HomeMy WebLinkAboutContract 43797FORT WORTH�, Project Name 2007 Critical Capital Project (Council District 2) DOE 5913/5914 City Sec # 43797 Client Project #(s) #00961 - #00956 Change Ortler Submittal #�9 Date 12/10/2014 _ � .: Original Contract Amount Extras to Date Credits to Date Dept. City of Fort Worth Change Order Request TPW 08,257.10 11,602.30 19,859.40 41,088.29 Pending Change Orders (in M&C Process) Contract Cost to Date of Proposed Chanqe Order Water $634,674.90 $125,330.00 $760,004.90 Sewer Totals 00 $4,213,292.00 00 $504,957.30 718,249.30 Revised Contract Amount $3,660,947.69 $769,004.90 $338,066.00 Original Funds Available for Change Orders $77,892.03 $31,733.75 $15,721.20 Remaining Funds Available for this CO $0.00 $0.00 $0.00 Adtlitional Funding (if necessary) $41,088.29 $9,000.00 CHANGE ORDERS to DATE (INCLUDING THIS ONEJ AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTR,4CT AMOUNT (ORIGINAL CONTR,4CT COST + 25%) JUST(FICAT[ON FOR CHANGE � � � , ; , ,_ :�: i Contract Time 465 230 60 755 125.346.98 13.17% $5,266,615.00 This change order is required to adjust the quantities of various line items in the contract. Items in this change order were either miscalculated or omitted in the original design and include the following. The removal and replacement of sidewalk along NW 22nd street which was deteriorated and presented trip hazards for pedestrians. Also, additional lime treated subgrade was needed on Lincoln Street and NW 22nd Street. Extra driveway removal antl replacement was needed at various locations in order to properly tie in to the existing driveways and to maintain a proper slope. The installation of Type E Ramps was needetl in lieu of the designed type F ramps to better accommodate field conditions and to meet ADA requirements. Variable height curb was needed at the back of the sitlewalk in various areas where sloping the yards was not feasible due to the presence of trees and/or structures. Manhole adjustments were included in the original design but were of insufficient quantities. Additional HMAC transitions were included in the original plans but quantities were miscalculated. b�►: ;� � � �J � '� - �� �' �`: ` :��`.-: � Q� �� �� �� �, _., . . � - -;� ; x - � �: �. F�. , _' �, ,. FpRT WORTH city of Fort wortn Change Order Additions Project Name 2007 Crifical Capital Project (Council District 2) DOE 5913/5914 City Sec # 43797 Client Project # #00961 - #00956 Change Order Submittal # 0 ADDITIONS Change Order Additions Page 2 of 4 Date 12/10/2014 FoxT Wo�rH c�ty of Fort wo�tn Change Order Deletions Project Name 2007 CriUcai Capital Project (Council District 2) DOE 5913/5914 City Sec # 43797 Client Project # #00961 - #00956 Change Order Submittal # �9 DELETIDNS Date 12/10/2014 ni ni os o a Decr 10 32 3.0 03 8" Concrete Paving TPW 22.00 Y 3.65 Decr 2. MA peed ushion TP .00 EA ,800.00 Decr 9 32 3.0301 " Conc Sidewalk TPW 276.00 F 3. 5 Decr . 5 8' Barrier Free Ramp, Type H TPW 5.00 EA 500.00 Decr 32 9999.0000 Remove & Replace Steps TPW 75.00 SF 0. GROUP 2E - DRAINAGE Decr 32 . 3 " Conc. idewa k TP 722.00 SF 3.25 Decr 30 3292.0 00 Seeding Hydromu ch TPW 802.00 SF .5 Decr 3 329 .0 Tapsoi TPW 3.00 CY 2.50 Decr Imported Select Backfill Material TPW 2,000. 0 Y 6.50 GROUP 2E SANITARY SEWER Decr 330 . 00 Pre- CTV Inspection Sewer ,708.00 LF 2.00 Decr 7 3339.100 4' Shallow Manhole Sewer .00 EA , 0.00 Decr 8 3305. Trench afety Sewer 8.00 LF .00 Decr 9 3201.0 00 Tempoary Asphait Pavement Repair 2" Type "D" Sewer 95.00 LF 9.00 TPW $46,367.80 Water $0.00 Sewer $7,819.00 ub Total De etions 5, 86.80 Change Order Deletions Page 3 of 4 CF W Change Order Approval9 Routinq Assigned To: Assigned By: Links 1 Page 1 of 3 Due Date: Due Time: fortworth4ov/Infrastructure Proiects/00961 - 22nd and Lincoln, 2007 CO 2E/Contractor/Chanae Orders/Chanqe Order 9 Breakdown Revised #2.xls Attachments (0) 1►�C.L'[iFi.7i ���i'fiRa.�C._f�:L�.7li'f��.7T� https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId... 3/5/2015 CFW Change Order Approval 9 FORT�ORTH��c�ty of Fo�t wo�tn Change Order Request Approval (Change Order Breakdown Available in Links) Page 2 of 3 For Change Order Submittal No.: 9 Change Order No.: 9 City Sec. No.: 43797 Date Started: 2014-12-15 Date Due: 2015-01-31 Project Name: Combined contracts 2D ( 00956) & 2E (00961) 00956 & 00961 DOE Numbers: Project Numbers: 5913 / 5914 PI"O]eCt Water, Sewer , Storm sewer & Pavement replacement for segments Description: of NW 23rd ( 2D) , Lincoln ave & NW 22nd street (2E) Project Manager: Khal Jaafari Contractor: Stabile & Winn COUNCIL ACTION (If Required): M&C Log Name: none M&C Number: COST AND DAYS SUMMARY: Department: Cost($) TPW $ 77,512.79 TPW Drainage Sewer Sewer Water Approval Status: City Inspector: Richard Salazar M&C Date: Fund Account Center: C295 541200 202400096183 $ -36,424.50 P227 541200 202280096183 $ 7,500.00 $ -7,819.00 $ 9,000.00 Total Cost: $ 49,769.29 P258 541200 702170095683 P258 541200 702170096183 P253 541200 602170096183 Requested Days: 40 �;� 12 Total Requested Days: 60 https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId... 3/5/2015 CF W Change Order Approval9 Approved: Yes Comments: User: Tara Fishback Date: 2015-02-04 3:13 PM Approved : Yes Comments: User: Jerry Henderson Date: 2015-02-04 3:36 PM Approved: Yes Comments: User: Khal Jaafari Date: 2015-02-05 10:19 AM Approved : Yes Comments: User: Najib Fares Date: 2015-02-05 1:59 PM Approved: Yes Comments: User: Andy Anderson Date: 2015-02-i1 8:38 PM Approved: Yes Comments: User: Doug Wiersig Date: 2015-02-11 11:33 PM Approved: Yes Comments: User: Doug Black Date: 2015-03-03 12:37 PM Approved: Yes Comments: User: Fernando Costa Date: 2015-03-03 10:45 PM Action Required: Review & circulate Page 3 of 3 https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId... 3/5/2015