HomeMy WebLinkAboutContract 43118-CO1 (2)� FORT WOR'TH.
� _�
City of Fort Worth
Change Order Request
r �
,��1� • �� . - -
Project Name Contract 2008 CIP 5A City Sec # 43118
Client Project #(s) # 01265 - DOE# 6170
Project Description
Christine Avenue, Christine Ct & Quinn St, TPW, Water, Sewer
Contractor Conatser Construction Tx, LP Change Order #�1 Date 6/13/2013
City Project Mgr. Gopal Sahu City Inspector Carlos Vasquez
Dept. � TPW
Original Coniract Amount
Extras to Date
Credits to Date
Pentling Change Orders (in M&C Process)
Contract Cost to Date
Water
rN�
�,ii �i
Revised Contract Amount
Sewer
000.00
Original Funtls Available for Change Orders $23,823.44 $6,128.95 $7,317.95
Remaining Funds Available for this CO $23,823.44 $6,128.95 $7,317.95
Additional Funtling (if necessary) $1,682.05
CHANGE ORDERS to DATE (INCLUDING THIS ONEJ AS % OFORIGINAL CONTR,4CT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Totals
$37,270.34
$1.682.05
1.97%
$931,758.44
10
210
246
Waste Water access tlevices were installed at SS L-2593 sta. 9+g7, sta. 11+55, and L-2593 sta.15+55 because of gas main running with line.
Existing sanitary manhole was adjusted to pavement grade and upgraded to 32" ring & cover. Replaced existing broken metal meter boxes
with new water meter boxes and relocated to grade on Quinn St. Replacetl exposed aggregate lead walk on Quinn (2667 and 2717).Time
delays are as follows-1-Chnstine paving grade bust issue under r�e,�vlg,�v,l�iengineer for 9CD from (9-11-12 to 9-19-12).2- Light Pole needed
to be relocated so that we could pour 1/4 intersection at Ch�r�'' ���rom(12-20-12 to 1-16-13).3- Gas line relocation delays
46CD. This change order is only for 36CD even though t�,}�r�o ys.
> ,��'� � /1 ���a.
L�
;
�
' ' � �..�
� � � � �
i � ;�
; � : �� r'
It is untlerstood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents
payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
�
`
�
�
�
�
('�.�
������� �� .�u�., � � ����
Contract Time
� �•
„. :�
. '� �-`FORTWORTH.
Project Name
Client Project #(s)
Project Description
�
Contract 2008 CIP 5A
# 01265 - DOE# 6170
City of Fort Worth
Change Order Request
!'�'! s'
City Sec # 43118
Christine Avenue, Christine Ct & Quinn St, TPW, Water, Sewer
Contractor Conatser Construction Tx, LP Change Order #�1 Date 6/13/2013
City Project Mgr. Gopal Sahu City Inspector Carlos Vasquez
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
nt of Proposed Chanqe Order
TPW
Water
Sewer
IT:�[:�:�[."
22,579.00
$146,359.00
Revisetl Contract Amount $477,318.75 $127,379.00 $155,359.00
Original Funds Available for Change Orders $23,823.44 $6,128.95 $7,317.95
Remaining Funds Available for this CO $23,823.44 $6,128.95 $7,317.95
Additional Funding (if necessary) $1,682.05
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTR,4CT AMOUNT (ORIGINAL CONTR,4CT COST + 25%)
JUSTIFICATION
FOR CHANGE ORDER
Totals
$745,406.75
$14,650.00
$760,056.75
$37,270.34
$37,270.34
$1,682.05
1.97%
$931,758.44
Contract Time
210
246
Waste Water access devices were installed at SS L-2593 sta. 9+97, sta. 11+55, and L-2593 sta.15+55 because of gas main running with line.
Existing sanitary manhole was adjusted to pavement grade and upgraded to 32" ring & cover. Replaced existing broken metal meter boxes
with new water meter boxes and relocated to gratle on Quinn St. Replaced exposed aggregate leatl walk on Quinn (2667 and 2717).Time
tlelays are as follows- 1-Christine paving grade bust issue under review by engineer for 9CD from (9-11-12 to 9-19-12).2- Light Pole neetled
fo be relocated so that we could pour 1/4 intersection at Christine @ Quinn 28CD from(12-20-12 to 1-16-13).3- Gas line relocation delays
46CD. This change order is only for 36CD even though there were 83CD worth of delays.
�;:
.' �� ;-
,•��
Inspector/inspection Supervisor Date Project Manager/Program Manager Date
Assistant Director (Dept) Date Director, Contracting Department (Dept) Date
Assistant City Attomey Date Assistant City Manager Date
Council Action (if required)
M&C Number M&C Date Approved �
..�,..
�
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents
payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
f.
`� FORT WORTH City of Fort Worth
Change Order Request
Project Name Contract 2008 CIP 5A City Sec # 43118
Client Project #(s) # 01265 - DOE# 6170
Project
Christine Avenue, Christine Ct & Quinn St, TPW, Water, Sewer
Contractor Conatser Construction Tx, LP Change Order #�1 Date 6/13/2013
City Project Mgr. Gopal Sahu City Inspector Carios Vasquez
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change
Revised Contract Amount
TPW
rr�
75
rN7
Water
Sewer
.00 I $146,359.00
Original Funds Available for Change Orders $23,823.44 $6,128.95 $7,317.95
Remaining Funds Available for this CO $23,823.44 $6,128.95 $7,317.95
Additional Funding (if necessary) $1,682.05
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTR,4CT COST + 25%J
Totals
$745,406.75
$14,650.00
$760,056.75
$37,270.34
$37,270.34
$1,682.05
1.97%
$931,758.44
210
246
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Waste Water access devices were installed at SS L-2593 sta. 9+97, sta. 11+55, and L-2593 sta.15+55 because of gas main running with line.
Existing sanitary manhole was adjusted to pavement gratle antl upgratletl to 32" ring & cover. Replaced existing broken metal meter boxes
with new water meter boxes and relocated to grade on Quinn St. Replaced exposed aggregate lead walk on Quinn (2667 and 2717).Time
delays are as follows- 1-Christine paving gratle bust issue untler review by engineer for 9CD from (9-11-12 to 9-19-12).2- Light Pole neetletl
to be relocatetl so that we could pour 1/4 intersection at Christine @ Quinn 28CD from(12-20-12 to 1-16-13).3- Gas line relocation delays
46CD. This change order is only for 36CD even though there were 83CD worth of delays.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents
payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's Company Name Contractor (Name) Contract Signature Date
Conatser Construction Tx, LP
Inspector/Inspection Supervisor Date Project Manager(Program Manager Date
Assistant Director (Dept) Date Director, Contracting Department (Dept) Date
Assistant City Attorney Date Assistant City Manager Date
Council Action (if required)
M&C Number M&C Date Approved �
Contract Time
�
i
� o
� =
o�
��
a
��
o�
LL �
4- O
O
�+' �
U�
�
t
U
�
Lr
�
�
F�
ai
W
�
M
d'
�
U
N
�
�
U
Q
�
d
U
�
0
0
N
U
N
c
0
U
�
�
(V
Z
U
N
O
�
O
�
�
w
O
0
lIi
�
N
0
*k
�
V
�
�o
�
c
�
U
�
�
�
�
�
�
�
�
�
c
�
.�
c�
�
U
�
C
.�
�
�
c
>
Q
N
�--�
.�
�
U
C
O
.Q
U
N
0
U
a�
'o
�
c�
0
N
M
�
�
m
�
�
�
a�
a
O
�
�
C
(E
L
U
d
J
X'
�--'
C
O
U
�
�
c
0
U
�
�
(V
c
0
U
O
U
(O
C
O
U
N
O
t
(6
U
O
U
N
Q
N
c
T
U
�
L
�
m
�
U
N
O
�
�
U
�
z
�
�
0
0
a
N
�
O
e-i
v
hA
l6
d
�
�
0
�
�
Q
�
�
�
L
O
Qi
tio
c
�
�
U
N
4-
O
N
4J
bA
cv
d
�
C
O
+.�
"a
�
Q
i
N
"a
L
�
�
�
�
(Q
i
U
�
C
'� ++
O �
� �
0 �
LL �
� 0
O
� �
V =
�
t
V
x
�
x
�
F•
C4
�
�
M
�
�
V
�
�
T
U
L(�
�
U
w
0
0
N
U
(6
C
O
U
�
�
Z
U
N
.o
a
O
�
<.O
W
O
0
tf�
�
N
O
�#
�
U
�
'o
d
c
a�
U
a�
a�i
�
a`�
m
�
a
F-
�
c
c
.�
C�
�
U
a�
C
.�
t
�
�
c
a�
Q
N
�
.N
L
U
�
0
.Q
U
N
N
�
U
N
'o
a
M
O
N
M
�
�
�
�
a`>
a
O
�
rn
c
cv
�
U
X
�
C
O
U
�
�
c
0
U
N
.-�-.
(6
O
U
0
(a
C
O
U
N
�
7
a
N
C6
�
N
O
(B
U
O
v
a�
a
w
c
�
U
�
c�a
�
�
�
U
N
.O
d
T
U
�
Z
�
�
W
J
LIJ
�
N
v--
O
�
N
h0
�
a
�
c
0
:�
v
a
�
N
�
L
O
a�
�
c
c�
�
U
N
v-
O
N
41
GA
cu
d
�
�
O
�_+
U1
�
0
L
�
�
L
�
�
�
�
�
�
U
M/WBE Breakdown for this Change Order