Project Name Sanitary Sewer Main-253 Replacement, Part 3 City Sec No. 46001
Project No.(s) P254-7051700109988 and P258-705170109988 DOE No. 6753 City Proj. No. 01099
, �-�
MAY
Gli`1 �`�
C'�
f --
�F
���
�
Project
Sanitary Sewer Main Installation on Randol Mill Rd from Woodhaven to Water Chase Golf Course
Contractor: S.J. Louis Construction of Texas, Ltd.
City Project Mgr. Walter Norwood
Phone Number: 817-392-5026
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
of Pro
� .•�
Ciiy of Fort Worth
Change Order Request
Sewer SRF
Funded
Change0rder: R1CO2 Date: 4/26/2016
City Inspector: Jutly Die
Phone Number: 817-392-8452
Sewer City
Funded
14,965,496.59 $315,664.26
$97,000.00
14,965,496.59 $412,664.26
Revised Contract Amount $14,965,496.59 $910,548,48
Original Funds Available for Change Orders $458,434.00
Remaining Funds Available for this CO $458,434.00
Atltlitional Funding (if necessary) $497,884.22
CHANGE ORDERS fo DATE (1NCLUDING THIS ONEJ AS % OF OR/GINAL CONTRACT
MAX ALLOWABLE CONTR,4CT AMOUNT (ORIG/NAL CONTRACT COST + 25%)
,,,�
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Tofals I Contract Time
r.
397,000�00
� 15,378,160.85
$497,884.22
�15,876,045.07
$458,434.00
$458,434.00
$497,884.22
3.89%
19.101.451.06
;��
�,`y `C
�� ,
., �--�'
a�
S�. � �``�-�� �
�l �
� t" %� .?�
� r� � �`� r 7f
��I ' ,�
Subsequent to execution of 46001-0O2, it was determined that due to a math error in the deletion
section, the deletion subtotal was calculated at $103,507.00 instead of the actual deletion subtotal
amount of $116,170.00. This revision to 46001-0O2 revises that error and should replace 46001-0O2 in its
entirety. The revised total for change order No. 2 is now $497,884.22.
Change Order No. 2 will provide for the following:
■ Removal of fili material and shoring at the M-253 / gas main conflict location to allow the gas company
to re-route its facility.
■ Additional drilled shaft casing to complete the piers for a project aerial crossing at the different
- Y6��ti�n-t.�a�qriginally designed due to actual field conditions that were encountered during
� ,`n The r�Y�`�'�t�
5 t�,,, ��� ; :.r,-n ��i
`NI/�1�41
%��5�##�ng�E�ry re
., :,,, ,
of a proposed 10-inch connecting sewer main with a 12-inch sewer due to conflict
storm drain line that was encountered at a difFerent elevation than depicted on
The size upgrade is necessaryto provide adequate conveyance.
�
,,-
�-
d
� --_`-�---'' I
It is understood antl agreed that fhe acceptance of this Change Order by the contractor constitutes an accord antl satisfaction and represents
payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
FORT WORTH
City of Fort Worth
Change Order Additions
Project Name Sanitary Sewer Main-253 Replacement, Part 3 City Sec No. 46001
Project No.(s) P254-7051700109988 antl P258-705170109988 DOE No. 6753 City Proj. No. 01099
Project Sanitary Sewer Main Installation on Randol Mill Rd from Woodhaven to Water Chase Golf Course
Description
Contractor
City Project Mgr
S.J. Louis Construction of Texas, Ltd. Change Order: R1C0 Date: 4126I2016
Walter Norwood City Inspector Judy Die
ADDITIONS
DEPT Q Unit Unit Cost Total
12 12" SS Open Cut Sewer City Funded 818.00 LF $70.00 $57,260.00
5 12" SS Carrier Pipe Sewer City Funded 180.00 LF $110.00 $19,800.00
17 24" BOTC Sewer City Funded 180.00 LF $326.00 $58,680.00
22 4' Diameter MH Sewer City Funded 1.00 EA $4,600.00 $4,600.00
25 Remove Existing MH Sewer City Funded 1.00 EA $2,000.00 $2,000.00
30 Post CCTV Sewer City Funded 460.00 LF $0.90 $414.00
31 Trench Safety Sewer City Funded 629.00 LF $0.01 $6.29
33 Concrete Collar Sewer City Funded 1.00 EA $400.00 $400.00
46 Hytlromuch Seeding Sewer City Funtled 4500.00 SY $0.40 $1,800.00
47 MH Vacuum Testing Sewer City Funded 1.0o EA $100.00 $100.00
62 Excavate & Haul Over Burden to Adjacent Property Sewer City Funded 15000.00 CY $12.80 $192,000.00
63 Excavate & Shore for Gas Line Relocation (Bottom 15-20VF) Sewer City Funtled 1.00 LS $45,000.00 $45,000.00
64 Cased/ Soecial Depth 36" Drilled Shaft for Aerial Crossing Sta 340+00 Sewer City Funded 183.00 VF $312.70 $57,224.10
65 Adjust 5' MH @ Sta. 276+92 & Add Drop Connection Sewer City Funtled 1.00 LS $17,500.00 $17,500.00
66 Connect to Existing 12" SS Sewer City Funded 1.00 LS $5,000.00 $5,000.00
67 Cost of 10" DIP Onsite Sewer City Funded 281.00 LF $48.43 $13,608.83
68 Cost of 10"x20" Spacers Onsite Sewer City Funded 60.00 EA $79.35 $4,761.00
69 Delivery of Pipe to Fort Worth Yard Sewer City Funded 1.00 LS $1,800.00 $1,800.00
70 Clearing Sewer City Funded 1.00 LS $7,500.00 $7,500.00
71 Fence Replacement Sewer City Funded 1.00 LS $4,000.00 $4,000.00
72 Gravel Drive Sewer City Funded 800.00 SY $10.00 $8,000.00
73 SWPPP Addition Sewer City Funded 1.00 LS $3,000.00 $3,000.00
74 Tree Replacement Sewer City Funded 1.00 LS $5,000.00 $5,000.00
75 Excavation and Shoring for Gas Main Relocation Sewer City Funded 1.00 LS $92,500.00 $92,500.00
76 Flowable Fill Backfill for Shore Removal Sewer City Funded 100.00 CY $121.00 $12,100.00
Sewer SRF Funded
Sewer City Funded $614,054.22
Page 2 of 4 Additions Sub Total $614,054.22
FORT WORTH City of Fort Worth
Change Order Deletions
Project Name
Project No.(s)
Sanitary Sewer Main-253 Replacement, Part 3
P254-7051700109988 and P258-705170109988
DOE No.
� City Sec No. 46001
6753 City Proj. No. 01099
Project Description Sanitary Sewer Main Installation on Rantlol Mill Rd from Wootlhaven to Water Chase Golf Course
Contractor S.J. Louis Construction of Texas, Ltd. Change Order: 1C0 Date 4/26I2016
City Project Mgr. Walter Norwood City Inspector Judy Die
ITEM DESCRIPTION
13 10" SS Opencut Pipe
6 10" SS Carrier Pipe
18 20° BOTC
24 Extra Depth 4" MH
28 Epoxy Liner
DELETIONS
DEPT Qty
Sewer City Funded 189.00
Sewer City Funded 269.00
Sewer City Funded 269.00
Sewer City Fundetl 2.00
Sewer City Funded 2.00
Unit
LF
LF
LF
VF
VF
Unit Cost
$67.00
$103.00
$280.00
$92.00
$148.00
Sewer SRF Fundetl
Sewer City Funded
Page 3 of 4
Deletions Sub Total
Total
$12,663.00
$27,707.00
$75,320.00
$184.00
$296.00
116,170.00
16,170.00