Project Name: Water and Sanitary Sewer Replacement Contract 2009, STM-0 City Sec No.: 46569
Project No.(s): P253-609170147983 & P258-709170147983 DOE No. 6771 City Proj. No.: 01479
Project Description;
Water antl sanitary sewer main replacement on W. Cantey Street, Statlium Drive, S. University Drive and N. Commerce
Street.
Contractor: Conatser Construction TX, LP
City Project Mgr. Roberto C. Sauceda
Phone Number: 817-392-2387
Dept. � Water
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
of Proposed Chanqe Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Availabie for this CO
Additional Funding (if necessary)
E�I
S�
5.00
515.00
.00
$1,366,515.00
$41,000.00
$41,000.00
Sewer
S�
Change Order# �1 Date: 11/25/2015
City Inspector: Luisa Allbright
Phone Number: 817-223-2259
121,365.00
100.00
100.00
CHANGE ORDERS to DATE (INCLUDING THIS ONEJ AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTR.4CT AMOUNT (ORIGINAL CONTR,4CT COST + 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Totals
Contract Time
(Calender days)
150
$1,487,880.00 150
$0.00 045
$1,487,880.00 195
$47,100.00
$47,100.00
0.00%
$1,859,850.00
The change order will pi•ovide for the following:
• The relocation of an e�sting public 6-inch water main that is in conflict with a proposed parlcing lot
at 1401 E. Lancaster Avenue.
• The installation of two fire hydrants and a 2-inch water meter service to a future Lego facility at
5600 Mark IV Parkway.
• A 8-inch water main lowering and fire hydrant relocation at 1513 E. Presidio Stre �
,.�� i�
Staff concurs with the contractor's request for 45 additional calendar days on the
� �'
� 1 1 �1.��
r . �1
; ,/
� � �� ��
�-�� °�
� t o
, o
'�'•`o��i.�_�" \ Q��
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's Compan Name Contractor Name Contra tor Si ature Date
Conatser Construction TX, LP Jesse Martinez
�
' Inspecfo Date Pro'ect anager Date
��� ; ;' ='-r _ 1" „��`�c/i � ' _:. :'
' Assistant-Dirj r VUater D`e t . ate on truction S pervisor ( PW De t ate. `T
•� � � — \ . ��,.
>y
— ,
�,; � ! L_ `- - � _�- --- ;? ` i _
� As�i�tar� �ity Attpr,ney r� ` ate Assistant Ci Manager Date
� .- "
� �
�" Council Action If Re uired
t' : -
M&C Number N�q M&C Date Approved N/A
C�+G����oF�� �E��G�►� �
CI'iY SECRETAR��' �
� : �, .
�.�T,...
City of Fort Worth
�_. Change Order Additions
Project Name Water and Sanitary Sewer Replacement Contract 2009, STM-0 City Sec No.: 46569
Project No.(s): P253-609170147983 & P258-709170147983 DOE No. 6771 City Proj. No.: 01479
Project
Description
Water and sanitary sewer main replacement on W. Cantey Street, Stadium Drive, S. University Drive and N. Commerce
Street.
Contractor Conatser Construction TX, LP Change Order:�7 Date: 11/25/2015
City Project Mgr. Roberto C. Saucetla City Inspector Luisa Allbright
ADDITIONS
9
11
15
16
25
34
41
43
46
54
55
56
�6" PVC Water Pipe
8" Gate Valve
6" Gate Valve
5' Wide Asphalt Pvmt Repair, Arterial
Water Abandonment Plug
Fire Hydrant
Ductile Iron Fittings
4" Concrete Sidewalk
16" X 8" Tapping Sleeve and Valve
2" Water Tap to Main
Class B PVC Meter Box
Water
Water
Water
Water
Water
Water
Water
Water
385.00
38.00
2.00
4.00
85.00
1.00
4.00
1.30
15.00
1.00
1.00
1.00
EA
EA
EA
EA
'LF
EA
EA
EA
SF
EA
EA
EA
G, � � �
950.00
�
�
000.00
600.00
500.00
).00
700.00
800.00
30.00
1,000.00
14,400.00
5,850.00
700.00
11
Sewer
Page 2 of 4 (Additions Sub Total
FO RT WO RT H City of Fort Worth
Change Order Deletions
Project Name Water and Sanitary Sewer Replacement Contract 2009, STM-0
Project No.(s): P253-609170147983 & P258-709170147983 DOE No. 6771
Project Description
Contractor
City Sec No.:
City Proj. No
46569
01479
Water and sanitary sewer main replacement on W. Cantey Street, Stadium Drive, S. University Drive and N.
Commerce Street.
Conatser Construction TX, LP
City Project Mgr. Roberto C. Sauceda
ITEM
1
2
9
10
22
DESCRIPTION
24" Water Pipe
24" Water Pipe, CSS Backfill
8" PVC water pipe
8" PVC water pipe, css backfill
Connection to Existing 24 inch Water Main
Change Ortler: �1 Date 11/25/2015
City Inspector: Luisa Allbright
DELETIONS
DEPT
Water
Water
Water
Water
Water
Qty
205.00
25.00
290.50
13.50
2.00
Unit
LF
LF
LF
LF
EA
Water
Sewer
Unit Cost
$135.00
$150.00
$70.00
$90.00
$8,000.00
Total
$27,675.00
$3,750.00
1,215.00
16, 000.00
11
Page 3 of 4 �Deletions Sub Total �$68,975.00
Page 4 of 4
• .
LOCATION; 1401 E. Lancster Ave. (Lowering in Kennedy St,) DESCRIPTION: 269 Lf. 8° Water Main Repiacement
DATE: 10/23/2015 ESiiMATED BY: SL OFFICE PR07EGT NO.: Contract 2009 STM-0
REVISED: APPROVED BY: TPW/DOE N0. City Proj. No. 01479
1TEM NO. DESCRIPTION QUAN"fTfY 11NIT PRICE SUB-TOTAL
I;��L�
18b20.00
16 6" Gate Valve 1 Ea. 1000.00 1000.00
15 8" Gate Vaive 1 Ea. 1200.00 1200.00
43 Ductile Iron Fit�inqs 0.597 Tn. 4500.00 2686.50
41 Fire Nvdrant
0.00
0.00
a.00
o.00
o.00
o.00
o.00
o.00
o.00
o.00
o.00
o.oa
o.00
o.00
a.00
o.00
o.00
o.00
o.00
o.00
o.oa
o.00
o.00
ESIZMATED CONSTRUCTION COST
CONTINGENCIES @
SUB-TOTAL
ENGINEERING @ 10%
0%
$ 30,179.00
0.00
30,179.00
3,017.90
CI7Y FURNISHED MATERIALS 0.00
TOTAL ES7IMATED PROJECT COST $ 33,196.90
NOTE: -m�s is a Preliminary Construcclion Cost EsEimate oniy. The actual construction cosi is subject to a num6er of factors induding, but not limited
to, contract availabiliry, contractor availability, and changes in scope and/or existing conditions. Final construction cost may vary from this
estimate.
COST ESTIMATE
LOCATION
5600 Mark IV Pkwy. (Future Lego Facility) DESCRlPT10N:
DATE: ?0/26/2015 ESTIMATED BY: J Carranza OFFICE PROJECT NO.:
REVISED: APPROVED BY: DOE NO.
Proposed (2) Fire Hydranfs, and
2" Irrigation
9510-09
STM-0
ITEM NO. DESCRIPTiON QUANTITY UNIT PRICE SUB-TOTAL
9 9 6" PVC Water
9 8" PVC Water
Valve
6 Lf.
65, 00
70.00
1,000:00
600. 00
n►�r�za,�c�i
272 Ibs
390.00
075.00
000.00
7.200.00
23,976.00
ESTIMATED CONSTRUCTION COST
CONTINGENCIES @
SU B-TOTAL
0%
�
0.00
23,976.00
2,397.60
ENGINEERING @ 1Q%
C1TY FURNISHED MATERIALS
TOTAL ESTIMATED PROJEC7 COST
0
0.00
26,373.60
NOTE: This is a Preliminary Construction Cost Estimate oniy. The actual constructlon cost is subject to a number of factors including, but not limited
to, contract availability, contractor availability, and changes in scope and/or existing conditions. Final construction cost may vary from this
estimate.
,,4��_.�.���--,z-- ��xtension 2 Ea. �1 400. 00
69 16"x8" Tapping Sleeve and Valve 9 Ea. 4,700.00 4,700.00
93 2" Water Tap to Main 1 Ea. 1, 8�0.00 1, 800.00
94 2" Copper Service Line 3 Lf. 48.00 144.00
COST ESTIMATE
LOCATI ON
DATE
ITEM NO.
1513 E. Presidio St. DESCRIPTION: Prop. 8" Water Main Lowering & Fire
(Future True Worth Homeless Resource Center) Hydrant
19/23/2095 ESTIMATED BY: J Carranza OFFICE PROJECT NO.: - 1511-05
DOE NO. STM-O
DESCRIPTION QUANTITY UNIT PRICE SUB-TOTAL
9 9 6" PVC Water pipe 15 Lf. 65.00 975.00
9 8" PVC Water pipe 47 Lf. 70.00 3, 290. 00
16 6" Gate Valve 9 Ea. 100.00 100.00
15 8"Gate Valve 1 Ea. 1,200.00 1,200.00
24 7" Conc. Curb and Gutter 5 Lf. 35.00 975.00
25 5' Wide Asphalt Pvmt. RepairArterial 60 Lf. 55.00 3,300.00
43 Cast Iron Fitting 1932 Lbs. 2.25 2,547.00
49
46 4' Conc. Sidewalk
25 SF
�0. 00 3, 600. 00
30.00 750.00
Fittinqs:
4- 8" 45 Deg. Bend = 960# 640 /bs
9- 8"x6" Reducer = 136#
1- 8" Sotid Sleeve = 195#
9- 8"x 6" Tee = 241#
115 Ibs
249 /bs
otal 1132
�
ESTIMATED CONSTRUCTION COST
CONTINGENCIES @
SUB-TOTAL
0%
0
15, 937.00
0.00
15,937.00
1,593.70
ENGINEERING @ 10%
CITY FURNISHED MATERIALS
TOTAL ESTIMATED PROJECT COST
0
0.00
17,530.70
NOTE:
This is a Preliminary Construction Cost Estimate only. The actual construction cost is subject to a number of factors including, but not limited to,
contract availability, contractor availability, and changes in scope and/or existing conditions. Final construction cost may vary from this
estimate.