Loading...
HomeMy WebLinkAboutContract 44407-CO2 (2)� �� � F4 RT ��O RT H Clty Of FOI'� WOI'�h Change Order Request Project Name: Project Project - _ �: �� • . ;, !, �' s 't' % I Water antl Sanitary Sewer Replacement Contract 2010 STM-C City Sec No.: 44407 P253-605170148683 & P258-705170148683 DOE No. 6590 City Proj. No.: 01486 The replacement of water and sanitary sewer mains on College Avenue, Travis Avenue, west Anthony Street, South Henderson Street and James Avenue. Contractor: Conatser Construction City Project Mgr. Roberto C. Sauceda Phone Number: 817-392-2387 Original Contract Amount Extras to Date Credits to Date Dept. � Water � Sewer Pending Change Orders (in M&C Process) Contract Cost to Date nt Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) FOR CHANGE Totals Contract Time (Calender days) $958,380.00 180 $49.516.00 090 $1,007,896.00 $45,201.38 $1,053,097.38 $50,000.00 $28,350.00 $52,450.88 9.88% $1,197,975.00 The change order will provide for additional quantities of water lines, meters, and asphalt pavement repait• lat were necessary to complete the project. The change order will allow for the deletion of pay item uantities that no longer needed on the project. .ri.•- it y +�: . �. r � -'Z`d � � z� �� ,� _� —i Change Order # � Date: 4/8I2014 City Inspector: Adilda Cazorla Phone Number: 817-223-2282 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTR,4CT AMOUNT (ORIGINAL CONTRACT COST + 25%) , �� 766.00 $25,000.00 s�, ; r _ � .'r� . : .. rlli �: ,�. : � i . . C � * T� r - TT F � � It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. FORT WORTH Project Name Project No.(s): Project Description Contractor City Project Mgr City of Fort Worth Change Order Additions Water and Sanita Sewer Re lacement Contract 2010 STM-C City Sec No.: 44407 P253-605170148683 & P258-705170148683 DOE No. 6590 City Proj. No.: 01486 The replacement of water and sanitary sewer mains on College Avenue, Travis Avenue, west Anthony Street, South Henderson Street and James Avenue. Conatser Construction Change Order: �2 Date: 4/8/2014 Roberto C. Saucetla City Inspector Adilda Cazoria ADDITIONS DEPT Qt Unit Unit Cost Total 1 16" PVC C905 Water 10.00 LF $90.00 $900.00 2 8" PVC Pressure Pipe Water 113.00 LF $30.00 $3,390.00 3 6" PVC Pressure Pipe Water 24.00 LF $28.00 $672.00 5 8" Gate Valve w/ Box Water 5.00 EA $1,000.00 $5,000.00 6 6" Gate Valve w/ Box Water 1.00 EA $900.00 $900.00 7 Fire Hydrant Install Water 1.00 EA $2,500.00 $2,500.00 8 Salvage Fire Hytlrant Water 2.00 EA $300.00 $600.00 10 2" HMAC on 6" Flex Base Temporary Water 906.00 LF $9.00 $8,154.00 11 Concrete on 2/27 Concrete Base Water 3.32 LF $50.00 $166.00 12 1" Copper Service from Main to Meter Water 563.00 LF $30.00 $16,890.00 13 1" Tap to Main Water 27.00 EA $200.00 $5,400.00 14 Meter Box - Class A Water 20.00 EA $150.00 $3,000.00 19 Walk 4' Install Water 26.48 SF $5.00 $132.40 20 Dehole 5-10' Depth Water 11.00 EA $600.00 $6,600.00 21 Fittings <16" DI Pipe Water 0.30 TN $3,000.00 $900.00 24 2" Temp Water Service Water 0.20 LS $20,000.00 $4,000.00 33 Meter Box - Class B Water 2.00 EA $250.00 $500.00 6 Remove 4' Sewer Manhole Sewer 1.00 EA $300.00 $300.00 7 4' Standard Manhole Sewer 2.00 EA $2,500.00 $5,000.00 8 Atldetl Depth Standard 4' Manhole Sewer 2.50 VF $150.00 $375.00 15 2" HMAC on 6" Flex Base Temporary Sewer 9.00 LF $500.00 $4,500.00 16 Concrete on 2127 Concrete Base Sewer 15.27 LF $50.00 $763.50 21 Trench Safety Sewer 46.00 LF $2.00 $92.00 26 Dehole 5-10' Depth Sewer 2.00 EA $600.00 $1,200.00 Water $59,704.40 Sewer $12,230.50 Atltlitions Sub Total $71,934.90 ra�c � vi -r Fv RT ��VO RT H City of Fort Worth Change Order Deletions Project Name Water and Sanitary Sewer Replacement Contract 2010 STM-C Project No.(s) Project Description Contractor P253-605170148683 & P258-705170148683 DOE No � City Sec No.: 44407 6590 City Proj. No.: 01486 The replacement of water antl sanitary sewer mains on College Avenue, Travis Avenue, west Anthony Street, South Henderson Street and James Avenue. Conatser Construction City Project Mgr. Roberto C. Sauceda ITEM DESCRIPTION 9 Fire Hydrant Barrel & Stem Extension 17 6" Driveway � Install 18 Curb & Gutter � Install 19C Walk 4' � Install 25 Conc TY B 26 Conc TY E 30C 6" Carrier Pipe 9 4' Drop Manhole 10 Added Depth 4' Drop Manhole 14 HMAC Repair Beyontl Definetl Width 17 Curb & Gutter � Install 23 Manhole Paint & Coat 24 6" Driveway — Install Change Order: �2 Date 4/812014 City Inspector: Adiltla Cazorla DELETIONS DEPT Water Water Water Water Water Sewer Sewer Sewer Sewer Sewer Sewer Qty 10.50 145.44 185.00 20.00 10.00 10.00 20.00 2.00 5.00 1,000.00 100.00 43.00 100.00 Unit VF SF LF SY CY CY LF EA VF SF LF SF SF Unit Cost $1 $8.00 $20.00 $27.00 $10.00 $10.00 $30.00 $3,000.00 $200.00 $3.00 $20.00 $160.00 Sewer Page 3 of 4 r Deletions Sub Total otal $1,050.00 $1,163.52 $3,700.00 $540.00 $100.00 $100.00 $600.00 $1,000.00 $3,000.00 $2,000.00 $6,880.00 $600.00 � � $26,733.52