City of Fort Worth
Change Order Request
- ; � •• �
� _ __
Trinity River Vision Phase 1- Britlge and Channel Relocations - Main Street Water & Sewer ICity Sec No
Units 1A and 1 B(Part3); Grantl Ave. Storm Drain Unit 2(Part1)
P265-6091700969-87 (Unit 1A), P275-7091700969-87 (Unit 1B)
and FE72-451970-006231701000 (Unit 2).
DOE No. 6940 City Proj. No.
,,,�:
11••'
Water antl Sanitary Sewer Utility Relocations for the Trinity River Vision Central City and Trinity Uptown Projects
Contractor S.J. Louis Construction of Texas, Ltd.
City Project Mgr. Liam Conlon
Phone Number: 817-392-6829
Change Order # �1 Date: 6/5/2013
City Inspector Paul Gieger
Phone Number: 817-223-2258
Dept. � Water (Unit 1A) � Sewer (Unit 1B)
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Chanpe Order
Revised
Original Funds Available for Change Ortlers
Remaining Funds Available for this CO
Adtlitional Funtling (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORI�INAL CONTR,4CT
MAX ALLOWABLE CONTR,4CT AMOUNT (ORIGINAL CONTRACT COST + 25%)
TION
FOR CHANGE
This change order will provide for the deletion of certain pay items from the Main Street
Sanitary Sewer Relocations project and the addition of pay items to provide for timely �
Settlement Road Bridge water and sanitary sewer relocations.
Totals
7
86,000.00
Contract Time
(Calendar days)
360
�,�
-`�t
�
The original Trinity River Vision Project included construction by the Texas Department of Transp'o��tlon
(TxDOT) of the Main Street, White Settlement Road and Henderson Street Bridges, each under separate
construction contracts. Subsequent to its receipt of bids for the Henderson Street Bridge construction project,
TxDOT rejected all bids and decided to advertise for bids in November, 2013 for one prime contractor tQ�
construct all three bridges. In addition, TxDOT has mandated that all public and private utility relocations �
must be completed by November 5, 2013. �
The original scope of work for this contract provided for the relocation of the existing water, sanitary sewer
and storm drain lines on North Main Street in order to clear required utilities ahead of the Main Street Bridge �
construction. With the package option being presented by TxDOT, the timeline for moving White Settlement..
Road wat�r and sanitary sewer utilities has been moved up from the originally scheduled Fall 2013�'
timeframe. The items deleted from the North Main Street work have been packaged in a new project fo
which bids are being received in late May 2013. This change order is necessary to avoid duplication in th
two contracts of the same work items and to meet the TxDOT bidding timeline. �
��
��
Storm (Unit 2)
u
�
�
�
U
a
�
�;
,
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
time and money) for all costs arising out of, or incidental to, the above Change Order.
FORT WORTH
Project Name
Project No.(s)
Project
Description
Contractor
City Project Mgr
City of Fort Worth
Change Order Additions
Trinity River Vision Phase 1- Bridge and Channel Relocations - Main Street Water & Sewer
Units 1A and 1 B(Part3); Grand Ave. Storm Drain Unit 2
P265-6091700969-87 (Unit 1A), P275-7091700969-87 (Unit 16)
and FE72-451970-006231701000 (Unit 2).
City Sec No.
DOE No. 6940 City Proj. No
,,,�:
11•.'
IWater and Sanitary Sewer Utility Relocations for the Trinity River Vision Central City and Trinity Uptown Projects I
S.J. Louis Construction of Texas, Ltd. Change Order # � Date: 6/5/2013
Liam Conlon City Inspector Paul Gie er
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
3B 3305.2007 24" Water Carrier Pipe - Concrete Pressure Pipe Water (Unit 1A) 45 LF $210.00 $ 9,450.00
15 3305.1107 42" Casing By Other Than Open Cut (Min. 0.625-Inch Thick) Water (Unit 1A) 45 LF $850.00 $ 38,250.00
17 0241.1001 Water Line Grouting Water (Unit 1A) 51 CY $90.00 $ 4,590.00
23 9999.000012" and Smaller Water Abandonment Plug Water (Unit 1A) 1 EA $300.00 $ 300.00
26 0241.1302 Remove 6" Water Valve Water (Unit 1A) 4 EA $300.00 $ 1,200.00
27 0241.1303 Remove 8" Water Valve Water (Unit 1A) 1 EA $400.00 $ 400.00
28 0241.1305 Remove 12" Water Valve Water (Unit 1A) 2 EA $500.00 $ 1,000.00
29 0241.1510 Salvage Fire Hydrant Water (Unit 1A) 2 EA $100.00 $ 200.00
30 0241.1602 Remove Concrete Water Vault Water (Unit 1A) 5 EA $500.00 $ 2,500.00
31 3125.0101 SWPPP >_ 1 acre (Water) Water (Unit 1A) 1 LS $8,000.00 $ 8,000.00
32 3201.0133 6' Wide Asphalt Pvmt Repair, Industrial Water (Unit 1A) 539 LF $44.00 $ 23,716.00
34 3201.0203 Asphalt Pvmt Repair Beyond Defined Width, Industrial Water (Unit 1A) 5 SY $66.00 $ 330.00
35 3201.061611" Conc Pvmt Repair (Water) Water (Unit 1A) 116 SY $61.00 $ 7,076.00
36 3213.0301 4" Conc Sidewalk (Water) Water (Unit 1A) 25 SF $4.00 $ 100.00
38 3216.0101 6" Conc Curb and Gutter (Water) Water (Unit 1A) 105 LF $17.00 $ 1,785.00
42 3291.0100 Topsoil (Water) Water (Unit 1A) 2 CY $15.00 $ 30.00
43 3292.0100 Block Sod Placement (Water) Water (Unit 1A) 5 SY $5.00 $ 25.00
44 3292.0400 Seeding, Hydromulch Water (Unit 1A) 150 SY $0.20 $ 30.00
50 3305.0109 Trench Safety (Water) Water (Unit 1A) 848 LF $0.01 $ 8.48
52 3311.0001 Ductile Iron Water Fittings (6-inch through 16-inch pipe) Water (Unit 1A) 1.75 TON $1.00 $ 1.75
55 3312.0001 Fire Hydrant Water (Unit 1A) 4 EA $3,400.00 $ 13,600.00
57 9999.0000 Connection to Existing Water Main 12" antl Smaller Water (Unit 1A) 3 EA $400.00 $ 1,200.00
61 3312.2001 1" Water Service, Meter Relocation Water (Unit 1A) 6 EA $1.00 $ 6.00
62 3312.20031" Water Service Water (Unit 1A) 6 EA $1,100.00 $ 6,600.00
63 3312.20041" Private Service Water (Unit 1A) 125 LF $10.00 $ 1,250.00
66 3312.2201 2" Water Service, Meter Reconnection Water (Unit 1A) 1 EA $1.00 $ 1.00
67 3312.2203 2" Water Service Water (Unit 1A} 1 EA $2,500.00 $ 2,500.00
68 3312.2204 2" Private Service Water (Unit 1A) 10 LF $20.00 $ 200.00
69 3312.3002 6" Gate Valve Water (Unit 1A) 4 EA $900.00 $ 3,600.00
70 3312.3003 8" Gate Valve Water (Unit 1A) 2 EA $1,300.00 $ 2,600.00
71 3312.300512" Gate Valve Water (Unit 1A) 4 EA $2,100.00 $ 8,400.00
72 3312.300616" Gate Valve w/ Vault Water (Unit 1A) 3 EA $13,000.00 $ 39,000.00
77 3312.6002 6" Blow Off Valve Water (Unit 1A) 1 EA $11,400.00 $ 11,400.00
78 3471.0001 Traffic Control (Water) Water (Unit 1A) 2 MO $1.00 $ 2.00
83 3311.054216" Water Pipe Water (Unit 1A) 250 LF $164.00 $ 41,000.00
84 3311.054516" Water Pipe (Restrained Joints) Water (Unit 1A) 308 LF �188.00 $ 57,904.00
85 3305.200412" Water Carrier Pipe Water (Unit 1A) 120 LF $124.00 $ 14,880.00
86 3311.044212" Water Pipe Water (Unit 1A) 248 LF $118.00 $ 29,264.00
87 3311.0242 8" Water Pipe Water (Unit 1A) 581 LF $96.00 $ 55,776.00
88 3311.0142 6" Water Pipe Water (Unit 1A) 51 LF $87.00 $ 4,437.00
89 3305.1104 24" Casing By Other Than Open Cut Water (Unit 1A) 120 LF �a569.00 $ 68,280.00
Page 2 of 6
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
90 0241.1016 Remove 16" Water Line Water (Unit 1A) 10 LF $1.00 $ 10.00
91 0241.120616" Water Abandonment Plug Water (Unit 1A) 7 EA $500.00 $ 3,500.00
92 3201.0132 5' Wide Asphalt Pvmt Repair, Industrial Water (Unit 1A) 620 LF $38.00 $ 23,560.00
93 3312.0106 Connection to Existing 16" Water Main Water (Unit 1A) 2 EA $800.00 $ 1,600.00
94 3312.410612" x 6" Tapping Sleeve & Valve Water (Unit 1A) 1 EA 54,300.00 $ 4,300.00
95 0241.110616" Pressure Plug Water (Unit 1A) 1 EA $1,000.00 $ 1,000.00
96 0241.1108 20" Pressure Plug Water (Unit 1A) 1 EA $1,200.00 $ 1,200.00
2 3331.4115 8" Sewer Pipe Sewer (Unit 1 B) 14 LF $49.00 $ 686.00
5 0241.2001 Sanitary Line Grouting Sewer (Unit 1 B) 191 CY $120.00 $ 22,920.00
6 0241.2201 Remove 4' Sewer Manhole Sewer (Unit 1B) 12 EA $1,800.00 $ 21,600.00
7 3125.0101 SWPPP >_ 1 acre (Sanitary Sewer) Sewer (Unit 1 B) 1 LS $1.00 $ 1.00
8 3201.0133 6' Wide Asphalt Pvmt Repair, Industrial (Sanitary Sewer) Sewer (Unit 1 B) 680 LF $44.00 $ 29,920.00
9 3201.0203 Asphalt Pvmt Repair Beyond Defined Width, Industrial Sewer (Unit 1 B) 10 SY $66.00 $ 660.00
10 3201.061611" Conc Pvmt Repair (Sanitary Sewer) Sewer (Unit 16) 153 SY $61.00 $ 9,333.00
11 3213.0301 4" Conc Sidewalk (Sanitary Sewer) Sewer (Unit 16) 185 SF $4.00 $ 740.00
12 3213.0401 6" Concrete Driveway (Sanitary Sewer) Sewer (Unit 1 B) 100 SF $6.00 $ 600.00
13 3216.0101 6" Conc Curb and Gutter (Sanitary Sewer) Sewer (Unit 1 B) 50 LF $20.00 $ 1,000.00
14 3291.0100 Topsoil (Sanitary Sewer) Sewer (Unit 16) 5 CY $15.00 $ 75.00
15 3292.0100 Block Sod Placement (Sanitary Sewer) Sewer (Unit 1 B) 83 SY $5.00 $ 415.00
16 3301.0001 Pre-CCTV Inspection Sewer (Unit 1 B) 3,591 LF $1.00 $ 3,591.00
17 3301.0002 Post-CCTV Inspection Sewer(Unit 1B) 1,685 LF $1.00 $ 1,685.00
18 3301.0101 Manhole Vacuum Testing Sewer (Unit 18) 11 EA $100.00 $ 1,100.00
19 3303.0001 Bypass Pumping Sewer (Unit 1B) 1 LS $1.00 $ 1.00
20 3305.0109 Trench Safety (Sanitary Sewer) Sewer (Unit 1 B) 2,252 LF $0.01 $ 22.52
21 3305.0110 Utility Markers (Sanitary Sewer) Sewer (Unit 1 B) 1 LS $1.00 $ 1.00
22 3305.0112 Concrete Collar Sewer (Unit 1 B) 11 EA $400.00 $ 4,400.00
25 3331.3106 4" DIP Sewer Service Sewer (Unit 1 B) 2 EA $2,200.00 $ 4,400.00
27 3339.1001 4' Manhole Sewer (Unit 1 B) 11 EA $4,000.00 $ 44,000.00
29 3471.0001 Traffic Control (Sanitary Sewer) Sewer (Unit 1 B) 1.75 MO $1.00 $ 1.75
31 3331.422216" DIP Sewer Pipe Sewer (Unit 16) 965 LF $298.00 $ 287,570.00
32 3305.300616" Sewer Carrier Pipe Sewer (Unit 1 B) 145 LF $263.00 $ 38,135.00
33 3331.420812" Sewer Pipe Sewer (Unit 1 B) 454 LF $229.00 $ 103,966.00
34 3331.421212" DIP Sewer Pipe Sewer (Unit 1 B) 107 LF $271.00 $ 28,997.00
35 3305.1105 30" Casing By Other Than Open Cut Sewer (Unit 1 B) 145 LF $759.00 $ 110,055.00
36 3331.3101 4" Sewer Service Sewer (Unit 1 B) 1 EA $2,000.00 $ 2,000.00
37 3331.3109 4" DIP Sewer Service, Private Relocation Sewer (Unit 1 B) 100 LF $134.00 $ 13,400.00
38 3339.1003 4' Extra Depth Manhole Sewer (Unit 1 B) 37.4 VF $290.00 $ 10,846.00
39 0135.0101 Railroad Coordination Sewer (Unit 1B) 1 LS $1.00 $ 1.00
40 0135.0102 Railroad Flagmen Sewer (Unit 1B) 10 WD $1,100.00 $ 11,000.00
36 0241.2015 Remove 12" Sewer Line Sewer (Unit 1 B) 185 LF $25.00 $ 4,625.00
37 0241.2021 Remove 24" Sewer Line Sewer (Unit 1 B) 545 LF $35.00 $ 19,075.00
38 0241.210410" Sewer Abandonment Plug Sewer (Unit 1 B) 2 EA $400.00 $ 800.00
39 0241.210512" Sewer Abandonment Plug Sewer (Unit 1 B) 1 EA $500.00 $ 500.00
40 0241.210615" Sewer Abandonment Plug Sewer (Unit 1 B) 1 EA $600.00 $ 600.00
41 0241.2111 24" SewerAbandonment Plug Sewer(Unit 1B) 2 EA $1,200.00 $ 2,400.00
45 3201.0132 5' Wide Asphalt Pvmt Repair, Industrial (Sanitary Sewer) Sewer (Unit 1 B) 397 LF $38.00 $ 15,086.00
48 3292.0400 Seeding, Hydromulch Sewer (Unit 16) 464 SY $0.20 $ 92.80
Water (Unit 1A) $496,062.23
Sewer (Unit 1 B) $796,301.07
Storm (Unit 2)
Additions Sub Total $1,292,363.30
Page 3 of 6
FORT WORTH
c�ty of Forr wortn
Change Order Deletions
Trinity River Vision Phase 1- Bridge and Channel Relocations - Main Street Water & Sewer I
Project Name Units 1A and 16 (Part3)� Grand Ave, Storm Drain Unit 2(Part1)
Project No.(s) P265-6091700969-87 (Unit 1A), P275-7091700969-87 (Unit DOE No. 6940
1 B antl FE72-051970-006231701000 Unit 2.
Project
Descriptian
Contractor
City Project Mgr.
City Sec No.
City Proj. No.
�
���.�
Water and Sanitary Sewer Utility Relocations for the Trinity River Vision Central City and Trinity Uptown Projects
S.J. Louis Construction of Texas, Ltd. Change Order #�1 Date 6/5I2013
Liam Conlon City Inspector Paul Gieger
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
3B 3305.2007 24" Water Carrier Pipe - Concrete Pressure Pipe Water (Unit 1A) 225 LF $210.00 $ 47,250.00
5B 3311.0644 24" Water Pipe (Restrained Joints) - Concrete Pressure Water (Unit 1A) 760 LF $354.00 $ 269,040.00
6 3311.0551 16" DIP Water Pipe Water (Unit 1A) 250 LF $109.00 $ 27,250.00
7 3311.0554 16" DIP Water Pipe (Restrained Joints) Water (Unit 1A) 414 LF $133.00 $ 55,062.00
8 3311.0451 12" DIP Water Water (Unit 1A) 168 LF $80.00 $ 13,440.00
9 3311.0251 8" DIP Water Water (Unit 1A) 274 LF $69.00 $ 18,906.00
10 3311.0151 6" DIP Water Water (Unit 1A) 109 LF $47.00 $ 5,123.00
12 3305.1107 42" Casing By Other Than Open Cut (Min. 0.625-Inch Water (Unit 1A) 225 LF $850.00 $ 191,250.00
16 0135.0102 Railroad Flagmen Water (Unit 1A) 10 WD $1,100.00 $ 11,000,00
17 0241.1001 Water Line Grouting Water (Unit 1A) 170 CY $90.00 $ 15,300.00
21 9999.000012" and Smaller Pressure Plug Water (Unit 1A) 2 EA $500.00 $ 1,000.00
23 9999.0000 12" and Smaller Water Abandonment Plug Water (Unit 1A) 1 EA $300.00 $ 300.00
25 0241.1210 30" Water Abantlonment Plug Water (Unit 1A) 4 EA $500.00 $ 2,000.00
26 0241.1302 Remove 6" Water Valve Water (Unit 1A) 4 EA $300.00 $ 1,200.00
28 0241.1305 Remove 12" Water Valve Water (Unit 1A) 1 EA $500.00 $ 500.00
29 0241.1510 Salvage Fire Hydrant Water (Unit 1A) 4 EA $100.00 $ 400.00
30 0241.1602 Remove Concrete Water Vault Water (Unit 1A) 2 EA $500.00 � 1,000.00
32 3201.0133 6' Wide Asphalt Pvmt Repair, Industrial Water (Unit 1A) 1,067 LF $44.00 $ 46,948.00
33 3201.0135 8' Wide Asphalt Pvmt Repair, Industrial Water (Unit 1A) 760 LF $59.00 $ 44,840.00
34 3201.0203 Asphalt Pvmt Repair Beyontl Defined Width, Industrial Water (Unit 1A) 68 SY $66.00 $ 4,488.00
36 3213.0301 4" Conc Sidewalk (Water) Water (Unit 1A) 25 SF $4.00 $ 100.00
37 3213.0401 6" Concrete Driveway (Water) Water (Unit 1A) 25 SF $6.00 $ 150.00
38 3216.0101 6" Conc Curb and Gutter (Water) Water (Unit 1A) 30 LF $17.00 $ 510.00
40 3217.1001 Lane Legend RR (Water) Water (Unit 1A) 2 EA $400.00 � 800.00
41 3231.0123 6' Chain Link, Aluminum, w/ Barbed Wire Security Top Water (Unit 1A) 30 LF $20.00 $ 600.00
42 3291.0100 Topsoil (Water) Water (Unit 1A) 2 CY $15.00 $ 30.00
44 3292.0400 Seeding, Hydromulch Water (Unit 1A) 1,500 SY $0.20 $ 300.00
47 3305.0003 8" Watedine Lowering Water (Unit 1A) 3 EA �4,000.00 $ 12,000.00
48 3305.0103 Exploratory Excavation of Existing Utilities Water (Unit 1A) 2 EA $800.00 $ 1,600.00
50 3305.0109 Trench Safety (Water) Water (Unit 1A) 1,589 LF $0.01 $ 15.89
52 3311.0001 Ductile Iron Water Fittings (6-inch through 16-inch pipe) Water (Unit 1A) 4 TON $1.00 $ 4.00
55 3312.0001 Fire Hydrant Water (Unit 1A) 4 EA $3,400.00 $ 13,600.00
57 9999.0000 Connection to Existing Water Main 12" and Smaller Water (Unit 1A) 4 EA $400.00 $ 1,600.00
61 3312.2001 1" Water Service, Meter Relocation Water (Unit 1A) 4 EA $1.00 $ 4.00
62 3312.20031" Water Service Water (Unit 1A) 4 EA $1,100.00 $ 4,400.00
64 3312.2101 1 1/2" Water Service, Meter Relocation Water (Unit 1A) 1 EA $1.00 $ 1.00
65 3312.21031 1/2" Water Service Water (Unit 1A) 1 EA $2,100.00 $ 2,100.00
66 3312.2201 2" Water Service, Meter Relocation Water (Unit 1A) 1 EA $1.00 $ 1,00
67 3312.2203 2" Water Service Water (Unit 1A) 1 EA $2,500.00 $ 2,500.00
68 3312.2204 2" Private Service Water (Unit 1A) 205 LF $20.00 $ 4,100.00
69 3312.3002 6" Gate Valve Water (Unit 1A) 2 EA �900.00 $ 1,800.00
70 3312.3003 8" Gate Valve Water (Unit 1A) 3 EA $1,300.00 $ 3,900.00
71 3312.300512" Gate Valve Water (Unit 1A) 3 EA $2,100.00 $ 6,300.00
72 3312.300616" Gate Valve wl Vault Water (Unit 1A) 3 EA $13,000.00 � 39,000.00
73 3312.3008 24" Gate Valve wl Vault Water (Unit 1A) 1 EA $24,000.00 � 24,000.00
76 3312.410912"x12" Tapping Sleeve and Valve Water (Unit 1A) 1 EA �4,500.00 $ 4,500.00
77 3312.6003 6" Blow Off Valve Water (Unit 1A) 1 EA $11,400.00 $ 11,400.00
Page 4 of 6
ITEM DESCRIPTION
78 3471.0001 Traffic Control (Water)
2 3331.4115 8" Sewer Pipe
4 0241.2103 8" SewerAbandonment PI�
6 0241.2201 Remove 4' Sewer Manhole
10 3201.061611" Conc Pvmt Repair (Sar
11 3213.03014" Conc Sidewalk (Sanitary
12 3213.04016" Concrete Driveway (San
13 3216.0101 6" Conc Curb antl Gutter (�
14 3291.0100 Topsoii (Sanitary Sewer)
15 3292.0100 Block Sod Placement (Sani
16 3301.0001 Pre-CCN Inspection
17 3301.0002 Post-CCN Inspection
18 3301.0101 Manhole Vacuum Testing
20 3305.0109 Trench Safety (Sanitary Se�
25 3331.3106 4" DIP Sewer Service
27 3339.1001 4' Manhole
29 3471.0001 Traffic Control (Sanitary Se
DELETIONS
DEPT
Water (Unit 1F
Sewer (Unit 1E
Sewer (Unit 1E
Sewer (Unit 1 E
Sewer (Unit 1 E
Sewer (Unit 1 E
Sewer (Unit 1 E
Sewer (Unit 1 E
Sewer (Unit 1 E
Sewer (Unit 1E
Sewer (Unit 1 E
Sewer (Unit 1 E
Sewer (Unit 1 E
Sewer (Unit 1 E
Sewer (Unit 1 E
Sewer (Unit 1 E
Sewer (Unit 1E
Page 5 of 6
1
250
1
1
170
10
10
10
1
5
375
250
3
150
2
3
0.25
Unit IUnitCost
�, � � �
�,�� ���
•, �� �� �
:�� �� �
,. 11 �
', ���
� �tQ
�, � � �
�, � � �
I��
LF
', � � �
�� �� �
,� � �
�� �� �
�� �� �
�, � � �
Sewer (Unit 1B
Storm (Unit 2'
Deletions Sub Total
1.00
12,250.00
300.00
1,800.00
10,370.00
40.00
60.00
200.00
15.00
25.00
375.00
250.00
300.00
1.50
4,400.00
12,000.00
0.25
Page 6 of 6
M&C Review
CITY COUNCIL AGENDA
DATE:
COUNCIL ACTION: Approved on 6/4/2013
6/4/2013 REFERENCE **C-26297 LOG NAME:
NO..
CODE: C TYPE:
CONSENT PUBLIC
HEARING:
Page 1 of 2
Official site of the City of Fort Worth, Texas
FURT WURTII
_`,�'_-
60TRVP3MAINC01-
SJLOUIS
�L�:
SUBJECT: Authorize Execution of Change Order No. 1 to City Secretary Contract No. 44408 with
S.J. Louis Construction of Texas, Ltd., in the Amount of $358,362.66 for Trinity River
Vision - Central City Project and the Trinity Uptown Service Area Phase 1- Bridge and
Channel Relocations, Part 3, Main Street Bridge Water, Sanitary Sewer and Storm Drain
Relocations to Add Water and Sanitary Sewer Relocations at White Settlement Road
Bridge for a Revised Total Contract in the Amount of $6,288,106.85 (COUNCIL
DISTRICTS 2 and 9)
RECOMMENDATION:
It is recommended that the City Council authorize the execution of Change Order No. 1 to City
Secretary Contract No. 44408 with S.J. Louis Construction of Texas, Ltd., in the amount of
$358,362.66 for Trinity River Vision - Central City Project and the Trinity Uptown Service Area Phase
1- Bridge and Channel Relocations, Part 3, Main Street Bridge Water, Sanitary Sewer and Storm
Drain Relocations to add water and sanitary sewer relocations at White Settlement Road Bridge for a
revised total contract in the amount of $6,288,106.85.
DISCUSSION:
On March 26, 2013, (M&C C-26178) the City Council authorized a contract with S.J. Louis
Construction of Texas, Ltd., in the amount of $5,929,744.19 for Trinity Uptown Service Area Phase 1
- Bridge and Channel Relocations, Part 3, Main Street Bridge Water, Sanitary Sewer and Storm Drain
Relocations.
This change order will provide for the deletion of certain pay items from the Main Street Bridge Water
and Sanitary Sewer Relocations project and the addition of pay items to provide for timely work on
the White Settlement Road Bridge water and sanitary sewer relocations.
The original Trinity River Vision Project included construction by the Texas Department of
Transportation (TxDOT) of the Main Street, White Settlement Road and Henderson Street Bridges,
each under separate construction contracts. Subsequent to its receipt of bids for the Henderson
Street Bridge construction project, TxDOT rejected all bids and decided to advertise for bids in
November, 2013 for one prime contractor to construct all three bridges. In addition, TxDOT has
mandated that all public and private utility relocations must be completed by November 5, 2013.
The City has completed the relocation of the necessary water and sanitary sewer mains to facilitate
the construction of the Henderson Street Bridge.
The original scope of work for this contract provided for the relocation of the existing water, sanitary
sewer and storm drain lines on North Main Street in order to clear required utilities ahead of the Main
Street Bridge construction. With the package option being presented by TxDOT, the timeline for
moving White Settlement Road water and sanitary sewer utilities has been moved up from the
originally scheduled Fall 2013 timeframe. The items deleted from the North Main Street work have
been packaged in a new project for which bids are being received in late May 2013. This change
order is necessary to avoid duplication in the two contracts of the same work items and to meet the
TxDOT bidding timeline.
http://apps.cfwnet.org/council�acket/mc review.asp?ID=18507&councildate=6/4/2013 6/5/2013
T:�I&C Review
The costs involved with the change order are as follows:
Oriqinal Contract Amount
Amount of Proposed Change
Order
$5,584,285.24
($395,551.66)
`�f:�i�.fi��I�]
$753,914.32
1.941.32
167.431.95
$ -0-
Page 2 of 2
$5,929,744.19
$ 358,362.66
Revised Contract Amount
188.733.58
167,431.95
Staff has reviewed the unit prices and considers them to be fair and reasonable.
106.85
Expenditures under this contract will not cause the City to exceed authorization of $26.6 million in
expenditures for the TRV project. Once the City's TRV expenditures reach $26.6 million, the TRV
Tax Increment Financing (TIF) district and the Tarrant Regional Water District (TRWD) will begin
making annual reimbursements to the City for all TRV-related expenditures above that cap. With this
change order, an additional $1,195,666.55 is considered TRV-related and will be credited towards the
City's $26.6 million commitment. With approval of this Mayor and Council Communication, the City
will have contracted for a total in the amount of $25.6 mitlion with actual expenditures of $17.5
million on the TRV project for design and construction activities associated with water/sewer utilities
and roadway/bridge activities.
M/WBE Office - S.J. Louis Construction of Texas, Ltd., agrees to maintain its initial commitment of 14
percent that it made on the original contract and extend and maintain that same M/WBE commitment
of 14 percent to this first change order. Therefore, S.J. Louis Construction of Texas, Ltd., remains in
compliance with the City's M/WBE Ordinance and attests to its commitment by its signature on the
Acceptance of Previous M/WBE Commitment form executed by an authorized representative of its
company.
This project is located in COUNCIL DISTRICTS 2 and 9, Mapsco 62Q, 62R, 62U, 62V, 62X and 62Y.
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that funds are available in the current capital
budget, as appropriated, of the Sewer Capital Projects Fund.
TO Fund/Account/Centers
FROM Fund/Account/Centers
P275 541200 709170096987
Submitted for Citv Manaqer's Office bv:
Originatinq Department Head:
Additional Information Contact:
ATTACHMENTS
60TRVP3MAINC01-SJLOUIS MAP.pdf
Fernando Costa (6122)
S. Frank Crumb (8207)
Liam Conlon (6824)
$753,914.32