Loading...
HomeMy WebLinkAboutContract 43797-CO6 (2)FORT WORTH« Project NameL 2007 Critical Capital Client Project #(s)� #00961 - #00956 Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) City of Fort Worth Change Order Request _ - -; •,� -.� .f ;;�i. ncil District 2) DOE 5913/5914 City Sec # 43797 Change Order Submittal #� Date 10114I2013 TPW ,308,257.10 �141,534.50 449,791,60 $7,400.00 457,191,60 $77,892.03 $0,00 $7.400.00 .00 Sewer ,360.00 38,385.00 $0.00 38,385.00 15.721.20 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTfFICATION Totals ,213,292.00 ;312,409.50 �,525,701.50 $29,880.00 �,555,581.50 $125,346.98 '� � 567 28 The water line on Lincoln at 20th street is shallow, thus there is a neetl to depress. An existing junction box at Lincoln and 20th street is higher than finished grade elevation, thus the need to readjust. The replacement of permenant ditch repairs due to newly placetl storm sewer lines, with full intersection repavement at 23 street & Lincoln ave, will generate a uniform cosistent treatment at the intersection � � ��J . � l/ �''/ Y 1/�',;�. / ���) i �nald P. Gon�.afea ee City �t,tttlt:t•'� �: ° � �-�� 0 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Water $102,850.00 1,733.75 � ,� 8.12% $5,266,615.00 Contract Time CD 465 102 €�ECEiVED ����0�'l�i;a Faxr Wo�rrH City of Fort Worth Change Order Additions Project Name 2007 Critical Capital Project (Council District 2) DOE 591315914 City Sec # 43797 Client Project # #00961 - #00956 Change Order Submittal #�6 Date 10114/2013 ADDITI�NS ni ni os o a nc 7 2. 00 - ime TP 20. T 5.00 GR P E- DRA N E ew 2 9. 6 Storm unction Structure 5' Top TP .0 S ,50 . GRO P 2E - ATER ncr 2 3 - P ater Pipe TER . F 2. ncr 2.3002 - 6" Gate aive TER .00 EA 750. 0 ncr 8 3 .0 - Fire ydrant TER . E 2,6 . ncr . 5 0 Remove S avage Fire y rant TER .0 EA 5. 0 Incr 2 2. - onnect to Exishng ater ain ATER . E ,5 . ncr 27 2 - Ductile ron Fit6ngs ATER . 0 T ,500.0 New 5 70.0 0 Water ine Remo tlizaUon TER 5, . ew 3 3 5. ater ine owenng inco n@ th &@ 23r AT R . E ,8 . TPW 7,400.00 Water $22,480.00 Sewer $0.00 u Tota A ditions 2,8 . Change Order Additions Page 2 of 4 Fc�x r WoH rH City of Fort Worth Change Order Deletions Project Name 2007 CriGcal Capital Project (Council District 2) DOE 591315914 City Sec # 43797 Ciient Project # #00961 - #00956 Change Order Submittal # �6 DELETIONS Date 10/14/2013 ni ni os o a TPW 0.00 Water $0.00 Sewer $0.00 Su Tota De etlons Change Order Deletions Page 3 of 4 Previous Change Orders ; Co # DATE AMOUNT Total $0:00 ' CFW Change Order Approval # 6 Routina Assigned To: Assigned By: Page 1 of 3 Due Date: Due Time: Links 1 fortworthaov/Infrastructure Proiects/00961 - 22nd and Lincoln. 2007 CO 2E/Contractor/ChanQe Orders/Chan4e Order 6 Breakdown Revised.xls Attachments (0) No Attachments have been added to this form. https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessI... 12/5/2013 CFW Change Order Approval # 6 FORT�ORTH�H,City of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) Page 2 of 3 ................................................... For Change Order Submittal No.: : ..................................................: Change Order No.: # 6 Date Started: 2013-11-15 City Sec. No.: 43797 Project Name: 00961 - 22nd and Lincoln, 2007 CO 2E 00961 & 00956 Project Numbers: 5914/5913 City Inspector: Richard Salazar PI'OjeCt Combined Contracts 2D & 2E, Water, Sewer replacements, and DeSCI'iptiOn: pavement reconstruction. Contract 2E or segments of Lincoln ave, 22nd street, and Contract 2D or segments of Refugio ave & 23rd street. Project Manager: Khal Jaafari Contractor: Stabile & Winn COUNCIL ACTION (If Required): M&C Log Name: N/A M&C Number: COST AND DAYS SUMMARY: Department: Water TPW Pavement TPW Drainage Approval Status: Cost($) $ 22,480.00 $ 2,900.00 $ 4,500.00 Total Cost: � 29,880.00 Date Due: 2014-01-04 DOE Numbers: M&C Date: Requested Days: 20 3 5 Fund Account Center: P253-541200-602170096183 C295-541200-202400096183 P227-541200-202280096183 Total Requested Days: 28 https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessI... 12/5/2013 CFW Change Order Approval # 6 Approved: Yes Comments: User: Tara Fishback Date: 2013-11-18 9:09 AM Approved: Yes Comments: User: Jerry Henderson Date: 2013-1i-18 9:34 AM Approved: Yes Comments: User: Khal Jaafari Date: 2013-1i-18 4:39 PM Approved: Yes Comments: User: Najib Fares Date: 2013-11-18 10:46 AM Approved: Yes Comments: User: Andy Anderson Date: 2013-11-25 1:46 PM Approved: Yes Comments: User: Doug Wiersig Date: 2013-11-25 1:48 PM Approved: Yes Comments: User: Doug Black Date: 2013-11-27 10:40 AM Approved: Yes Comments: User: Fernando Costa Date: 2013-1i-27 5:23 PM Action Required: Review & approve Page 3 of 3 https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&Processl... 12/5/2013