Loading...
HomeMy WebLinkAboutContract 44256-CO1 (2)FoRT WoxrH The Construction of the N. Riverside Bridge at Fossil Creek, Paving, Bridge and Drainage � • � , ► f,. �� � � Change Order Request Project Name N. Riverside Bridge @ Fossil Creek - Paving, Drainage & Bridge City Sec # 44256 Client Project #(s) City Project # 01810, DOE 6740 - GR74-541200-000302626830 Project Contractor AUI Contractors, LLC. Change Order# �1 Date 11/14/3013 City Project Mgr. Leon Wilson, P.E. City Inspector James Bowers '�-�� Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date �Amount of Proposed Change Order Revised Coniract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) TPW E $195,541.13 $195,541.13 city of Fort wortn Water I Sewer CHANGE ORDERS to DATE (INCLUDING THIS ONEJ AS % OF ORIGINAL CONTR,4CT MAXALLOWABLE CONTR,4CT AMOUNT (ORIGINAL CONTR,QCT COST+ 25%) JUSTIFICATION FOR CHANGE ORDER Totals 929.87 $195,541.13 $195,541.13 0.77% $4,436,162.34 During construction an existing 36" storm drainage concrete pipe was discovered at a higher elevation than shown indicated in the record drawings. The location of the 36" RCP was beneath a proposed MSE wall so the pipe was removed and replaced with a class V 36" RCP which will withstand the load of the proposed MSE wall. The initial irrigation design included an irrigation valve and meter. The existing valve and meter will be utilized so there is a deduction in the cost. At the re ral residents underbridge light has been added at the walking path location. The original plans included staining the M ~ " tion began it was decided that staining all of the exterior components of the bridge that are visible f[jm the sid ��i' e�r +-_ --_ --_- _=___� o° � ° ', �i/. .a .E� s Secretar�► .:� ,'w�: °--' � -� - '�,� •'`� .; � , , �. �� �: '� . _ �i!'F OFFICIAL RECO�� �ITY SECRETAftv FT. UV9RTM, 77t It is understood and agreed that the acceptance of this Change Ortler by the contractor constitutes an accord and satisfaction and payment in full (both time and money) for all costs arising out of, or incidental to, the abqve Change Order. Contractor's Comnanv Name AUI Contractors, LLC. S M&C Number aJ �, Contractor (Name) Con ct ic �� � Date Project Mana /Program Ms ''-�'' z v, �� .� , - ; Date ire or, Contracting Departrr /-Z %- c.� l.,1' Date Assist City Manager i �z . . � � Council Action (if required) M&C Date Approved � Date Select Day 210 210 11 221 /l-� Date l/ z"l I 3 Date 3//3 0 1 �� 4i �� tl� D 4 J 1�. �.^ V V � V I� N i b ^ � ,l , f � � cg ' FORT WORTH City of Fort Worth Change Order Request Project Name N. Riverside Bridge @ Fossil Creek - Paving, Drainage & Bridge Client Project #(s)� City Project # 01810, DOE 6740 - GR74-541200-000302626830 r Rt ���.,t ,.. City Sec # 44256 Project Descriptionl The Construction of the N. Riverside Bridge at Fossil Creek, Paving, Bridge and Drainage I Contractor AUI Contractors, LLC. Change Order# �1 Date 11/14/3013 City Project Mgr. Leon Wilson, P.E. City Inspector James Bowers Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Prop� Revised Contract Dept. Original Funds Available for Change Orders Remaining Funds Available for this CO Atlditional Funding (if necessary) Water I Sewer TPW 548,929.87 $27,476.50 $195,541.13 $195.541.13 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRAGT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) JUSTIFICATION FOR CHANGE ORDER Totals $3,548,929.87 476.50 $195,541.13 $195,541.13 0.77% $4,436,162.34 Select Day 210 11 221 During construction an existing 36" storm drainage concrete pipe was discoveretl at a higher elevation than shown indicated in the record dsawings. The 4acation of the 36" RCP was beneath a propased MSE wall so the pipe was removed and replaced with a class V 36" RCP which will withstand the loatl of the proposed MSE wall. The initial irrigation design included an irrigation valve and meter. The existing valve and meter will be utilized so there is a deduction in the cost. At the request of several residents underbridge light has been atlded at the walking path location. The original plans included staining the MSE walls. After construction began it was decided that staining all of the exterior components of the bridge that are visible from the sides would be more appropriate. i. ! �' f i f�, � <! E It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. :� : City of Fort Worth -� Change Order Request Project Name N. Riverside Bridge @ Fossil Creek - Paving, Drainage & Bridge City Sec # 44256 Client Project #(s) City Project # 01810, DOE 6740 - GR74-541200-000302626830 1' 1' Project Description� The Construction of the N. Riverside Britlge at Fossil Creek, Paving, Bridge and Drainage Contractor AUI Contractors, LLC. Change Order# �1 Date 11/14/3013 City Project Mgr. Leon Wilson, P.E. City Inspector James Bowers Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date �Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) TPW 3,548,929.87 $27,476.50 3,576,406.37 $195,541.13 $195,541.13 Water I Sewer .00 Totals $3,548,929.87 $3,548,929.87 .00 $27,476.50 $3,576,406.37 $195,541.13 $195,541.13 CHANGE ORDERS to DATE (INCLUDING THIS ONEJ AS % OF ORIGINAL CONTR,4CT MAXALLOWABLE CONTR,4CTAMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION FOR CHANGE ORDER 0.77% $4,436,162.34 Select Day 210 210 11 221 During construction an existing 36" storm drainage concrete pipe was discovered at a higher elevation than shown indicated in the record drawings. The location of the 36" RCP was beneath a proposed MSE wall so the pipe was removed and replaced with a class V 36" RCP which will withstand the load of the proposed MSE wall. The initial irrigation design included an irrigation valve and meter. The existing valve and meter will be utilized so there is a deduction in the cost. At the request of several residents underbridge light has been atlded at the walking path location. The original plans included staining the MSE walls. After construction began it was decided that staining all of the exterior components of the bridge that are visible from the sides would be more appropriate. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. N i s� 'C = O� � � Q � L � � LL � � O � � � �..% � � s U x r {Y+ 3 � CG � co � N � d' � U N � A U � � a� � U .� � O LJ._ N a � � � Z � � fD z � 'o d 0 M � � N � N 0 M O O O O O N � v � c� 0 ti co W 0 � 0 � 0 � � � .o d c N U N � N C .� � '� c (6 � rn -o m � � .� d Y N N U .N � O LL C6 � � a m � � � � � Z N t 0 C 0 U � � O U a� L H � 0 .Q U a�'i � U a> "o � M O M � a> m � N N � � O m N N � � � � � � � a� � C CO L U U J J i O U C O U Q O U N Q � C .�^ U W a C O � � 0 J o � U � N � C V o °' U a � C.0 � z � 0 � Q � 0 O O O d� Cfl lf7 • O N O O � N d�' I` M N � � C � � � � � � J J J J (n O O O O O O O O O O d' d' �, N N N � O � ����� daa. aa H I— I— F- H N � .� N � � Q O a� a .� � � � o aS � m � o.. Y � U � = a a`� — t6 — � N . � � � fn — u�'i U � � N pQ � � � U U c � � U � c � � � � � � � - U N � � � � T M �- � � � � � � C � c J �c W o���� �,��� m�w��-� `�L � � � � m C +V-' U O M p (E N � E w° � E.«.° a a o �n a> � c -v � F- � � � Q ~ � � v � � � � � � � 'c 'c "c •� •� � � � � � N O r-I � dA c0 a � � � � a N '.a � 41 4A C f0 t U N 4-� � N 4J � !O d N C O '�+ � � Q L � � L � � � � � .0 U N C �� O � �o � L O � LL � � � O � �' C� V � (� i V x � cc � H � � w � � N 'd' �' � U � � T U 0 � m � U .N � 0 LL. N "a N N > � Z � E C6 Z N 'o a � d- ti � � 0 ti � W O � 0 � 0 � � U N �o d c a> U N � (E C .� � -a c c6 N rn -o m` � � .� � a � a� � U .� � 0 � m a� rn a .� m � a .� a> > � Z N s �=- O c 0 U � � C O U � F�- � 0 .Q U h N � U � •o � M O M V' � a� m � � � i d a � N rn c m s U U J J � O U � C O U � Q 0 U N C O U � a`> 3 0 m N � � N 7 i O U a� o.. � c T U W a C N � c O J � � U � �O a � U � z 0 � w J W � :- � . � _ -' � i • . : ► ► � � • . ► � ' . ► N � O � N h0 fD a � c 0 � v v 0 n� � O � c co � U N `+-- O N N ti0 t0 d N � 0 i-� � � Q L � � � � � � � ro s t� _ ! l ! � 1