Loading...
HomeMy WebLinkAboutContract 44993-CO1 (2)FORT WORTH,� City of Fort Worth Change Order Request Breakdown Project Name Bridge Repair and Rehabilitation at Eleven Locations (2013-26) `�, i �.��, . • �' - City Sec # 44993 ClientProject#(s) GG01-539590-0202003 Change Order Submittal # �1 Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date nt of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) TPW $OA� Date Totals 18.830.00 14,889.60 .� CHAN�E ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTR,4CT MAX ALLOWABLE CONTR,4CT AMOUNT (ORIGINAL CONTR,4CT COST + 25%) 2,87% $648,537.50 :� JUSTIFICATION (REASONSj FOR CHANGE ORI3ER This change order is to add striping on bridge deck at Allen Ave. once epoxy overlay was complete. 136 SF of sidewalks atljacent to new approach slab at Allen Ave. were replacetl due to tripping hazard. To jack Allen Ave. britlge existing street light contluit was modifietl with a new junction box and concrete bridge rail was repaired. Allen Ave, bridge was re-jacked to install correct bearing pads. Re-jacking cost will be reimbursed by engineer to City. RECEIVED �FFICfAL �3E��RD CITY SEC�ETQ�gy �� WOOtT'k, �'X I 5/20/2014 Contract Time JUL 0 8 1014 FORT WORTH c�ry of Fort wortn Change Order Additions Project Name Bridge Repair and Rehabilita6on at Eleven Locafions (2013-26 City Sec # 44993 Client Project # GG01-539590-0202003 Change Order Submittal # 01 ��� •�E�9 Date 5I20/2014 R p ty nit nit ost ota en ve. Pavement triping 28 Allen Ave. Sidewalk Replacement TPW 136.00 SF 15.00 29 Alien Ave. Bridge Re-Jacking Cost TPW 0.50 LS 2,700.00 30 Ailen Ave. Electrical Modifications for SUeetlight TPW 1.00 LS 2,287.60 31 Allen Ave. Concrete Bridge Raii Repair TPW 1.00 LS 350.00 32 Allen Ave. Portabie Message Sign TPW 2.00 WK 800.00 TPW $14,889.60 Sub Total Additions 14,889.60 Change Order Additions Page 1 of 1 FORT WORTH City of Fort Worth Change Order Deletions Project Name Bridge Repair and Rehabilitafion at Eleven LocaUons 2013-26) City Sec # 44993 ClientProject# GG01-539590-0202003 Change Order Submittal # 01 R���1[�l�F.'1 Date 5/20/2014 R ry mt nit ost ota TPW $0.00 Sub Total Delefions Change Order Deletions Page 1 of 1 CFW Change Order Approval St-COApp01 Routina Assigned To: Assigned By: Page 1 of 5 Due Date: Due Time: Links 1 fortworthqov/Infrastructure Proiects/Bridae Repair and Rehabilitation at Eleven Locations (2013-26)/Contractor/Chanqe Orders/ChanQe Order Breakdown #1 revised 5.xls No Attachments have been added to this form. https://projectpoint.buzzsaw.com/ bz web/F'orms/FormPrint.aspx?SiteId=51500&ProcessId... 7/7/2014 CFW Change Order Approval St-COApp01 �� �� . . . ��. .. . .... y .- . .- .. � .. Page 2 of 5 For Change Order Submittal No COSub01 Change Order No.: St-COApp01 ___ _ City Sec. No.: 44993 ' Date Started: 2014-05-30 ' Date Due: 2014-07-15 ; Project Name. iBridge Repair and Rehabilitation at Eleven Locations (2013-26 GG01-539590-0202003 Project Numbers: 7172 Project Description: DOE Numbers: _ __ ___. Bridge repair and rehabilitation at eleven locations. Project Manager: Tariqui Islam ; City Inspector: Edward Davila ; Contractor Gibson & Associates, inc. COUNCIL ACTION (If Required): M&C Log Name: M&C Number: i , r.. _ __ __ _ COST AND DAYS SUMMARY: M&C Date: : __ _ _____ _ __. Requested Department: Cost($) Fund Account Center: Days: _ _ _ . , __ _ ;. ;TpW $ 14,889 60 GG01-539590-0202003 ' Total Cost $._14,889.60 Total Requested Days:.� Approval Status: https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId... 7/7/2014 CFW Change Order Approval St-COApp01 Page 3 of 5 https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId... 7/7/2014 CFW Change Order Approval St-COApp01 Page 4 of 5 Approved: Yes Comments: User: Lane Waters Date: 2014-06-02 8:50 AM iApproved: Yes �Comments: 'User: Lane Waters 'Date: 2014-06-02 10:32 AM Approved: Yes Comments: No M&C required User: Tariqul Islam Date: 2014-06-02 1:33 PM roved : Yes Comments: User: Najib Fares Date: 2014-06-02 1:40 PM Approved: Yes Comments: Discussions are being held with Designer re: missed shop drawing issue User: Andy Anderson Date: 2014-06-12 8:12 AM pproved: Yes omments: User: Doug Wiersig Date: 2014-06-13 3:08 PM Approved: Yes Comments: User: Lane Waters Date: 2014-07-02 8:10 AM 4pproved: Yes �omments: Jser: Lane Waters �ate: 2014-07-02 3:56 PM 4pproved: Yes �omments: Bearing pad cost has been -eimbursed from consultant services. Jser: Tariqul Islam �ate: Z014-07-02 8:58 PM onroved: Yes removed. 50% re-jacking cost is included which will be https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId... 7/7/2014 CFW Change Order Approval St-COApp01 Comments: User: Najib Fares Date: 2014-07-03 8:42 AM Approved: Yes Comments: User: Andy Anderson Date: 2014-07-03 3:36 PM roved : Yes Comments: User: Doug Wiersig Date: 2014-07-03 4:34 PM Approved: Yes Comments: User: Grant Jordan Date: 2014-07-07 9:20 AM roved : Yes �ments: User: Fernando Costa Date: 2014-07-07 3:04 PM Page 5 of 5 Action Required: ;Please review, approve and submit _ ___ https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId... 7/7/2014