HomeMy WebLinkAboutContract 44408-CO2FC�RT WORTH
Trinity River Vision Phase 1- Britlge and Channel Relocations - Main Street Water & Sewer City Sec No. 44408
Project Name Units 1A antl 1 B Part3 � Grand Ave. Storm Drain Unit 2 Part1
Project No.(s) P265-609170096987 (U�it 1A), P275-709170096987 (Unit 16) and DOE No. 6940 City Proj. No. 00969
Project Description Water and Sanitary Sewer Utility Relocations for the Trinity River Vision Central City and Trinity Uptown Projects
Contractor S.J. Louis Construction of Texas, Ltd.
City Project Mgr. � Liam Conlon
Phone Number: 817-392-6824
Dept. � Water (Unit 1A)
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
nt
Order
-$395,551.66
188,7
Revised Contract Amount
Original Funds Available for Change Ortlers
Remaining Funds Available for this CO
Additional Funding (if necessary)
FOR CHANGE ORDER
�
�
o:
�
�;
e change order will provide for the following:
�
r:
$168,000.
City of Fort Worth
Change Order Request
$178,0�
$753,91
Change Order # � Date: 10/18/2013
City Inspector Paul Gieger
Phone Number: 817-223-2258
1
Storm (Unit 2)
Totals
$5,929,744.19
$753,914.32
-$395,551.66
$6,288,106.85
$98,687.75
$6,386,794.60
$186,000,00
Contract Time
(Calendar Days)
360
360
939, 944.
$18,000.
003.
67
CHANGE ORDERS to DATE (INCLUDING THIS ONEJ AS % OF ORIGINAL CONTR,4CT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
- :�ti. '; '�
, � ..;�-1�
/ �:) �I � _ t� : S.IV �S��i►�4.-_ _ " _'__'
'J� ] ��'1'.05% %' S.
$7,412,180.24
441
6' chain link steel chain link fence (3 strand barbed wire) with gate to replace fencing that was removed to construct
water and sewer main crossing three lots on White Settlement Road.
Temporary asphalt paving repair to provide a decent driving surface subsequent to construction on White Street, Main
Street and Rupert Street, prior to installation of permanent paving repair on the identified streets.
.�.,
Repair to existing unrestrained water main t_ � �ing storm drain box culvert installation on 10th Street and
clean up of silt from the box culvert due t�(
aff concurs with the contractor's request for
ain and���x culvert (3 days) ar�d
8 days). ° �
,� 1�� ���;� ,-, ����, ,�� �;
�
order for the ti
f[?i�i:iTi��
�
Sewer (Unit 1 B)
ilroad permit from
��„ti�� _s_ _
o ���� ���,���� n �R
���� G �r� f;�r�['��GrI;�� �i �"t
r
Iroad
time and money) for all costs arising out of, or incitlental to, the above Change Ortler.
FORT WORTH
City of Fort Worth
Change Order Additions
Project Name Trinit River Vision Phase 1- Brid e and Channel Relocations - Main Street Water & Sewer Units 1A City Sec No. 44408
Project No.(s) P265-609170096987 Unit 1A , P275-709170096987 Unit 1 B antl FE72- DOE No. 6940 City Proj. No. 00969
Project Water antl Sanitary Sewer Utility Relocations for the Trinity River Vision Central City and Trinity Uptown Projects
Description
Contractor S.J. Louis Construction of Texas, Ltd. Change Order #�2 Date: 10/18/2013
City Project Mgr. Liam Conlon City Inspector Paul Gie er
ADDITIONS
97
�
.0000 6" Chain Link, Steel, 3 Strand Barbed Wire, wlGate
�orary Asphalt Paving- 6" Flex Base 2" Hot Mix Asphatl
to Repair Exst 20" WL and Clean 6x6 dbl Box SD in 10th St.
.0000 6' Chain Link, Steel, 3 Strand Barbed Wire, w/Gate
Water (Unit 1A) 100.
Water (Unit 1A) 1600.
Water (Unit 1A) 1.
Sewer (Unit 1 B) 100.
SY
LF
$34,681.
(Unit 1A)
(Unit 1 B)
;Unit 2)
ns Sub T
$8,003.
$48,000.
$8,003.
90, 684.75
$8,003.00
$98,687.7
Page 2 of 4
FO R`T WO RT H
City of Fort Worth
Change Order Deletions
Project Name I Trinity River Vision Phase 1- Bridge and Channel Relocations - Main Street Water & �
Project No.(s) P265-609170096987 (Unit 1A), P275-709170096987 (Unit 1B) DOE No. 6940
City Sec No.
City Proj. No.
,,,�:
11'.•
Project Description I Water and Sanitary Sewer Utility Relocations for the Trinity River Vision Central City and Trinity Uptown Projects I
Contractor S.J. Louis Construction of Texas, Ltd. Change Order #�2 Date 10/1812013
City Project Mgr. Liam Conlon City Inspector Paul Gieger
DELETIONS
ITEM IDESCRIPTION
DEPT
Unit
Unit Cost
otal
Page 3 of 4
r (Unit 1A)
�r (Unit 16)
i (Unit 2)
ions Sub Total