FOURTI� AMEI�DMENT TO CITY SECRETARY
CONTRACT NO. 43762
WHEREAS, on August 21, 2012 the City of Fort Worth ("City") and The Cornell FW
Company, LLC ("Design-Builder"), collectively the ("Parties"), made and entered into City
Secretary Contract No. 43762 (M&C C-25798), a Design-Build Agreeinent for Design-Build
Services (the "Agreement") for the Public Safety Training Center ("Facility"); and
WHEREAS, on October 17, 2012, the City issued a Notice to Proceed to Design-Builder,
which established a Date of Commencement and triggered certain performance schedules under
the Agreement; and
WHEREAS, on May 21, 2013, the Parties executed Ainendment No. 1(City Secretary
Contract No. 43762-A1) which made a series of changes to the Agreement; and
WHEREAS, on November 18, 2013, the Pai-ties executed Amendment No. 2(City
Secretary Contract No. 43762-A2) which extended the Design-Builder's deadlines for providing
a GMP (Guaranteed Maximum Price); and
WHEREAS, on December 31, 2013, the Parties executed Amendment No. 3(City
Secretary Contract No. 43762-A3) to reduce the IGMP (Initial Guaranteed Maximum Price) by
$83,260.00 for costs related to relocation of the General Services Administration's ("GSA")
water meter and for the purchase of 0.38 acres of land from the GSA to serve the project; and
WHEREAS, the Parties desire to further amend the Agreement to add an additional
$4,316,336.00 in funding from the Police Department's Federal Asset Forfeiture Funds for
additional features and finish out; and
WHEREAS, the Parties desire to amend the Agreement to provide that the Guaranteed
Maximum Price ("GMP") shall be memorialized by amendment; and
WHEREAS, the Parties desire to establish the GMP in the amount of $101,406,033.00.
NOW, THEREFORE, the Parties, hereby agree as follows:
I.
City Secretary Contract No. 43762 is hereby amended by revising Section 5.2.5 as
follows:
Section 5.2.5 The GMP shall be memorialized b� amendment to the Agreement.
II.
The GMP for the Project is $101,406,033.00 (M&C C-26781,_A�ri122���- . he GMP
FOURTH AMENDMENT TO DESIGN-BUILD AGREEMENT CSC NO. 43762 ��f���� ������ Page 1
The Cornell FW Company, LLC — CFR� Public Safety Training Center ��'q'�' ��,C�{�����
��. ������ ��
includes an additional $4,316,336.00 in funding from the Police Department's Federal Asset
Forfeiture Funds for additional features and iinish out (same M&C as above). The Work for
which the GMP is based is outlined on Exhibit A attached hereto and incorporated herein.
III.
All other terms and conditions of the Agreement, as amended, and not amended herein,
�emain unaffected and in full force and effect, are binding on the Parties and are hereby ratified
by the Parties.
IN WITNESS WHEREOF, the City and the Design-Builder have each executed this
Fourth Amendment in muitiple counteiparts by and through each Party's duly authorized
signatory.
THE REMAINDER OF THE PAGE INTENTIONALLY LEFT BLANK
SIGNATURE PAGE AND EXHIBITS TO FOLLOW
FOURTH AMENDMENT TO DESIGN-BUILD AGREEMENT CSC NO. 43762 Pabe 2
The Cornell FW Company, LLC — CFW Public Safety Training Center
This Fourth Amendment is effective as of the last date subsci•ibed by the City Manager's
Office.
'�'he Cornell
Design-Bui�
� ��
, g,LC.
� �
City of F'ort Worth
Lee D. (Pat) Corriell
Presid
Date:
� �
Fernando Costa,
Assistant City Manager
Date:
Planning
� .9 /4
;o ended:
�
od, irector
Development
M&C _C-26781,
Date: Apri122, 2014
as to Form and Legality:
Douglas W. Blacic
Assistant City Attorney
I1
City
i~'" ';
�
�
.s
► � :,.
,� ��
_'•, , . : , :� �`�
� � .�' .
.� _"�
, s �� ` �
,- > � r
FOURTH AMENDMENT TO DESIGN-BUILD AGREEMENT CSC NO. 43762
The Comell FW Cocnpany, LLC — CFW Public Safety Training Center
,�
S 1 Y: d.' f' I,.1
EXHIBIT A
DOCUMENTATION OF GMP CONSISTS OF THE FOLLOWING 35 PAGES
FOURTH AMENDMENT TO DESIGN-BUILD AGREEMENT CSC NO. 43762
Page 4
The Cornell FW Company, LLC — CFW Public Safety Training Center
y
ar
�
�a
a
�
0
a�
�
�a
a�
s
v
�
a�
�si
a.
�
�c
G
�X
�
�
'.a
N
G3
�
�
�
tC
�
�
�
�
c
�
c,
a;o
c
'� B
•ca :=
� �
A s
+, x
� w
y-
f0
�
u
�
�
a
sw � �� 2_, �.. n� .w.�, _,: � _���� � �� _ _���_h„ ., �,,�w ��� ,� , , . �����.� -..
• � � • • • • • • • • � •
� . � � � .. � . �
.. � . � � � . .. � —
.. � � . � � •
. .. •• • —
� . . : � ..
. � .
.
; , � � � � � • • � � � • • •• � • '
. � � �
� � � . :. �
� . � . � ..
. .. •
: .
• • • • • • • � • • � • •
. � � . .. � � . � ;.
• . . � � .. .. • • �
.. • � • • • . . �
.. .. • • • •
� � � .. • .. �
� . . •
.
n �
• � • � . • •• —
• • • •
.. . •
.. • •
.. •
� • • • • � � • —
. � � � . � � ..
— . � • • • � �
.. � �
• �
.. � � � • • • • • � • • • � •
• • • • � • • � •
• • • � • " • �
.• � • • • • . • .
.• .� • • .• • • .•
� � .• • •
• • •
•
�
•
� �
�
�
�
.� .� � .
• �
.� �
• •
.� .�
• ' • �
� � � ,� �
� � � •
• � � �
� • .� .� • � � '
� �
�
.� •
� • •
• • ' .� �
• • •
� � � �
u � � .�
.� � .� • �
� � •
.� • �
� • � � •
� � � • • � • � • _.
�;:: � . . • • �
�
a�
txA
co
a.
Guaranteed Maximum Price - Breakdown for Police Seized Asset Funding
Public Safety Training Center
Exhibit A
May 21, 2014
I' � ''
, ,, � �
Amendments
Current
Final GMP
Current
Variance (Shortfall)
Additiona) Drops for Cable TV (Police
Additional Video Cameras (Police)
Revised Variance (Shortfall
Landscape Plaza in lieu of Hardsca
IT Costs (1 box instead of 2/officeJ
Digital Signage
0
�
�
�I
V for Fitness Areas
lue Engineering Items:
Delete Electric Hand Dryers
1" Louvered blinds in lieu of Mechoshades
Utilize Citation 90B fixed chairs w/o tablet arms in Auditorium
Chan�e sidewalks from 5" thick to 4" thick
New Variance
First Allocation of Remaining Contingency (Pool/Jib Crane
Amount Needed from PD to Avoid Cutting Scope
' Breakdown`of Additional PolicE
Office Space (Admin. & Training) due to Staff Increases
Conference Room Increases
Classroom Increases
Tactica) Operations Finish Out (Training Building)
Mock Village Smol<e Evacuation System
Site Work Savings (PD Portion
Page 2
$97,522,957
(5433.260
697
$102,774,952
(597.089.697
$
$300,000
$200,000
$112,463
$134,820
$60,000
$27,561
$32,913
$8,468
hortfall)
719
$5,298,454
$328,500
$633,292
$388,575
79,180
Total $6,728,001
($2,411,665)
$4,316,336
�
C
41 U
++
C L
V ~
v
� c d�
�C � Q O
•� C ,y� N
E"' C 'Q a
T O N
v V W c�o
"- -a �
(6 �
� �
l� (d
_ �
� M
a •�,
m
�
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
00 O� 00 00 N d' O O O O I� �Y � d' O
� � in �n �n �n o in m m m rn o m m m o
N N N N f» ll� Ql Vl 61 CO l0 N l0 l0 K7
C = N' I� M W O' M O' N c-I' d� M� N' t� ('n
f0 f0 00 N N d' C� Ol Ol Lfl N�-i c-1 O tf1 cI' c-i
f0 � Ql Ol Ol 00 /n N e-I �-i �-i c-i �-1 ci O O O
m � a--I e-I e-I c-i' e-1 e-i c-i e-I e-I' e-1' .-1 c-1' �-�I �--i' �-i
M_ i/} i/} 'V} th i/} i/} L} i/i V} Vi V} V}, 'V} i/} L}
�
41
t�6
O
Q
C
7
O
�
Q
�
�
O
U
a�+ N
"a "a
0
Y U
�
V
�
Q
O O O O O O O O O O O O O O O
O O O O O O O O O O O O O O O
O O O lD 00 d' O O O M M O O�F 61
O O O u'1 d' N O O cf' 00 h O O tn O
O O O 61 h lD cF lO N O('� l0 O M I�
tn d' IJ") I� l0 N 00 O 1� c-I' Q1 c-I' lf1 d' c-i
i/? � t/} � i/i O i/} {/� i/? �!i V} � i/? ��
i!} U}
QI�IOIQI�IOI �I�I�I�IOI�IOIOIO
�
O ..0
U V
� �
o "
0
N
4/
O
a
�
a
Q
Q
Q p
;, z
�
a
Q1
N
0
U
�
M .N h0 U
O C p1
� U
Q ��' a--1 ��(p L N p�p
�
� � fl- � � a�i � "a m
� N � Y a � L �"� >
� N L. O' y yq
� �n � � C7 O� � N C bp
�o .� E �� r:� o ��
o�v � "� o fl.. o� N'� �o
'� @ � v v�+- uo o c s F- +�
fl.. �� o� c X'� � n- m� o
O � 3'''' N �i' LL�,} E O I.L E
i-+ �
v� � � Q O � O s.. �-a -� >
v�''i � -O � � Q O = � � C .� O
� N � � O Q � � v � � � �
Q �p r � +� � � y N i -� � �
i
O L O
ta �'6 G V ta O U�
? � � � � � @ a-+ � 3 � pp
� '° � a`� v v m � c o � � � �n
a � v} Q�@ • o v�i co � c Q�
� vi .F., N �,, 41 GA �
� � C O � UJ � U) � � 'Q N v@i �
+,, c�6 N _ 'v� � � L Q- � � v�i '6 ,�,,, v-,
C v � N �-O � � � � � t6 c6 � O
O O`�" �O � N � 2 � O�+ C G Q i- i
-p • +� O O C
� � � � C�A C C � 'v�--, �p '6 i� :++ � � p
a c) N Q 'v� +�., W T O � � -0 -O � +' "�
T �-+ C
U (O C Ur '� N � CJ �' � fO (6 IO L � iI
� L � L L O L L � L S� O ��{-.
bA � tvD �+�- � �f- bA v- 4- O �O �O v�-� +-+ +� �
�.:� � Y i�-' i-N-+ @ M+N-+ N Y iN-+ Y f6 � U
ro a� v� v� �n a� +� v� v� vi �n v� +� Q
� O O O > � O O O O O �� O
� � O D U U O N U lJ U U U
U � �
�p O1 N N 4J N �� N N N N � O � �
> > > > > > > > > > > Q
.A o 0 0 0 0 o v o 0 0 0 0 �� Q
O I— f— I-- f— i— I— Q I-- I— F- I— I-" W J 0
�INI�I�I�I�I�I�I�I"
N N m m m m m m m m
rl .--I c-i c-I c-I a-i c� ri a-i a-1
O O O O O O O O O O
N N N N N N N N N N
c-I' c-1' a-f lD' l0' i� N' N N('�7
L L _ N N N N N N N
N UJ s- N QI UJ L 1_ L
-fl ..Q fl- G C C v N N N
� � a � 7 7 � � ..Q �
N N -' --. -� E E E E
> u a� a� a� a�
z p o 0 o a�i
Z Z Z �
O
O
r
�
�
O'
�
�
i/?
'�
N
U
O
a
°
F�—
M
�
bA
d
7raining Equipment Allowance
Updated for GMP
May 21, 2014
Exhibit A
�y,.� , � � ,�,�- �., ���,�� �,�� �_ � ����� �� � - ��,.�,.� � � �� � W �w.�� � �
� � r__ W � �
�,_,_ � _ w t
�- .� . � . : .• � • � ' �
� ..� � _. . � �___ =
C ' •• : • : • • • .11 111� ' ► :
: • .�• :: 111 :: 111 1'
' � • :_ � 1 - 111 _ 111
•.� -' • : • C C � 1 1/I111 11 111'`r�
. :
� .�•
: 111� : 111��"�,
-•� .�• - 1 111 1 111 1:,
. - . : 111 : 111 Ip
.�• -
.�• - - I 111 111 �;
.�• - _ 111 111 1;,
•� ' •• .�• - ■ :. 111 : 111 1,
• -
,
-
- . • : • 1 -. _
1 1 1
i �
- - - . • • ..- : -. -i 1 111 1 111 � 1 1���
' •• • _ � 111 i1�� 111,'
� �� 111�� 111 1,
• • • _� �
• . - .•'�• • ._� �� i �
• • �� •.: • 1 : • � �11.• i
• • • • • . �11 111■ .. 1� �. 1
•�• • • :. : :i • 1 �.1• 1'
• : • _ 1 /11 _��- 1:
� - � -_- . 1 1 11 ''
i ' •• .• •• •• -• -� 1 I II
.�- '• • _ il 111 / /11 � 1 111i'',
• .•-' • '• •� ■ 1 111 S Ilill
.•- • 11 Ili :1 111 :i I�I li
• . • ' • •� 1 1 /11 1 1 11 ':I'
� - - - . _ 11 111 ___�'II
' • •- �- • . .� :11 .1 1�1',
. ._ _ . __.._. , , u,.__ _.___..._�__ _., ... _,_. __. . .. _ .__ __ _. _._
��
, . 1 . 1■ � ••II
���_ �
Public Safety 7raining Center
Furniture, Voice/Data, audio/visual Allowance
May 21, 2014
Exhibit A
Page 5
a,
c
a�
U
bA
C
.�
.�
F'
�
�
�
�
U
�
7
a
m
U
i
�
3
0
¢
fl.
�
c
R
N
U a
f6 t�+
C �
N �
� X
= W
O
.�
i
w
O
�
m
E
�
�
�
'�.
�
O
N
c-I
N
A
cN
G
�x � w. _� ... , , _,�,��� q4 � _.��..,,_.r_ M _� a��.�� �,n_ � � �x�� ���, ,..�. ..
� � � . � � . � _ . � � —
. � � ' � '. .. � • . � .
_ �
� � . . . . —
� ' : .. � ' .
� — , .. :.
� . . . . �
.. .
.. '
• . � • • - • -
.. .
�� . .
�
.
•
.
• ..
.
..
.
.
: , •
�
. . �
� ; .
.
. .
.
. �
�
.. . �
� � ..
. '
� � .
.
.
. .
.
. . . .
.
.
. . . . • •
•
:.
.
' • • • • • • •
..
:. :. :� :. :.
� • .. •
. � • ..
.
. • . . . .
�
� �
� :. :� :. .. :� :.
• �
. • • .
:� •
.
• �
.. .. .. ..
�
Public Safety Training Center
Franchise Utility Allowance
February 13, 2014
Page 7
�xl�ibit A
,� •. � N �
. �
_� -
� � � ��- � - " � �,
_ _ �- l ..� � � , . . � - �. � _ _ - _ -- � . _ � _: `
_ � •
��i�'C9' �����%�°���
. ! _ _ .' _ , - .. .. . .. I I t
o1ia' • . �p � :�;���7.;:�: 4.ii_C '
� � ... �
Impact Fees Allowance v✓/ Pkg 3 Site Util.
:Monument Sign Allowance w/ Pkg 5 Trades
BP00730 :Site Security - Fire Training Village $55,567
BP00730 :Site Security - Administration Building $55,567
BP00730 :Site Security - Training Buildings $55,567
����c��e °� � �baterr��r��
:Asbestos Abatement By others
P�c�z��� � - Denno�i�ion
Precision ;Demolition $1,513,791
Package 3 - �ite Work
RPM :Earthwork $1,548,233
:Remaining Earthwork Scope w/ Earthwork
:Allowance for Liner at Retention Pond N/A
Wright :Temporary Fire Loop Work w/ Private Utilities
Wright :GSA Utility Work w/ Private Utilities
Wright :Site Utilities (Private) $3,091,106
:Remaining Open Site Utility Items w/ Private Utilities
Maverick :Site Utilities (Partial Public) $516,074
:Remaining Public Utility Work w/ Public Utilities
CH4 :Franchise Gas Utilities By Others
Osburn :Concrete Paving & Retaining Wall $3,318,395
:Remaining Open Concrete Items w/ Concrete
SCS ;Site Sealants $82,750
TBD � Franchise Electric/Tele/Data Ductbanks By Others
TBD :Temporary Power & Paving Sleeves $169,492
Lone Star :Railways $34,437
����Z��� �
Buildings 1& 2 Exteriors & Indoor Shooting Ranges
020200 : Demolition $524,480
033000 : Concrete $829�79�
036000 :Concrete Finishes (Stained and/or Sealed) $43,040
040000 : Masonry $1,302,559
049000 :Masonry Restoration $1,254,589
051000 :Steel Fabrication & Erection $674,753
059010 :Expansion Joint Covers (Allowance) $35,000
064000 'sArchitectural Woodwork $122,900
071000 :Waterproofing & Sealants $530,074
May 21, �014 ��g� �
- _ � - �
`� �' ` � i
. �.
. -
- � � ' � ' �! -
-- -i- �� • • - - � � -__
_ --• �
I�afiP� �/21/2014.
� - ;�i�;;i��; � � ., .
075000 : Roofing $4,141,589
072129 ;SprayApplied Insulation $148,300
081000 :Doors, Frames & Hardware $228,050
083459 :Vault Doors $20,000
083600 :Overhead Doors $51,850
088000 :Glass & Glazing $1,064,379
092000 : Plastering $55,806
092500 :Drywall & Acoustical $753,085
093000 :Tile $63,450
096513 ;Carpet & Res. Flooring $49,000
091000 : Paint & Wallcoverings $296,695
100000 ; Specialties $85,758
105613 :Storage Shelving Allowance Exclulded
101400 �Signage (Allowance) $50,000
105100 � Lockers $10,000
110000 :Misc. Equipment $41,677
113100 :Residential Appliances w/ Misc. Equipment
210000 :Fire Protection $152,844
220000 iPlumbing & HVAC (Including Range Mech) $2,864,571
260000 ':Electrical & FireAlarm $1,620,272
313116 : Pest Control $20,000
314000 :Shoring & Underpinning $44,000
330000 �Site Utilities w/ Package 3
Fire Training Village
033000 : Concrete $1,596,493
036000 :Concrete Finishes (Stained and/or Sealed) $10,546
034000 �Pre-cast Hollowcore Panels $51,571
040000 : Masonry $803,825
051000 `Steel Fabrication & Erection $523,994
064000 'Architectural Woodwork $4,330
071000 :Waterproofing & Sealants $147,390
075000 : Roofing $206,059
081000 :Doors, Frames & Hardware $259,805
083600 :Overhead Doors $10,621
088000 :Glass & Glazing $142,800
089000 :Louvers & Vents $9,800
092500 :Drywall & Acoustical $152,179
093000 : Tile $1,948
096513 :Carpet & Res. Flooring $1,215
091000 :Paint & Wallcoverings $32,448
100000 ':Specialties $26,988
101400 :Signage (Allowance) $5,000
May 21, 2014 �age 9
- _ f .
_, , ' N #
. ��
A JS]INT VB^fTURE
- (-
� � � ��` :. i �� _
-- - --'
� � �. � � . • � - ' � � :_ _
- ^• -
�ate: 5/�1/2014
.►
- - � � ��,; _ _ I I -.;,,.,_:,;tz
105000 : Lockers $7,374
107300 : Walkway Covers & Awnings N/A
110000 :Misc. Equipment $2,750
110155 :Window Washing Equipment $82,270
113100 :Residential Appliances w/ Misc. Equip.
116600 :Athletic Equipment (Bleachers) w/ Specialties
131113 :Aquatic Training Simulator $893,835
142000 : Elevators $18,548
210000 :Fire Protection $34,170
220000 : Plumbing $311,751
230000 : HVAC
260000 : Electrical $456,197
310000 :Earthwork (Excavation atAquatic T.S.) $133,000
313116 : Pest Control $3,240
323100 : Fencing $17,656
330000 :Site Utilities (Confined Space Training) $19,287
331223 €Recirculation Pump $342,883
412200 :Jib Crane & Hoist (Allowance) by Others
Package 5
Administration Building
033000 :Concrete $1,846,606
036000 :Concrete Finishes (Stained and/or Sealed) $24,642
040000 : Masonry $388,685
051000 €Steel Fabrication & Erection $980,015
061300 'sHeavy Timber Construction (Trusses) $178,006
064000 :Architectural Woodwork $178,340
071000 :Waterproofing & Sealants $104,448
075000 �Roofing $537,825
079513 : Expansion Joint Covers N/A
081000 : Doors, Frames & Hardware $206,650
088000 :Glass & Glazing $355,490
089000 :Louvers & Vents N/A
092000 �Plastering $62,275
092500 sDrywall &Acoustical $1,050,033
093000 :Tile $107,933
096513 'Carpet & Res. Flooring $143,951
091000 ;Paint & Wallcoverings $142,821
100000 : Specialties $90,473
101400 ;Signage (Allowance) $25,000
105000 sLockers $5,041
�n�y �1, �01� ���� 10
-- f �,
, . ,� ; � ��C�7 `�.1'
A 1AINT Y�fTURE
� � � ,, - �
' � � • • - -
r � • � � , _ � _
_ � -
f�ate� �/21/20'i4
. . �, � � - � �. _� �:;ai� -
107300 :Walkway Covers & Awnings $68,106
107500 : Flagpoles $13,750
110000 :Misc. Equipment $7,388
113100 :Residential Appliances w/ Misc. Equip.
118200 :Solid Waste Management Exclulded
126100 :Fixed Audience Seating $60,278
122000 : Window Treatments $42,524
210000 :Fire Protection $97,818
220000 :Plumbing $951,114
230000 : HVAC
260000 : Electrical $956,374
313116 : Pest Control $4,658
321723.01 :Pavement Striping $150,000
321723.02 :Pavement Markings @ EVOC (Allowance) $35,000
323100 : Fencing $356,031
330000 :Site Utilities w/ Package 3
Training Buildings
020200 iDemolition $154,328
033000 : Concrete $669,284
036000 :Concrete Finishes (Stained and/or Sealed) $72,905
040000 : Masonry $543,345
051000 'sSteel Fabrication & Erection (Allowance) $160,000
059010 :Expansion Joint Covers (Allowance) $96,050
064000 :Architectural Woodwork $120,044
071000 :Waterproofing & Sealants $100,980
081000 : Doors, Frames & Hardware $424,455
083600 �Overhead Doors $18,205
088000 :Glass & Glazing $119,985
089000 �Louvers & Vents $68,094
092500 ': Drywall & Acoustical $1,453,774
093000 : Tile $363,055
096513 :Carpet & Res. Flooring $284,853
091000 :Paint & Wallcoverings $337,988
100000 : Specialties $196,391
101400 :Signage (Allowance) w/ Package 4a
100001 :Portable Platform $26,915
105100 'sLockers $51,317
107300 : Walkway Covers & Awnings $29,900
110000 :Misc. Equipment $48,124
113100 :Residential Appliances w/ Misc. Equip.
114501 :Laundry Equipment $19,138
114502 :Fixed Tiered Classroom Training Tables $152,661
May � 1, 2014 Page 11
�xhibit �,
' "� ' M �
.
. -
•' •, ' �' !. � _
- _ __ _- -
- - ___
=--�.i� • _� • �_ =
- . _
�ate: 5/21 /2014
,<,�:.,<r�:
122000
210000
220000
230000
260000
321443
323100
330000
59000
59000.01
; Window Treatments
:Fire Protection
:Plumbing
: HVAC
:Electrical
�Unit Pavers
: Fencing
;Site Utilities
Site Work
;Highway Guardrail
': Barrier Cable Syster
Additional GC's for Added Scope to IGMP
Cost of Work Subtotal
General Conditfons
CO#6 - Updated G.C.'s
Building Permit
Data Processing (Accounting/IT)
Construction Costs Subtotal
CGL � Umbrella Insurance
Builders Risk
Payment & Performance Bond
Fee
Construction Cost & Insurance Subtotal
Landscape Plaza
ITEM Delete Electric Hand D ers
ITEM Louver Blinds
ITEM Auditorium Seating
ITEM Sidewalk Depth (5" to 4")
Aauatic Traininq Simulator
LS
N/
$480,11
$3,018,385
$2, 817,
$37,
$4,
w/ Packac
$31,090
$163,848
$58,436
$55,123,668
$4,181,054
$49,250
$140,00a
$59,493,972
0.25% $168,173
1.00% $672,692
4.00% $2,530,769
$63,269,221
on Fee, lump sum 0.0�
Contingency LS
Total
Grand Total
$4,00O,OOC
$67,269,221
($300,000
(�60,000
($27, 561
($32,913
(�£3,4G8
(�1,193,839
$65,646,44(
nn�y �1, Zo�4 ��g� ��
- � �
: `j ' � #
. . + ►l =
�. � � � � _ i +� i i: � �' '� � ;
•' - • • , - • - • _
�ort VVorfh, �exas
�inal CM�
�ate: �/2'I/�0'i4
Division 9� Ceneral hequirements 3� Misc. Clarifications
- Sales tax (on incorporated materials) and State remodel tax are excluded
- All FF&E is assumed by Others
- All hazardous materials and soil remediation is assumed by Others
- Builder's Ris{< Insurance is included
- All easements are assumed by Others
- Includes a budget of $140,000 for Building Permit
- Materials testing, roof inspections, and Geotechnical report are by Others
- LEED requirements, certification and/or commissioning of any kind are excluded
- Architect/Engineer and all design fees are by Others
- Building Information Modeling will be used for 3D spacial coordination only.
- Franchise utilities (gas, electrical, phone services) are by Others
- Landscaping and irrigation is assumed by Others
- Payment and performance bond is included
- EVOC traffic signal and service is assumed by Others
- Includes a budget of $47,546 for utility impact and meter fees.
- Transportation impact and other governmental fees are excluded
- Due to budget constraints we specifically excluded the City of Fort Worth's Facilities Management
Group Design Guidelines for New and Existing Facilities. The Final GMP is based on the most
current set of Construction Documents.
- Excludes a 50 year design criteria
- Fire and Police Mock Village interior improvements are excluded
- Training equipment is excluded within the Fire & Police Training buildings
- For testing and commissioning of the firing range HVAC system, a period of twenty five hours of
power use and its cost has been allowed for per the vendor's recommendation. Costs associated
with additional run time will be carried by the Owner.
- The portion of overall utilities associated with early occupied areas shall be paid for by the Owner.
- The General Conditions (Attachment 'A-11' to Byrne/Ridgemont's Agreement with the Design
Builder) are considered fixed (lump sum) and are non-auditable.
- This Final GMP is guaranteed as a total. Individual line items are not guaranteed
- Traffic studies are not included
- Demolition and removal of unforeseen below grade conditions such as: unknown debris, tanl<s,
utilities, etc. are not included
- We exclude work for requirements set forth by the Texas Historical Commission's statutes,
regulations, and rules other than as specifically stated below in division scopes of work
- Evaluation and modifications of the existing structures is excluded
May � 1, �01 � Pag� 13
� �
- General Requirements set forth by Division 1 of the Architect's Project Manuals are excluded unless
specifically required by the contract between the Design-Builder (The Cornell FW Company) and
Byrne/Ridgemont, JV.
- Any and all work behind curb at the future flashover chamber structure is excluded.
- Once finai design and/or construction is completed for specific budgeted items listed below, the final
costs will be reconciled via change order or contingency. Costs exceeding the specific budget item
listed below will be funded via change order. Savings to specific budgeted items listed below will
accrue to Contractor Contingency or buy-out savings.
Divi�ion 2
� �, _ .
- Abatement is excluded.
Demolition
- Per pians and specifications.
Excavation
- All spoils to be remain onsite. Therefore final grading is subject to change based on the amount of
spoils generated. Costs for spreading of spoils is included.
Pavement Striping
- A budget of $35,000 is being held for thermoplastic pavement markings at the EVOC.
- CASS Barrier System (TL3) to be utilized in lieu of the specified cable barrier system.
Division 3
Concrete
- Slab removal & replacement at settlement areas per current plans.
- A budget of $270,245 has been included to reconcile pier casing and depths.
- Sidewalks are included at 4" thickness in lieu of 5" as shown in the plans.
- A budget of $100,000 is included to allow for hardscaping (i.e. concrete, masonry, unit pavers, etc.)
in the courtyard area between the Training Buildings. Courtyard paving and planter walls, as
currently shown, are excluded.
- A budget of $30,000 is included for concrete loading dock rework to meet ADA requirements.
- Concrete patching of existing floor spalls in the Training Buildings is excluded.
Division 4
Masonry
- The rehabilitation scope of work at the existing masonry veneer of Training Buildings 1& 2 is per
Clarification Letter issued by Komatsu Architecture, Inc. on October 2, 2013.
- Vertical CMU wails at the Confined Space / Trench Rescue Structure are included as gray block.
- Masonry partitions to deck shown in Bid Package 5 are to be non-fully grouted except K-9, Tactical
Ops Storage and Mock Village Demising Wall.
Division 5
Steel
- Guardrails at edges of docks are excluded except where shown in the Contract Documents.
- We have included $150,000 for catwalk steel at the Mock Villages.
Expansion Control
- A budget of $131,050 is being carried for expansion joints in Training Buildings 1& 2.
�ay 21, 2014 Page 14
! � �1
�ivision 6
Rough Carpentry
- Per plans and specifications.
Wood Framing
- Wood trusses, purlins, decking, and wood trim at Administration Building Lobby from salvaged
materials from Buildings 3& 4.
Archifecturai VVoodwork
- Includes plywood interior construction in lieu of inelamine.
Division 7
Insulation
- Rigid insulation in Training Buildings 1& 2 is included only where new masonry and drywall
partitions furr-out existing exterior building walls.
Insulation
- Fluid applied air barrier is inciuded only at existing exterior masonry wails. Coverage over concrete
columns and beams is excluded.
Membrane F?oofing
- Boxing in and roofing over the existing steel beams over the roofs at the Training Buildings is
excluded.
Applied Fireproofing � Insulation
- Spray applied fireproofing is excluded
Division 8
Doors & Hardware
- Detention hollow metal doors are excluded except for at openings 1311A, 1555B, and 1556A under
Package 4a and 5 scope of work. All other openings scheduled as detention hollow metal doors are
included as heavy gauge hollow metal per submittal information.
Overhead Doors & Grilles
- Per plans and specifications.
Glass � Glazing
- Includes "All Seasons" windows in lieu of "Kawneer" windows at the eight-story Burn Tower.
Division 9
Lath � Plaster
- Per plans and specifications.
Drywall
- Tops of non-rated walls at Training Buildings will anchor through existing wood fiber ceiling material.
7ile
- Epoxy grout is excluded.
- Anti-fracture membrane is included only at shower floors & control joints.
- Minor fioor prep and leveling is included.
Nlay 21, 2014 Page 15
" i: � � ` 1
Carpet � Resilient Flooring
- In lieu of Flooring Type F9 in the Training Buildings, we have included sealed concrete.
- Minor floor prep and leveling is included.
Paint � Wallcoverings
- Reflective tape at the fire training village bollards is excluded as detailed.
Division 10
Specialtie�
- A budget of $29,550 is being carried for interior partition corner guards, which are specified, but not
currently shown.
- Fire extinguishers are per plans and specifications.
- Electric hand dryers are excluded.
- Shower mats are excluded.
Flagpole�
- Per plans and specifications.
Signage
- A budget of $25,000 is included at each the Administration Building and Training Buildings 1& 2; as
well as, $5,000 for signage at the Fire Training Village (total of $80,000).
Lockers
- Concrete bases at lockers are excluded. Bases are specified as metal in the Project Manual.
Operable Partitions
- Any and all operable partitions are excluded.
Protective Covers
- Pricing includes pre-engineered single column parking structure by East Texas Canopy at the skills
pad parking area. Columns and beams are to be galvanized with deck and trim to be baked
enamel.
- Pricing includes alternate canopies at the Administration Building to be equal to the canopies as
specified and detailed in the Contract Documents.
Division 1'i
Audio Visuai Equipment
- AudioNisual Equipment is by Others
- Projection Screens are by Others
Fixed Audience Seafing
- Includes Citation 90B chair without tablet arms in lieu of the specified Davies units.
Food Service Equipment
- Food Service Equipment is by Others
Residential Appliances
- Per plans and specifications.
May 21, 2014 Page 16
: . � • �1
Firing Range
- All firing range equipment, target systems, baffles and design are by Others
General Equipment Exclusions
- Gun and ammo vaults (including weapons and ammo) are excluded except as currently specified.
- Detention equipment is excluded except for detention hollow metal doors as specified above.
- Vending machines are excluded
- Gym and fitness equipment is excluded
Division 1�
Foot Crilles
- Foot grilles (manufactured walk-off mats) are excluded.
.. -
- 1" louvered window blinds in lieu of MechoShades at all locations except the Auditorium in the
Administration l3uilding.
Divi�ion 13
5pecial Construction
- Aquatic Training Simulator and associated equipment building, sidewalks, etc. are excluded.
Security Systems � Access Control
- Security systems, video surveillance, and access control systems are by Others
Division 14
Elevators
- Manual elevator doors with non-illuminated/electrified controls are included at the 8-story training
tower per the current Contract Documents.
Division 15
HVAC
- DDC controls are excluded except where shown and specified at the Administration Building.
Plumbing
- Per plans and specifications.
Division 16
Electrical
- MC Cabling is included in walls and for branch circuits.
- Aluminum feeders will be utilized for #1 and larger.
Communications � Audio/Visual
- Data/Telecomm and Audio/Visual work is by Others
May 21, 2014 Page 17
i .. I�� - ;- _
f)afP� 112/2012
- 1 �
.. — —
Fort Worth Public Safety Training Center
Fort Worth, TX
Package 1 - Abatement
Contract Qocuments List
Bid Pkg 1
_ _ i �
•..- .
� . � ' i
i : Ii - -
Date: 2/15/�013
_ - - � I.
.
Fort Wo�th Public Safety iraining Center
Fort Worth, YX
Package 2 - Demolition
Contract Documents List
Bid Pkg 2
�xhibit �
-..- •
� �� .� �
- � � ,
__ 1 -
_ .a . .
Exhibit A- Contract Documents Lisg
Fort Worih Public SafetyTraining Center
Fort Worth, TX
Package 3 - Sitework
�szo,��.w����k,���
Irr�ng, TX ]�39
21 SC?2A?00
Byrne�Ri��J� Ve�ire� ' � 0 1 � Contrad Documenis �'st ��� � � QP 9= � of 2
�xhibit A
�� � RIDGENLI7NT
A!(�1f W�R9C
Exhibit A- Contracf Documenfs List
Fort Worth Public Sa(ety Training Cenler
Fort Worth, TX
Package 3 - Sitework
1520Y/.1Ya'iwl Wl lafv
ir.;�3.1x r�a
210.592bwJ
Byme�Ric��J� Ve�re1 ' � 0 1 Q. Coniracl Oocuments List ���� ��age 2 of 2
BYRI� � RIDGEMONT
A!P'N7 VENIURE
Exhibit A- Contract Documents List
Fort lVorth Pu blic Safely Tralning Cenfer
Fort Vlorth, TX
Package4a
Exh i bit A �°'�` �'; ;_xz ;�a
B/mx�Ridgemord, A Jo!M VeMure CanUaclOx�vnents Lisi Page t of 4
May 21, 2014 Page 22
BYRHE � RIDGEMONT
AxJ%rll vFN1ueE
Exhibit A- Contract Documents List
Pot� Wohh Public Sa(etyTralNng Center
Fort Worlh, TX
Package4a
Exhibit A`�'`�,;,r„��
Byme�RidgemoM, A Ja"vd VeMura Contracl Doc�unenis Lisf Page 2 0l4
May 21, 2014 Page 23
Bl(Rt�E � RIDGEMONT
A 10'�NI V:NIIiRE
Exhibit A- Contract Documents List
FarlVJorth Publlc Sa(etyTrainln9 Cen[er
Fart WoM, 7X
Package4a
Exhibit Ap"d'=;3;°�;;E;;;
6yme�fti�gemerd, A JoiM VeNurc Cortracl �ocian^nts lizt Page 3 of 4
May 21, 2014 Page 24
BYRt�E � RIDGEMONT Exhibit A�'°��;;',;;E�=;;
A 10-,NI VENIURE
Bymz�Rljgemont, A JOIM VeMure CanUacl Docim^Ms List Page 4 of 4
May 21, 2014 Page 25
• Exhibit A- Contract Documents List
Fort YJoM Publlc Safety Tralning Centef
Fort WoNt� TX
Package4a
BYR1�E ( F�i[�GEI�h�NT
A 1 O:N i 'JENTUBE
Contract �ocuments �ist
Fort Worth Public Safety Training Center
Fort Worth, TX
Package 4b - Fire Training Village - Construction Documents
nara• e�4i�n�d
�� 1_ I� I 1 /� 520 W. Wainut Hill Lane
;�� 6 � ` Irving,TX75038
214/492-8900
FAX 214/441-3702
Byrne�Ridgemont, A Joint Venture Conlracl Documents List Page 1 of 4
M�y 21, 2014 ��g� �6
BYRI�E ( RIaGENt�NT
a io:N; ver.rru�e
Contract Docu�r►ents List
Fort Worth Public Safety Training Center
Fort Worth, TX
Package 4b - Fire Treining Village - Construction Documents
n��o. n�onnaA
-1 ��ll1.l�J.l,
n'szo w. wai�m wu �a�e
Ed Irving,TX75038
/ \ 214/492-8900
FAX 214/4413702
Byrne�Ridgemont, A Joint Venture Contract Documenls List Page 2 of 4
May � 1, 2014 ��g� ��
BYR�E � F�I[�GEMt�f+�T
A IO.N± �WTURE
�onfraci �ocuments L,ist
Fort Worth Public Safety Training Center
Fort Worth, TX
Package 4b - Fire Treining Village - Construction Documents
n�ra� a�s�zo�a
�
/�1520 W. Walnul Hill Lane
� ` Irving, TX 75038
214/492-8900
FAX 214/447-37a2
Byme�Ridgemonl, A Joint Venture ConUact Documenls List Page 3 of 4
May 21, 2014 Pag� ��
=i 1-''' :7� ' � �
A 1O�MI VitJTU4E
Coniract Documents �ist
Fort Worth Public Safety Training Center
Fort Worth, TX
Package 4b - Fire Training Village - Cons[ruction Documents
n�ra• eiannad
��� I� I1 /� 52o W. Walnul HiII Lane
t y Irving,TX75038
214/492-8900
FAX 214/441-3702
Byme�Ridgemont, A Joint Venture Contract Documents List Page 4 of 4
May � 1, 2014 �age �9
� I Rra��r�a�-�
A I�%��If YEfI'�Y.f
Byrne � Pidg¢mon[, A Jaint Venture
May 21, 2014
�xh i b it A ,5�"Fp':z�;�;;{;;,
Contract Documents Lisf
Fort Worth Publlc SafelyTraining Cenler
Fort Worth, TX
Package 5•Administration Building • Construction �ocuments
Conlract �ocuments List Page 1 of 3
� . � � �
BYRIiE � RIDGEMONT
n li:i��i vEti'!*E
9yme � Ridgemont, A loinl Venture
nn�y 2 � , 2014
�xhibit A �S�F�;��;�;J,�3;0z
Contract Documents List
Fort Worth Pu611e SafelyTraining Center
Fart Woith, TX
Package 5-Adminislration Building - Construclion Documents
Contratt Documen[s L�st Page 2 of 3
� .. . �
_,
�rF � �t����nnoN-r „N,.,,.,.�.:K,�.�e
�xhibit ,� �� �°a�x�=��
r. )c1' �i� vf�i`i�,F F`.xzi<ea �-c�
i nux
Byrne � Aidgemont, A loinl Venture
- _ , ,
Conlract Oocumen[s List Pa;e 3 of 3
� . �
I ' _
Contract Documents List
Fort VJorth Public SafetyTraining Cenler
Fort Worth, TX
Package 5 •Administralion Building -Consl�uction �ocumenfs
S1fRi►E � RI�GEMQNT
n IC,�T.T vmT.�Rf
Byme�Rid9emoM, A Jaint VenNre
_ ' I
�xhibit A 15���";��;a-3����
F�ziaaia�oz
Contract Documents List
Fort Worth Puhlic Safety Training Cenler
Fort Worth, TX
Package 5-Training 6uildings -Construction �ocuments
CoMract �ocvnents list Page 1 of 3
■ • y
- -
BYRI�E � RI[?GEMUIVT
n Ir+r.T��•T�.T.Ii'r
Bym>�Ridgzmant, AJo:M VerM1ure
May 21, 2014
�xhibit A ,Sp`.'�°���33���
Fnn ziawi-a�oz
Contracf Documents List
Fort Worlh Public Safety Training Center
Forl Worth, TX
Package 5- Train in9 Buildings - Gonstruction Documents
Contact Document� List Page 2 of 3
� � • � /
BYR.1� � RIQ�EMQNT
n ior.i vTtiT.:v(
Byme�RidgemoM, AJoint VenLre
May 21, �014
�xhibit A'S�".,,�°�ax=�>;
FA%]14':113I0]
Contract Documents List
Fort Worth Public Safety Training Center
Fort Worth. TX
Package 5-Treining Buildings -Canstruclion Oocuments
Contract Ooc�anents List Page 3 of 3
: ,_ -
_,
M&C Review
; � �' � '
Page 1 of 2
Official site of the City of Fort Worth, Texas
F(3RT W��RTH
�-.r _�2 . „_�._ �� r._.�.: �, .� � , ...,.„.... _ �, �,.-,� , ..,r � ..� ,., <-._, � ., _ ..�..�..� , _ , .., ...,, ___._ _.� ,..� ,.. _. _._,. � , . , , , a
COUNCIL ACTION: Approved on 4/22/2014 - Ordinance Nos. 21220-04-2014, 21221-04-2014 &
21222-04-2014
�«-. �.. � ,� �_.�� �� �� ��. ,.�. �,..
DATE: 4/22/2014 REFERENCE NO.: C-26781 LOG NAME: 06PSTC AMENDMENT
NO. 4
CODE: C TYPE: CONSENT HEAR NG: NO
SUBJECT: Authorize Execution of Amendment No. 4 to City Secretary Contract No. 43762 with The
Cornell FW Company, LLC, in the Amount of $4,316,336.00 from Federal Asset Forfeiture
Funds for Additional Features at the New Public Safety Training Center as Requested by
the Police and Fire Departments, Approve the Guaranteed Maximum Price for the Design-
Build of the New Public Safety Training Center in the Amount of $101,406,033.00 and
Adopt Appropriation Ordinances (COUNCIL DISTRICT 9)
� �� � _ � �. .r�a�,� , .�.�. _. ��,. _.� �. .�� � .,�__ � ,_�� �__�,� �
w��� �.,_ �w�� � �_ �
� ��_ . ���
RECOMMENDATION:
It is recommended that the City Council:
1. Adopt the attached appropriation ordinance increasing appropriations in the High Intensity Drug
Trafficking Area Asset Forfeiture Fund in the amount of $2,357,000.00 and decreasing the restricted fund
balance by the same amount;
2. Authorize the transfer of $2,357,000.00 from the High Intensity Drug Trafficking Area Asset Forfeiture
Fund to the Federal Asset Forfeiture Fund;
3. Adopt the attached appropriation ordinance increasing estimated receipts in the Federal Asset Forfeiture
Fund in the amount of $2,568,116.70 (which includes $211,116.70 in current year revenue), increasing
appropriations in the Federal Asset Forfeiture Fund in the amount of $3,974,924.00 and decreasing the
Federal Asset Forfeiture Fund restricted fund balance in the amount of $1,262,924.07, the committed fund
balance in the amount of $108,022.87 and the assigned fund balance in the amount of $35,860.36;
4. Adopt the attached appropriation ordinance increasing appropriations in the Treasury Asset Forfeiture
Fund in the amount of $341,412.00 and decreasing the restricted fund balance by the same amount;
5. Authorize execution of Amendment No. 4 to City Secretary Contract No. 43762 with The Cornell FW
Company, LLC, in the amount of $4,316,336.00 to complete the design and construction of the new Public
Safety Training Center; and
6. Approve the Guaranteed Maximum Price for the Design-Build of the Public Safety Training Center in the
amount of $101,406,033.00.
DISCUSSION:
This project provides for the design and construction of a new training center and headquarters for the Fire
and Police Departments. This Amendment is needed to provide for additional finish-out for increases in
administrative and training-related Staff beyond what was included in the original project scope. The
additional finish-out includes office space, conference rooms, classrooms, and associated FF&E (Furniture,
Fixtures, and Equipment).
Throughout the design period of the Design-Build Agreement (M&C C-25798), the Cornell FW Company,
LLC, has been working with Staff to accommodate requested design and space needs for the facility. The
Cornell FW Company herewith presents its Guaranteed Maximum Price (GMP) in the amount of
$101,406,033.00 to design and build the Public Safety Training Center. Staff has reviewed and now
recommends that this amount be memorialized in the Design-Build Agreement as the GMP.
The net effect of proposed Amendment No. 4 is as follows:
http://apps.cfwnet.org/council_packet/mc_review.asp?ID=19660&councildate=4/22/2014 5/21/2014
M&C Review
Original Contract (M&C G25798)
_ __
Amendment No. 1(Material Testing performed by
separate City contract — M&C C-26219)
Amendment No. 2 (Administrative)
Amendment No. 3(Water Utility Relocations and
Land Costs for GSA Property Acquisition — M&C L-
15635)
Amendment No. 4 (In Process)
$97,522, 957.00
($350,000.00)
Schedule
Change
($83,260.00)
16,336.00
Guaranteed Maximum Price
01
Staff has reviewed Amendment No. 4 and considers it to be fair and reasonable.
Page 2 of 2
M/WBE Office - The Cornell FW Company, LLC, agrees to maintain its initial M/WBE commitment of 30
percent of construction costs that it made on the original contract and extend and maintain that same
M/WBE commitment of 30 percent of construction costs to all prior change orders up to and inclusive of this
Amendment No. 4. Therefore, The Cornell FW Company, LLC, remains in compliance with the City's
M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE
Commitment form executed by an authorized representative of its company.
The Fort Worth Police Department (FWPD) participates in the High Intensity Drug Trafficking Area (HIDTA)
Task Force and serves as fiscal agent over the awarded HIDTA Asset Forfeiture Fund. FWPD is paid from
the HIDTA Asset Forfeiture Fund based on its resources dedicated to the HIDTA Task Force, and the funds
must be transferred into the Federal Asset Forfeiture Fund before being used. The Federal Asset Forfeiture
Funds can only be used by FWPD to purchase items which are permissible under the U.S. Department of
Justice Guide to Equitable Sharing for State and Local Law Enforcement Agencies (April 2009). The
Department of Justice must pre-authorize the use of Federal Asset ForFeiture Funds for capita(
improvement projects, and FWPD has secured all necessary approvals.
This project is located in COUNCIL DISTRICT 9, and benefits the entire City. It is located at the Southeast
corner of Felix and Hemphill Streets at Mapsco grind 91 N.
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that upon approval of the above recommendations
and adoption of the attached appropriation ordinances, funds will be available in the Federal Asset
Forfeiture Fund and the Treasury Asset Forfeiture Fund.
TO Fund/Account/Centers
1.) R190 538040 0351000 $2.357,000.00
2.) R107 476190 0351000 $2,357,000.00
3.1 R107 476190 0351000 $2,357,000.00
3.1 R107 541200 0351000 $3,974,924.00
4.1 R104 541200 0351000 $341,412.00
3.) R107 488332 0351000 $211,116.70
Microsoft OLE DB Provider for ODBC Drivers error'80004005'
[Microsoft][ODBC SQL Server Driver]Timeout expired
/council_packet/mc_review.asp, line 1267
FROM Fund/Account/Centers
2.1 R190 538040 0351000 $2.357,000.00
5.) R107 541200 0351000 $3,974,924.00
5.1 R104 541200 0351000 $341,412.00
http://apps.cfwnet.or�lcouncil_packedmc_review.asp?ID=19660&councildate=4/22/2014 5/21/2014
M&C Review
Page 1 of 3
Official site of the Ciry of Fort Worth, Texas
,CI`fY COUNCIL AGENDA
COUNCIL ACTION: Approved on 8/21/2012 - Ordinance No. 20337-08-2012
�ORT_ ��QRTII
-�'�_
DATE:
CODE
8/21 /2012
C
REFERENCE
N O..
TYPE:
G25798
NON-
CONSENT
LOG NAME:
PUBLIC
HEARING:
06PUBLIC SAFETY
TRAINING CENTER
DESIGN BUILD
NO
SUBJECT: Authorize Execution of a Design-Build Contract with The Cornell FW Company, LLC, at a
Guaranteed Maximum Price in the Amount of $97,522,957.00 to Design and Build the New
Public Safety Training Center at a Site Near the Intersection of Hemphill Street and Felix
Street, Authorize Non-Interest Bearing Inter-Fund Loan Between the Solid Waste Fund and
the Public Safety Training Facility Fund in the Amount of $20,522,957.00 and Adopt
Appropriation Ordinance (COUNCIL DISTRICT 9)
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize a non-interest bearing inter-fund loan from the Solid Waste Fund to the Public Safety Training
Facility Fund in the amount of $20,522,957.00 for interim financing of the new Public Safety Training
Center;
2. Adopt attached appropriation ordinance increasing estimated receipts and appropriations in the Public
Safety Training Facility Fund in the amount of $20,522,957.00; and
3. Authorize execution of a Design-Build Contract at a guaranteed maximum price in the amount of
$97,522,957.00 with The Cornell FW Company, LLC, to design and build the new Public Safety Training
Center.
DISCUSSION:
The purpose of this Mayor and Council Communication is to award a Design-Build (D-B) Contract with The
Cornell FW Company, LLC, at a Guaranteed Maximum Price (GMP) amount of $97,522,957.00 for the
design and construction of the new Public Safety Training Center on the property purchased last year from
the federal government through General Services Administration (GSA). It is also necessary to authorize a
non-interest bearing inter-fund loan in the amount of $20,522,957.00 between the Solid Waste Fund and
the Public Safety Training Facility Fund in order to provide interim financing for the project. This is
necessary due to the timing of funds being available from the Crime Control Police District (CCPD) and
from the sale of the Police DepartmenYs headquarters located at 350 Belknap to Tarrant County. The
remaining $77,000,000.00 will come from the sale of Certificates of Obligation expected to occur on or
around August 14, 2012.
The current public safety training center located at 1000 Calvert Street was developed over the past 50
years to train the City's police and fire personnel. Due to its age, limited capacity and functionality, and the
impacts of the bypass channel associated with the Trinity River Vision project, it has become necessary to
replace the current facility. After an in-depth analysis of potential locations, Staff has determined that the
most appropriate location is the Federal Depot property located at 501 West Felix Street in south central
Fort Worth. This location has numerous benefits including good freeway access, central location, proximity
to current City facilities and existing zoning and infrastructure.
Last year, the City acquired the 75 acres of property through GSA at a cost of $6,425,000.00.
On July 26, 2012, the Crime Control Police District (CCPD) was presented with the option of using
http://apps.cfwnet.org/council�acket/mc review.asp?ID=17282&councildate=8/21/2012 6/11/2014
M&C Review
Page 2 of 3
$10,000,000.00 in CCPD funding to help pay for the cost of the new training center. Before being able to
co►�mit any funding, however, two public hearings must be held. At its July 26, 2012 meeting, the CCPD
.Board of Directors recommended moving forward with the public hearing process. The first hearing is
scheduled for the next CCPD Board meeting on August 30, 2012, followed by the second public hearing at
the September 18, 2012 City Council meeting. The $10,000,000.00 in funding from CCPD will not be
available until after the public hearing process has been completed and the City Council has approved the
use of CCPD funding.
Similarly, the sale of 350 West Belknap requires a formal advertisement process before the sale of 350
West Belknap can be considered by the City Council, which is expected to occur by the end of September
2012. In order to get the Public Safety Training Center project initiated without further delay, Staff
recommends moving forward with the inter-fund loan approach between the Solid Waste Fund and The
Public Safety Training Facility Fund. Timing is critical as the City is expected to have some its new facilities
in place, including the new Firing Range, by the end of December 2013 per the lease Agreement signed
with the Tarrant Regional Water District (M&C L-15268) when the current police/fire training facility was sold
last year.
Regarding the sale of 350 West Belknap, the County has agreed to purchase the City's share of the
building by the end of this fiscal year and has agreed in principle to the price of $13,500,000.00 which is in
line with the City's appraisal. Staff will use $10,522,957.00 of the sale proceeds to reimburse the Solid
Waste Fund while an additional $335,520.00 will be used to pay TPW-Facilities Management for
Construction Administration Services. Because the County wants to begin using some office space and
parking shortly after they purchase the City's share of 350 West Belknap, it will be necessary to temporarily
move some Police staff out of their headquarters. This move will entail some additional costs to make
replacement space ready including IT, parking, and possibly some minor remodeling. It is also expected
that the County will charge a commercial lease rate for the space the City continues to use at 350 West
Belknap. All of these costs will be identified and brought forward as part of the upcoming Mayor and
Council Communication in September that will involve the sale of 350 West Belknap to the County. Lastly,
the Solid Waste Fund will also be reimbursed with the $10,000,000.00 in CCPD funding that is expected to
be approved by the City Council in September.
Due to the ambitious construction schedule, Staff determined that the only viable procurement option was
Design-Build (D-B), which is one of several contracting and delivery procedures for construction projects
authorized by Chapter 2267 of the Texas Government Code. Under a D-B model, the government entity
contracts with a single entity that provides both design and construction services. For projects on a tight
timeline, the D-B procurement method generally results in a quicker, more seamless delivery with fewer
change orders and delays than those typically associated with a traditional design-bid-build method.
The Request for Statements of Qualification (RFQ) from D-B firms opened on January 13, 2012, and was
advertised in the Fort Worth Star-Telegram. A total of 15 teams responded. The selection panel shortlisted
four teams and issued a Request for Proposals to each that included a more detailed scope of
services. Upon receiving their proposals, interviews were held with each of the four teams on April 11,
2012. The selection committee assigned points for each proposer based on experience and qualifications
of the D-B team members, project scheduling, M/WBE participation, understanding of public safety training
centers in terms of their planning and functionality, and ability to finance and costing methodology. Based
on evaluation of the listed performance-based factors, The Cornell FW Company, LLC, received the most
points and was selected as the top ranked D-B firm based on the demonstrated ability to design and build
the Public Safety Training Center.
The Cornell FW Company, LLC, is in compliance with the City's M/WBE Ordinance by committing to 25
percent M/WBE participation on the design phase and 30 percent M/WBE participation on the construction
phase of this D-B Project. This is achieved through the use of a joint venture for design between Komatsu
Architects, a certified M/WBE firm, and Brinkley-Sargent Architects and a second joint venture for
construction between Thos. S. Byrne, Ltd., a certified M/WBE firm, and Ridgemont Commercial
Construction. In addition to the M/WBE joint venture participation, The Cornell FW Company, LLC, has
committed to realize substantive M/WBE participation through the use of additional M/WBE subconsultants
and subcontractors. The City's M/WBE goal on the design phase is 25 percent and on the construction
phase is 30 percent.
This property is located in COUNCIL DISTRICT 9, Mapsco 91 N.
http://apps.cfwnet.org/council�acket/mc review.asp?ID=17282&councildate=8/21/2012 6/ll/2014
M&C Review
Page 3 of 3
F!�C..AL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that upon approval of the above recommendations
and adoption of the attached appropriation ordinance, funds will be available in the current capital budget,
as appropriated, of the Public Safety Training Facility Fund.
TO Fund/Account/Centers
FROM Fund/AccountlCenters
1) C236 222064 000000198700 $20,522,957.00
2) C236 444100 061070198783 $10.522,957.00
2) C236 472079 061090198783 $10,000,000.00
2) C236 541200 061070198783 $10,522,957.00
2) C236 541200 061090198783 $10,000.000.00
Submitted for City Manager's Office by_
Originating Department Head:
Additional Information Contact:
1) PE64 137236 0000000 $20,522,957.00
3) C236 541200 061070198783 $87,522,957.00
3) C236 541200 061090198783 $10,000,000.00
Fernando Costa (6122)
Randle Harwood (6101)
Mark Rauscher (2446)
ATTACHMENTS
06PUBLIC SAFETY TRAINING CENTER DESIGN BUILD A012.doc
draft 2012 CO Sale MC.htm
Public Safety Training Center Site MC Map 08 21 12.pptx
http://apps.cfwnet.org/council�acket/mc review.asp?ID=17282&councildate=8/21/2012 6/11/2014