Loading...
HomeMy WebLinkAboutContract 43797-CO7 (2)Ft�RT WORTH� -_-.•� Project Name� 2007 Critical Client Project #(s)� #00961 - #00956 Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) City of Fort Worth Change Order Request Sewer District 2) DOE 5913/5914 City Sec # 43797 Change Order Submittal #� Date 12l17/2013 TPW $3,308,257.10 $E $148,934.50 $1 $3�,457,191:60� '; ��$7 Water 0.00 $63,211.75 $0.00. - $3,52Q,403.35; $760,004.90 ' $77,892.03 $31,733.75 $0.00 $0.00 $63,211,75: ,� .A t Totals 00 $4,213,292.00 00 $342,289.50 �0 $4,555,581.50 �„ �.,.., .,.. �� $15,721.20 ` '$0,00: CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $4,618,793.25 $125,346.98 $63,211,75 9.62%' $5,266,615:00; 130 595 .� The plans as is calls for the placement of a storm sewer line along 23rd street at Lincoln. Plans call for premenant repair section. In lieu of a permenant repair section & to achieve a uniform consistent pavement section, it was decided to expand the full pavement section to encompass 23st & Lincoln. This called for an increase in pavement, excavation, stabilization, & ADA ramps. This change order also adds items to Group 2E for the following items of work required on Lincoln and 22nd for which there were no original pay items established, remove sidewalk, variable height sidewalk curb, curb and gutter replacement, and remove & replace concrete steps, - � • � .� - .• �. Contract Time ; � t " �� �;i FORT WORTH City of Fort Worth � Change Order Additions Project Name 2007 Critical Capita� Project (Council District 2) DOE 5913/5914 City Sec # 43797 Client Project # #�00961- #00956 Change Order Submittal #�7 Date 12/17I2013 ADDITIONS ni ni os o a Inc 10 32 3.0 3 8" Conc Pvmt TPW 45.00 SY 3.65 inc 32 3.0 03 9.5" onc Pvmt TPW 58 .00 S 36.75 Inc 13 3 23.010 Unclassified Excavation TPW 60.00 CY 18.00 Inc 6 32 .050 6" Lime Treatment 27 Ibs sy TPW 768.00 SY .75 Inc 7 2.0 00 Lime TPW 12. 0 TN 45.00 Inc 22 3213.0505 " Bamer Free Ramps Type E TPW 3.00 EA ,300.00 nc 23 32 3. 508 " Barrier Free Ramps Type H TPW 3.00 EA 500.00 Inc 2 02 .030 Remove ADA Ramps TP 6.0 EA 50.00 New 28 02 .0 00 Remove Si ewa TPW 5, 3.00 SF 0.75 ew 2 2. 000 Remove Conc Pvmt TPW 736.00 SY 9. New 30 9999.0000 Variab e eight idewa k Cu 6" - 2" TP 300.00 LF 2.00 New 3 3216.0 02 7" Conc Cur and Gutter TP 0.00 LF 25.0 New 32 99 9. 000 Remove & Rep ace Concrete Steps TPW 00.00 5F 30.00 TPW $63,211.75 ---•Water._...--�---- ---$0.00 Sewer $0.00 Su Total Additions 63, .75 Change Order Additions Page 2 of 4 Fox_ 2�Woa_�H City of Fort Worth Change Order Deletions Project Name 2007 Criticai Capitai Project (Council District 2) DOE 591315914 City Sec # 43797 Client Project # #00961- #00956 � Change Order Submittal # �7 DELETI�NS Date 12/17/2013 ni ni os o a TPW $0.00 Water $0.00 Sewer $0.00 Sub Total Dele6ons . 0 Change Order Deletions Page 3 of 4 CFW Change Order Approval7 Routina Assigned To: Assigned By: Page 1 of 3 Due Date: Due Time: Links 1 fortworthQov/Infrastructure Proiects/00961 - 22nd and Lincoln, 2007 CO 2E/Contractor/Chanqe Orders/Chanqe Order 7 Breakdown.xls Attachments (0) No Attachments have been added to this form. https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId... 2/3/2014 CFW Change Order Approval 7 FORT�ORTH�,c�ty of Fo�t wo�tn Change Order Request Approval (Change Order Breakdown Available in Links) Page 2 of 3 ................................................... For Change Order Submittal No.: � ..................................................: Change Order No.: 7 Date Started: 2014-01-22 City Sec. No.: 43797 Project Name: 00961 - 22nd and Lincoln, 2007 CO 2E 00961 Project Numbers: 5914 City Inspector: Richard Salazar PI"Oj2Ct Combined Contracts 2E(00961) segments of Lincoln ave, 22nd DeSCI'iptlOn: street & 2D(00956) segments of Refugio & 23rd street. Water & Sewer main line replacements & pavement reconstruction. Project Manager: Khal Jaafari Contractor: Stabile & Winn COUNCIL ACTION (If Required): M&C Log Name: N/A M&C Number: N/A COST AND DAYS SUMMARY: Department: TPW Approval Status: Cost($) $ 63,211.75 Total Cost: $ 63,211.75 Date Due: 2014-03-13 DOE Numbers: M&C Date: Requested Days: 25 Fund Account Center: C295 541200 20240096183 Total Requested Days: 25 https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId... 2/3/2014 ; CFW Change Order Approval 7 Approved: Yes Comments: User: Tara Fishback Date: 2014-01-22 4:40 PM Approved: Yes Comments: User: )erry Henderson Date: 2014-01-22 4:48 PM Approved: Yes Comments: User: Khal Jaafari Date: 2014-01-27 11:32 PM Approved: Yes Comments: User: Najib Fares Date: 2014-01-28 9:15 AM Approved: Yes Comments: User: Andy Anderson Date: 2014-01-28 1:27 PM Approved: Yes Comments: User: Doug Wiersig Date: 2014-01-30 2:06 PM Approved: Yes Comments: User: Doug Black Date: 2014-02-03 4:01 PM Approved: Yes Comments: User: Fernando Costa Date: 2014-02-03 10:25 PM Action Required: Review & Approve Page 3 of 3 https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId... 2/3/2014