Loading...
HomeMy WebLinkAboutContract 45817-CO2 (2)i ;, R • I,��ro� _ FORT WORTH Change Order Request Project Name Clear Fork Drainage Basin M-210 Sewer Improvements, Part 4 Project No.(s) P265-603170102283 & P275-7031 DOE No. 6809� City Sec No. 45817 City Pro. No. 01022 Project Water and Sanitary Sewer Improvements, Part 4, on Colonial Parkway, Simondale Drive, Wilshire Boulevard, Description Glenco Terrace, Ward Parkway, Lyn�crest Drive and Heritaqe Park Plaza Contractor Circle C Construction City Project Mgr. Roberto C. Sauceda, P.E, Phone Number: 817-392-2387 Dept. Original ContractAmount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proposed CY Revised Contract Amount Orig. Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) UNIT IA Water $731,641.00 $480,915.00 $731,641.00 Change Order # �� Date: 9/15/2015 City Inspector Judy Die Phone Number: 817-879-9818 UNIT IB IUNIT IB Water $783,301.00 �$1,623,825.00� $212, $70,664.00 5ewer UNIT II Sewer 660.00 $1,622,955.00 660.00 $1,622,955.00 060.00 $1,341.00 720.00 $1,624,296.00 $53,688.00 $1,341.00 TOtaIS Contract Time (Calandar Days) 9,145,081.00 354 $480,915.00 90 145,081.00 444 $99,061.00 090 244,142.00 534 124,352.00 $70,664.00 $1,341.OQ CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTR,4CT 13.99% MAX ALLOWABLE CONTR.4CT AMOUNT (OR/GINAL CONTRACT COST + 25%) $5,181,351.25 n _t q �� JUSTIFICATION CHANGE he change order will provide compensation for the installation of a sanitary sewer mair-i'fine to serve he Log Cabin Village. concurs with contractor's request for 90 additional calendar days on � \ 1, ������� in z^� SEP 2 3 2p15 ''��' �'�, c�no� Fo�r UvaRr�� ..' r,�Ns�rr�rr,nn,, `;� -� � __—__. _--...-._-_-.. '` _ ; ���r�:�r�� ���o CITYSi�CRE�/`,i�,,;� � �7'. �lUt�1�1'9�, '��"',,' i , ��l ` � £ ' `�i �i f � � � +�4 � � f��; ` f � R ,, n � (�� ��. , •��` ��. � �b jjl� � '.. � tt s � f S y � �Y�f �.�' It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time antl money) for all costs arising out of, or incidental to, the above Change Order. FORT WORTH City of Fort Worth Change Order Additions Project Name Clear Fork Drainage Basin M-210 Sewer Improvements, Part 4 City Sec No. 45817 Project No.(s) P265-603170102283 & P275-703170102283 DOE No. 6809 City Pro. No. 01022 Project Description Water and Sanitary Sewer Improvements, Part 4, on Colonial Parkway, Simondale Drive, Wilshire Boulevard, Glenco Terrace, Ward Parkway, Lynncrest Drive antl Heritage Park Plaza Contractor Circle C Construction Change Order #�2 Date: 9/15/2015 City Project Mgr. Roberto C. Sauceda, P.E. City Inspector Judy Die ADDITIONS DEPT 48 116" D 25 26 27 7 15" PVC Sewer � 12" Sewer Carrier Pipe BOTOC Trench UNIT IB Sewer UNIT IB Sewer UNIT IB Sewer UNIT IB Sewer UNIT II Sewer Q Unit 245.00 LF 62.00 LF 185.00 LF 25.00 LF 25.00 LF 1341.00 LF Unit Cost $800.00 $30.00 $70.00 $700.00 $550.00 $1.00 UNIT IA Water UNIT IB Water UNIT IB Sewer UNIT II Sewer 4dditions Sub Total Total $1,860. $12, 950. $17, 500. $13, 750. 1,341.00 96, 000. $1,341.00 $243,401.00 Page 2 of 4 FORT Z�VORTH Clty Of FOrt WOr'th Change Order Deletions Project Name Clear Fork Drainage Basin M-210 Sewer Improvements, Part 4 Project No.(s) P265-603170102283 & P275-703170102283 DOE No. 6809 Project Description Water and Sanitary Sewer Improvements, Part 4, on Colonial Parkway, Si Glenco Terrace, Ward Parkway, Lynncrest Drive antl Heritage Park Plaza Contractor Circle C Construction City Project Mgr. Roberto C. Sauceda, P.E. City Sec No City Pro. No. 45817 01022 Change Order #�2 Date 9/15/2015 City Inspector Judy Die DELETIONS ITEM IDESCRIPTION 3 16" Water Pipe, CSS Backfill 7 10' Wide Asphalt Pvmt Repair, Arteri 8 4" Concrete Sidewalk 10 Brick Pvmt Repair 11 i[! 6" Conc Curb and Gutter Trench Safety 28 16" antl Larger Pressure Plug 30 Concrete Staircase Repair 31 Remove and Replace Bollards 32 Remove and Replace Metal Beam Guartlr 33 Tree Drain Line Repair DEPT UNIT IA Water UNIT IA Water UNIT IA Water UNIT IA Water UNIT IA Water UNIT IA Water UNIT IA Water UNIT IA Water UNIT IA Water UNIT IA Water UNIT IA Water Qty 245.00 30.00 1960.00 20.00 170.00 352.00 1.00 1.00 20.00 1.00 Unit LF LF SF SY LF LF EA LS EA LF LS Unit Cost $390.00 $55.00 $8.00 $150.00 $30.00 $5.00 $1,000.00 $6,500.00 $1,200.00 $200.00 $3,000.00 UNIT IA Water UNIT IB Water UNIT IB Sewer UNIT II Sewer Sub Total otal $95,550.00 $1,650.00 $15, 680.00 $3,000.00 $5,100.00 $1,760.00 $1,000.00 $6,500.00 $3,600.00 $4,000.00 $6,500.00 $144, 340.00 $144,340.00 Page 3 of 4