Alternate Bid List Item 25 No.A-2,COLOR 2(CS-12 WEATHERED BRONZE)(Sheet 52,Detail I &2) 26 from 218.555556 SY TO 219 SY. 27 e. MODIFICATION—Modify the quantity for Bid list Item No.I--2,REMOVING 28 CONC(PAV),from SY to 502 SY. 29 f. ADDITION--Add TxDOT Spec Item 502(Description Code 2001)listed as 30 Additive Alternate"B"Bid list Item No.B-2,BARRICADES, SIGNS AND 31 TRAFFIC HANDLING,measured by the month,MON,with a quantity of 1 32 MOM. This item is intended to pay for all additional barricades,signs,and traffic 33 control necessary to perform work included as part of Additive Alternate"B". CITY OF FORT NORTH BEAR YRJ ERSIDE URBAN YLUAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CSI.-0902 48 826 Revised June 21,2012 CFrY PROTECT NO.018337 DOE:6059 ADDENDUM NO. I PAGE 3 OF 33 PW 000515-4 ADDENDA Page 4 of 5 1 g. ADDITION—Add TxDOT Spec Item 502 (Description Code 2001)listed as 2 Additive Alternate "E"Bid list Item No.E-2,BARRICADES,SIGNS AND 3 TRAFFIC HANDLING, measured by the month,MOM,with a quantity of 1 4 MON. This item is intended to pay for all additional barricades, signs,and traffic 5 control necessary to perform work included as part of Additive Alternate"E". 6 h. MODIFICATION--Modify the quantity for Unit 11—Roadway Bid Item 11-7 w 7 from 4230 LF to 2233 LF. 8 PW 9 6. SPECIFICATION SECTION 00 72 00—General Conditions(General Conditions 10 Page 25 of 62 attached to this Addendum) 11 a. MODIFICATION—Modify Section 6.07, Wage Rates, sub section"A"by 12 removing the reference to and replace 13 with Wage_Rates as shown in Appendix Section"GC-6.07 Wage 14 15 7. SPECIFICATION SECTION 00 73 00--Supplementary Conditions 16 (Supplementary Conditions Page 4 of 6 attached to this Addendum) 17 a. MODIFICATION—Modify Section SC-6.07,, "Wage Rates",by removing the 18 following"GeneFal Decision 19 , 20 21 — 'and replace with General 22 Decision Number:TX120035 01/06/2012_TX35(Refer to Appendix Section GC- 23 6.07 Ware Rates shown in the back of this project manual. 24 25 8. SPECIFICATION—GENERAL NOTES(General Notes attached to this 26 Addendum) sk 27 a. Modification—Modify the General Notes by including the following section: 28 "Item 170. Irrigation 29 30 The irrigation contractor shall contact appropriate agencies for tap and 31 installation of water meters into water supply at designated locations 32 and pay for directly to noted agencies, unless noted otherwise. 33 Irrigation contractor shall install all double check valve assemblies as 34 indicated in the plans." CI'T`Y OF FORT WORTH BERRY RIVERSIDE URBAN VILLAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CV-0902 48 826 W Revised June 21,2012 CITY PROJECT NO.01833, DoE:6059 ADDENDUM No. 1 PAGE 4 OF 33 ■ 000515-5 �r ADDENDA Page 5 of 5 1 b. Modification—Modify the General Notes by including the following sentence at 2 the end of the Item 502. Barricades, Signs and Traffic Handling: 3 "The contractor shall maintain a minimum of one lane for all 4 intersection approaches throughout all phases of construction." 5 c. Modification—Modify the General Notes by including the following sentence at 6 the end of the Item 360, "Concrete Pavement": 7 "All crosswalk scoring shall be subsidiary to Item 360 and shall be 8 constructed at the time the crosswalk is constructed." 9 10 d. Modification—Modify the General Notes by including the following sentence at 11 the end of the Item 530 And 531, "Intersections,Driveways and Turnouts,and 12 Sidewalks": 13 "All sidewalk scoring shall be subsidiary to Item 530 and shall be 14 constructed at the time the sidewalk is constructed." 15 16 Failure to return a signed copy of the addendum with the Proposal shall be grounds for rendering 17 the bid non--responsive. A signed copy of this addendum shall be placed into the Proposal at the 18 time of bid submittal. 19 20 Receipt Acl/n' wledged: 21 By• PE y' ra 'e President 22 Comp y: The Fain Group, inc. PF 23 24 END OF SECTION 25 PIN CITY OF FORT WORTH BERRYRIVERSIDE URBAN VILLAGE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CSJ.•0902 48 826 Revised June 21,2012 CITY PROJECT No.01833, DOE:6059 ADDENDUM NO. 1 PAGE 5 OF 33 PM i � I � I, II I �� ;� i I � � I� "�' � i �.� «, ., I �. ii i i i j � � i d, � � � W � ,> i j i .. '' � � I � � i �' i '� I �. � �, i ,. I I ,� I I I „„ I I � i l � I „� � � � ,: � � i '' i i � i i I � � � I � i � i �. i ,, � �, � �i "` � "" � i I �� � �'� � �I � �� � "����a � Ili ��, I � �� i� �' ��� � � � :� ,. �,,,: I � ", I i� �. � � :� � � i �� i � i ,� i I� � I I I � I � � � �„ >;,,: y„ � i� i � i I� i �� I� �,,, i ,, i ,, ; I I � � I r i �, a � � � � '� L �; I r; I I i i w� i I (,. � � � i � pw:, rr» aw .m �: �, I I �" ��, � i _ .. i i � � �. � r � I� �� � I I �� � � I i � I I � II I � �„ i i I � i. � � ,, I � yaw i � I � eIM, I !' a � �n. � .nx � i � � ��. I i i:..�r; � ���. �� I '.: i is I i I I I I � ; I � �» � I I ��. i I i i I �rw I ' i min I I � I �. II I I I I i I � I I i I I I i I I I I I I I �i i i� �u a �� ��"4 �� � ,4,. r, ��� r � J � � � ,�,I �, i � I ��� F i � � I �" � � "! � «� � i �i � III � � � � i�' r �� "�� �i�' ,fi � � � ,� � I ;�' �it I�� � � � ii �� i "I � i i I I I I� �� I �: I � „„ � � � I � i I " i i � � � � � �i I � I � I � � I I r. I, � _ � � � � �� � III �I i � .� "i �i � �M i �� ����i� i I I � �I I � �� "'� � � � ,., . � ,�� a ,� �� � � '' i I �, �� �: '" ", � � I � � � � � `�� �,�, r" " ,.wx x��� �r ;�. �..� .,.� � ,� ,w drew� d: ��.ww ww` r�'"r �.,a'� ��" .., ��.,. Vii, i � �w aar y, r ri �M 4. i " i i� i 4 � r i � p� r W i� i i � � ,� i � � � � � � � M �# I I �, I I. �. � � � I, � � •� ,;„,,. I 0 I � i I i �� � � III, � I i � i I� , it � � � ! ,�, �, i � i I II I '� , I �� i uu,,,,,„ � � i I i u i� �d, i I M� I I C I ',, i� �, �� 111 ��� ��'' 'V, i�� �i it I i �i i� ��I�I� o � �� ��,!� I IV i III i i �' i ���'i� VIII ° i li I �I�� �, II���gip,illll '1111 �„ � I' ,� I i � I I ,n. ,, yp, � I i iw, I //j% i `al � i I I � �" �<. i � � I i � i � � I � I I I � I I I I I I I I I I I I I I I I I I I I I ,,,, I I I � �I � I I � I I I I I I I � I a .� � I � I � � i i �, ,� i : i � i � : �a� I I I� � i ',. ,. Ali .. I I I II �, � I �� I C I I I I I I I � I I I I I I II I I I i �, i� II i I� i .��, I I � mm � .rte, Jw ,gym .«w ixw � xxw '. � � I I I x ! a I I r� � � �fit,:,z � �. �. � Vii. i I. i i i, i �; i �'� i � i i r,, I � � � � I ,w �ww � � � I i � ,; � �, I �g i �i .� � i �" i� � X11 � ' � � I ,,,�, �,I -� i� i N� � � � +a. I I � II i I �, � �. i i � � �� ,� �, ;T � �� � � � " � � �, it �:� � i I � i � �� i i I � I� - i i i I I I i i i � I � I � i � �, i i � � 11 i � I , I Iw, ,,,t I ,� � � I I I I I I � � I � I I II I „„ I »� I � i I I ! I I i i � I I I II I II I i I� I I �I I I � I �" I I I �" I � I i I �" I �� I I i I .� I I I I I I I I � I �. � � �. I � I ,,, I I �, I � � I � a �, I I i I I I I II � I ,' I I I „,; I I i , a- i II i i I i I �. II �� � I I ,µ I I I I I I I I �� I � � �. � I� I. I. �, ,� +w �i:. I.I. ,.�. aw I �...... I: ».« � ,,:�, I � � �.: »;w,. I I I i I I I *;, ., �I � � I � : ;� �,., '.... �, I dpi.. � '� i I �, � I.. ,yam �y � � �., �� +�; I � II � i � I I I I I�I i I I I I I I ii Is 11i will xw ' I i i i I �I j i; i I I I a� i I I I I I I I I , IM I I I I I I � I ' II I �- '.. � �.� I � I.. ,.. A� � I ii i I � I i r � �" I �, i � �, ��.� I .� +� � �. i yaw .w � ' ��.. � "m � +� �: � � � � awn I i - � i � �, ',li I ', i ''. � i � � +�:�,.. ', I.. � ��. � did ��. ', I � I �tl � �� �. �PF � M i �I � � � i r i ,� :, �� � � i � � �« .�� I � '.. -' I �. I ��.. �.i. �. �t � I I i i � �I ""... ,may I WGi ��� ytl�,,.Y�.a I „,,.. � N9 NIP �A '�P � � �.. i i �, i i i ii I I .., .w .„ I �I �� �», I i i� I I I j i i I IN PM 005243-1 Agreement 00 Page 1 of 5 1 SECTION 00 52 43 2 AGREEMENT 3 AGREEMENT THIS AGREEMENT,is made by and between 4 The Ci ty of Forth Worth a home rule municipal co ration in the State of Texas,acting by and 5 through its City Manager,hereinafter called C ity,and THE FAIN GROUP,INC.,authorized to 6 do business in Texas,acting by and through its duly authorized representative,hereinafter called 7 Contractor.City and Contractor, in consideration of the mutual covenants hereinafter set forth, 8 agree as follows: 9 Article 1.WORK 10 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 11 Project identified herein. 12 Article 2.PROJECT 13 The project for which the Work under the Contract Documents may be the whole or only a part is 14 generally described as follows: �• 15 Berry/Riverside Urban village 16 City Project No.000706,DoE: 5059,CSJ: 0902 48 826,Federal Aid Project No.LIMO 2007 17 (208) 18 Article 3.CONTRACT TIME 19 3.1 Time is of the essence. 20 All time limits for Milestones, if any,and Final Acceptance as stated in the Contract 21 Documents are of the essence to this Contract. P■ 22 3.2 Final Acceptance. 23 The Work will be complete for Final Acceptance within 109 days after the date when the 24 Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 25 3.3 Liquidated damages 26 Contractor recognizes that time is of the essence of this Agreement and that City will 27 suffer financial loss if the Work is not completed within the times specified in Paragraph 28 3.2 above,plus any extension thereof allowed in accordance with Article 12 of the 29 General Conditions. The Contractor also recognizes the delays,expense and difficulties 30 involved in proving in a legal proceeding the actual loss suffered by the City if the Work 31 is not completed on time.Accordingly, instead of requiring any such proof,Contractor 32 agrees that as liquidated damages for delay(but not as a penalty),Contractor shall pay 33 City Five Hundred Ninety and no/100 Dollars(5590.00),in accordance with TxDOT 34 Special Provision 000---2332 Schedule of Liquidated Damages for each day that expires 35 after the time specified in Paragraph 3.2 for Final Acceptance until the City issues the 36 Final Letter of Acceptance. CITY OF FORT WORTH Berry/Riverside Urban Village STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No 00706,DOE 6059,CSJ No 0942 48 826 Revised July 1,2011 Federal Aid Project No.DMO 2007(2 08) 005243-2 Agreement Page 2 of 5 37 Article 4.CONTRACT PRICE 38 City agrees to pay Contractor for performance of the Work in accordance with the Contract 39 Documents an amount in current funds of FOUR HUNDRED NINETY-Two THOUSAND 40 EIGHTY AND 461100 DOLLARS($492,080.46). 41 Article 5.CONTRACT DOCUMENTS 42 5.1 CONTENTS: 43 A. The Contract Documents which comprise the entire agreement between City and 44 Contractor concerning the Work consist of the following: 45 1. This Agreement. 46 2. Exhibits to this Agreement: 47 a. Bid Form �• 48 1) Proposal Form 49 2) Vendor Compliance to State Law Non Resident Bidder 50 3) Prequalif cation Statement 51 4) State and Federal documents 52 b. Current Prevailing Wage Rate Table 53 c. Insurance Accord Form(s) 54 d. Payment Bond 55 e. Performance Bond 56 f. Maintenance Bond 57 g. Power of Attorney for the Bonds 58 h. Worker's Compensation Affidavit 59 i. MWBE Commitment Form 60 3: General Conditions. 61 4. Supplementary Conditions. 62 5. Specifications as included in the Project Manual. 63 6. Drawings. 64 7. Addenda. 65 8. Documentation submitted by Contractor prior to Notice of Award. 66 9. The following which may be delivered or issued after the Effective Date of the 67 Agreement and, if issued,become an incorporated part of the Contract Documents: 68 a. Notice to Proceed. 69 b. Field Orders. 70 c. Change Orders. 71 d. Letter of Final Acceptance. �* 72 73 Article 6,INDEMNIFICATION CITY OF FORT WORTH BerrylRiwrside Urban Village STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.00706,DOE 6059,CSJ No.0902 48 826 Revised July 1,2011 Federal Aid Project No.DMO 2 407(2 08) p 005243-3 Agreement an Page 3 of 5 74 6.1 Contractor covenants and agrees to indemnify,hold harmless and defend,at its own 75 expense,the city,its officers,servants and employees,from and against any and all 76 claims arising out of,or alleged to arise out of,the work and services to be performed 77 by the contractor,its officers,agents,employees,subcontractors,licenses or invitees 78 under this contract.This indemnification rovision is smicificaliv intended too rate 79 and be effective even if it is alleged or Broven that all or some of the dame es bein 80 sought were caused,in whole or in part,by-any act,omission or neilitence of the city. 81 This indemnity provision is intended to include,without limitation,indemnity for 82 costs,expenses and legal fees incurred by the city in defending against such claims and 83 causes of actions. 84 85 5.2 Contractor covenants and agrees to indemnify and hold harmless,at its own expense, 86 the city,its officers,servants and employees,from and against any and all loss,damage 87 or destruction of property of the city,arising out of,or alleged to arise out of,the work 88 and services to be performed by the contractor,its officers,agents,employees, 89 subcontractors,licensees or invitees under this contract. This indemnif cation 90 vrovision is simcifical1v intended too erate and be effective even if it is allezed or 91 proven that all or some of the damazes being„sou ht were caused,in whole or in rt 92 b n a act omission or neeffizence of the ci 93 Pw 94 Article 7.MISCELLANEOUS 95 7.1 Terms. 96 Terms used in this Agreement which are defined in Article 1 of the General Conditions will 97 have the meanings indicated in the General Conditions. 98 7.2 Assignment of Contract. 99 This Agreement, including all of the Contract Documents may not be assigned by the 104 Contractor without the advanced express written consent of the City. i o 1 7.3 Successors and Assigns. 102 City and Contractor each binds itself, its partners, successors, assigns and legal 103 representatives to the other party hereto,in respect to all covenants,agreements and 104 obligations contained in the Contract Documents. 105 7.4 Severability. 106 Any provision or part of the Contract Documents held to be unconstitutional, void or 107 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 108 remaining provisions shall continue to be valid and binding upon CITY and 109 CONTRACTOR. no 7.5 Governing Law and Venue. 111 This Agreement, including all of the Contract Documents is performable in the State of 112 Texas.Venue shall be Tarrant County,Texas,or the United States District Court for the 113 Northern District of Texas,Fort Worth Division. CITY OF FORT WORTH BerrylPiverside Urban Village STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No,00706,DOE 6059,C5d No.0902 48 826 Revised July 1,2011 Federal Aid Project No.DMO 2007(2 08) 005243-4 Agreement Page 4 of 5 114 7.6 Other Provisions. 115 The Contractor agrees to pay at least minimum wage per hour for all labor as the same is 116 classified,promulgated and set out by the City,a copy of which is attached hereto and 117 made a part hereof the same as if it were copied verbatim herein. 118 7.7 Authority to Sign. 119 Contractor shall attach evidence of authority to sign Agreement, if other than duly 124 authorized signatory of the Contractor. 121 122 SIGNATURE PAGE To FOLLOW PW 00 P• CITY OF FORT WORTH Berry/Riverside Urban Village STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.00 70 6,DOE 6059,CSI No.0902 48 826 Revised July 1,2011 Federal Aid Project No.DMO 2007(2 08) 005243.-5 Agreement Page 5 of 5 123 IN WrIWESS WHEREOF, City and Contractor have signed this Agreement in multiple 124 counterparts. At least one counterpart each has been delivered to City and Contractor. 125 OCT 126 This Agreement will be effective on 2012 20 which is the 127 Effective Date of the Agreement). 128 City of Fort Wo Contractor:The Fain Group,Inc. 12 4; Z B : IL ernando Costa i ature Assistant City Manager M&C J Larry Frazier jute AC (Printed Name '�`�' I 0000000000,a o Title: President Attest: a,,,,, C i o v F� Address: 1616 North Sylvania Avenue o a (Seal) n/A+C C-af 819 q 00C)O00000° .a 4r r �R4 C i IState/Zi : Fort Worth, Tx 76111 Approved as to Form and Legality: h/G t -c V, Doug Black "Assistant City Attorney �. 129 130 131 11RECTOR PPROVAL CO ED: 132 133 134 � 135 d1e d 136 137 PLANNING AND DEVELOPMENT 138 DEPARTMENT 139 1000 Throckmorton Street 140 Fort Worth,Texas 76102 141. 142 143 T 144 OFFICIAL RECORD CITY SECRETARY FTe WORTH,TX CITY OF FORT WORTH Berry/Riverside Urban Village STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No 0070£,DOE 6059,CSJ Nn.0902 48 826 Revised July 1,2011 Federal Aid Project No.DMO 2007(2M)