Loading...
HomeMy WebLinkAboutContract 46789-CO1 (2)FORT WORTH City of Fort Worth Change Order Request Project Name Cultural District/Will Rogers Sanitary Sewer Improvements, Part 4 Project No.(s) P266-707170146889 DOE No. 7453 Project Description A:�� i � �►�������`��/�� �$�l � � . ��4�'c�',�-�'����A� �3�� �.�[ `�"- - --��---- - City Sec No. City Pro. No. � ;. 1 ��: 24-inch Sanitary Sewer Main Installation on Montgomery Street Contractor S.J. Louis Construction of Texas, Ltd. City Project Mgr. John Kasavich Phone Number: 817-392-8480 Dept. � Water � Sewer Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date nt of Proposed Chanqe Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) Change Order # �1 Date: 10/7/2015 City Inspector pon Watson Phone Number: 817-392-8306 1,645,417.2C 1,645,417.20 $49,330.00 1,694,747.20 $50,000.00 $50,000.00 CHANGE ORDERS to DATE (INCLUDING THIS ONEJ AS % OF ORIGINAL CONTR,4CT MAX ALLOWABLE CONTR.4CT AMOUNT (ORIGINAL CONTR,4CT COST + 25%) JUSTIFICATION FOR CHANGE ORDER Totals 1,645,417 1,645,417 $50,000.00 $50,000.00 3.00% $2,056,771.50 Contract Time (Calendar days) 150 150 021 171 The change order will provide the necessary pay item quantities to allow for the realignment of the project 24-inch sewer main due to conflict with a previously unknown storm drain structure. The change includes the addition of a access shaft and manhole at station 7+ 27 and the abandonment of 20 feet of installed tunnel that cannot be utilized due to the conflict. Staff recommends the approval of an additional 21 calendar days for the change order. "'. �.,:i.`'` - . � �,� � _ g ��s�.a _o�, �, �►F�IClAL RE �I'�V ��CRET,�.r:',".; � � - � �:: � '� ,��� ' �Vi s , City S � , � � �. `+ It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. �'.` cs� � � � � ; 4 Contractor's Company Name Contractor Name Contract j ature Date S.J. Louis Construction of Texas, Ltd. Atlam Lunsford ' '' '' � � � - .�� ,: � FORT WC�RTH City of Fort Worth Change Order Additions Project Name Cultural District/Will Rogers Sanitary Sewer Improvements, Part 4 Project No.(s) P266-707170146889 DOE No. 7453 Project Description City Sec No. 48789 City Pro. No. 01468 24-inch Sanitary Sewer Main Installation on Montgomery Street Contractor S.J. Louis Construction of Texas, Ltd. Change Order #�1 Date: 10I712015 City Project Mgr. John Kasavich City Inspector pon Watson ADDITIONS 3 � 24" Fiberglass Sewer Pipe, CSS Backfill 11 HES Conc Pvmt Repair w/ Asphalt Overlay, Arterialllndustrial 35 16' Dia Shaft for Added Manhole at Sta 7+27 36 8' Manhole Base with 5' Riser (after 6 VF) at Sta 7+27 including full depth install and epoxy liner 37 CLSMICSSISpoil Trucking for Manhole at Sta 7+27 38 Abandon and Grout 20' of installed tunnel startin4 at Sta 7+27 Sewer Sewer Sewer Sewer Sewer Sewer Q Unit Unit Cost 16.00 LF $466.00 70.00 SY $93.00 26.00 VF $2.000.00 1.00 LS 1.00 LS 1.00 LS Toial 0.00 ��� ��, $53,000.00 �$53,000.00 $13,000.00 $5,000.00 $13,000.00 $5.000.00 36,966.00 �Additions Sub Total � $136,966.00 Page 2 of 4 FORT WORTH Project Name Project No.(s) Project Description Contractor City of Fort Worth Change Order Deletions Cultural District/Will Rogers Sanitary Sewer Improvements, Part 4 P266-707170146889 DOE No. 7453 City Sec No. City Pro. No. .; ;. 1 �.: 24-inch Sanitary Sewer Main Installation on Montgomery Street S.J. Louis Construction of Texas, Ltd. City Project Mgr. John Kasavich ITEM DESCRIPTION 2 24" Sewer Carrier Pipe 4 18" Sewer Pipe, CSS Backfill 5 12" Sewer Pipe, CSS Backfill 24 Epoxy Manhole Liner 25 4' Manhole 27 4' Extra Depth Manhole 34 Contaminated Material Loading, Transporting, and Disposal Change Order#�1 Date 10/7/2015 City Inspector pon Watson DELETIONS DEPT Sewer Sewer Sewer Sewer Sewer Sewer Sewer Qty 16.00 29.00 3.00 57.00 2.00 50.00 900.00 Unit LF LF LF VF EA VF CY Water Sewer Unit Cost $360.00 $392.00 $163.00 $167.00 $4,500.00 $94.00 $52.00 Total $5,760.00 $11,368.00 $9,519.00 $9,000.00 $4,700.00 ,636.00 Page 3 of 4 �Deletions Sub Total �$87,636.00