Loading...
HomeMy WebLinkAboutContract 43754-CO1 (2)_ - -.. .M, . 'r � � �., 1 , ,�' : �.; � 't.. � , i � '.�� . FORT WORTH City of Fort Worth Change Order Request Project Name Village Creek WRF Deep Filters 1-20 Modifications City Sec # 43754 Client Project #(s) Fort Worth (01628); F&N (FTW11104A); Pepper-Laswon (21813) '""''"'"` Rehabilitation of 20 filters at Village Creek WRF, Design M&C C-24703; Construction M&C C-25887 Description Contractor Pepper-Lawson Waterworks LLC Change Order #�1 Date 10/3/2013 City Project Mgr. Farida S Goderya, PhD, PE City Inspector Robert Walker and Ted Gay (F&N) Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date of Proposed Change Order Revised ContractAmount Original Funds Available for Change Orders Remaining Funds Available for this CO Adtlitional Funtling (if necessary) Water $16,268,000.00 $0.00 $16,268,000.00 $75,977.00 $16,343,977.00 $0.00 1 Totals 0.00 7.00 Select Day It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord antl satisfaction antl represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. n ; I�ECEIVED CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.47% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $20,335,000.00 N i � O �i' = O � �a � L Q � �� �o 0 � �' � � U� � U x F Q�i 3 F � � Lz. � � � M V � U N � T U � , � �, o Q '� Q a� w a a � Q o '� N � N � L.L ��--- Q Z d � N � L.L � � N � Y O N � L U � a� � rn � � > �i a� *k � U z .� O N � "o c � � U ti � � � N U U � � 0 U �_.. c 0 U cYS 0 ti v N U U � � m .N � 0 � � � Y d U N N � (U N � � O N O O .� :.fl m � 0 .Q U N � U a� 'o a. M O N � � Z � L.L > � N U m -a 0 � a c co a`� Y (6 � � � � � � � � � O � o � U C � (6 Q L U c .� U J J Y a O � 0 fa � � � � m � � � o � U � � � U O � U � O.. � U N Z � 0 0 a � 0 � v � to a c 0 'a � Q N � � � � � � s U c ; D�PARTMENT NAME: ��`-�j . 6 a o q lr 13 , ESTIMATED COST / PROF SA DATE v' C �i �T �' '� �-� �3 �. t-� �.. � � 1 ��-� Y��.� NAME OF PROJECT/BID: SIGNATURE O� MANAGER � 2 1� EXTENSION �1�2.� DOE/PROJECT NO. � l3 l 3 DA E NIGP CODE Prior to advertisement, the contracting/managing department shall determine whether the bid/proposal is one whzch MBE/WBE requirements should not be applied. MBE/WBE requirements may be waived upon written approval of the M/WBE Managex. If one of the conditions listed below exists, the contracting/managirig department shall notify the•Manager via this form, stating the specific reason (s) for reauestine a waiver. ' If the contracting/managing department and the Manager are in conflict over the granting of a wazver, either may appeal to the City Manager, or designee, and his/her decision is final. Please Check Applicable Reason: A. A public or administrative emergency exists which requires the goods oz' services to be provided with unusual immediacy; or ►/ B. Purchase of goods or services from source(s) whexe subcontracting or supplier opporiunities axe negligible; or C. The application oi the provisions of this ordinance will i.znpose an economic risk on the City or unduly deJ.ay acquisition of the goods or services; or '� D. Other (explain) Justifp Commodity or Service Waive�r Request: _ � ��.� ,� F..� J �� n � ; <�- »� N r � - Y� c�z ti `� c.Q --� � W ��'�r� � L� �ld..�ora�,� -� ^�? ^� �t- i i "�/'e�- 1 S� �:..� cr�� � Q C �-. � tJt� +t��� �oi[ �..� v ..i� , t- �..v C�. _ CY t- �- v� ��- �. �'�'�� Zij q�� 1� �.�i. r-�. J� �.-� J�. ��. k\�.5� � � C, t--�-+1�� e� `�► C,� "'-e-'�� UY �.-r J� �i C�.2-Y �,��, � � Please use additional sheets, if needed M/ E OFFICE USE ONLY: � � � � - ���i���� ���o I� �. °�,�, i.� �. Approved Not Approved , Signa�ure of M/WBE Authorized e-� ������ ate ' Rev. 212aroa � City of Fort Wortih Departmerital Request for Waiver Of MBE/ WBE Subcontracting/ Supplier Goal �C__,Y _ Bailes, Norma To: Subject: ajames@pepperlawson.coi� FW: VC Deep Filters CMR002B REVIEW RECOMMEND From: Goderya, Farida S�nt: Monday, September 16, 2013 1:55 PM To: Gay, Ted; matt jal .bert@fr_eese.com; Bailes, Norma Cc: ajarr�e_s_ a>�e�per_lawson,co__m; 'Gorell, Dean T.'; 'Robinson, John M. (Dallas)'; Walker, Lance Price; 'Wendy Nilsson'; Matus, Luke; Pena, )acob Subject: RE: VC Deep Filters CMR002B REVIEW RECOMMEND Hi Ted and All, Robert; Ana Julia Pena-Tijerina; I have reviewed this CMR 002B (Additional Controller for the DCS system) and its previous versions (CMR 002 and CMR 002A). We realize that the need for this work was discovered during early construction (October 2012), after bidding process. Therefore, consideration of procuring this work by any means other than by Contract Modification was neither practical nor desirable. The City Staff has also reviewed this CMR and related aspects and considers this fee to be within acceptable limits for the scope of services proposed. Please proceed and incorporate it into the official Change Order. Thank you all for your efforts and coordination. Regards. Farida ♦Fm•rdn S. Goderyo, Ph.D., P.E ♦ Facilities Pro�ert Ma!tager 1F,ngineering K F'iscal S.rvices 1H'oe•! �i"orth �1'ater Dep:irtment ♦if00 Th��od<.r,�ort�n 5�. Fo�t ��Vor�:h, TX 751Q2 ♦%�U39?.s32�Ld oFfire ♦-� 17 351.�91[) Culi �Farida.r,��ler�7forbr�oi thtexas.gov From: Bailes, Norma Sent: Thursday, September 12, 2013 3:24 PM To: Goderya, Farida Cc: Pena, Ana; ir�att�alb_ert�freEse.com; Walker, Robert Subject: VC Deep Filters CMR002B REVIEW RECOMMEND Farida, Attached please find our CMR002B Additional Controller for DCS recommend letter. Thanks. Norma �: �, `� �•� � ,, � 1 September 12, 2013 City of Fort Worth Water Engineering Department 1000 Throckmorton 5treet Fort Worth, TX 76101 Attn: Ms. Farida Goderya, P.E. RE: Village Creek Deep Filters 1-20 Modifications Capital Pr�ject No. 0162� F&N No. FTW11104A CMR-002B Additional Controlier for DCS Dear Ms. Goderya: Transmitted herewith please find a copy of Pepper-Lawson's September 11, 2013 price proposal for the referenced work. The cost for this work is $75,997.00. No additional Contract Time has been requested. The Contract Drawings required a new DCS Controller 6/56 iri the new Filter Control Building #i2 for process cantrol of the new filter equipment and wiring terrninatior� of some of the new equipment and a remote Terminal Cabinet in the new Electric Building for terrnination of the remaining new equipment. The design of the project and the preselected Application Engineering Services provider's (CDM/Smith) scope of services were both prepared on the assumption that the 32,000 database points provided in new DC5 Controller 6/56 w�re sufficient. The preselection price proposai was submitted by CDM/Srnith July 26, 20�2 and the construction contract bid August 23, 2012. CDM/Smith was the Application Engineering Services pr�vider for the main plant computer replacement project at VCWRF under another corrtract. It v�as deterrnined in October 2012 that the required programming and graphic plant standards adopted needed more database points than had been expected. This issue also manifested itself in the Deep Filters Renovation project. A second new DCS controlier is requieed to provide sufficient database points for programn�ing the new filter controls. The new DC5 cont�-oller will replace the remote Terminal Cabinet. We have revie�Ned this price proposal and are of the opinion that it is a fair and equitable price. We recommend the City accept this cost and issue a Change Order in the amount of $i5,977.00. Please advise if the Water Department desires this CN1R be incorporated in a Change Order, Sincerely, FREESE AND NI%NOLS, 1NC, ���o ,/ � y'�,., s� ' G, E. Gay, P.E. Xc: Matt Jalbert-FNI file FTW1110�A.4.4Z.002B L:\VC Deep Filters\CHANGES\CMR\CMR0026 Addition2l Contr�oller For DCS RCMD 91213 ;� '�: i�� � � 1 i �" - 4055 Internatlonal Plaza, Sufte 200 • Fort Worth, Texas 76109 • 817 735-7900 • fax 817-735-7A91 �nrww.frnrtie.cnnt � CONTRACTOR'S MODIFICATION REQUEST (4.42 /002B) PROJECT: OWNER: CONTRACTOR: ENGINEER: CONST. MGR.: VILLAGE CREEK WRF DEEP FILTERS 1-20 MODIFICATIONS CITY OF FORT WORTH WATER DEPARTMENT PEPPER-LAWSON FREESE & NICHOLS, INC. FREESE & NICHOLS, INC. DESCRIPTION: Additional Controller for DCS NO. CMR002B NOTIFICATION BY CONTRACTOR The Contractor proposes to make the additions, modifications, or deletions to the Work described in the Contract Documents, as shown in Attachment "A" and requests that you take the following action: ❑ Notify us that you concur that this change does not require a change in Contract time or amount and issue a Field Order. X Issue a Change Order for perForming the described change. Change in Contract amount is indicated in the attached detailed cost breakdown of labor, materials, equipment and all other costs associated with this change. Impacts on Contract Time are shown in the attached revised schedule. L ❑� Authorize the Contractor to proceed with the described change. Payment will be requested at the unit price bid. Authorize the Contractor to proceed with the change under the time and materials provisions of the Contract. PROJECT NUMBER: 01628 21813 FTW 11104 By: Aaron James CONSTRUCTION MANAGER'S RESPONSE We respond to your request as follows: ❑ ❑ ❑ ❑ ❑ ❑ By: Date: 9/11 /13 We concur that this is a no cost or time change. See attached/forthcoming Field Order No. _/ comments. Your proposal is recommended to the Owner. See attached/forthcoming proposed Change Order. Proceed with the change at the unit price bid. Proceed with the change under the time and materials provisions of the Contract. Additional information is required to evaluate this request. Provide information as described in the attached comments and resubmit. Contractor's Modification Request is not accepted. W:11 - Active Projects121813 - Village Creek Filters\31.2 - Spec No - SubmittallPEPPER LAWSON (CMR) ED.doc :� ,ie :;��; ��f PEPPER-LAWSON W��l i_i;W�F�KS September 11, 2013 Mr. Ted Gay Freese and Tlichols 4055 International Plaza Suite 200 Fort Worih, Texas 76109 Re: City of Fot�t Worth Vilinge Creek Deep Filte��s i-2o mo�i�r�ar�o��s CMR002 Rev. 2 Dear Mr. Gay: Additiona( Controller lor DCS Per the Engineer's request in RFI029, Pepper-Lawson Waterworks offer a proposal to purchase and install one (1) additional controller for the filter DCS. A copy of CDM Smith's proposal, cost breakdo�vn, and memv detailing the history and issues requiring the addition of a second redundant controller. "1'his revision has breaf.down as requestcd and a scrvices price reduction. This chrnage ivil! resa�lt i�a a ndcl to tlae Conh•act of $75,997 arxl an i�zcrense in coi�N�nc[ duratron of D enlendnr cicrys�i•om �he clate of npproval /o deliver /he nrcrle��rnls lo /he sile a�zcf pe�fa��n tlze ivorlc. Upon receipt of approval from the City of Fort Worth and Freese and Nichols as to the acceptability of our proposal, Pepper-Lawson avill proceed �vith prociiring the materials to be installed. Should you or [he owner have any queslio�s you are welcame to contact me at any time. Thank You. Sincerely, PEPPER-LAWSON WATERWORKS. LLC Aaron James Project Manager �i3U� c �� rl��vy i 1�3I, Suii� i%0 ��url�s�n, IX 7S0`ti3 � ("060) 530-%98' �_ (856) 2o5-E220 www. plwaterworks. com � s ! ,�, :• � r i �. y_.... `,`_t' . ! �f. ,,, ! ! ' � - �� ;� PEPPER-LAWSON �''.' 'I ,;'�;'�;�i�� �. �. City of Fort Worth - Village Creek Deep Filter 1-20 Modifications Pepper Lawson Job # 21813 CMR002 Rev. 2 ITEM NO. 1 DESCRIPTION Quote iA�IJilion,il ('uid�ullci liir I )C'ti NON-TAXED TAXED LABOR MATERIAL MAiERIAL EUUIPM UNIT TOTAL UNIT TOTAL UNIi TOTAL UNIT QT`( UNIT COST __ COST COSi_ COST COSi COST COS7 0.00 0.00 0 00 1 LS 0 00 0 00 0 00 0 00 0 00 0 00 o.00 0 00 o ao 000 000 000 0 00 0 00 0.00 o.00 0 00 0 00 0 oa o ao 0 00 0 00 0 00 0.00 SUMMARY DIRECT COST SUBTOTAL A LABOR BURDEN B TAX @ 8.25% C SUBTOTAL2(A+g+C) D SMALL TOOLS E SUBTOTAL(D+E) F EQUIPMENT BURDEN G SUBTOTAL(F+G) H OH&P SUBS @ 5% (0 ixH) I SUBTOTAL 3 (H+I) J OH&P SELF PERFORMED @ 15°/ (0.15xJ) K SUaTOTAL 4 (J+I<) L BONDS & INSURANCE @ 1.59% (0.0159xL) M SUBTOTAL(L+M) N TOTAL BASE BID (J1+J2+J3+�4+J5) TOTFlL BASE BID (J�+J2+J3+J4+J5) OTHER TOTALCOST 2 0 N/A N/A 0 N/A 0 N/A 0 N/A 0 00 0.00 0 00 0 00 0.00 0 00 3 0 N!A 0 0 N/A � N/A 0 N/A 0.00 0.00 0 00 0.00 0 00 LNT SUBCOP TOTAL UNIT COST COST _ OAO 0 00 71245.00 a o0 0 00 a o0 0 00 0 00 0 00 4 0 N/A 0 0 N/A 0 0.00 0 00 N/A OAD 0.00 0 00 0.00 0.00 � 5 �`; � ' 1 r � i - v�' .: s- -r o.00 1 0 0 00 N1A 0 0 00 0.00 N/A 0 N/A 0 00 0.00 0.00 0.00 0.00 75996.69 N/A $ 75,997 9 /1 112 01 3 +CTOR fOTAL COST 0 �izns 0 00 o.oa o.00 0 00 o.ao 0 00 5 71245 71245 �I/A 71245 N/A 71245 3562 25 74a�% ZrJ M!A 74807 25 1189.44 75996.69 ! i w �w- � ' � June 28, 20�.3 Pepper-Lawson Construction P.O. Box 120338 Arlington, TX 76012 Attn: Aaron James RE: Change Request 1—Add an additional controller to the Ffiter DC5 Village Creek Waste Water Reclamation Facility Deep Filters 1— 20 Modificatfons City of Fart Worth CDM Constructors Inc, shall furnish, instail and program ali required Hardware modificatlons for the above referenced Change Order as follows: • Hardware o Replace the Remote I/O Node kit and 24V power supply in the Remote I/O cabinet with 1 Ovation Redundant OCR400 Controller Kit, including one (1) additional 24V power supply, one (1) set of power supply feeds, and 2 Media Converters. o Hardware Submittals will be modified to show the changes • Subm(ttals o I/O List ■ Revise and resubmit I/O list for both contrallers o Control Narratives ■ Revise and resubmit control narrat(ves for both controllers • Programming o Contraller Configuratian ■ Setup and configure new controller with new I/O list ■ Remove deleted I/O points from the existing contraller o Control Loglc ■ For equipment wired to the remote I/O cabinet, remove blocks and logic from the existing controiler to the new controller ■ To free the existing controller memory, remove ail backwash sequence logic to the new controller. ■ Develop memory mapping for data sharing between both controllers. Fi{ters status, backwash data and interlocks will need to be transferred between both controllers due to relocating the backwash sequence logic. o Graphics ■ Modify graphics/database of all equipment wired to the remote I/0 cabinet .�'' ` r t , : �" �f - -,� r ( t � i�' • ��� �1''1�flri'� graphics ■ Modify parts of fllters 1-20 graphlcs/database as It relates to points relocated to the new controller • Testing o Unwitnessed Factory Test ■ Repeat Unwitnessed Testing using two virtual controllers after all logic and I/O modification is implemented o Wltnessed Factory Test ■ Perform Witnessed Testing using two virtual controliers o Operational Readiness Test (I/O Checks� ■ No additional effort needed • Commissioning o Functional Demonstration Test ■ Demonstrate and test backwash sequence interlocks and permissives communfcation and exchange between both controllers. � O&M o O&M manuals will reflect the revised hardware configuration Exclusions • Configuration of any communications switches, routers, etc. Assumptions • COFW has communicated via the submittai process al) critiques of the proposed logic and graphics. • Scope and cost are based on technlcal requirements of adding a second controller plus COFW comments provided in submittals prior to lune 21, 2013 • COFW and engineer will review updated I/O list and Control Narrative submittals in a timely fashion, Total Fee far this change Request: $76,850.00. ,� - .j � �,. � _ � - - ;. t J } �; . . CDM Sm�th September 10, 2013 Pepper-Lawson Construction P.O. Box 120338 Arlington, TX 76012 Attn: Aaron lames RE: Change Request 1— Add an additional controller to the Filter DCS Village Creek Waste Water Reclamation Facility Deep Filters 1. — 20 Modifications City of Fort Worth Subject: Revised Pricing for CMR 1 Dear Mr. James, CDM Smith Constructors Inc has received review comments dated September S, 2013 and consulted with individuals in the respective Engineering organizations relating to their concerns. CDM Smith understands the concerns raised and values the opportunity to work for the City of Fort Worth, Texas. Accordingly, we offer a reduction in the pricing of all services quo#ed with the ove�all pricing of CMR 1 being revised as noted below: Equipment 1. Emerson Hardware & Software Services 2. Configuration update (Coordination with Emerson, I/0, additional Virtual Controller, Narrative changes) 3. Application Engineering (Data base, Graphics, Programming, O&M update) r�i Testing & Startup (Unwitnessed, Witnessed, Field checkout) $ 26,567.00 $ 6,132.00 $20,016.00 $11,028.00 5. CCI Project Management & Administration $ 6,236.00 ,� � . .� ; ,x . . � , � � � � CDM Smith Services Subtotal Services price reduction at 12% of Subtotal Subtotal Equipment, Services, and reduction OH & Profit @ 10% Total Please let me know if you have any questions. Rega rds, Dean T. Gorell Project Manager $ 43,412.00 $ (5,210.00) $ 64,769.00 $ 6,476.00 $ 71,245.00 ;� � . �,, . .. � "• � CITV SECRE'�iARY �3��','L+1�: ;i;':�i:i:�