PROJECT COMPLETION
D.O.E. Ns: 6589
Regarding conuact 44516 for WATER&SEWER REPLACE CONT 2009 WSM-P as required bp the
WATER DEPARTMENT as appraved bp City Coundl on 5/7/2013 thcough M&C G26240 the director of the
WATER DEPARTMENT upon the recommeadatioa af the Assistant Director of the Transportation & Public Works
Department has accepted the project as complete.
�' � r� r: _ = .; i�'r:.�
Original Contract Prices: �� � `'' " a �`jG �" �� $2,210,111.00
r j� l� .
Amount of Approved Change Orders: AU6 2 5 201� � $Z98,352.00 Ns 1& 2
Revised Contract Amount: 8y �� _s _ $2,508,463.00
Total Cost Work Completed:
Less Deductions:
Liquidated Damages:
Pavement Deficiencies:
Total Deduction Amount:
Totel Cost Work Completed:
Less Previous Payments:
Final Payment Dne
Recommended for Acceptance
Asst. Director, TPW - Infrastructure Design and Construction
_ - � ��% r �-�-_�
Accepted /
Asst. Director, WATER DEPARTMC#� �'
. � � �-2 "'l_` � �
) l
--- - - -- - -- - -�---
Asst. City Manager
$2,436,466.20
$2,436,466.20
$2,314,642.89
5121,823.31
I� �53-�1�SS
C S 1-i4S^I (o
Days @ $210.00/ Day
_ �?� /�
Date
_ _ � .�s ,,=-
Dati �
Date
���
Comments: P253-541200-603170148583, P258-541200-703170148583
°t�u� � s 2���
G�
� I
� kT WORTH«
request for final
i�; � _ 4 ,1 , - '1 1}
_ � .,. � _ � Is` �i ,.':
.,r;T, .,
. ��--
- co
�-� �
�ul�G
�a5 3 -61y�sr
cs .�.��� �
� zo�5
City Project Numbers 01485 0�_ _��^�_ ___.J
Contract Name Water/Sanitary Se�ver Replac Contract 2009 WSM-P on Walton Av
Contract Limits �✓esthaven Dr, Encanto Dr, Wolens Way, Leith Av, WiserAv,
Project Type WATER & SEWER
Project Funding
Project Manager Sauceda
Inspectors / WATSON
Contractor CIRCLE C CONSTRUC770N COMPANY
PO BOX 40328
FORT WORTH , TX 76140
DOE Number 6589
Estimate Number 46
Payment Number 46
For Period Ending 721R015
City Secretary Contract Number
Contract Date
Contract Time
Days Charged to Date
Contract is 000000
•�fiGi
5/7/2013
630 CD
629 CD
Complete
CTTY OF FORT WOR'�j #/ S_vUU � Zg(p �"
SUMMARY OF CHAR�,�, ��, �, �� � � �i1 /
�.�.r ! `-�' �
Line Fund Account Center Amount Gross Retainage Net
Funded
��53-DI��--�f7S� -- p,Ul �".�1���1 C�� N75`%,l
��s�ol�_� _—Iv3��05_°� -e- ��-��,��' D
Total Cost of Woric Completed $2�436,466.20
Less % Retained $0.00
Net Earued $2,436,466.20
Tuesday, July 28, 2015
Earned This Period $121,8233]
Retainage This Period 50.00
Less Liquidated Damages
0 Days @ $0.00 / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on I3and Less 15%
Balaoce Due This Payment
$0.00
$0.00
$0.00
$2,314,642.89
$0.00
$121,82331
Page 6 of 6
i
Fo�T woR�cH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name Water/Sanitary Sewer Replac Contract 2009 WSM-P on Walton Av
Contract Limits Westhaven Dr, Encanto Dr, Wolens Way, Leith Av, Wiser Av,
Project Type WATER & SEWER
City Project Numbers 01485
DOE Number 6589
Estimate Number 46 Payment Number 46
City Secretary Contract Number 44516
Contract Date 5/7/2013
Project Manager Sauceda
Contractor CIRCLE C CONSTRUCTTON COMPANY
PO BOX 40328
FORT WORTH , TX 76140
Inspectors
/ WATSON
For Period Ending 7/21/2015
CD
Contract Time 63�D
Days Charged to Date 629
Contract is 97.000 Complete
Tuesday, July 28, 2015 Page 1 of 6
City Projecf Numbers 01485
Contract Name Water/Sanitary Sewer Replac Contract 2009 WSM-P on Walton Av
Contract Limits Westhaven Dr, Encanfo Dr, Wolens Way, Leith Av, Wiser Av,
Project Type WATER & SEWER
Project Funding
Sanitary SewerTmpmvements
DOE Number 6589
Estimate Number 46
Paymeni Number 46
For Period Ending 7121l2015
Item Descriptiou of Items Estimated Unit Unit Cost Esrimated Complefed Completed
No. Quanity Total Quanity Total
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
I SWPPP > 1 acre 1 LS $4,500.00 $4,500.00 1 $4,500.00
2 5' Wide Asphalt Pvmt Repau, Arteria 2870 LF $38.00 $109,060.00 2885 $109,630.00
3 Asphalt Pvmt Regair Beyond Defined W 250 SY $10_00 $2,500.00 120 $1,200.00
4 Temporary Asphait Paving Repair 8595 LF $7.00 $60,165.00 10490 $73,430.00
5 Conc Pvmt Repair, Residen6al 13 SY $75.00 $975.00 2 $150.00
6 6" Concrete Driveway 465 SF $7.00 $3,255.Q0 987 $6,909.00
7 7" Conc Curb and Gutter 120 LF $25.00 $3,000.00 160 $4,000.00
8 4` Chain Link, Steel 120 LF $10.00 $1,200.00 125 $1,250.00
9 6' Fences, Wood 20 LF $15.00 $300.00 50 $750.00
10 8'Fences, Wood 40 LF $15.00 $600.00 40 $600.00
i i Block Sod Placement 80 SY $10.00 $800.00 690 $6,900.00
12 Pre-CCTV Inspection 1980 LF $4.00 $7,920_00 7081.8 $28,327.20
13 Post-CCTV Inspection 10556 LF $2.00 $21,112.00 7455 $14,910.00
14 Manhofe Vacuum Tes6ng 48 EA $100.00 $4,800.00 44 $4,400.00
15 Trench Safery 8578 LF $1.00 $8,578.00 7026 $7,026.00
16 Concrete Collaz 52 EA $300.00 $15,600.00 23 $6,900.00
17 8" PVC Water Pipe 15 !F $75.00 $1,125.00
18 8" PVC Water Pipe, C3S Bacl�ll 20 LF $65.00 $1,300.00 20 $1,300.00
19 Service Reinstatement, Pipe Enlazgem 26 ER $750.00 $19,50�.00 34 $25,500.00
20 4" Sewer Service 177 EA $200.0� $35,400.00 169 $33,800.00
21 8" Sewer Pipe, CSS Backfill 80 LF $65.00 $5,200.00 20 $1,300.00
22 Epoxy Manhole Liner 140 VF $185.00 $25,900.00
23 WastewaterAccessChamber 3 EA $1,800.00 $5,400.00
24 4'Manhole 44 EA $3,200.00 £140,800.00 50 $160,000.00
25 4' Drop Manhole 3 EA $4,000.00 $12,000.00 3$12,000.00
26 4' Extra Depth Maril�ole 35 VF $150.00 $5,250.00 34.5 $5,175.00
27 4' Shallotv Manhole 1 EA $2,600.00 $2,600.00 1 $2,600.OD
28 Traffic Control 5 MO $2,500.00 $12,500.00 5 $12,500.00
29 8" Horizonal Direcrional Drill 200 LF $85.00 $17,000.00 200 $17,000.00
30 Manhole Rehabilitation 3 EA $2,000.00 $6,000.00 5 $10,000.00
32 Raised Marker TY W 60 EA $7.00 $420.00
Tuesdag July 28, 2015 Page 2 of 6
City Project Numbers 01485
Contract Name WaterlSanitary Sewer Replac Contract 2009 WSM-P on Walton Av
Contract Limits Westhaven Dr, Encanto Dr, Wolens Way, L,eith Av, Wiser Av,
ProjeCt Type WATER & SEWER
Project Funding
DOE Number 6589
Estimate Nnmber 46
Payment Number 4b
For Period Ending 7(21/2015
33 Raised Marker TY Y 80 EA $7.00 $560.00
34 REFL Raised Marker TY I-C 12 EA $14.00 $168.00
35 REFL Raised Marker TY II-A-A 38 EA $14.00 $532.00
37 8" Sewer Pipe 8465 LF $36.00 £304,740.00 7396 $266,256.00
38 8" PipeEnlargement CO#1 2000 LF $52.00 £104,000.00 2785 $144,820A0
39 Remove Fence 180 LF $5.00 $900.00 205 $1,025.00
40 Sanitary Line Grouting 25 CY $120.00 $3,000.00 20 $2,400.00
41 6" Sewer Abandonment Plug 4 EA $500.00 $2,000.00
42 Remove 4' Sewer Manhole 26 EA $8D0.00 $20,800.00 21 $16,800.00
43 4" Sewer Setvice 177 EA $400.00 $70,800.00 159 $63,600.00
44 ConcPvmtRepair 41 SY $85.00 $3,485.00
45 4" SERVICE RECONNECTS CO#1 2 EA $750.00 $1,500.00
Sub-Total of Previous Unit $1,047,245.00 $1,046,958.20
Water Improvemenis
Item Description of Items Estimated Unit Unit Cost �s6mated Completed Completed
No. Quanity Totat Quanity Total
1 Remove 8" Water Valve ll EA $200.00 $2,200.00 10 $2,000.00
2 Remove 12" Water Valve 3 EA $400.00 $1,200.00 3 $1,200.00
3 Salvage Fire Hydrant COltl 17 EA $600.00 $10,200.00 17 $10,200.00
4 Salvage3/4"WaterMeterCO#1 261 EA $50.00 $I3,050.00 203 $10,150.00
5 Salvage 1" WaterMeter 1 EA $I00.00 $100.00 9 $900.00
6 Salvage 1 1/2" WaterMeter IS EA $100.00 $1,500.00 27 $2,700.00
7 Salvage2"WaterMeter I7 EA $100.00 $1,700.00 36 $3,600.00
8 SWPPP > 1 acre 1 LS $3,500.00 $3,500.00 I $3,500.00
9 5' Wide Asphait Pvmt Repair, Artcria 2890 LF $35.00 $101,150.00 2890 $101,150.00
10 Temporary Asphalt Paving Repair 12820 LF $7.00 $89,740.00 10188 $'71,316.00
11 Conc Pvmt Repair, Residential CO#1 237 SY $85.00 $20,145.00 237 $20,145.00
12 6" Concrete Driveway C0#1 1150 SF $7.00 $8,050.00 1090 $7,630.00
13 Topsoil 20 CY $20.00 $400_00 30 $600.00
14 Block Sod Placement CO#1 91 SY $10.00 $910.00 530 $5,300.00
] 5 Temporary Water Services CO#I 1.39 LS $40,000.00 $55,600.00 1.39 $55,600.00
16 TrenchSafetyCO#1 14697 LF $1.00 $14,697.00 I3935 $13,935.00
17 Ductile Iron Water Fittings �v! Restr CO#1 6.7 TO $6,500.00 $43,550.00 6.7 $43,550.00
Tuesday, July 28, 201 S Page 3 of 6
City Project Numbers 01485
Contract Name WaterlSanitary Sewer Replac Contract 2009 WSM-P on Walfon Av
Confract Limits Westhaven Dr, Encanto Dr, Wolens Way, Leith Av, Wiser Av,
Project Type WATER & SEWER
Proj ect Funding
DOE Number G589
Estimafe Number 46
Payment Number 46
For Period Ending 7/21/2015
18 Fue Hydrant CO#I 17 EA $2,500.00 $42,500.00 17 $42,500.00
19 Connection to Existing 6" Water Main 4 EA $1,500.00 $6,000.00 4 $6,000.00
20 Connection to E�cisting S" Water Main l 1 EA $1,500.00 $16,500.00 11 $16,500.00
21 Connection to Esisting 12" Water Mai 4 EA $2,000.00 $8,000.00 1 $2,000.00
22 Connection to Existing 16" Water Mai 1 EA $2,500.00 $2,500.00 1 $2,540.00
23 2" Combination Air Valve Assembly fo 1 EA $3,800.00 $3,800.00 1 $3,800.00
24 1" Water Service, Meter Reconnection COfFl CO#2 270 EA $400.00 $108,000.00 258 $103,200.00
25 1" Water Service CO#1 CO#2 270 EA $200.00 $54,000.00 258 $51,600.00
26 1 U2" WaterService,MeterReconnec 15 EA $500.00 $7,SOO.OQ 17 $8,500.00
27 1 1!2" Water Service CO#2 20 EA $300.00 $6,000.00 17 $5,100.00
28 2" Water Service, Meter Reconnectio 17 EA $600.00 $10,200.00 24 $14,400.00
29 2" Water Service CO#2 19 EA $400.00 $7,600.00 24 $9,600.00
30 6" Gate Valve CO#I 17 EA $700.00 $11,900.00 16 $11,200.00
31 8" Gate Valve CO#1 20 EA $950.00 $19,000.00 18 $17,100.00
32 12" Gate Valve 10 EA $1,700.00 $17,000.00 10 $17,000.00
33 Tr�c Control CO#1 6 MO $1,500.00 $9,000.00 6 $9,000.00
34 Conc Pvmt Repair, ArteriaUlndustria 9 5Y $85.00 $765.00 9 $765.00
35 16" PVC C905 Water Pipe 970 LF $65.00 $63,050.00 968 $62,920.00
36 12" PVC Water Pipe 3785 LF $54.00 £204,390.00 3814 $205,956.00
37 12" DIP Water 30 LF $85.00 $2,550.00 20 $1,700.00
38 8" PVC Water Pipe COfF 1 CO#2 10319 LF $42.00 £433,398.00 9606 $403,452.00
39 8" D1P Water 125 LF $75.00 $9,375.00 26 $1,950.00
40 6" PVC Water Pipe 153 LF $41.00 $6,273.00 186 $7,626.00
4f Water Line Grouting 25 CY $120.00 $3,000_00 25 $3,000.00
42 8" WaterAbandonmentPIug 2 EA $500.00 $1,000.00 2 $1,000.00
43 Remove 6" Water Valve 16 EA $200.00 $3,200.00 16 $3,200.00
44 6" CONC CURB & GiJ"i'TER CO#1 300 LF $25_00 $7,500.00 30 $750.00
45 6" FLEX BASE CO#1 1000 SF $7.00 $7,000.00 1359 $9,513.00
46 IMPORTATED EMBEDMENT CO#1 333 CY $25.00 $8,325.00
47 REMOVE 8" GATE VALVE CO#1 2 EA $200.00 $400.00 2 $40Q.00
48 REMOVE 6" GATE VALVE COi�I 4 EA $200.00 $800.00 4 $800.00
49 ROADWAY STRIPPING CO#1 1 LS $7,500.00 $7,500.00 1 $7,500.00
50 ADDITIONAL EMBEDI4IEN'P CQ#1 1 LS $5,500.00 $5,500.00 1 -$5,500.00
Sub-Total of Previous Unit $1,461,218.00 $1,389,508.00
Tuesday, July 28, 2015 Page 4 of 6
City Project Numbers 01485
Contract Name WatedSanitary Sewer Replac Contract 2009 WSM-P on Walton Av
Contract Limits Westhaven Dr, Encanto Dr, Wolens Way, Leith Av, Wiser Av,
Project Type WATER & SEWER
Project Funding
Total Contract Price
Contract Information Summary
Original ContractAmount
Chan�e Orders
Change Order Number 1
Chaoge Order Number 2
� !� Date —��-�
�4 7 s
Contractor �
:�(����;�J':�il�l llatec�(G %�
Inspection Supervi�eff ,
If
J
�
Design and Cpnstryctic
n9ra �'/�S�f
��irector / Contracting
DOE Number 6589
Estimate Number 46
Payment Number 46
For Period �nding 7/21/2015
$2,210,111.00
$261,882.00
$36,470.00
$2,508,463.00
Total Cost of Work Completed
Less % Retained
Net Earned
Earned This Period $121,82331
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$2,436,46620
$0.00
$2,436,466.20
$0.00
$0.00
$0.00
$2,314,642.89
$0.00
$121,82331
Tuesday, July 28, 2015 Page 5 of 6
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
CONTR.ACTOR'S EVALUATION OF CITY
I) PRO,T�CT INFORMATION
Name of Contraclor
Circle C Conshuction
DOE Inspector
Don Watson
DOE Number Project D�culty
6589 � Simple QQ Routine Q Complex
1 Contract Amounf
10.111.00
In PERFORMANC� �VALUATION
0- Inadequate 1- Deficient 2- Standard
INSPECTION EVALUATION
1 Availability of Inspector
2 Knowledge of Inspector
3 Accuracy of Measured Quantities
4 Display Of Professionalism
5 Citizen Complaint Resolution
6 Performance - Setting up Valve Crews, Labs
ADMINISTRATION
1 Change Order Processin Time
2 Timliness of Contractor Payments
3 Bid Openin� to Pre-Con Meeting Timeframe
Iin COMMENTS & SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
Project Name
Water & Sewer Replacement
Project Manager
Robert Saueda
Type of Conlracl
✓Q Water❑� Waste WaterO
Frnal Contract Amount �W
$2,436,466.20
3 - Good 4 - Excellent
RATING ELEMENT
(0 - 4)
�
PLANS & SPECIFICATIONS
1 Accuracy of Plans to Existing Conditions
2 Clarity & Sufficiency of Details
3 Applicability of Specifications
4 Accuracy of Plan Quantities
PROJECT MANAGER EVALUATION
1 Knowledge And/Or Problem Resolution
2 Availability of Project Manager
3 Communication
4 Resolution of Utilitv Conflicts
Date: 17/31 /2015
REV: �2,22,��
Contract 2009 WSM-P
Storm Drainag� Pavement
RATING
(0 - 4)
TR�INSPORTr1TION r1ND PUBLIC WORKS
-���` The Ciry of Fort Worth • 1000 Throclunorton Street • Foxt Worth, TX 76012-6311
; (817) 392 - 7941 • Fax: (817) 392 - 7845
� i ii
REV: 02/20/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTR.ACTOR
n CONTRACTOR & PROJECT DATA
Name of Ca�traclar
Circle C Construction
DOE Inspector
Don Watson
DOElnspector
❑� Water ❑� Waste Water❑ Storm Drainag� Pavement
Initial Contract Amount
$2,210,111.00
Final Contrac� Amount
II) PERFORMANCE �VALUATION
Praject Name
Water & Sewer
DOE Nunrber
6589
Project Manager
Robert Saueda
Project D�culry
� Simple
7/31/2015
Contract 2009 WSM-P
Q Roudne � Complex
0- Inadequate 1- Deficient 2- Standard 3- Good 4- Excellent
ELEMENT WEIGHT ( x) APPLICABLE (Y / I� RATING (0 - 4) MAX SCORE SCORE
1 Submission of Documents 2 Y 4 8 8
2 Public Not�cations 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision I S Y 4 60 60
5 Work Performed 15 Y 3 60 45
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Tr�c Control Maintenance 15 Y 4 60 60
9 Daily Clean Up 5 Y 4 20 20
10 Citizen's Com laint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 4 20 20
12 After Hours Res onse 5 Y 4 20 20
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE (A)
BONUS POINTS (25 Ma�cimum) (B)
TOTAL SCORE (TS)
IIn CONTRACTOR'S RATING
Maximum Score (MS) = 448 or sum of applicable element score maximums which = 448
Reting ([TS / MS] * 100%) 433 / 448 = 97%
Performance Category Exceltent
<20% _/nadequate 20% to <40% = Deficient 40% to <60% = Standard 60% to <80% = Good >_80% = Fxcellent
Inspector's Comments (INCLUDING EXPLANATION OF BONUS POINTS ANARDED)
Signature DOE Inspectar
Signature DOE Inspector's Supervisor
CONTRACTOR'S COMMENTS
:/�
. �� :
ire Contractor
TR�INSPORT�TION �ND PUBLIC WORKS
433
433
/�ss��.�,oa
The Ciry of Fart Worth • 1000 T7�ockmorton Street • Fort Woxth, TX 76012-6311
(817) 392 - 7941 • Fax: (817) 392 - 7845
���i
/ ,
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME:
PROJECT NUMBER:
DOE NUMBER:
PIPE LAID
C905
Water
Water
Water
Water
Water
FII2E HYDRANTS: 17
PIP� ABANDONED
DENSITIES:
NEW SERVICES:
PIPE LAID
Sewer
Sewer
Sewer
' I' : �\►111]�L�l1
DENSITIES:
NEW SERVICES:
_/'��-_
\�"/- .
Water/Sanitary Sewer Replacement Contract WSM-P
1485
6589
SIZE
16"
12"
12"
8��
8��
6"
SIZE
SIZE
g��
8��
4��
SIZG
WATER
TYPE OF PIPE
PVC
PVC
DIP
PVC
DIP
PVC
VALVES (16" OR LARGER)
TYPE OF PIPE
SEWER
TYPE OF PIPE
C900
Pipe Enlargment
C900
TYPE OF PIPE
TRc�NSPORTr1TION t1ND PUBLIC WORKS
The City of Fort Woxth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311
(81'� 392 - 7941 • Fax: (817) 392 - 7845
LF
968
3814
20
9606
26
186
LF
LF
7396
2785
159
LF
AFFIDAVIT
STATE OF Texas
COUNTY OF Tarrant
Before me, the undersigned authority, a notaxy public in the state
and county aforesaid, on this day personally appeared Teresa S Skelly,
Vice President Of Circle C Construction, known to me to be a credible
person, who being by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injuiy andlor
property damages;
On Contract described as; __
Water and Sanitary Sewer Replacement Contract 2009 WSM-P
DOE b589
BY ��_. �� c c�r�-��
VTeresa S Skell Vice Presient
Subscribed and sworn before me on this date 15 of
.
m uSh�.�.���J . L�-n` (
2015.
,o Pµ, ��m�=: �rrcx�L� s. r.��r�FaR�a
r� `,���� �Iota�� Public
�'�9r�. _ �+Pyr STRTE aF [ EJCf1S
OF S „
�Y �mm. Exp. Qctober 7, 2015
COI�TSENT OF SURETY
TO FINAL PAYMENT
AIA Document G707
Bond No. TXC107214
TO OWNER:
City of Fort Worth
1000 Throckmorton Street
Fort Worth, TX 76111
OWNER
ARCHITECT
CONTRACTOR
SURETY
OTHER
ARCHITECT'S PROJECT NO.:
City Project No. 01485; DOE No. 6589
CONTRACT FOR: Utility Improvements
CONTRACT DATED: May 07, 2013
PROJECT:
(name, address)
Water and Sanitary Sewer Replacement Contract 2009 WSM-P
in the Ciry of Fort Worth, TX
In accordance �vith the provisions of the Contract between the Owner
(Insert mm�e artd address ojSurery)
Merchants Bonding Company (Mutual)
2100 Fleur Drive
Des Moines, IA 50321-1158
on bond of
(Ir�sert name and address of Contractor)
William J. Schultz, Inc., dba Circle C Construction Company
P. O. Box 40328
Fort Worth, TX 76140
hereby approves of the final payment to the Contractor,
of any of its obligations to
(Inser! name and address of Owner)
City of Fort Worth
1000 Throckmorton Street
Fort Worth, TX 76111
as set forth in the said Surety's bond.
the Contractor as indicated above, the
►�
■
■
■
■
,SURETY
,CONTRACTOR,
and agrees that final payment to the Contractor shall not relieve the Surety
, OWNER,
IN WITNESS WHEREOF, the Surety has hereunto set its hand this date: May 13, 2015
(Insert in wriling the month fo!lowed by N�e ntnneric date mtd year.)
�sE: ' Witness as to Surety:
(Seal): `�
f ' ,� �
� '� ,�'�r_ _ �
�•
John A. Miller, Witness
Sheryl A. Klutts, Attorney-in-Fact
(Printed name and title)
Note: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND
CLAIMS, Curren[ Edition
AIA DOCUMENT G707 � CONSENT OF SURETY COMPANY TO FINAL PAYMENT � April 1970 Edition � AIAO One Page
01970 • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 New York Ave., NW, Washington, D.C. 20006
MERCHANTS
BONDING COMPANYTM
POWER OF ATTORNEY
Know All Persons By These Presents, that MERCHANTS BONDING COMPAt�Y (MUTUAL) and MERCHANTS NATIONAL BONDING,
INC., both being corporations duly organized under the laws of the State of lowa (herein collectively called the "Companies"),
and that the Companies do hereby make, constitute and appoint, individua�ly,
John A Miller; John R Stockton; Sheryl A Klutts
of Fort Worth and State of Texas their true and Iawful Attorney-in-Fact, with full power
and authority hereby conferred in their name, place and stead, to sign, execute, acknowledge and deliver in their behalf as surety
any and all bonds, undertakings, recognizances or other written obiigations in the nature thereof, subject to the limitation that any
such instrumeni shall not exceed the amount of:
TEN MII�LION ($10,000,000.00) DOLLARS
and to bind the Companies thereby as fully and to the same extent as if such bond or undertaking was signed by the duly
authorized officers of the Companies, and all the acts of said Attorney-in-Fact, pursuant to the authority herein given, are
hereby ratified and confirmed.
Tfiis Power-of-Attomey is made and executed pursuant to and by authority of the following By-Laws adopted by the Board of
Directors of the Merchants Bonding Company (Mutual) on April 23, 2011 and adopted by the Board of Directors of Merchants National
Bonding, Inc., on October 24, 2011.
"The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any �ce President shali have
power a�d authority to appoint Attorneys-in-Fact, and to authorize them to execute on behalf of the Company, and attach the
seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in
ihe nature thereof.
The signature of any authorized officer and the seal of the Company may be a�xed by facsimile or electronic transmission to
any Power of Attomey or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance,
or other suretyship obiigations of the Company, and such signature and seal when so used shail have the same force and
effect as though manually fixed."
In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 13thday of August , 2014 ,
'"�rttUtfi.�C
:�����q�
-p-
20Q�
STATE OF IOWA
COUNTY OF POLK ss.
�
.�•_••.
`�. . ���N� , CO,�j•.
t9a: ;m0•44P�1q A9'•
._� _ �y.v q�.y��
.
►:� � .f-tz -o- o; .
; � ' : y- 1933 � c;
' : � •. ��,�.
����.�i� •��,��•.....•�`-�'a,
,��� . � �'s .
•......
MERCHANTS BONDING COMPANY (MUTUAL)
MERCHANTS NATfONAL B�NDING, INC.
By
��
President
On this 13th day of August 2014, before me appeared Larry Tayior, to me personally known, who being by me duly sworn did
say that he is President of the MERCHANTS BONDWG COMPANY (MUTUAI) and MERCHANTS NATIONA� BONDING, INC.; and
that the seals a�xed to the foregoing instrument is fhe Corporate Seals of the Companies; and that the said instrument was signed and
sealed in behalf of the Companies by authority of their respective Boards of Directors.
In Testimony Whereof, I have hereunto set my hand and affixed my Official Seal at the City of Des
first above written.
�pR�A�s WENDY WOODY
a y C����mission Numbe� 7�4554
? ° ° ° ° : My Commission Expires
�o�,,P June 20, 2017
Moines, lowa, the day and year
Notary Pu6tic, Polk County, lowa
STATE OF IOWA
COUNTY OF POLK ss.
i, William Warner, Jr., Secretary of the MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDIN�, INC.,
do hereby certify that the above and foregoing is a true and correct copy of the POWER-OF-ATTORNEY executed by said Companies,
which is stiil in full force and effect and has not been amended or revoked.
In Witness Whereof, I have hereunto
this 13thday ot May .,,:
POA 0014 (7/14)
my hand and affixed the seal of the Companies on
S•
,.•�*� tUff,�� '•,
.�`� '-
. -
�°'.� .�°� ��'�'' �Q'
ti' � ..p_ �:t�'.,
�L: '
,�,�: �003 :;�
- d'a` ` ...�:��t�'a'
'-�'.�,it _..a`'
�......
�. • �\N� �O�lj`•,
: �o��gPUq.�a,9•
.
�y �G �?,,�.y,t,:
.r--:��' -o- o; .
:�� .3'
y, isss : c:
•�Y.
•.;'�;��. . � . . •`.a; •
•.....
���� ���
Secretary
MERC�3[ANTS
BONDING COMPANYTM
MERCHANTS BONDING COMPANY (MUTUAL) • MERCHANTS NATIONAL SOi�JDING, I[�IC.
2100 FLEUR DRIVE • DES MOINES, IOWA 50321-1158 � t800) 678-8171 •(515) 243-3854 FAX
1 , � ♦ i
To obtain information or make a complaint:
You may contact your insurance agent at the telephone number provided by your insurance agent.
You may call Merchants Bonding Company (Mutual) toll-free telephone number for information or to make a
compiaint at:
1-800-678-8171
You may contact the Texas Department of Insurance ta obtain information on companies, coverages, rights or
complaints at:
1-800-252-3439
You may write the Texas Department of Insurance at:
P. O. Box 149104
Austin, TX 78714-9104
Fax: (512) 475-1771
Web: htip://www.tdi.state.tx.us
E-mail: CansumerProtection@tdi.texas.gov
PREMIUM AND CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim
you should contact the agent first. If the dispute is not resolved, you may contact the Texas Department of
Insurance.
ATTACH THIS NOTfCE TO YOUR POLICY: This notice is for information only and does not become a pa�t
or condition of the attached document.
SUP 0032 TX (12/13)
O RT WO RT H rev 03/OS/07 ,�
TRANSPORTATION & PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO. 46
NAME OF PROJECT: Water &
PROJECT NO.:
Sewer
1485
PERIODFROM7\1\IS TO: 7\15\IS
WORK ORDER EFFECTIVE 7/11/2013
DAYS
Contract 2009 WSM-P
CONTRACTOR: Circle
DOE NO. 6589
FINAL 1NSPECTION DAT�: 19-Dec
CONTRACT TIME 630 O W� CD
DAY OF REASON FOR DAYS
MONTH CHARGED CREDITED
niiurNr,
l.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
Su
M
T
W.
'I'h
F
S
Su
M
T
W
Th
F
S
Su
�
�
�
�
�
�
�
�
�
�
�
�
�
�
�
Other
Other
Other
Other
Other
Other
Other
Other
Other
Other
Other
Other
Other
Other
Other
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
DAY OF I DAYS^
MONTH CHARGED
REASON FOR DAYS
CREDITED
SAT, SUN, RAIN, TOO WET, UTILITI�S �T,�� * DAYS TOTAL
& HOLIDAYS & TOO COLD RELOCATIONS CHARGED DAYS
THIS 0 0 0 15 0 15
PERiOD
PREVIOUS 0 0 0 91 629 720
PERIOD
TOTALS 0 0 0 106 629 735
TO DATE