Loading...
HomeMy WebLinkAboutContract 43501-CO1F�RT WORTH Project Description: Project Name: Project Contractor: Medical District Part 8 P265-609170168787 ^ �. S•' . . . � ��wi.Y - - .. • " �' - • • • • - � � 1 — �• � . :. � � . Water Distribution System Improvements on Bradner Street, Broadway Street, Henderson Street, Magnolia Avenue, St. Louis Avenue and South Main Street William J. Schultz, Inc., dba Circle "C" Construction Co. City Project Mgr. John Kasavich Phone Number: 817-392-8480 Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Ortlers (in M&C Process) Contract Cost to Date ount of Proposed C Revisetl Contract Amount Original Funtls Available for Change Orders Remaining Funtls Available for this CO Additional Funtling (if necessary) WATER 1,441,842.00 $25,000.00 CHANGE ORDERS fo DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) STIFICATION � m n m C m � � �---- � � 9�I'� � �J days on this change order. � ,i � .. '� ` ii; r �,. �� j � :� � It is understood and agreed that the acceptance of this Change 01'�l��actor constitutes an accortl and satisfaction and represents payment ��� in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. � The change order will provide for the following: Change Ortler # �1 Date: 5/17/2013 City Inspector: Mike Myers Phone Number: 817-480-4451 FOR CHANGE ORDER Totals 1,842. 3.410. 1 0.93% $1,802,302.50 • The installation of a 12-inch casing pipe by box tunnel instead of by bore and jack method due to limited job space at the job site to install a bore bit. The removal and replacement of a conflicting 18-inch storm drain pipe. The removal of trolley ties and concrete base that were encountered during construction. �.� �[��� �. Staff concur•s with the contractor's request for : �.r - . r Contract Time � . Project Name Project No.(s): Project Description Contractor City Project Mgr. District Part 8 fZfi i[:�:II;3�1 City Sec No.: 43501 DOE No. 6786 City Proj. No.: Water Distribution System Improvements on Bradner Street, Broadway Street, Henderson Street, Magnolia Avenue, St. Louis Avenue and South Main Street liam J. Schultz, Inc., dba Circle "C" Construction Co. John Kasavich ADDITIDNS Page 2 of 4 City of Fort Worth Change Order Additions � Chane Order # � Date: 5/17/2013 City Inspector Mike M ers FnRT WORTH Project Name Project No.(s): Medical District Part 8 P265-609170168787 City of Fort Worth Change Order Deletions DOE No. 6786 City Sec No. City Proj. No.: 43501 Project Description Water Distribution System Improvements on Bradner Street, Broadway Street, Henderson Street, Magnolia Avenue, I St Louis Avenue and South Main Street Contractor William J. Schultz, Inc., dba Circle "C" Construction Co. Chane Ortler #�1 Date 5/17/2013 City Project Mgr. John Kasavich City Inspector Mike Myers DELETIONS Page 4 of 4 Previous Change Orders