Loading...
HomeMy WebLinkAboutContract 43754-CO2 (2)� ���r�a�" �,� �7�� �_ � � � FORT WORTH, City of Fort Worth ��I�`�Lv�l�����.��—��- 1`i�'"`� Change Order Request Project Name Village Creek WRF Deep Filters 1-20 Modifications City Sec # 43754 Client Project #(s) Fort Worth (01628); F&N (FTW11104A); Pepper-Laswon (21813) Project Rehabilitation of 20 filters at Village Creek WRF, Design M&C C-24703; Construction M&C C-25887 Contractor Pepper-Lawson Waterworks LLC Change Order #�2 Date 12/16/2013 City Project Mgr. Farida S Gotlerya, PhD, PE City Inspector Robert Walker antl Ted Gay (F&N) Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Hmouni of r'roposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) Water $16,268,000.00 $75,977.00 $16,343,977.00 $1 U,335AU $16,354,312.00 $0.00 $10,335.00 CHANGE ORDERS to DATE (INCLUDING TH/S ONE) AS % OF ORIGINAL CONTRACT MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) JUSTIFICATION (F This Change Order # 2 covers the following: , CMR 04, CMR05, CMR 06, PCM 01A, PCM 04B Note, Time Extension for this Change Order is two (2) days. The additional details may be found in the sub� quent p - `� � A9,t8S� �y° l ,� � � Iviary J. Searetary NS) FOR CHANGE ORDER �, .�� ,.::�� :`� ; Totals $16,268,000.00 $75,977.00 $16,343,977.00 $10,335.00 $16,354,312.00 $0.00 $10,335.00 0.53% $20,335,000.00 Select Day Type 730 0 730 2 732 - � "`" :�,�'� ��� t -�,,•� f`�P�i„ en^��'�f�l�'��n �i'i'� � �,c��/ It is understootl and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaciion and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Pepper-Lawson Waterworks LLC Inspectorllnspection Supervisor Robert Walker / George (Ted) Gay, Assistant Director (Dentl .i � Andrew T Cronberg, PE Assistant Citv Atte�n� Doug Black Contractor (Name) Aaron James / Bennie Fretwell Date � Project ManagedProgram ,�;'�� "�- Farida S. Goderva, PE D te Director, Contracting D� y i% S. Frank Crumb, PE ` Date Assistant City Manager 2.oy_ �N FemantloCosta��n Council Action (if M&C Number N/A M&C Date Approvetl � � �L_, —_ ; �, . N/A . .. �` , Date '����; Date fal`'`°1 ;._l� : � E. l ■ � i � o �.' = � � � � Q L L � � �� �o Q � � � � U� ca � U x F �i 3 F � � v u� ti M �7' � � UJ T <.0 � C � � � J C � o Q "� n a� � d � � Q o � N � N � LI. � Q z a� ,� a> � 0 � � � N � Y p N � � U � a� � � � > ii a� *k � U z .� O � � "o c d � U � W � � N U U �S � 0 U i C O U M 0 � N U U �5 � m .N N � � � � Y N � U N � � � iv i a� � 0 N O O .� m a�i � 0 .Q U � 0 U a� 'o d M O N � N � L.L ? N N U m a � � � c ca a`� Y N j � � N � � � � � � � o � U C � � Q L U c � CU U J Y a`o � � a> � ia �- � � O � � O J � � � Q a Q a> �`o a � `o � (d � � U O � U � d � U N Z � ❑ 0 a r-I O � � � co d C 0 � � Q N � � � M i co t U Goderya, Fari�a � �� � \ From: Sent: To: Cc: Subject: Goderya, Farida Monday, December 16, 2013 4:35 PM Gay, Ted Bailes, Norma; 'Matt Jalbert' RE: VC Deep Filters PCM001 Multi Stage Centrifugal Blowers REVIEW COMMENTS** IOC needed Hi Ted, Please proceed with this PCM 001, the Credit ($2760) for Correction Capacitors for the centrifugal blower motors. Regards. Farida �Fnrida S. Godeiya, Ph.D., P.E. ♦ Facilities Project Manager �Engineering & Fiscal Services �Fort Worth �Yater Department ♦1000 Throckmorton St, Fort Worth, TX 76102 �817392.8214 office �817.851.4910 Cell �Farida.Goderva@fortworthtexas.�ov From: Gay, Ted Sent: Monday, December 16, 2013 7:59 AM To: Goderya, Farida Cc: Bailes, Norma; 'Matt Jalbert'; Gay, Ted Subject: RE: VC Deep Filters PCM001 Multi Stage Centrifugal Blowers REVIEW COMMENTS** IOC needed Farida; I don't have a concurrence email from you for PCM-001A for the CO #2 package. Attached is the recommend letter. � From: Gay, Ted Sent: Thursday, April 11, 2013 7:14 AM To: Goderya, Farida; Matt Jalbert Cc: Bailes, Norma; Gay, Ted Subject: RE: VC Deep Filters PCM001 Multi Stage Centrifugal Blowers REVIEW COMMENTS** Farida: PCM-002 has many incorrect issues. The cost of the work is ridiculous, Prime's cost is high and duplicates Texsun's work, the markups are incorrect, and the PCM will not be recommended to the FW1ND. It is on my plate to do some shopping to see what the cost of the materials is retail but I haven't had time to do that yet. The high level float in the Plant Sewer Meter Vault #3 is not a critical work item-it wouldn't be installed until probably January 2014 so I'm not pushing its processing. PCM-001 markups are per the General Conditions (see GC 12.01.C.2.d) and in FNI's opinion represent a fair credit. Normally my FW1ND PM issues an IOC advising FNI that the PCM should be included in a Change Order if the price/credit for the changed work is acceptable. That IOC is forwarded to the General Contractor which acts as an effective notice to proceed with the changes in the work until a change Order is processed. � From: Goderya, Farida Sent: Wednesday, April 10, 2013 5:08 PM To: Gay, Ted; Matt Jalbert i Cc: Bailes, Norma Subject: RE: VC �Jeep Filters PCM001 Multi Stage Centrifugal Blowers REVIEW COMMENTS** HI Ted, I was reviewing/comparing both PCM 001 and PCM 002. It's interesting to note that for credit Pepper-Lawson refunds back only subs overhead (5%); and bonds & insurance (1.59%). However, for change order (additional money), they include multiple OH&P (Texsun 15%; Prime 5%a, PL 10%), bonds 1.59%, etc. You may review pages 4& 6 of PCM 002 proposal and Pg 4 of PCM 001. Regards. Farida 1Farida S. Goderyn, Ple.D., P.E. ♦ Facilities Project Manager �Engineering & Fiscal Services �Fort North Water Department ♦1000 Throckmorton St, Fort Worth, TX 76102 �817392.8214 office �817.851.4910 Cell 1Farida.Goderya@fortworthtexas.�ov From: Bailes, Norma Sent: Monday, April 08, 2013 8:12 AM To: Kyle Smith (KsmithCa�pepperlawson.com); James Ryan (jryan@pepperlawson.com); aiamesCa�pe�perlawson.com Cc: Goderya, Farida Subject: VC Deep Filters PCM001 Multi Stage Centrifugal Blowers REVIEW COMMENTS Village Creek Deep Filters PCM001 Multi Stage Centrifugal Blowers REVIEW COMMENTS have been posted to Buzzsaw. Tha nks. Norma � April 11, 2013 City of Fort Worth Water Engineering Department 1000 Throckmorton Street Fort Worth, TX 76101 Attn: Ms. Farida Goderya, P.E. RE: Village Creek Deep Filters 1-20 Modifications Capital Project No. 01628 F&N No. FTW11104A PCM001A - Multi Stage Centrifugal Blowers Delete Power Factor Correction Capacitors Dear Ms. Goderya: www.freese.com / �� �� � / Transmitted herewith please find a copy of Pepper-Lawson's April 3, 2013 credit proposal for the referenced deleted work. The credit for the deleted worl< is $2,760.00. The VCWRF recently had plant wide power factor correction capacitors installed as part of the Johnson Controls Inc. Energy Improvements contract. These plant wide power factor correction capacitors eliminate the need to have individual motor power factor correction capacitors on the Multi Stage Centrifugal Blower motors. We have reviewed this credit proposal and are of the opinion that it is a fair and equitable credit. We recommend the City accept this credit and issue a deductive Change Order in the amount of $2,763.00. Please advise if the Water Department desires this PCM be incorporated in a Change Order. Sincerely, FREESE AND NICHOLS, INC. G. E. Gay, P.E. Xc: Matt Jalbert-FNI Lance Price-GAI file FTW11104A.4.41.001A L:\VC Deep Filters\CHANGES\PCM\001A Multi Stage Centritugal Blowers 040813 RECMD 4055 InternaHonal Piaza, Suite 200 • Fort Worth, Texas 76109 • 817-735-7300 • fax 817-735-7491 ' , '�7 �.�` �'� � � eile rn11110�/�.�1/001 PROPOSL�D COI3TRACT MODIFICATION 4.91/001� PROJECT:Vi1J.age Creek WRF Deep Filters 1-20 Modification PROJECT NUMBER OWN�R: City of Fort Wor�h 01628 - CONTRACTOR: Pepper-Lawson 21813 CONSTRUCTION MANAGER: Freese and Nichols, Inc. FTW11104 PCM DSSCRIPTION: Nfulti Stage Centrifugal Blowera PCM N0. 001 NOTiT+TCATION TO CONTRACTOR: The Otvner proposes to make the additions, modifications or deletions to the Work described in the Con�ract I7ocuments as shown in Attachment "A��. We request that you take the fo].],ow�ng ac�ion within 10 calendar days: Notify us that you concur that this change does not require a change in Contract time or amount. A Field Order wilZ be i.ssued. X Submit a Credit Priae Proposa]. wi.th detai.J.ed cost breakdown ot ].abor, materials, equipment, and all othex cos� related to Chi.s change. Proceed wfth the change. Payment will be made at the unit price bid. Proceed with the change under the time and matera.a].a provisions of the Contract. Authoxiza�ion �o procaed with changes must be approved by Field Order ar Change Order in accordance v�ith the Contract nocuments, By: G.E. Gay, P. E. Date: February OS, 2013 CObIPRACTOR'S RES�ONSE: We respond to your rec,{ues� as follows: I� We concur that this is a no cosG or time change. Tssue Field Order. L� We submit the attachad Price Praposal cva.th detailed cost breakdoom and raviged schedule for performing the described change. ❑ We axe proceeding with the change at the unit price bid. ❑ W are proceeding with the change under the ta.me and materials provisions of h Cont ct. . gY� Date; 4 3 �.CTION TAKENt ❑ Proposed Contract Modification rejected. Contractor is hereby notified NOT �o proceed: BY° Date; ❑ Field Order issued: No. Date: By; ❑ Change Order issued: No. Aate: By; 1 - 1- -, � � PROJECT:Village Cre OWN.ER: City of For CONTRACTOR: Pepber- r�� Plle PfH1011Y.f,41.001 PROPOSED CONTRACT MODIFICATION PCM-00]AATTACHMENT A k WRF Deep Filters 1-20 Modifi< Wo7C'C h : Freese PCM DESCRIPTION; Multi 5tage Centrifugal Blowers PCM NO. 0p1 ion PROJECT NUMBER � 01628 - 21813 FTW11104 The Owner propodee to make the f'ollowing additiona, modifications or delekione to the work described in the Contract Dovuments. Authorization to proceed with theae changee muet be approved by Field Order or Change Order 3.n a000rdanae with the Contract Documenta. RE: Delete Multi Stage Centxifugal Blower biotor Power Factor Correction Capacitor as 8lantwide Power Factox Correction ie being providad by other improvements. Provide credit proposal for deletion oE capacitor, bypass contactor in starter, and associated controls and wiring. 1. 3pecification 43 11 17.2.02.A� Add aentence specified in Section 26 05 50.2.04.5 are not 2. Revise your record drawings as appropriate. Power factor correction capacitors required. By: G. E. Gav, P.E. Date: February 05, 2013 2 �_ . . . � � :,� :=J�� . . + . Apri13, 2013 Mr. Ted Gay Construction Manager Freese and Nichols 4055 International Plaza, Ste. 200 Fort Worth, TX ?G109 Re: Village Creek WRI� Deep Tilters 1-201•iodifications PCMIq' Dear Mr. Gay: Ms�iti Sta�e Centrifueal Blowers ' �.r� � _- l (7� Per the engineer's request, Pepper La�vson offers this proposal to delete multi stage centrifugal blower po�ver factor correction capacitors, bypass contactor in starters, and associated coi�trols in wiring. This cftarrge fi�i!/ restrl� irr a deduct 10 llte Conli•ac1 of $2,763 and mi increase in �o�itract drrrtrlio» of D cale�rdar days fi•om tlie date ofapprovaf to deliver the n�aterials io the sfte and pej�'ami the wo�•k. Upon receipt af approval from the City of Fort �Vorth and Preese aitd Nichols as to the acceptability of our proposal, �'epper-Lawson will await the deductive cl�ange order from fl�e City of Fort �Vortl� for tlte modification to the Contract Docwnents. Sliould you have auy questions or concerns, please advise. Sincerely, PEPPER-LAWSON `VATER\VORKS, LLC �— Aaron James Project Manager 4305 Easl Hwy, 1187, Su(te 120 � Burleson, TX 76028 P. (868) 63fi-7892 � F. (866j 265-6220 u�ww, plwaterworks.com � _ �_ • - � � - "- - ♦ � � • City of Arlinglon - Arkansas l.ane Pump Slatlon Pepper Lawson Job # 21673 ITEFA ND. A B C D � F G H I J K l M N 1 Multi Stage Cenfrifugai Blowers PLW - AM 0 hrs ALW - Supt. 0 hrs PLW-Surveyor 0 hrs ConUnentai Blo�ver 2 EA 0 LS 0 LS 0 LS LABOf2 BUROEN TAX @ 8.26% SUBTOTAl2(A+B+C) SMALL TOOLS SUBTOTAI. (D+E) EQUIPMENTBURDEN St1BTOTAL (F+G) OHB�P SUBS @ 5% (0.05xH) SUBTOTAL 3 (H+I) OH&P SELF PERFORMED @ 0% (O.OxJ) SUBTOTAL 4 (J+K) BONDS & INSURANCE Q 1.59%(0.01&9xL) SUBTOTAL(LtM) TOTAI BASE BID (J1+J2+J3+J4+J5) TOTAL BASE eID (J1+J2+�3+,►4+J5) • �[1�;Q:7 TOTAI. COST �� ���.i _ , � LABOR TOTAI COST 0.00 0.00 0 0.00 0 0.00 0 0.00 O.OD 0.00 O.QO 1 0 0.00 WA 0 0.00 0.00 N/A 0 WA 0.00 0.00 0.00 0.00 0.00 O.QO 0.00 0.00 1295 2590.00 0.00 O,aO 0.00 0.00 O.QO O.OU 0 O.QD 0 0,00 0.00 0.00 UNIT � �� � r� � �.� N/A 2590 N/A hllA 2590 WA 2590 N!A 2590 129.50 2719.50 0.00 2719.50 43.24 2782.74 0 N/A 0 0 N/A 0 N/A 0 WA 0,00 O.QO 0.00 O.QO 0.00 U� ► �� i� WA 0 0 N/A 0 0.00 0.00 WA 0.00 0.00 0.00 0.00 0.00 4131201 � 0.00 �n N/A N/A i �� i�' �—� �� �`� v� /� • Froint Ben Nordmark (hennordmarkQkJeleclric.comJ SeiiE: Frlday, Marcfi 1S, 2013 � 1:16 AM To; Mika Malfltano SubJaat: Re: Village Creek Atlachments: Ben_PD�_Scan•049.pdf Quantlty (2j - General Electric, 35 kVAR, NEMA�.2/3 enclosure, 480 volk, 3, pl�ase, 60 Hz power faclor correction capacltors with 3 fuses and 3 lights. Prlce; $695.00 eacl� Average lead t(me is 5 working days. f.v.b. (actory freight not included In Ehe prtcing . K.1. �lectric terms and conditlons of ale apply, BesERegards Ben �ert Nordmark Vlce P�es/dent of Englneerb�g Phono; 3tb•a5d-5G36 Fax: 31b•d54•554A Emall: �ennordmarkfNkJQlg�tric.com WED; h��o•/fv�v�rr klolnctrtacom ''.'�t` l�/�tiiiiJt7��•i1(..(li�t�"�i �.�if-1.1.(.f�iti, 1.IF'11ra .11'ii:.��`1.; NiUij y1J�--f����1���1�i: � i'i�z�,i'inl:', /�l�//-tl).�ai;il_�:: (T..t ji(.t1j11hii.,�:.1la1�1 N.1 us��iirnr.l<iL.�i?.c;l.J�lc'r.,.�_r�l.���� 7!i!s conrrrrun(callon, !ncluding al�achmenfs, ls for fho BxchrsNe use ol rhe edd�esseo antl Conlalns prpprio(ary, col�Oden(Ip! anJ prtvifeyed 4�Jormallon. I/ you are not Ihe /Mendediec+'planl, a��y usa, copy/1tg, disclosulo, disSenUna►ion ort6sfnGt+llonls sblcflyproAlG/fed.!lyou are nol fhe HNendedrec/p1an1, p/eesa nolily the sander Imn�edlafely by relunt e•ma11, do/elo fhis comn�unkefion and dasfroy all coptes. On 3/�5/201310;12 AM, Mike Malfitartio wrote; f3en Wtiat is ttie cost for PF capacitors for these motors? Mike ... , --� -'�, � �� � � Aaron James �— From: Sent; To: Cc: Subjeat: Atfachments: Aaron Mike Malfftano (mlkem@contlnentalblower.aom] Wednesday, March 27, 2013 9:40 AM Aaron James; 'Janlce Fuqua' 'Leelon Scoll' RE; N075a00•Vlllaga Creek S{<MB%C3G4130327p9350. pdf Aftaclied is a copy of a quote I received on the capacitors, $695.00 each $A00.00 for the contactors $200.00 for wiring $1295.00 pe�• blowex�, $2,590.00 tota(. Will fhis work fox yau? If so, send me change order for $2,590,00 . Mike Frozii: A.aroti James [mailto:AJames�pepperlawson.com] Sen#; Tuesday, MarclY 26, 2013 5;49 PM To; 'Janice Puqua; 'V1ike Matfitano' Subjeet; RE: NO'15400 Vil[age Creek Janicc/Mike, G�' GAJISC/fUP ,. Ty;pe GEM� Low.Voltage Powe�• Fac�o�� Col�reciion Capacito��s G�M�Serios Stngle-�lnit indooi/UufdoorAssenibHes A4'APIAb20 Rfl1Il1SS; Nol for hnrinouic applications 0 2�lQ volt, i•q0 kVAR, stnglo nnJ 1•pliaso, GO Nz Tv dc�ennine kVAR o1208 volls. m�d1(ply 240 vol�s kVAR by .75 b�l80 volt, I-l00 kVAlt, singla flnd �•plinse, 60 F(z • 600 vul6 1•GO kVAR, 3•phAse, 60 Hz o UL Liated Fc CSA Inliele� o Ulsrhargc resiscots �duce volln�c to SO volts ar Icss wltl�fn ano minutc • Gnclosurc N4t�7A a & 12 + Factor�� ina��iled R�ses eiid biown Rue inJicmfug IiglUs(Opltonal) • Pressurc 5cnsitivc �ntcmiptcr (PSI) in cach ccll �I?M' nssemhlies fcahire multl��lo copaciror ceUs tvf�h molnlltzed polypropylenc 8bn diolectrtc wiiich provldes tns(nnlaneous selt= Ireniing nellnn and roduccd Cq�t�ylussc�. Safoty fs provlded WIUi ihe patented Ob hUernal Pressu�e Sensiltvc fntcrrupter (PSI) desfgn�d lu seiuo Ihe btdldup uf prasstin: if�� Mu(l uccurs und lu lnlerrur� �he iuternol elaclrlenl connectfuos 6efore Ihe cuW�clior ccll c�in ruplure. (IGMwcells l�;tturc linic�pro��en �Irleklrolr, n bio�tegr�idTblz NFPA Ct�.ss Illt3 dicicclric tluld, G�M` ofitrs high rolinbfllcy end luub Hfe Aud Is sullnble fm� operntion over n tcro- perature r�nge of •�10°C lo �IG°C. Lluc I�usc/l3toivn 1�'uso ludicating L(glUs �1'I�en ll�ses nry speclfieJ, OG provides !00 KA IC t1n� 244 KAIC inlemipling c�pacil)� fiucs for up lo I?..5 kVAli anJ Inrger reltngs r�spcu�tvety, Blowo tlrse inJlcn�ing Ilghis ura ulso nn optlo�i. Urder byTpproprialo DA51C CATALOCi ninnBcrplus lhcnpproprtnto ncccssory SUffIX for a complalc cetnfog utunbcr. . �_��� �•r�.t.,'s ntR,� � -!�?'d�l': ��M, ,��.:' r _._____ �-- j•--�� ��5,�''� id. �•� ...--' , �l / / � \ /, I\\ �� ` � . \ � / � �� P r � �:3 � r. /�" Nole: d'�:'(',Irriet�� �Gp.S1J�ql�ln�tcn/�rt�9/vr,rluhmrava�� ca����N prwrcllmt In oH i�ngrou�4hd �nurhrclurs (oxapl !% cwureNe�l on �hv IOR(IlIIIJ O,jn i�rolw� u�•��r/,xrdp,vrvelh��� dP��l�l• 7ltrce•plN�r�� cn1k�Ntnr,r�utrl oa� � an Atn plrnh.s irdl iiol prui�/r!¢ ndci�nury ptv�luc!lin7lfi� llnt��lfF�lyNlfll lnrNshuid�lu��curinllrv�mftrtP�I��I7rNY. • Mountfn� ULM� 6SL800 series un(Is nre dcsfgned fo be mounlcd upright on any Icvel siirfncc, such ns a Raor, lop of a �uolur coulrol cenlcr, or direclly !o any tiv�l) wlll� btackcls provided. Ltus Connoctlon nnd CnLIe �ntrmico eotrnnco on S(zr Codc 4 unps musi be ntedc ihrough Ihe rig61 enQ panel. (ror oll uilier slaes Ihe onlrancu mny be ntadc thruugh aitlicr end pnnel (nRcr Ilrst pmicldi�g oul Ilie approprlate sizc holu), Soldcrless eunneclurs nre pruvldod un en�h phnse. .��Ij'��"i�iS�� l.��i!:; Uate subjecl to Cheqqe Wiihout NWlce 0 � YAh �.0 I.S ��, e, 1 1 1 1 i IOq TA�IB; u��i sl�. J LI �li Oodo 1 1 1 f v �,� � �1.1 P �.I 10 �,6 10 1.5 i 1 6.0 f6 O,E 16 6,E �.� os e0t TA/ iCl I81 / p ?.0 0d 80f TA1 i01 rpi 1 g 2.5 iSL80� TA1 TC1 i�f � 7.0 6SLS0� TA1 TO1 T8f � g t.o ss�eo6 r�� rc� ret � 9 a.o 051806 rn� rot iei � g a.o es�eor rni rot re� � p +s ea�eoe tnt rc� r�i � �o �0.0 65LB00 TA1 fCt TEI { 10 12•S 86Ll10 iA! !CI TSI � �p IS.O 061a11 YA1 TQI Tpl 1 �� 17.5 68Lef� YA) iCf T61 .{ �� 2Q,0 65L81� 7A1 iCf YY.S cSLS1A iA1 TCI TCI � jj 26.0 65L815 iA1 YCI i!! q f9 Y>.6 651Of6 iAl TC1 i@1 6 19 90.0 ES1817 �A1 iG� IBI S Ig J2.5 651a14 Tht TCt YEI d fo 35.0 05Ld19 T�I 1C� TE{ 6 fD J7.a ASlq20 iA1 iCl TEI S 18 IO�o 631621 iA! TCI Ygi 6 �p 14.3 65tORZ iA1 TCt 7!I 6 �Z �G.o 66102� YA1 fCl 7E1 b ;? ��.6 84�b7� iA1 iCi iEl 5 22 .v aower 7At fC1 TEI 6 J� 65�0 661�2E iA1 TC1 TFI 4 �2 T0.0 66L049 tAi 7bt T@1 6 7� �5.0 66Ls90 tAf T01 TEt 6 » A0.0 651E91 fA1 f01 T§t 6 IO 6d 0 6516a2 iA1 06.e e6ieJ� 7AI fCt T8� 6 J6 100.6 35 TAI T61 T6y g 3� Noto 1: Coneull FaUay (ot Singfo Phas9 Produc! UotoaubjaG lo Chango Wilhout Nollce a.� �. � �r` �� V(� �� V Goderya, Farida From: Sent: To: Cc: Subject: _-' _�-�t1.a\ l'1 ) ,- � � Goderya, Farida � f� �-- Monday, December 16, 2013 4:40 PM _ Gay, Ted 'Matt Jalbert'; Bailes, Norma; 'Aaron James' RE: VC Deep filters CO #2 IOC for PCM004B Effleutn Gallery Pipe Painitng Modifications Hi Ted, Proceed with the PCM 0046, which is for the additional painting and grout floor protection for 24" filtered water piping in the filter gallery. You may roll this into the next Change Order No 02. Regards. Farida �Fcn•rda S. Goder��a, PIr.D., P.E. ♦ Facilities Project Manager �Engineering & Fiscal Services ��ort Worth �1'ater Department ♦1000 Throckmorton St, Fort Worth, TX 76102 �817.392.8214 office �817.851.4910 Cell 1Farida.Goderva@fortworthtexas.Rov From: Gay, Ted Sent: Monday, December 16, 2013 8:03 AM To: Goderya, Farida Cc: 'Matt Jalbert'; Gay, Ted; Bailes, Norma Subject: VC Deep filters CO #2 IOC for PCM004B Effleutn Gallery Pipe Painitng Modifications Farida: I don't have a IOC from you for PCM-004B which is needed for CO #2 package. Attached is PCM-004B recommend. Ted. 7 � � �� il Y e Yo Avk a 0.4'+p,YC�' ; a.� °�°1 �(+�k; K� � t� Y� "J 0°}ii.[•.%�7Y_red�Pi(€:��:1'��iil�; fYet(lwhCcTe; May 17, 2013 - � � � �'-`� � � L" ,� City of Fort worth Water Engineering Department 1000 Throckmorton Street Fort Worth, TX 76101 Attn: Ms. Farida Goderya, P.E. RE: Village Creek Deep Fllters 1-20 Modifications Capital Project No. 01628 F&N No. FTW11104A PCM0046 — Filtered Water Mechanical Piping Painting & Corrosion Protection Dear Ms. Goderya: Transm(tted herewith please find a copy of Pepper-Lawson's May 9, 2013 cost proposal for the referenced work. The cost for this work is $13,609.00. No additional Contract Time has been requested. The filter effluent gallery mechanical piping for filters 1-14 was installed in 1976. The coating system on the 36" side outlet tees and the 24" filtered water pipes at their floor penetrations is failing. The piping above the side outlet tees and fllters 15-20 piping remains in good condition. This extra work corrects the coating failures and provides additional protection of the 24' floor penetra�ion by using a grout buildup at the floor line. We have reviewed this price proposal and are of the opinion that it ts a fair and equitable price. We recommend the City accept this cost and fssue a Change Order in the amount of $13,609.00. Please advise if the Water Department desires this PCM be incorporated in a Change Order. Sincerely, FREESE AND NICHOLS, INC. ,,�'/,��� G. E. Gay, P.E. Xc: Matt Jalbert-FNI file FTW11104A.4.41.0048 L:\VC Deep Filters\CHANGES\PCM\0048 FilteredWaterMechan(calPiepPaint&CorrosionProtection 051713 RECMD 4055 InYernallonal Placa, Sulte 200 • Fort Worth, Texas 76109 • 817-735-7300 •(ax 817-735-7491 www.freese.com . . , /; , 1 � � , . v `.'� � .�a. �,��o,,...��Qo, PROPOSED CONTRACT hfODIFICRTION 4.91/009 PROJECT:Village Creek WRE Deep Filtera 1-20 ModiEication PROJECT NUMBER OWNER: City of Fort Worth 01628 - CONTRACTOR: Pepper-Lawsori 21813 CONSTRUCTION MANAGfiR: Freeee and NiChols, InC FTW11104 PCM DESCRIPTION: Filtered Water Mechanica� Piping Painting and Corro�ion Protection PCM N0. 004(3 NOTIBICATTON TO COx$'!'RACTOR: The Owner propoaes Co make the additions, modifications or deletione �o the Work deacribed in the Contract Documents as shown in Attachment �'A". We requeet that you take the following action within 10 calendar daye: Noeify us that you concur that this change does not require a change in Contract time or amount. A Field Order will be ieaued. X Submit a Price ProQosal cvi�h detailed cost breakdown of labor, maEerials, equipment, and all other cost re�ated to this change, Proceed with the change, Payment will be made at the unit price bid. Proceed with the change under the txme and materials provi$iona oE the Contract. Authorization to proceed with ehanges muat be ap�roved by Fie�d Order or Change Oxder i.n accordance with the Contract Documents, By: G,E. Gav, P. E, Dates Apri.l 11, 2013 CONTRACTOR�B RESPONS�r We reapond to your requeat as follows: �We concur that this is a no coeC or time change. Issue Field Order. We submit the attached Pri.ce Proposal with detailed coae breakdown and revxsed achedule for per�orming the described change. ❑ We are proceeding cvith the change at the unit price bxd. ❑ We are proceeding wi�h the change under the Cime and materials proviaions of he C aCt. BY� nate: 5 ACTION TAIC�Nt ❑ Proposed Contract Modification rejected. ContracCor is hereby notified NOT to proceed: BY� Date: ❑ Field Ozder issued: No. Date: By; ❑ Change Order i.ssued: No. DaCe: By; 1 � �� �-- �� C�v` � li]e r71f1011].�.�1.00� PROPOSED CONTRACT MODIFICATTON PCM-004 ATTACE�NT A rnvun�r:viiiage c:reek wRF Dee F11�era 1-20 Modi.fivation PR0.7ECT NUNIDER 047NBR� City of Fort Worth 01628 - CONTRAC4'OR:_ Pepper-Lawson ^ 21813 CONSTRUCTION MANAO�R: Freese and Nichols, Inc. 8TW11109 PCM DESCRIPTION: Filtered Water MeChanical Piping PainCing and Corrosion Protec�ion PCM NO. 004 The Ovmez propo�ee Eo make bhe iollowing addxtione, modiEiaa�ion� ox de].e�ione to �he woxk de�cribad in the Contract Dooumente. Authorizabion to proaeed with the�e Changea muet be approved by Field Osder or Change Order in &CCO]CC�dx1CO with tihe Contract Aocumente. RE: Add 36" filtered water piping coa�ing repai.r for filtere 1- 19. Add 29" filtered �oater piping additional corroeion protection. 1. Shaets F-19 and F-16 - Note by 3ymbo]. 3: Ad,d the following sentences - "Contractor shal� recondition existinq 36" effluent piping and aide outlet tee for fi.lters 1-�4, Contractox shall provide additional corrosi.on protection for 24^ eE�luent piping at the slab by buehing a 4" wide, 1�' deep etrip on the perimetex o� pxpe prior �o reconditioning pipe and install non-ghrink grout tapered to 1" above slab at the �ipe wall." 2. Revise your record dra�vings as appropriate. 8Y: C3. 8. Gav, P.E. Date; April ii, 2013 r. :_.�_r . - �• � • May 9, 2013 M�. Ted Gay Freese and i�Iichols 4055 Intemational Plaza Suite 200 Fort Wortl�, Texas 76309 Re: City of Fort 1Vorth Vipege Creek Deep Filters I-20 ModificaHons PCM 4 - Rev. 2 riltered Water Mecfianical Piping nnd C�R�ainn P.��MN�„ n L� C U� '� Dear Mr. Gay: , Per the Engiueer's requcst iti PCM-OOq, Pepper-Lawson Watenvorks offer a proposal to recondition the existing 36-inch effluent piping a�id side outlet lee for �Iters 1-]4. We also p�opose to provide additional corrosion proteclion for the 2q-inch effluent piping at the slab by busUing a 4-inch wide by l-inch deep slrip on the perimeter of the pipe prior to reconditioning the pipe and install non-shrink grout tapered to one inch above slab at the pipe wall, This change wilJ �•esul! in a acld to tire Co�t�rqct oj 513,608 and an increase in contrac! du� ntlon vf 0 c�rlendar daps fr•an !he dnle of app� ovqT 10 delfve�• Il�e �nalerlals 101he s!!e and peffo»i11he wotk. Upon receipt of approval from ihe Cily of Fort Worih and Freese and Nieliols es to tl�e acceptability of our proposal, Pepper-Lawsoii w111 proeeed witli procuring ihe materials to be installed. 5liould you or the o�vner have any c�uestions you are weleome to coutact mc at any dme. Ti�ank You. Sincerely, PEPPER-LAWSON �VATERIVORKS, LLC Aaron James Project Manager 4305 �ast Hwy. 1187, Sutte 120 p Bufleson, TX 76028 P. {866) b36•7992 p F. {866) 265-6220 www.olwatenvorks.eom i � � 4 � ,'�.__ . - . • � � � • � Cf1ybJ Fort Worih • Vllfage Creek Deep Ftfter 1-20 ModlflceUons Peppar Lawson Job q 2l813 PCM 4 - Rev. 2 ITEM 1lDohhs Coalfngs f 1 2 PreP and Pour lirout � � �' v> �: � �. ��, '�u � i:nKnion i �� : �� i �, � �� �� A LqBOR BURqEN � �� 8 TAX � 8.25% C SUBTOTAL 2 (AtB+C) D SMAU.TOOLS E SUBTOTAL(D+�) F BQUIPMENTBURDFJJ G SUB70TAL(F+G) H OH�PSUBS�S%(O.txNj 1 SUBTOTAl3(H+I) J OH�P SE1F P�RFORMED � 16% (0,15xJ) K SUBTOTAL 4 (,k}() l BONDS Yi INSURAAICE � 1.59'Ye (0.0189x1) �4 SUBTOTAL (L+M) N TO7AC BqSE BiD J1+,F2+J3+,lq+,►5 FOTAL BASE BID 1J1+.f2a.lZ+_�e�.�Fti 773.78 N/A 2281.76 398.28 2b01.02 N/A 2801.024 N/A 28p1.02 380.16 2981.i8 a�.ss 3038.74 � �� WA wa 0 WA 0 WA 0 N!A 0,00 0,00 O,UO O.QO 0.00 .J .� �� �� � �� � �� � i� � �� WA 4.125 64.125 WA 64.126 rUA 64.126 WA 64.13 8.12 ezza 0.99 83,23 blA12013 0.00 � 9850.00 � �� � � �, WA 0 0 WA 0 0.00 0.0p WA O.QO O.QO o,ao 0.00 0.00 �4 492.60 1�342,6 WA 10342,60 184.45 T05pg,951 OTHER N/A Goderya, Far�sia From: Sent: To: Cc: Subject: Goderya, Farida Tuesday, August 20, 2013 10:37 AM Bailes, Norma; Gay, Ted Walker, Robert RE: VC Deep Filters CMR004 WP-11 � ` ��� U� -� Discharge Piping Mods RE�6IVIMEND HI Norma/Ted, I am in concurrence with this. Please proceed and finalize. Regards. Farida ♦Fnrida S. Goder��a, Plr.D., P.E. ♦ Facilities Project Manager �Engineering & Fiscal Services �Fort Worth Water Department ♦1000 Throckmorton St, Fort Worth, TX 76102 �817.392.8214 office �817.851.4910 Cell �Farida.Goderva@fortworthtexas.�ov From: Bailes, Norma Sent: Thursday, August O1, 2013 9:24 AM To: Goderya, Farida Cc: Pena, Ana; Walker, Robert Subject: VC Deep Filters CMR004 WP-11 Discharge Piping Mods RECOMMEND Good Morning Farida, Attached is VC Deep Filters CMR004 WP-11 Discharge Piping Mods RECOMMEND. This has also been posted to Buzzsaw. Thanks for your help. Norma � , tvww.ii�•r���.rcun August 1, 2013 City of Fort Worth Water Engineering Department 1000 Throckmorton Street Fort Worth, TX 76101 Attn: Ms, Farida Goderya, P.E. RE: Village Creek Deep Filters 1-20 Modifications Capital Project No. 01628 F&N No. FTW11104A i ��� `� CMR-004 Waste Washwater Pump WP-11 Discharge Piping Modifications Dear Ms. Goderya: U� Transmitted herewith please find a copy of Pepper-Lawson's July 25, 2013 cost proposal for the referenced work. "fhe cost for this work is $5,351.00. No additional Contract Time has been requested. The Contract Drawings require new waste wash water pumps and discharge piping be installed and connected to the existing waste wash water discharge header piping. The Contractor determined during field layout measurements that the new discharge piping was too long to fit up to the existing piping stub up for WP-11; the header is about 7" too close to the new pump. There is sufficient room for the discharge piping for pumps WP-12 and WP-13. The discharge header was not installed as shown on the original construction Record Drawings; it is turned at an angle to the pumps rather than perpendicular to the pumps and each pump has a different length of horizontal discharge piping, -fhe Contractor submitted RFI-031 which presented several alternatives for corrective action. Consultation with the plant staff and consultants determined that the custom built discharge 90 degree bend fabricated with steel pipe provided the best lang term solution. Attached is a sketch of the proposed pipe modification. We have reviewed this price proposal and are of the opinion that it is a fair and equitable price. We recommend the City accept this cost and issue a Change Order in the amount of $5,351.00. Please advise if the Water Department desires this PCM be incorporated in a Change Order. Sincerely, FREESE AND NICHOLS, INC. � ' � _ i , > G. E. Gay, P.Er Xc: Matt Jalbert-FNI t e � file FTW11104A.4.42.004 L:\VC Deep Filters\CHAN6ES\CMR\CMR004 WP-11 Discharge Piping Mods RCMD 80113 4055 InternaHonal Pla:a, Sulte 200 • Fori Wotth, TeKas 76109 • 817-735-7300 • fax 817-735-7491 [ k� 4� �� — .� I — .:� a . — � � �. :1�r:�. ,"Ct4E,��, PRO.JI'.0 i : ovvN�:iz� CONTR/1Cl OI:: f;NG1Nf=.t=.l:. CONS'r. PAC-;R.: r,c�N��zn�:���rz��� NIUI)ll�l(;/17/UNRf�(,1l1(:Sl {�?.!�'l. /004) VIIJ/1c;f_CI(I 1 I<��Vltl 1�1 ( I'I II II I1:; I 2uM��i�ll Ic;nllc�hl', �>>��r��� ����ii w���i;iiiavnri�t:r��.i�ni;ir�ii rii ��i i�i�� it i n4v:;c�rd i RI I`;I N. ��II(',11t )I `;. Ii�1t' � r;� ESI K I�JICI Ic )I S. Itd(; DE.��c;R{P"f�it)N: ?NI' 1 1 Uiscliarc�c Mo�ls NO�I'If�fC/1"l�lc)N (tY (:c)1�f7f./�c; l c)It l`�tstf�o�ire tl��, (;�uiti�it:l��t in r�ir,i.�;���i av�itli tlirr cl��sr.ril�e�1 ch��n���� I';tyr�iE�nl wiill hE: re��uestecl at tfie �ini! ��� ice l�i�! fFar:, Co��trac;too E>rot�os�::�. !u iri,�f��� li��� �i�.l�fili�,r��;, riiu�lifi���3fu,n•,, r�i �lelE:li��ns lu tfi��� W<�ik �i��scribe�i in tl�e (,':�rit�ac( !)<}c;iiti�c�itts, ��s r;how�n in nl�,��;liiiu�iit "!�" <iii�l rcc��ic�:;l�s Ih,il y��u l�ikf� th�:� ic>Ilo�r�ir��� �u;tioii ,_l f�lotiiy �is li�.-�f ytr�� �;r>n�::,n tli�ii tl�i��; �:h�in��c rlu��.; n�,( r�����iir�, ,� t:i�,uu��: i�, (;c�i�lracl tiinc �x �i�uo�_int a�i�! issuf= �� }�iel�l (7�clei . 'f. (ssate a Ci����x�c�. Or�IE;� fc�r ��c�fc�rn�iiic� tiie cic�ciil�ed ch�ui��r, (;h�i+i��c iri (;�,iitr�u:t .�rnoiint is iriclic��tc;cl i�� f1u: ��t(s��;lir;<I <lc�t<iileti cost lncr�lulcrNn ��f I��hrn, n�.it��ririls, cy��ifinic:�at �in<I rill c�tlu;r LUS{S [1JJQ��Iat::fl with tliis c:h�uic���;. IrnE>�tcts oti C;onfir�cl I ��iu� :uc� s►a<�wii in ti�e �i�t:��ched revised schedtilc 1� i _', /1��tltorizt: tl�ti�^ t;��rztr:��:tur ic� r�t+,�:ee�i �n�itEi iiii� r.1r<in��r: itn�lc:r fl��� ti�nc rin�l rn��itt:rial�; ��r��visions of the C;ontsr-�c!. �� °� � � Nt) (;MIz(�U�1 I'Itu.11 c:1 f�1tlMfll R: 1) i 6'liS 21(Si:i I 1Nl1I10�1 �iy� �,��iur� Jt�rt�es r;��N�1 rrz���,�rt<>jv Mn�v��;E,�l�:i �:r�:;����Ns}- W� r� spoiid to y���j� ��e��uF�r;t ��s follo�r�s� �! Wc� cor��cur that ih�is is a no cosi oi tirY�e cl?anc�e / cotiin�;;nts I I Y��ur pro��os<il is reco�i�ii�ei�clec! to tft�; Owiic;r- Clyder. i� IJ U I� (3y; _ I )��Ic; 1125113 Set� �itl�tchec!/f<�rihcoit�ing f ic�lcl Oider No Sec �ttsich�;rl/f��ilhcr��ninc� ��1�;��c�sc;ci (;}t��n��:: i'ioceecl �,vi�)� li�e cl�ar�ge ��t th�� iiriil }�ricc t>ici. I'rocec�l Uvifh the change un�l;�r tY�r� liui�: ��nd rn�ilerials ��rovi�;i�,ns ��f ti�c C��nlrar,l. ne�cl;tio�,��� �i�funi���t�<�„ is rec�iiiieil t�.� E:v����i�ite lPiis rec��,�,s,(. r'ruvi�i��;i�forin�t;on �_� clr-:sc:rii��ec� in the a(t�checl con►nienfs and re:;ui�ii�ii. (;r�nti=�rfr��'s �It��dification }�e,�<�ii�s� is nt�i �icCe��tecl. l )�ttc:: VV.11 - A�;liv� Pruie'.Is'�21£s 13 �/dl���=, c;r+:ch 1=�pur.:', f I."l. SpF� N�, -SnLinill-ilU'!=)'YfR l AWSU(d (<:Di,iil C ��P11 RAC"r D�;c�U711i;A71OT] RL�iUf_S 1 1 `/,{�DIFIF.��.do:, " SNOIld�I.�I40W - N011�3S dNV Nt1ld ��OH�d�Ld-Dd . � ,{�� mc�aRU�i��l wi ruo �'^" ��H NOI1V15 dVlfld 1131VM HSVM 315VM � L1 � vsaPot tis oo� � wi: �i..��.+ r.m: 1V71NVH�3Y1 n �,., ti t �����? ���'= as3�a�� �S401N OZ- l Sa31ll� d330 �aM �3321� 39t+lllA i,"„ .�, �a�,v� svx3i 'Niaont laoe eo ui� /01'"u,__ „_ � • 8 �� �a �� �3 Q� o z �'S�j ' �� �� '�� �� ��< W�' ��S � �� �� . ����� o�� $� � �� ia F�� ����� ��� ��� �� �� � ��p �` �� "� ��� �� �� ~ � a�W ���� ��g ��� �o �o_ oaC=7 o��E u'?§ �F�J � ir5 0 < � ��� 8���4 ��� ��� � ��m _ � ri . � � L�! ._�: � � � Y� �33 �� 3 � a \ �1" � I �k ,Y 1 .i�. `i .. � » � =2 n ,;. �� —� ' 3 �� �.�' . �3 � Z; 3r a� � � aaix J � � � z � W -- � � � � x � /� � I � � � � Y+ b 4�' ' ., ' � a � 0 0 0 ,I U ; W � U1 n I � c� `� /( v_� / E-i 1 � ��;N �'� ���:h �••n .,l�Yl►���R.�6'�9 �' � '� 1/V/\ I I I� 1l�/� � I� I�`; Jul�• 25. 'Z�1 I � iA�Ir 7��ccJ G<iy I`reese s�nclli��!�c,is =!0?5 1i�tern��linn��l 1'I;i�,� tiatit? 20D ��c�:i l!'n�'tll., Te�;t� 7h111�) T'.r� (-i!)' nf I�c�ri �1'orih �;Illai,�r t'rc��l, U��c�� l�ill���s I-7.0 a�indiiir��linn. C:��IP.au; I)cnr ilir (i,�v- '.•�'1'f I I)c,i�L.n,,� I'i� ., ,ll��,,i-. � � � l7 �Y � , i��; I��: En�,it�e�r'•; t'�:t;ii�,l ii; R�IOl l. I'��i�,: r L�ir:sou 11'ail� i�����l,s i>i�t�•rt a j�rn�i�r,:ii t�� ��uiclitr,r ainil ii;�,t;ill :i �,I�. Ilii�riculccl st��cl ofl's:.! !c� Iil iyllilitl IEIc �)I��UI,L' Ci)Il.�ll,�inl, �il 117'I 1 f'aicini, in�luil��, Ilir cic�lil li�i .i Ilill b���li 11.�nE�r-h� fl.in�c I?" �)U-d�s�ire be�i�:l ;ulcl ,i,�c�s;r�nc� Pe�,��e�-L�i;r;u�i sissuui� , �9i:3� uati�i �u�itriial ivil� I,r ,i�:�cpl�il�le lill I;n Ilir {�i��'iuv. ,o n�� srl.il fill aual'v� �>;.nel fill is i��t:l�stic�l in �his pr���;�,.�;il I�l'iieCirurr�t��ri'li:��'�dini;�rut�/l>>//�� !'���;!��,i;��ei,� �5,351 �uh/tri�ii�rr<��teri�i<�nrr/rnrf r/ru u1i���r n/ 1 r� �l�-ru/:�� rla�' tr, lh.� f�runj� 1,11ih-�Ioui• /i�r,�n ll��� �lu�r �?�ry,�,����i��rl /v c!<�/i� ��� Iln rnulcrrr�J�� lu �h,�.ci<<� rui�l /�rrJ�:,vn il;r ,,.,,rk. L���vfi re<��ip� c�l�appn��,°a� f�iom Ihe (�ity ul F<u i 1ti'r,ilh �uid Pre�:�e an�l �Aieliul:� ,r, k� Ihe uccepl;rirility oE ,.>iu ���r,E�nn,il 1'eppc��-1 ,i���;;,�a� ;ti•ili ��ri;c;�etl �;�iih �irn�i��i��� U�c mnl�:�i:il. ti� he i�>>Inik�l. �6ould y���i oi (br a�tivuer lia���� t�r�j t�u��ii�;��� }•nti �E c t•re)rnnae it, coniari ii�r vi �m1' lii��:. T1»i�k Ynii Sin;;erzl�, P�PPLR-Lr�\Y5�1�V 1Y?1T�J;\��OTZI;�, LLC ,� i���,� ���,���,; _►�<<��,�5 ����,�c�� ��i;,����zt� 1 �. �;.. � �, . ,. , ,. „ � �, �, - ��� ,.. ,,i:��.�t����-:���,:�;�;,n, !� ! �"� �-'�a���_= t d-� 9.�'�!!1� �, � K e ��y 1i\//`, I I I;1/\/ i J;; I: Ci!y ol fc>i t YUurll� � Villa�e Creck Deup tlllci 1'1.0 G1���lili� ,iUun ; I'��)���er La�:yson.Jt,b //21Rf3 (;P,Il:un,l i r� r�� t�i0. � C'�;=:>C4?li'71u7��1 1 S;J �fe:<as F'i�;e arid Sup��1y 2 50 "iexa;� Pi;,e and Susi��ly 3 6lechanical Ci s*:� 9 F3�+r.lcti:,W 5 Cornpacir�; G [qui�N�iei�t Uefl:i• ry 7 Ey�iipu�e�,!}'j�_ki���� .;�.:D,';:LiRY �;1RCCT CO ;1�St;ETp`-�,�1. i f `. II ., �) Pr11 I I Ilay ! ���.q. I i t; I � `l P, ! P:QOR B�Ji?U1:Td B 'IAX �i? &' 2,,",f c :i,sTor��i.2�r�cs,:-:; D 8'dALI i0[3L:� E SUBTOTAf {DtFj F E�ZUIPAdEt•17 B1J;�f�f=i•J � sur�T��rr,! SrFr;� tl O}i� `r SSJflS �� t, (ii. Ix�.�!} I �,oJB7p rAE_ 3 1H ri) J 0113P;T1! Pt=i��()liP,1FD�il 1�','�4C� I:;<,Ij K £�UG"J07AL =1 (.JFKj L Ci01�!DS ° 4t1 ;? IF?.nPICE (i� t 59;?. ((7.015�),rl ) >>�1 �JF�JO";rL (I-�t,1j i S TOT/?l 3,�`.:JF L'1D (J! � J.�: J3;,i�1-r.1S) TO7t�,� [? rtSF [?q�) (, I i 1.J`1�+J3 �:l-I � J5) UTHE,n, - -- _7_��n�_�.:v�•�r I� t I Y �Uh!I I V; I'i I I r�...li.u,�,� I'i��. .V��J. I i�f;i q.? �irin i�>in� �:rr;l (:r)[,I O U(1 r) c�u U (lU It�� t�il �I�;U O(1 O 011 i � 0( t, U (Ii l (} (IO O (11) u cr� i _ ,1ri0 !r; t !'n Pk�i 7:t,! I ± I !;(I i:';, � r:n I J7A t+�>s �> f' 1i/\ F}(,5. GO ILts :39 RFL'Sry1 1�. Gq '7SC). ii11 5'J';OJ4 'r --r: f5Q �`'il (�- _ =-=r� ,�'I i — �I �S b,3[i! ;� td�l�I IAX� ! � 1^�1A�1 fil/\I �iri�i ic,ini Ccr�T C�c;l 0 (`(1 :,4:tis t} S�Ctt).Go !1`>:ipl %q`,.tol 0 OU U.�HI n !)!) U U(1 11(Hl Q t1(1 n op 2 )!18!i,',�f) t-�rn r�ia� 79lYi ':51 FIIA 2�1R�, ;9 h!?A 2�)It:� 59 run 2�iti.`i `,��) 4 1 L+s4 i,J:i i, q'1 s a ss �S�f tl f:.07 In;<r r> F;lAlf R�AI llflll Icill�d �:c>:;I �:c�:;l O 4U /1 I:U lllil) I) (!0 U (IU i i cr� U UU l) Oq O DU o r,� i 0 4d�A u O r�un 0 ri+n 0 r�,n O (IQ u nq O.Cri 0 (;ll (1O0 �� � 1 � )llll'��.'i i�11 uiiii i�nni cUt�,l t�.t�::l U f)0 0 iiU U OU O fltl 7.fU .'.lU(iQ /.`i 7'i QI) /•; 1`.�.OU� 7`+ 7i OQ 0 i)1) n oo � ,} ��,- PllA s/ S:i75 4��J 531� PI; P, �1f)7 6.i/ i �-irs �i /:1f;. t3 I rv�� 7:ttf ft) I I u_[sl tl l�) ii:3 t�s;i f;G3. t �1 �� /I ").'.i170 I -I ,UIiCOi'1 Uti1l'.I �_1}t Uh:�l ir')ini c��'�I cU(�I 0 D(� p I10 O CO 0 OU O.OD D on 0.00 0 CO 0 C,0 o.ou rdrn � 0 on D r{1 0 r:(i SO TEXAS PIPE AND SUPPLY, INC PO BOX 164842 FORT WORTH, TX 76161 (817)562-3021 DATE: 7/16/2013 CONTRACTOR: PROIECT: ORDERED BY: ADD: TAG N 915 935 936 TOTAL: DEL; TAG # 910 920 930 TOTAL: ADD/DELETE: 5 PEPPER LAWSON VILLAGE CREEK ARRON Q�1' DESCRIPTION 1 24" OFFSET 90 TN140,C/L 1 24" MJ RESTRAINT ACC SET 4 %" SS ATR W/ 2HHN $5,438.60 Qn' DESCRIPTION 1 24" DI FLG 90 1 24" FL X PE DI PIPE 1 24" BNG SET $2453.01 TOTAL: $2,985.59 ��� �s� __- Goderya, Farida -- — From: Sent: To: Cc: Subject: Aaron: Gay, Ted Tuesday, December 03, 2013 7:42 AM AJames@pepperlawson. com Goderya, Farida; Bennie Fretwell; Nicolas Monsanto; Gay, Ted; Bailes, Norma FW: VC Deep Filters CMR-005B Rotork Actuator Cable Replacements Rcmnd This email will serve as F1NWD's PM notification that the extra work will be added to upcoming Change Order #2. Recommend PL release the cable order to get the longer cables on site due to their lead time. Norma will set up the Change Order form for signatures next Monday and the Change Order should take about 2 weeks to process. Ted From: Goderya, Farida Sent: Monday, December 02, 2013 5:30 PM To: Gay, Ted Cc: 'Matt Jalbert'; Chad Simmons; 'Lance Price'; Bailes, Norma; Walker, Robert Subject: RE: VC Deep Filters CMR-005B Rotork Actuator Cable Replacements Rcmnd Hi Ted, I have reviewed this CMR 005B, and I am in agreement with the scope and amount. Please proceed and roll it into the next Change Order no 2. Regards. Farida ♦Fnrida S. Godei��n, Ph•D., P.E. ♦ Facilities Project Manager �Engineering & Fiscal Services �Fort Worth �i'ater Department ♦1000 Throckmorton St, Fort Worth, TX 76102 1817.392.8214 office 1817.851.4910 Cell �Farida.Goderva@fortworthtexas.�ov From: Gay, Ted Sent: Monday, December 02, 2013 1:07 PM To: Goderya, Farida Cc: 'Matt Jalbert'; Chad Simmons; 'Lance Price'; Gay, Ted; Bailes, Norma; Walker, Robert Subject: VC Deep Filters CMR-005B Rotork Actuator Cable Replacements Rcmnd Farida: Attached please find the CMR-005B package which prices and recommends a Change Order for the 10 longer Rotork actuator control cables. $6,199 and 2 days. The FVWVD does not have any extra costs associated with longer cables which had not been released for production; 10 control cables for washwater valves were released before it was realized they would be too short. Once we have your concurrence notification, we will put together Change Order No. 2. Ted �i Dec�mb�r 2, 2013 City of Fo�t Worth W�ter Engineering D�pat�trne��# 3.000 Throckmarton Skre�t Fort Warth, TX 76101 Attn: I�s, Farida Gc�r_I�E�ya, P,�. RE: Village Creek Deep Fil�ers 1-20 tVloclifi�a#i�ns Capital Project No. 01628 F&N No. FTW11104A CMR-0058 Rotorl< Act�aator Cable Replacements Dear Ms. G�derya: ��n���u.h��c�:t� cn�n Transmitt�d he�-e��vith pie�s€� find a c�py ofi Pepper-Lav,is�n's November 27, 2013 price proposa! Fc�r the �-eference�l ,n�ork. Th� cosfi for this work as $o,i9`-3.��. i�n�o �clditionai days fcr sa�b�fiar�tial Completior� ancl Finai Compietion have bee�� r�ec�uester�, Th2 �'oratrar_r Specification 40 92 �i3.13.�.�7,�1 re��►a�r�s the nev�, povver �nci control cords be 2� feei lor�g. D�,iring �1�ctr�cal panel �nd conci�ta� �ay���t it w�s determined th�t t�e �0' ca�)es v»uld ibn too short fflr sorn2 of th� actuators. A kotal o€ 1q controi cables had alread�� b�e� ���Y'IC�k2CI ��1C� �COLIICI i30� %� used. Pt is propase� to repl.��e those cab�e� v�rith ionger cables. Tempo�ary ��iice� +,vil! be i�stailec! on 5 �ilters to alf�vv construction to proceed �n�hiJe nevv cables are procured. We h�ve reviPwed this price proposai ar�d are of the opinion that it is a#air and equitable price. We recomm�nd the City accept this cost and i�su� a Change Oa�der in the am�o�ant of $6,199.00. Vl/e h�ve revieN�ed the time extensiora r�quest �nd �oncur it is appropriate ancl recqmmencl th� FWWD grant a two day time extensic�n for S��bstantial Corr��le#�on and Final Cornpl�tiorae Please ativis� if the Water Department desires this CMR be incorporated i� a Change Order. Sincerely, FREES� Ai�� IVICHOLS, I�V�. �,, l , � G. E, G�y, P.E. Xc; Mati Jalbert-FiVI � �_ ;�,�:: file FT1N11104A.4.42,00�8 L:\VC Deep Filiers\CFIAMGES\CMR\CMR0055 Rotork Acitiator C�ble Replacements RC�AO 120213 �055 InternaHonal Plaza, Suite 200 • Fuit Worth, Texas 76109 • 817-735.73pp .(�x 817-735 7491 �''4�' _.� . PEPPER-l.AW50N �/%� I �F����f�f�`_> November 7_7, 2013 Mr. 1 er_l �'i�y Freese and I�lirhols 4055 International Plaz� Suit� 200 Fort Wo�th, Texas 76109 Re: �Ci4y a#' Fart '�Yo,•#h �il�age C��e�� Ile�p F3�i�a�s 1_�.20 Niotalfic, dion� CNIR005B Dear Mr. G�y: Revised Actuator Cabie In the July 1, 7_013 lctuator installation r�vie�,v, it +,vas determined that the cabling tor the 36° backtivash header valves tiv..r� too short. 4'er the Engin�eer's revised rec�uest, Pepper �L�,,vson lhlai�nvorks offers �, proposal to piu�chase ten (10) control cables 15 meters long to allory proper installation oF the cabling for thc proposed actuatvrs. The cond�.iit and existing cabl�s avill be splice as tliscussed on a temporary basis until the netiv cables �rrive �nrl the filters are transferred to the nery DCS. Electrical iabor inclii�les tenporary splicing for five (5) filters. Two {7_) cal�ndar clays ha�ie been requested to perForm tnis worl<. It is estimate�l ihat ihis work riill r�quire an addiiional three houTs pei filter. This tivorl< ls on the critical path of the projecr, 1 his chc�rzge wi.1l ; estil� i;� n n�Id !o tlze �on.trnct oj` �6,35� nnd n;z incrsnse an contracl clasrniiora of Z calendn-r� dnys from the clate of npp;-ovnl to deliv,sr �lae inoterinls to the site n.;zd perfo;rn the work. Upon rec`ipt of approval From the City of Fo�t Worth and Freese �n�l �lichols as to the acceptability of our proposal, P�pper-Lawson yvill proceed tivith proruring the materials to be installed. Should you or the owner hzve any Guestions yot� are �vefcome to contact me at any time. Thank Yoi�. Sincerely, PEPPER-LE1WSOi�( WA 1 ERbVORICS, LL� flaron James Project Managzr ;'O 80:; 'I 2033� � (817) 357-<' I Su Arlirgicn, T,� 70012 F. (voo) �S� 02?0 PEPPER-LAWSON �'�:�- v.' .'�,, i f�-( ;���� %�;i�_` ; City of ros-k Woi th -�/ill�ge C�-eal; Dse� Filier I.<20 ModiFications Pepp�� Lawson Job:+�2'18�i3 CiwR0058 IZcviscd i�Acivalor ('ablc� »��_.. _�..� riori-rnxer,y_ _�. =rr�;a=� __�T LFlUqF; MA I ERIAI_ NIA f ERIAL UI�IIT TOTAL UhIIT TOL�I UPIIf TOTFlL COS I_ - rpST C(�ST CUS f COS i CO;�f — -- 0.00 --- 0 DO -- 0 00 0 00 �137 4320 00 p Op 0 00 0 00 0 00 0 00 0 OU 0.00 o �� o 00 0 00 00o aoo 000 o.00 0 00 0 00 0 00 0 00 0 00 0 0o a o0 0 00� 0 00 0 00 0 00� o.00 o.00 0 00 � Z 3 0 4320 p 0.00 f�l/Fl r�/q N/A N/A p 0 <��20 p 0.00 �I/A h�/Fl 0.00 4�20 0 ru,� w,� �va 0 <1320 p rl/Fl PUA i�l/;> 0.00 q�20.00 0.00 0.00 64�.00 OAO 0 00 �596�.00 OAO 0 00 73 99 0.00 0.00 SOd5.99 0 00 6'199.30 ITEIVI �IO. DESCP.IPTIOPI I "J11� Qeiot? � 'TLxsun L�bioYa OIE;1 a r_ n SUMIVIAP.Y � DIRECT COST SUBTOTAL A LABOR BURDEN B IAX@3.25% C SUBTOTFlL 2 (A+Fl-rC) D SMALLTOOLS E SUBTOiAL(D+E) F EQUIPMEN i BUP,DEi�I G SUDTOTFlL(FFG) I-I OI-I�P SUBS c� 5%(0.'I:<H) I SUBTOTAL 3 (FI : I) J OHB�P SELF PEP,FORPAED @ 'IS % (0.15xJ) f( SU8TOTIL 4 (J+f<) L �O�IDS & INSUR�PICE @'1.59% (0.0'159;;L) Nl SUBTO i AL (L-rNl) i�l TOTAL BASE E31D (J'I rJ2 rJ3-rJ4-rJ5) TO It1L B,�SE BID (J'I+J2�J3-r,�q+J5) OTI-I�P. 70TALCOST �I/A S 6.199 � �� EQUIPNIENT UNIT TOTFlL COSf COSi 0.00 0 00 0 00 0 00 o.00 0 00 0 00 0 00 0 00 0 00' 0 00l �� 0 N/Fl 0 0 NIF� 0 o.00 0 00 f�l/Fl 0.00 0.00 0 00 OAO OAO �.S (3 i I1?7/201"3 SUFJCOi�ffKAC fOf: unu i _ — To r,�i_ COSf COSf -- --0 00 0 00 1080 26 10�0.26 0.00 o.00 o.00 o. 0 o. 1080 I OII0.2f tJ/F I OII0.2f ruF I 0802E 59.01 1 13�27� fV/A 1 134.�7 i3.09 �I'152.8'I , C�� U� � ♦ Yy71.liVl�9�.�� Sc 18�IDdJ�TR1AL AL�T�J�9A'�'1ON SPEClA�.IS78 F'hon�o 8�7�773�79�9 Fa.x: 9�-89'7•394-0524 ����o�� #: i7B-MIA�VG0826'13 R'I ��s�i'is: P�pper La+,�lson Customea• fJaXne: Aaron Jai7ies :5�aip ic�: Village Creek Pepper L.a�vson Creek Ship Via: Bestway �OB: Jobsite Qake: 10/24/2013 �'•�.� order Date: Salesrnan: Paul McAlexander List D"escoi�r�f 5al� Totai li�r�a Qty Descrip#ion Pri�;� Price 'i 10 �v1iA-AALCC411UC150Al1X $�132.00 .�v r i ��:{ v '12P nAL F P S.S. S-�QOVV 1 o/"12C $n , 320 . o0 n an�, n �(� -rcn�nanv "�_ "_. " .- -r " TP�rJ�i��Tl7C -"_ _ 'TT GII'i _-.i7.�TJ ��i/�i ��vnn� � C� - .yt i �}:GV . - 'Z•i � i vi/. vJ Freignt: lnclucled Dslivery: 6-8 weeks �or �nor� inf�orrn�k9ora pl�ease �onta�ia P.�u! McAl�x�nde� �97=�7�a4�`16 Ce�l PQ ,BOX 223� Mansfield, TX 76063 6iO4 W Pioneer Park;vay, 5te. 2�?. Arling#on, TX 75013 Q����i����� C�oaa��any 9�arn�: 7��elepnone #: F�x#� PR�OJ�Ci# �I miautoinc.com �EXSUN f' '�� ._ .� .. .�' ,. �. ��p}���� ��v��o�z W.�ter�vfl�-i�s, I,LC �305 E�s# �id��tiv�� � 1��7, Sl�� l'Z� �a�t•l�so�a� �'.�Y 750�� �t�� o A�a��� �a��e� Aea Vill��� C'r�eelc Dee� �'il�ei•s 1�20 Ndorlife�►tic��as ��b,��ct; `�'�e�������°y �'iLte�° V���e co����e�c��r��a�m�•�d�s�e�l — ��� �� � �' � A�ron, �v� p�o��5� k� p��o+�i�tl� �1.� e�uipin�nr_, m�te�-i�is �n�c� l.abor� r��cess�ry to install t,�rnpflr�ry ��.r�tx��� cflrui�c���ns t� {Sj B��1Lav�zs�� z�aiv�s ci�.��e t� t�i� �h���., in valve cai�l� :���gt��, Atta�n�d i� �n it��r�izecl qa��t� sh�et for �he �v���k i#e� d�sc�-ib��1, (2) Addit��n�� c�ay is rec1uirec� ta per�fonn the wo�rk, �11 contra�t excl�.ision� apply. P1��s� c�ll if yoi� ��ve �ny �uPstions, `I'����s, Steve Mi�l�r T�IYSill� E��Ctd°f��l L'ontra�t�rs VCreek Quote Sheet Temporary Filter Valve ConnectionsR1 Item 1 Valve cablina Materials 75 12/c #14 thhn 60 #14 insulated splice Matl's. Total Misc. Tools & equipment Labor Labor Burden Subtotal OH & Profit Subcontractor Subcontractor OH&P @5% Total @ $2.29 ft @ $0.55 e $171.60 $32.76 $204.36 $0.00 $525.00 $210.00 $939.36 $140.90 $0.00 $0.00 $1,080.26 Goderya, Fari�a From: Sent: To: Cc: Subject: Goderya, Farida Monday, September 16, 2013 2:27 PM Gay, Ted; Bailes, Norma 'msj@freese.com' RE: VC Deep Filters CMR006 Recommend* .�� � �b Hi Ted, Ok to proceed. The numbers looks very similar to the one quote (dated July 19, 2013), Robert walker has received. Regards. Farida ♦Furicla S. Goc%i��a, Plr.D., P.E. ♦ Facilities Project Manager �Engineering & Fiscal Services �Port Worth �Vater Department ♦1000 Throckmorton St, Fort Worth, TX 76102 �817.392.8214 office �817.851.4910 Cell �Farida.Goderva@fortworthtexas.gov From: Bailes, Norma Sent: Monday, September 16, 2013 12:51 PM To: Goderya, Farida Subject: VC Deep Filters CMR006 Recommend Farida, Attached please find VC Deep Filters CMR006 Filter Gallery Bolt RECOMMEND. Thanks much. Norma From: Goderya, Farida Sent: Tuesday, September 10, 2013 8:57 AM To: Gay, Ted; 'Matt Jalbert' Cc: Bailes, Norma; Walker, Robert Subject: FW: VC Filters - nuts and bolts quote; CMR 006 Hi Ted, FYI and necessary follow up. As I indicated before, Robert got a couple of quotes for nuts and bolts, back in July. See attached. Call or email with questions. Regards. Farida ♦Forida S. Goderya, Ph.D., P.E. � Facilities Project Manager �Engineering & Fiscal Services �Fort Worth Water Department ♦1000 Throckmorton St, Fort Worth, TX 76102 �817.392.8214 office �817.851.4910 Cell �Farida.Goderya@fortworthtexas.�ov From: Walker, Robert Sent: Friday, July 19, 2013 1:44 PM To: Goderya, Farida Subject: FW: nuts and bolts quote Farida, this is quote from one of are city contract that we use at Village Creek I will get another one from a different supplier so we can compare the two. Thanks From: Knoop, Richard B Sent: Friday, July 19, 2013 9:22 AM To: Walker, Robert Cc: Cain, Tim Subject: nuts and bolts quote 1 :5ef��.'si�,��-. :�;�, r� i.:. �:�';�y of ��r'� �Nor�:h U1I�re'r Fng�ir��ering Departrr�er�r. 'j.�zi�3(3 �l�i7Er�c3����ri�ri .�tree�. i=�r � 111/i��ti�, 3�i( 7oli3:i J-�±:)�,a; i�li�, F�a'ici_� Go�lerya, P.E. 3�i�e 'I4�l�;e �;��e;; i��-Yf� �i1�c�Ms 1 2� iV)a�A:ii#icr�tic>r3s G:���i�i:�� �'�'oj��f�i 1`�l0. C3��:��� ��i�i �7�. ��IUV3I�O�A �iV1R-�00� �il�r�r ��allery Boii (:redit ��JIY i�:1�S, �'.7.1��F.'a'a�1%e '� � v b � ��"��ansini'��?:�d �er�����i�xi� ; Ie�s� fitasi a c:opy of Pepp.e��.�_av��_;�oy�'� Se���er��b��s�.�, 1{3�d3 c:r���ii1 pro�,osal fo� the r�2�ie�ei�c�ci ��✓og'�s<., Thi E�reclit fo9- �1his ,nrt,ri� is �1:�,�6�?.00, l�io char�,�e ili C��rtr'act �lirne }ra� #�e�n �=��u�s��:e�cj. � n� �xis�i.ing s���c:i�ar�;r:�l }�i��'sra� �c�i�ts a��d r�.t��ts iYa k�ae ��,ff)uPy�z gaHei�y �a� bee�n ��o>>ncl �to be ir� g�o.r_t ��:�,,�a��t;oa� �n:._l an oF�port�an�i�3y �xists �:o re�luce r�s�s Co it�e }�VVU�ID by reusing so�ne o�Fth� bolrs anr� r�ut:�. �� ��;;:r;�a ��r f��M t r:-�� ,:> :>���" ���rs�e:= �ix�� 24' �3� u��_; �,i fi:,�.�.., (;" � �,.� „ �,, ��-, ,r c� Ii•ar�i�a..ar�:, 'f ;: o . � r'-'b , cl' y r�d "d�t., .11�j fl .Ci 'l�,.1rV 1�, !'�R.I5� �9 .)_t3Y �����a;�; ��s��o���os��9 is i_��i���; ���„ :� ����� e:a�c1�� �i:ang�� ��si�i:. .Sor,3e of i�,.� ,�zt,v r���rd��,val�e i��s al,�a��y �t�eer� �l?��v�r:.�c1 ;ancl .a�a•r�� spa�-� i��r:;�,N:a��,� shod_�l� b� an }iai�cl in ca:�e a bar.� set: �F �a,d��L�re i� Fo��nd. fir�e c�os���.ac�r:r }aas �¢•a�oseci to q�j�ati ro reaase t��irr.y Fotai 30" tl�nge sefis, fori�y eignt :Z4" Flange sets, �nc� 3:Z p,. �i�l73�2 S�'r�, �Yl� �t2Cj1'L �>l'�xJO�:d� i.f_`",C-'S tl'd3 �V�'�'�g�? j.7�'f' �i.�11�%c +:'JS"� ���J�' �)i'E'')"�ad'3f1,>�T, 'i:i7E �Oi"�;� fti�f!'�P._1S�'. �Yli:� �}]� �5 �f3j3!'O�JCie1.'tc. �/a�� f'a�,�l-?fK' �?lll�'�f!lal� �idSy t:t�.'i.-�'.'+ ``U'I'tJ;�{3:�_l� �lid�,i _l{�? O�'��!';� 7Oif11^l�I ;�.fill" 7a= i;� ��c11;`' :�T7�ti� w'Cji.19�����' K�'V'ICE,' a�rl.11�a�+rne��,r.. li�J� f ��c;3�r��ra�nvi �tr� �:i�t�y ��c��.e��� �ii,�:� �r�cli�� �,3�ci �ss�a�e t� �lec3ur��:i��� �n�n�� Ord�a� �n :���e ��sno�ra�: c�f $:�2,�640�0. i'��.�.�e �f�v��.e if the 4�la,�i D2��2r�r�ierjt c)v�ire:� t��is CI�i3� k�L in�o�����a�:e� i,� :� �Cia�nge Jrder, Si n;:;�;��)'/, f���E.S� Al�i� �31�.:; IOL�,. li�1C, ��%�%'� '%, �, (�i�I; �',�. x�„ ��]�I.:� ialbe�'t-r-iv� ti1� FT��i11:i0��.�,�2.00�fi L:\�IC O�ap 1=ilce�s\Ci-lAIVG�S�r_viz�c�na�os � ilb�r .�N�ry 3olr Credi? r�CI�Ai) 091o:i3 4055 Internar.Ional PI.��:�. Sult.. ?00 • F���i Wurth, tc �:� � i�,lu'� • HU-71'� ];uri . f.ix 81 { 71S /�1'�) I , ti � ■� �RE6SE•NICIiOL8 C �`� l'� � � � CONTRACTOR'S MODIFICATION REQUESi (4.42 /006) PROJECT: VILLAGE CREEK WRF DEEP FII.TERS 1-20 MODIFICATIONS PROJECT NUMBER: OWNER: CITY OF FORT WORTH WATER DEPARTMENT 01628 CONTRACTOR: PEPPER-LAWSON 21813 ENGINEER: FREESE & N(CHOLS, INC. CONST. MGR.: FREESE & NICHOLS, INC, FTW 11104 DLSCRIPTION: _ Filter Gallery Boft Credit NO. CMR006 NOTIF[CATION BY CONTRACTOR The Contractor proposes to make the additions, modifications, or deletions to the Work described in the Contract Documents, as shown in Attachment "A" and requests that }rou take the following action: ❑ Notify us that you concur that this change does not require a change in Contract time or amount and issue a Field Order. X Issue a Change Or�der for performing the described change. Change in Contract amount is indicated in the attached detailed cost breakdown of labor, materials, equipment and all other costs associated with this change, impacts on Contract Time are shown in the attached c�evised schedule. • X Authorize the Contractor to proceed with the described change. Payment will be requested at the unit price bid. ❑ Authorize the Contractor to proceed with the change under the time and materials provisions of the Contract. By: Aaron James Date: 9/5/13 CONSTRUCTION MANAGER'S RESPONSE We respond to your request as follows: ❑ We concur that this is a no cost ortime change. See attached/forthcoming Field Order No. / comments. 0 Your proposal is recommended to the Owner. See attachedlforthcoming proposed Change Order. ❑ Proceed with the change at the unit price bid. ❑ Proceed with the change under the time and materia3s provisions of the Contract. ❑ Additional information is required to evaluate this request. Provide information as described in the attached comments and �submit. ❑ Contractor's Modificat(on Request is not accepted. By: Date: W:11 - Active Pro)eclsl2]813 - Vtllege Greek FIlters131.2 - Spec No - SubmlttellPEPPER LAWSON (CMRj CONTRACT MODIFICATION REQUEST 1- MODIFlED.doc .=1 i ' x'o�.� ' . . '4 i :.ut 3 vr� �<� �`.�::. .�M� . .:.r�__: ��������,Awsa� ��������� � �� Septe►nber 5, 2013 Mr. Ted Gay Freese and Nicho]s 4055 Intemational Plaza Suite 200 Fort Worth, Tesas 76109 Re; City of Tort �Vorth Wllage Crcelc Dec�� Tilters 1-20 Moditicattous r � �� Dear Mr. Gay: Tiiter Qallery Bolt Credit /��� �b/ i Pepper-Lawson Waterworks offers a credit proposal to reuse the bolts for the 6" gate valves, 24" blilterfly valves, and the 3G" butterfly valves in tlie tilter gallery. Since the totat amotu�t of reuseable bolts hasn't been yuantificd, Pepper-Lawson ot'fers ttie Foilowing unit-price struch�re: -�7.75/set for t�ic 6" gate valves (a $248.00 vali�e); -5102,33/set for the 24" bolts (a ��F,912.00 va[ue); -$203.06/set For the 36" bolts (a $6,904.00 value). The cpst to cleaii the bolts for reuse is incEuded in the proposal, Tlris clrrntge wll! result in a ac�d to the Co�r�ract oj -�12,064 aJtd an i7tcrease i�t conlract dttl�alion of Q ealendnr dnysfi�om llte date ofapprovnl to deliver the materials to dhe sile and pe��'a�ui the Knrk. Upon receipt of approval frora Uie City of Fori Wortti a�id Freese and Niciiols as to the acceptability oPour proposal, Pepper-La�vson will proceed with proc��ring Uie inaterials to be i��stalled. Shoi�ld you or lhe owner have any questions you are wetcome to conEact me at any tune. Tliank You. Sincerely, PEPPER-LAWSON WATEItWORKS, LLC Aaron James Project Manager 4305 East Hwy. 1187, Suite 120 � Burieson, TX 76028 P. (ass) �s-��2 � F. (ese) 28�e22o www. piwaterworks.com _�yy � � �� � � Clry of Fort Worth - Vlliage Creek Deep Fllter 1-20 Modlficatlons Pepper Lawson Job �i 21813 CMR006 ITEM 1 38" A307 Bolts 1A Clean 36' Bolts (2 men 1/2 Hr. Ea.) 2 24" A307 Bolls 2A C[ean 2A" Boits (2 mon 1/2 Hr. Ea.) 3 6" A307 Bolts 3A Clean &" Bolls (2 men 1!2 Hr. Ea,} Filler Oallery Bolt Credit NON-Ti IOR MA7E TOiAI UNIT �TY UNI COST COST 0.00 -34 Sel 6.00 3A MH 18 644.00 •48 Set 0.00 d8 16 768.00 -32 Set 0.00 32 MH 18 512.00 0.00 0.00 0.00 A LABOR BURDEN B TAX @ 8.25% C SUBTOTAL 2 (A+B+C) D SMALL TOOLS E SUBTO7AL(D+E) F EQUIPMENT BUROEN G SUBTOTAI(F+G) H OH&P SUBS @ 5%(O.txH) I SUBTOTAL 3 (H+I) J OH&P 5EI.F PERFORMED Q 15% (0.15xJ) K SUBTOTAL A (J+K) L BONDS 8� INSURANCE @ L59% (0.0159xL) M SUBTOTAI. (L+M) N TOTAL BASE BID J1*J2+�3+J4+J5) TOTAL BASE BIQ (Ji+J2+,13+J4+J5) 348.48 N/A 2772.48 415.87 3188.35 WA 3188.352 N!A 3188,35 478,25 3666.60 68.30 3724,90 •12084.19 249.1 -8489.40 125.8 �8028.80 9.49 -303.88 0.00 0.00 0.00 o.00 -tA801.9 N/A WA -1A801.9 N/A -14801.9 WA -14801.9 N!A •tA801.88 Q 5% -740.03 -iB541.97 •247.12 -15789.09 % ,-'�� � G� MATERIAL EQUIPMENT S UNIT TOTAL UNIT TOTAL U :OST COST COST COST C� 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 � �� � .� 0.00 0.00 0.00 0.00 WA 0 0 WA 0 WA 0 N/A 0.00 0.00 0.00 0.00 0.00 0 WA 0 0 WA 0 0.00 O.OQ WA 0.00 0.00 0.00 0.60 0.00 � 9/512013 '� � �' 0,00 o.ao o.00 �� N/A 0.00 OTHER wq , --� ��� �� i /✓� SO TEXAS PIPE AND SUPPLY, INC PO BOX 164842 FORT WORTH, TX 76161 (817 j562-3021 - CONTRACTOR PROJECT: ORDERED BY: � �� 7/27/2013 DELETE: 6 70TAL: $14,801,88 PEPPER LAWSON VILLAGE CREEK ARRON DEL; TAG # 3341 1382 1370 QTY DESCRIPTION 34 36" A307 GRB BOLT NUT SET 48 24" A307 GRB BOLT NUT SET 32 6" A307 GRB BOLT NUT SE7 TOTAL: OR(GINAL PURCHASE ORDER: NET SUM OF PREVIOUS CHANGES CONTRACT SUM PRIOR TO THlS CHANGE: ADD 5 NEW CON7RACT SUM INC THIS CHANGE: TOTAI. $ 8,469.40 $ 6,028.80 $ 303,68 $14,801.88 $247,590,00 + $ 1,914.80 $ 249,504.80 - $ 14,801.88 $ 234,702,92