Project Name Cultural District/Will Rogers Sanitary Sewer Improvements, Part 4
Project No.(s) P266-707170146889 DOE No. 7453
Project Description
A:�� i � �►�������`��/�� �$�l � � .
��4�'c�',�-�'����A� �3�� �.�[ `�"- - --��---- -
City Sec No.
City Pro. No.
� ;.
1 ��:
24-inch Sanitary Sewer Main Installation on Montgomery Street
Contractor S.J. Louis Construction of Texas, Ltd.
City Project Mgr. John Kasavich
Phone Number: 817-392-8480
Dept. � Water � Sewer
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
nt of Proposed Chanqe Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
Change Order # �1 Date: 10/7/2015
City Inspector pon Watson
Phone Number: 817-392-8306
1,645,417.2C
1,645,417.20
$49,330.00
1,694,747.20
$50,000.00
$50,000.00
CHANGE ORDERS to DATE (INCLUDING THIS ONEJ AS % OF ORIGINAL CONTR,4CT
MAX ALLOWABLE CONTR.4CT AMOUNT (ORIGINAL CONTR,4CT COST + 25%)
JUSTIFICATION
FOR CHANGE ORDER
Totals
1,645,417
1,645,417
$50,000.00
$50,000.00
3.00%
$2,056,771.50
Contract Time
(Calendar days)
150
150
021
171
The change order will provide the necessary pay item quantities to allow for the realignment of the project
24-inch sewer main due to conflict with a previously unknown storm drain structure. The change includes
the addition of a access shaft and manhole at station 7+ 27 and the abandonment of 20 feet of installed
tunnel that cannot be utilized due to the conflict.
Staff recommends the approval of an additional 21 calendar days for the change order.
"'. �.,:i.`'` -
.
� �,�
� _ g ��s�.a
_o�, �,
�►F�IClAL RE
�I'�V ��CRET,�.r:',".;
�
�
- �
�::
� '� ,���
' �Vi s , City S
� , � �
�. `+ It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents
payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
�'.`
cs�
�
�
�
�
;
4
Contractor's Company Name Contractor Name Contract j ature Date
S.J. Louis Construction of Texas, Ltd. Atlam Lunsford ' '' '' � � � - .�� ,: �
FORT WC�RTH City of Fort Worth
Change Order Additions
Project Name Cultural District/Will Rogers Sanitary Sewer Improvements, Part 4
Project No.(s) P266-707170146889 DOE No. 7453
Project
Description
City Sec No. 48789
City Pro. No. 01468
24-inch Sanitary Sewer Main Installation on Montgomery Street
Contractor S.J. Louis Construction of Texas, Ltd. Change Order #�1 Date: 10I712015
City Project Mgr. John Kasavich City Inspector pon Watson
ADDITIONS
3 � 24" Fiberglass Sewer Pipe, CSS Backfill
11
HES Conc Pvmt Repair w/ Asphalt Overlay, Arterialllndustrial
35 16' Dia Shaft for Added Manhole at Sta 7+27
36 8' Manhole Base with 5' Riser (after 6 VF) at Sta 7+27 including full depth
install and epoxy liner
37 CLSMICSSISpoil Trucking for Manhole at Sta 7+27
38 Abandon and Grout 20' of installed tunnel startin4 at Sta 7+27
Sewer
Sewer
Sewer
Sewer
Sewer
Sewer
Q Unit Unit Cost
16.00 LF $466.00
70.00 SY $93.00
26.00 VF $2.000.00
1.00 LS
1.00 LS
1.00 LS
Toial
0.00
��� ��,
$53,000.00 �$53,000.00
$13,000.00
$5,000.00
$13,000.00
$5.000.00
36,966.00
�Additions Sub Total � $136,966.00
Page 2 of 4
FORT WORTH
Project Name
Project No.(s)
Project Description
Contractor
City of Fort Worth
Change Order Deletions
Cultural District/Will Rogers Sanitary Sewer Improvements, Part 4
P266-707170146889
DOE No. 7453
City Sec No.
City Pro. No.
.; ;.
1 �.:
24-inch Sanitary Sewer Main Installation on Montgomery Street
S.J. Louis Construction of Texas, Ltd.
City Project Mgr. John Kasavich
ITEM DESCRIPTION
2 24" Sewer Carrier Pipe
4 18" Sewer Pipe, CSS Backfill
5 12" Sewer Pipe, CSS Backfill
24 Epoxy Manhole Liner
25 4' Manhole
27 4' Extra Depth Manhole
34
Contaminated Material Loading, Transporting, and Disposal
Change Order#�1 Date 10/7/2015
City Inspector pon Watson
DELETIONS
DEPT
Sewer
Sewer
Sewer
Sewer
Sewer
Sewer
Sewer
Qty
16.00
29.00
3.00
57.00
2.00
50.00
900.00
Unit
LF
LF
LF
VF
EA
VF
CY
Water
Sewer
Unit Cost
$360.00
$392.00
$163.00
$167.00
$4,500.00
$94.00
$52.00
Total
$5,760.00
$11,368.00
$9,519.00
$9,000.00
$4,700.00
,636.00