Loading...
HomeMy WebLinkAboutContract 44408-CO2FC�RT WORTH Trinity River Vision Phase 1- Britlge and Channel Relocations - Main Street Water & Sewer City Sec No. 44408 Project Name Units 1A antl 1 B Part3 � Grand Ave. Storm Drain Unit 2 Part1 Project No.(s) P265-609170096987 (U�it 1A), P275-709170096987 (Unit 16) and DOE No. 6940 City Proj. No. 00969 Project Description Water and Sanitary Sewer Utility Relocations for the Trinity River Vision Central City and Trinity Uptown Projects Contractor S.J. Louis Construction of Texas, Ltd. City Project Mgr. � Liam Conlon Phone Number: 817-392-6824 Dept. � Water (Unit 1A) Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date nt Order -$395,551.66 188,7 Revised Contract Amount Original Funds Available for Change Ortlers Remaining Funds Available for this CO Additional Funding (if necessary) FOR CHANGE ORDER � � o: � �; e change order will provide for the following: � r: $168,000. City of Fort Worth Change Order Request $178,0� $753,91 Change Order # � Date: 10/18/2013 City Inspector Paul Gieger Phone Number: 817-223-2258 1 Storm (Unit 2) Totals $5,929,744.19 $753,914.32 -$395,551.66 $6,288,106.85 $98,687.75 $6,386,794.60 $186,000,00 Contract Time (Calendar Days) 360 360 939, 944. $18,000. 003. 67 CHANGE ORDERS to DATE (INCLUDING THIS ONEJ AS % OF ORIGINAL CONTR,4CT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) - :�ti. '; '� , � ..;�-1� / �:) �I � _ t� : S.IV �S��i►�4.-_ _ " _'__' 'J� ] ��'1'.05% %' S. $7,412,180.24 441 6' chain link steel chain link fence (3 strand barbed wire) with gate to replace fencing that was removed to construct water and sewer main crossing three lots on White Settlement Road. Temporary asphalt paving repair to provide a decent driving surface subsequent to construction on White Street, Main Street and Rupert Street, prior to installation of permanent paving repair on the identified streets. .�., Repair to existing unrestrained water main t_ � �ing storm drain box culvert installation on 10th Street and clean up of silt from the box culvert due t�( aff concurs with the contractor's request for ain and���x culvert (3 days) ar�d 8 days). ° � ,� 1�� ���;� ,-, ����, ,�� �; � order for the ti f[?i�i:iTi�� � Sewer (Unit 1 B) ilroad permit from ��„ti�� _s_ _ o ���� ���,���� n �R ���� G �r� f;�r�['��GrI;�� �i �"t r Iroad time and money) for all costs arising out of, or incitlental to, the above Change Ortler. FORT WORTH City of Fort Worth Change Order Additions Project Name Trinit River Vision Phase 1- Brid e and Channel Relocations - Main Street Water & Sewer Units 1A City Sec No. 44408 Project No.(s) P265-609170096987 Unit 1A , P275-709170096987 Unit 1 B antl FE72- DOE No. 6940 City Proj. No. 00969 Project Water antl Sanitary Sewer Utility Relocations for the Trinity River Vision Central City and Trinity Uptown Projects Description Contractor S.J. Louis Construction of Texas, Ltd. Change Order #�2 Date: 10/18/2013 City Project Mgr. Liam Conlon City Inspector Paul Gie er ADDITIONS 97 � .0000 6" Chain Link, Steel, 3 Strand Barbed Wire, wlGate �orary Asphalt Paving- 6" Flex Base 2" Hot Mix Asphatl to Repair Exst 20" WL and Clean 6x6 dbl Box SD in 10th St. .0000 6' Chain Link, Steel, 3 Strand Barbed Wire, w/Gate Water (Unit 1A) 100. Water (Unit 1A) 1600. Water (Unit 1A) 1. Sewer (Unit 1 B) 100. SY LF $34,681. (Unit 1A) (Unit 1 B) ;Unit 2) ns Sub T $8,003. $48,000. $8,003. 90, 684.75 $8,003.00 $98,687.7 Page 2 of 4 FO R`T WO RT H City of Fort Worth Change Order Deletions Project Name I Trinity River Vision Phase 1- Bridge and Channel Relocations - Main Street Water & � Project No.(s) P265-609170096987 (Unit 1A), P275-709170096987 (Unit 1B) DOE No. 6940 City Sec No. City Proj. No. ,,,�: 11'.• Project Description I Water and Sanitary Sewer Utility Relocations for the Trinity River Vision Central City and Trinity Uptown Projects I Contractor S.J. Louis Construction of Texas, Ltd. Change Order #�2 Date 10/1812013 City Project Mgr. Liam Conlon City Inspector Paul Gieger DELETIONS ITEM IDESCRIPTION DEPT Unit Unit Cost otal Page 3 of 4 r (Unit 1A) �r (Unit 16) i (Unit 2) ions Sub Total