Change Order Request
Project Name East Side II 54-Inch Water Main- Phase 3
Project No.(s) P262-608140036987 and P265-608140036987 DOE No. 6898
Project Description
� i .�'d'r� f � �'r
� .' �. . : , . �,.
City Sec No. 43993
City Pro. No. 00369
54-inch Water Main Installation from Scott Avenue to Vickery Boulevard
Contractor S.J. Louis Construction of Texas, Ltd
City Project Mgr. Susan Schwinger
Phone Number: 817-392-6529
Dept. � Water
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
E��� '�
Revised Contract Amount
Original Funtls Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
11
500.00
500.00
Change Order # � Date: 10/17/2013
City Inspector Raymond Brice
Phone Number: 817-392-8452
640.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAXALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%)
TION
FOR CHANGE ORDER
Totals
1.11
920,941.11
$4,985,131.99
$295,500.00
1.30%
$6,151,176.39
210
The change order will provide for the installation of 6-inches of top soil over the fairway and
No. 6 Tee box (at Sycamore Golf Course) as required by the Parks and Community Services
Department prior to bermuda sod installation. It was determined that sod would not grow on
the rocky native material that was excavated during water main installation on the fairway
and tee box.
Staff concurs with the cc
order. �a
Att�st�ed byR �� _
�
�`�
ti
t �
ional calendar days on this change
� ��
�.
�
,�:
��
ce ot thfs Ghange Urder by the contractor constftutes an
l.i
("j �
�--
rr;
�I
G
�
:' )
�-1
�
C9
ry
�
P��
f �s � � . ��,
�.
� � �.
Contract Time
in full (both time antl money) for all costs arising out of, or incidental to, the above Change Order.
FORT WORTH
City of Fort Worth
Change Order Additions
Project Name East Side II 54-Inch Water Main- Phase 3
Project No.(s) P262-608140036987 and P265-608140036987 DOE No. 6898
Project
Description
Contractor
City Project Mgr
City Sec No
City Pro. No.
43993
00369
54-inch Water Main Installation from Scott Avenue to Vickery Boulevard
S.J. Louis Construction of Texas, Ltd
Susan Schwin er
ADDITIDNS
Course
Change Order # �2 Date: 10/17/2013
City Inspector Ra mond Brice
Sub Total
190.
Page 2 of 4
FOR�' �7VORTH City of Fort Worth
Change Order Deletions
Pr�ject Name East Side II 54-Inch Water Main- Phase 3
Project No.(s)
Project Description
Contractor
P262-608140036987 antl P265-608140036987
DOE No. 6898
54-inch Water Main Installation from Scott Avenue to Vickery Boulevard
S.J. Louis Construction of Texas, Ltd
City Project Mgr. Susan Schwinger
City Sec No.
City Pro. No.
43993
00369
Change Order #�2 Date 10/17/2013
City Inspector Raymontl Brice
DELETIONS
ITEM IDESCRIPTION
DEPT � Qty �Unit �Unit Cost �Total
Page 3 of 4 �Deletions Sub Total
MIWBE Breakdown for this Change Order
�`����a�i��°°� l���l������o� ��r��c���
__ __.----
�oject f'�'nn:e — �y Proposn! �'o,
ast Sic�e tt 54 t�r'ater 1-tai;�- I'ffase lIl � f�'�4R-3 Rcviscci
.sponse Requiree! F3y � Trurrsjnitted By
7'onv Sholola
Ciry of I=ort Worth
l)epartment of'F.r�gincering
IOOU'I'itrockmortnn Street
�ort ��Jortt�, TX 76i Q2
Justin 14'i�itman
�roject iv�anaeer
,Srgnnfuve
Oy� 1?its
aj Wark
SJL has been directed by the CFW ta install 4° to 6" of Siver Creek'l�oospoii over then entir� Sycamare Creek t'olf C'ourse
and is cxpected to cover a ininimum �f 7,000 SY. The total vo[ume is expected to be behveen 60 and 90 loads of Tap Soil.
SJL understar�ds that CF�V rnay °As Direcl" additic�nal topsoil coverage as �vell so has included "per the Laad" as thc unit
fumisiiin� and placing ehe referenced top soil.
The rarnp areas, the north end ofthe fairway, and the south end ofthe fairway may require "As Directed" additional top soil.
The �er load price is $S?3.00.
E;ach [AAD of material will include 24 CY per load.
The 2�� C1' per LOAD volume is 534.29 per Cl'
Tialli
ion
new This unit price includes the furnishing and piacing
Si(ver Creek Materiais Topsoii on the Sycamore Creek
Golf Course in the ROW beiween Sta 51+00 and Sta
60+30 on pian sheets sheet {24-27}, The volume
shouid he be[ween 60-90 loads depending on whether
it is onty installed at [4" thick X 60 loads] & if at (6" thick
X 90 Ioads). Additional vaidth at the north or south end
of this Goff Course may be "As Directed" also.
Ut1it
CY
�,�s�a..
Utiit �fICB
$34.29
T�TAI, CC35"T
acccptahlc, plcase provide an authoriz.etion sigttature bela�i• aed return one (t) cop}' Ea our oCfice,
is change requires an extensian of contract time and deadlines by 5 days.
J. Lauis Constrrrction �tc7ron;
Les V. �Vhitman, S.J. Louis C�nstructior� of'I'e;cas I..td.
�
���O�AI
G�,J�o
�
(� c �/ �O, �f
�-��_�3
S.,J; F,urris Coiistructfon ojT �xns Lt�t
P. f). fit� t• 83 :�
:�tansf'reld, Terrrs 7fi043
(81 ?} d; 7-�32/J lJff r:,e (8 t?) �7 i-r1 � 3z 1�n.t�
' , ' ' o
October 14, 2013
Mr. Tim Powell - Sales
East Jordan Iron Works, Inc.
270 Redwing Road
Ardmore, OK 73401
RE:
Paul Mayfield
Bass & Hays Foundry
238 South Bagdad Road
Grand Prairie, Texas 75050
30"ERGO XL Assembly
Hinged Ductile Iron Manhole Cover with Cam Lock
Dear Mr. Powell Mr. Mayfiefd:
Thank you for your submittal. The Fort Worth Standard Product Approval Committee
recently completed the review of the above mentioned product and found it acceptable
for use in water and/or wastewater applications where ,a hinged and lockable manhole
cover is required. The following specific manhole castir�gs are approved:
EJIW 30° ERGO Assemblv with Cam Lock, MPIC & T-Gasket
Product Number. NPR10-1444A
Description: 00148029L02 ERGO (XL) 30 DI 4L Cam WO/LFT 4.5 UND
The materials shall be in accordance with ASTM A536
requirements of AASHTO M105 and shall be marked
depending on the application. The City of Fort Worth I
but not required option.
and shall be in compliance with
as "Sanitary Sewer' or "Water",
ettering and Logo is a preferred
Should you have any questions regarding this letter, please do not hesitate to call me at
817-392-6820.
Sincerely,
C�;:��
David R. Townsend, P. .
Facilities Engineering Manager
� r`� "I
*****
�
Xc Frank Crumb, P.E., Water Director
Andy Cronberg, P.E., Assistant Director/Water Engineering and Regulatory Compliance
Travis Andrews, Assistant DirectoNWater Field Operations
AndyAnderson, P.E. Assistant Director/TPW Construction
Chris Harder, P.E., Water Production Engineering Manager
Tony Sholola, P.E., Water Pipeline Engineering Manager
Martin Phillips, P.E., Engineering Manager/TPW Construction
Doo Kim, P.E., Sr. Professional Engineer/Water Engineering & Fiscal Services
Gregory Stean, Warehouse ManageNV1/ater Field Operations
WATER DEPARTMENT
ADMINISTRATION