HomeMy WebLinkAboutContract 46547-CO7 (2)�. �� City of Fort Worth Change Order Request Breakdown ' '- / � � = t Project Name Alliance Airport - RTR Duct Bank and TWY H Impvt City Sec # 46547 Client Project #(s) 960 Contractor EAS Contracting, LP PM Anne-Marie Stowe Inspector Billy Jones Change Order Submittal #�7 Date 7/16/2015 Dept. � Aviation Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funtls Available for this CO Additional Funding (if necessary) 7 $9,677.42 1,147,367.42 $1,172,346.42 979.00 Contract Time (CD) 70 11 74 144 0 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 3.05% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $1,422,112.50 JUSTIFICATION (REASONS) FOR CHANGE ORDER This change order is drafted for changes to the 4W4" ductbank and manhole in Phase 3, per tlrawings C7, C8, Revision 1 dated 6-8-15. This is an ADDER change order. Any existing Base Bid unit items installed will be charged for in full under the Base Bid pay items. The revision significantly lowered the planned ductbank and MH-14C depths to avoid future site tlrainage. The scope of work includes placement of 4W4" Ductbank from STA 63+00 to 68+43 at a lower elevation. Lowering elevation of MH-14C, with additional spacer rings. Also included is a deduct of installation cost of eliminated MH-13E from project. Material cost of MH-13E will be charged as the manhole is unable to be returned. �' , ,� �: _ ��. �«Z��;�:�] �I�"�` �i��;�EiARY �.. SCANNED P% 1NORTH, TX Totals $9,677.42 1,147,367.42 $1,172,346.42 $0.00 •�� �`'''= �,�� � ,> ��/�� , '�j1� �OR��I��� C\C` fl � ���:,lt���� ,,_�_.�. , CFW Change Order Appr•oval CO-07 � � � � f � � � � .- • .- � . �.. . '`� • - • • - . • • � . • Page 2 of 3 For Change Order Submittal No.: CO-7 Change Order No.: CO-07 Date Started: 2015-07-17 City Sec. No.: 46547 Date Due: 2015-09-05 Project Name: AFW RTR Duct Bank and Twy H Impry Project Numbers: Project Description: 00960 DOE No. Project Manager: Anne-Marie Stowe Contractor: EAS Contracting, LP COUNCIL ACTION (If Required): M&C Log Name: N/A M&C Number: COST AND DAYS SUMMARY: Department: Aviation Approval Status: Cost($) $ 24,979.00 Total Cost: � 24,979.00 DOE Numbers: City Inspector: Billy Jones M&C Date: Fund Account Center: GR14-539120-055218634800 Requested Days: ❑� Total Requested Days: � https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId=976... 8/24/2015 CFW Change Order Approval CO-07 Approved: Yes Comments: User: Billy ]ones Date: 2015-07-28 12:58 PM Approved: Yes Comments: User: James McKenzie Date: 2015-08-03 10:12 AM Approved : Yes Comments: User: Anne-Marie Date: 2015-08-17 Stowe 3:11 PM Approved: Yes Comments: User: Christian Childs Date: 2015-08-18 2:39 PM Approved: Yes Comments: User: Tom Harris Date: 2015-08-20 8:56 PM Approved: Yes Comments: User: Grant Jordan Date: 2015-08-24 4:22 PM Approved: Yes Comments: User: Fernando Costa Date: 2015-08-24 9:24 PM Action Required: https://projectpoint.buzzsaw.com/ bz web/Foi-ms/FormPrint.aspx?SiteId=51500&ProcessId=976... Page 3 of 3 8/24/2015 •� City of Fort Worth Change Order Additions Project Name Alliance Airport- RTR Duct Bank and TWY H Impvt City Sec # 46547 Client Project # 960 Contractor EAS ConUacting, LP PM Anne-Marie Stowe Inspector Billy Jones Change 0rder Su6mittal # 07 Date 7/1612015 ADDITIONS ITEM DESCRIPTI N DEPT Qty Unit Unit ost Total R# Phase 3 Revisions viation L 32, 7.0 , 79. Aviaiion $32,979.00 Sub Total Additions $32,979.00 Change Order Additions Page 2 of 4 Foxr Wox� H City of Fort Worth Change Order Deletions Project Name Alliance Airport- RTR Duct Bank and TN^! H Impvt City Sec # 46547 ClientProject# 960 Contractor EAS Contracting, lP PM Anoe-Marie Stowe Inspector Billy Jones Change Order Submittal # �7 Date 7/16/2015 IIIq��INI� ti`l ITEM DESCRIPTION DEPT Qty Unit UnitCost Total 13 FAA MANHOLE (AIRCRAFT LOAD RATED) Avia6on 1.00000000 EA 58,000.00 58,000.00 Aviation 58,000.00 Sub Total Deletions $8,000.00 Change Order Deletions Page 3 of 4 CFW Change Order Approval CO-07 Routin Assigned To: Assigned By: Page 1 of 3 Due Date: Due Time: Links 1 fortworthaov/Aviation Proiects/00960 - RTR at AFW/Contractor/Chanqe Orders/960 AFW RTR Chanae Order 07 Breakdown.xls Attachments (0) No Attachments have been added to this form. ' https://projectpoint.buzzsaw.com/ bz web/For�ms/FormPrint.aspx?SiteId=51500&ProcessId=976... 8/24/2015