Change Order Request
Project Name HMAC Surface Overlay 2012-19 Ciry Sec # 43783
Client Project #(s) DOE # 6897
Change Order Submittal # �2
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funtling (if necessary)
TPW
,089.10
,873.16
`;$902;962;26 g
$120,179.84 -
' $1;023;142,10 ' $
$0.00
$120.179.84 :
Water
12.544.55
12,544.55
60,121.01
56 ► .
Sewer
:�
$0.00 ;$C
121;01 �60;121
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTR,4CT AMOUNT (ORIGINAL CONTRACT COST + 25%)
Date
Totals
1, 650,178.20
$77,873.16
1,728,051.36
$1,968,473.22
$0.00
$240,421.86
: 19.29°/a ,;
$2,062;722:75
11/15/2013
Contract Time
150
12
162
267
Additional quantities required for contract items due to construction over-runs. Additional time required for the additional work as well as
waiting on streets to be released for construction by water department
by�
0
Maiy J.
n
,�
:
t'��tt�t3r{ ',�. zt � ° �
�� �� � �
�. --,.
�'� -�
� v.� �*'
� _ r ` _.
zi
_ �.
'�' • ' . �' � �� �, • �
.- _ �
+i. ' ,
i � �; ;x� ;
. 1 _r � r �
FORT WOR'CH
Project Name
Client Project#
city ot Fort wo�tn
Change Order Additions
HMAC Surface Overiay 2012-19 City Sec # 43783
DOE # 6897
Change Order Submittal # �2
ADDITI�NS
Change Order Additions Page 1 of 1
Date 11/15/2013
Faxr Wak•rx City of Fort Worth
Change Order Deletions
Project Name HMAC Surface Overlay 2012-19 City Sec # 43783
Client Project # DOE # 6897
Change Order Submittal # �Z
DELETI�NS
Change Order Deletions Page 1 of 1
Date 11/15/2013
M/SBE Breakdown for this Change Order
CFW Change Order Appr�oval St-COApp01
Routin
Assigned To:
Assigned By:
Page 1 of 5
Due Date:
Due Time:
Links 3
fortworthqov/Infrastructure Proiects/01967 - HMAC Surface Overlav (2012-19)/Contractor/Chanqe Orders/Chanqe Order Breakdown -
co2 revised.xls
fortworthaov/Infrastructure Proiects(01967 - HMAC Surface Overlav (2012-19)/Contractor/Chan4e Orders/43783- CO2.pdf
fortworthqov/Infrastructure Proiects/01967 - HMAC Surface Overlav (2012-19)/Contractor/Chanqe Orders/Copv of Chanqe Order
Breakdown - co2 revised.xls
Attachments (0)
No Attachments have been added to this form.
https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId=154&Active... 2/17/2014
CFW Change Order Approval St-COApp01
� � � � • • , •
. • - � • - ' - • - � � • • .
• - • • - C • • ` . •
For Change Order Submittal No.: 2
Change Order No.: St-COApp01
City Sec. No.: 43783
Project Name: HMAC Surface Overlay (2012-19)
01967
Project Numbers:
DOE No. 6897
DOE Numbers:
PI"ojeCt City streets rehabilitation by pulverization and stabilization
Description: with the use of modifiers for 8" of existing pavement and then
resurfaced with 2" of surface course asphalt.
Project Manager: Kristian Sugrim
Contractor: JLB Contracting, LLC.
COUNCIL ACTION (If Required):
Date Started: 2014-01-17
Date Due: 2014-03-08
City Inspector: Mike Glover
M&C Log Name: 20HMAC Surface Overlay 2012-19 CO 2
M&C Number: C-26633
COST AND DAYS SUMMARY:
Department:
TPW
Water
Sewer
Approval Status:
M&C Date: 2014-01-14
Requested
Days:
Cost($) Fund Account Center:
$ 120,179.84 C293 541200 205620196783
$ 60,121.01
P253 541200 605170196783
$ 60,121.01
Total Cost: � z40,421.86
P258 541200 705170196783
267
Total Requested Days: 26�
Page 2 of 5
https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId=154&Active... 2/17/2014
CFW Change Order Approval St-COApp01
Approved: Yes
Comments:
User: Tara Fishback
Date: 2014-01-17 10:54 AM
Approved: Yes
Comments:
User: Sam Davis
Date: 2014-01-17 11:42 AM
Approved: Yes
Comments:
User: Kristian Sugrim
Date: 2014-01-22 11:23 AM
Approved: Yes
Comments:
User: Najib Fares
Date: 2014-01-22
11:39 AM
Approved: Yes
Comments: City Counci) Approved this
Copy Attached to these documents
User: Andy Anderson
Date: 2014-01-23 9:29 AM
Approved: Yes
Comments:
User: Doug Wiersig
Date: 2014-02-03 11:58 AM
Approved: Yes
Comments:
User: Tara Fishback
Date: 2014-02-07 1:48 PM
Approved: Yes
Comments:
User: Sam Davis
Date: 2014-02-11 9:14 AM
Approved: Yes
Comments:
User: Kristian Sugrim
Date: 2014-02-11 9:48 AM
Change Order on January 14, 2014, M&C C-26633,
lttps://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId=154&Active...
Page 4 of 5
2/17/2014
CFW Change Order Approval St-COApp01
Approved: Yes
Comments: City Secretary number was missing.
User: Najib Fares
Date: 2014-02-13 10:22 AM
Approved: Yes
Comments:
User: Andy Anderson
Date: 2014-02-14 1:15 PM
Approved: No
Comments: need to be more specifice on reason for CO - not just quanity overruns
User: Doug Wiersig
Date: 2014-02-14 3:03 PM
Approved: Yes
Comments:
User: Doug Black
Date: 2014-02-14 4:18 PM
Approved: Yes
Comments:
User: Fernando Costa
Date: 2014-02-14 10:21 PM
Action Required:
ittps://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId=154&Active,..
Page 5 of 5
2/17/2014
M&C Review
CITY COUNCIL AGENDA
Page 1 of 2
p(ficial site of the CI[y of Port Worth, Texas
Fo���
COUNCIL ACTION: Approved on 1/14/20�14 - Ordinance Nos. 21095-01-20'14 & 21096-01-2014
DATE:
CODE:
SUBJECT:
1/14/2014 REFERENCE NO.: **C-26633 LOG NAM�. 20HMAC SURFACE
OVERLAY 2012-19 CO 2
C TYP�: CONSENT PUBUC NO
HEARING:
Authorize Execution of Change Order No. 2 to City Secretary Contract No, .43783 with
JLB Contracting, LLC, in the Amount of $240,421,86 to Rehabilitate Street Sections of
Pate Drive, Putnam Street, Stark Street, Park Hill Drive, Dryden Road and Alton Road,
Thereby Increasing the Total Contracf Amaunt to $1,968,473,22 and Adopt Appropriation
Ordinances (COUNCIL DISTRICTS 3, 5 and 9)
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize a transfer in the amount of $120,242.02 from the Water and Sewer �und in the amounts
of $60,121.01 to the Water Capital Projects �und and $60,121.01 ta the Sewer Capital ProjeGts
Fund;
2. Adopt the attached appropriation ordinances increasing estimated receipts and appropriations in the
Water Capital Projects Fund in the amount of $60,121.01 and the Sewer Capitai Projects Fund in the
amount of �60,121.01 from available funds; and
3. Authorize the execution of Change Order No. 2 to City Secretary Contract No. 43783 with JLB
Contracting, LLC, in the amount of $240,421.86 to rehabilitate sections of Pate Drive, Putnam
Street, Stark Street, Park Hill Drive, Dryden Road and Altan Road, thereby increasing the total
contract amount to $1,968,473.22.
DISCUSSION:
These street segments are part of the Contract Major Maintenance Program which provides for the
rehabilitation of the City's deteriorated asphalt streets. This pavement work is being undertaken in
conjunction with a separate contract for the replacement of water and sanitary sewer lines.
Change Order No. 2 is necessary due to quantity overruns for repairs to curbs, gutters, driveways and
sidewalks beyond that which was anticipated.
The Water Department will contribute funding in the amounf of $120,242.02 for this change order. The
Transportation and Public Works portion in the amount of $120,179.84, which is available in the Contract
Streef Maintenance Fund.
http://apps.cfwnet.org/council_packeVmc_review.asp?TD-19303&eouncildate=l/14/2014 1/17/2014
M&C Review
M/WBE Office - JLB Contracting, LLC, agrees to maintain its initial commitment of 16 percent that it made
on the original contract and extend and maintain that same MM/BE commitment of 16 percent to this
second change order. Therefore, JLB Contracfing, LLC, remains in compliance with the City's M/V1lBE
Ordinance and attests to its commitment by its signature on the Acceptance of Previous Commitment
Form executed by the authorizad representative of its company.
These street prajects are located in COUNCIL DISTRICTS 3, 5 and 9, Mapsco 75Z, 76S, 78V, 79H and
89D.
FISCAL INFORMATION/CERTIF'ICATlON:
The Financial Management Services Director certifies that upon approval of the above recommendations
and adoption of the attached appropriation ardinances, funds will be available in the current capital
budgets, as apprapriated, of the Water Capital Projects Fund and the Sewer Capital Projects Fund; and
are availabie in the current capital budget, as appropriated, of the Contract Street Maintenance Fund.
TO Fund/Account/Centers
1&2
P253 476045 605170196ZZ
1&2
P258 476045 705170196ZZ
2}P253 541200 605170196783
2} P258 541200 705170196783
$60,121.01
$60,121.01
60,121.01
$60,121.01
Submitted for City Manaqer's Office bv:
Oriqinating Department Head:
Additional Information Contact:
ATTACHMENTS
FRtJM Fund/Account/Centers
1� PE45 538040 0609020
� PE45 538040 0709020
3)P253 541200 605170196783
3)P258 541200 705170196783
3)C293 541200 205620196783
Fernando Costa (�122)
Douglas W. Wiersig (7801)
Kristian Sugrim (8902)
20HMAC SURFACE OVERLAY 2012-19 CO 2 P253 AO.docx
20HMAC SURFACE OVERLAY 2012-19 CO 2 P258 AO,docx
http://apps.efwnet.org/eouncil�acket/me_review.asp?1D=19303&councildata=l /14l2014
$60,121.01
$60,121.01
$60,121.01
$6p,121.01
$120,179.84
Page 2 of 2
1/17/2014
On September 25, 2012, (M&C C-25883) the City Council aufhorized the execution of a contract with JL.B
Contracting, LLC, in the amount of $1,650,178.20 for Hot Mix Asphaltic Concrete at various locations,
following water and sanitary sewer main replacements.