HomeMy WebLinkAboutContract 42920-CO2 (2)��ORT WORTH City of Fort Worth '�'�S O 1�����. '�
Change Order Request ����"�
Project Name: Sanitary Sewer Rehabilitation Contract LXIV (64), Part 1 City Sec No.: 42920
Project No.(s): P253-702170149383 DOE No. 3454 city Proj. ►vo.: 01493
Project Description:
Contractor:
Sanitary Sewer Replacement on Sandy Lane, Lincoln Avenue, Angle Avenue, NW 14th Street, North Main Street and five alleys.
William J. Schultz, Inc. d/b/a Circle "C" Construction Co.
City Project Mgr. Rakesh Chaubey
Phone Number: 817-392-6051
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
ount of Proposed Chan
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Adtlitional Funding (if necessary)
change order will provide for the following:
Water
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%)
JUSTIFICATION
.
.
.
.
Staff
Sewer
Change0rder# �2 Date: 10/1/2013
City Inspector: Randy Horton
Phone Number: 682-432-4037
1,242,650.00
$40,215.00
,282,865.00
$7,920.00
,290,785,00
$10, 255.00
FOR CHANGE
Totals
E�i
�
,11,
3.87%
$1,553,312.50
The rehabilitation of a 345 feet segment of L-649 (8-inch) by CIPP instead of by open cut method in
order to minimize traffic disruption on Main Street.
The rehabilitation of a 1,452 feet segment of L-215 (8-inch/10-inch) instead of by pipe enlarge '
method in order to avoid potential damage from the vibration (created by the pipe enlar �
process) to older houses that are adjacent to the sewer main. �;' ���0�
Internal service reconnections for the CIPP process. ��
connection of an existing 8-inch sewer line to a new project manhole.
� ,r
eletion of pay item quantities that are no longer needed on the project. �°q,r-
�����a���-� c���o�� �tte� by. . e� �-�
o��'��'��;�' request for 120 additional calendar days on the proje�t:� .� �, ,-�� ,'?..,�
G�`�o �l��lf'[�� �i �t � .�
Mary J.
Contract Time
(Calendar Days)
200
15
.:�
�
►��
;11y
�,
It is understootl and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents paymeniin full
(both time and money) for all costs arising out of, or incidental to, the above Change Order.
FnRT WORTH
City of Fort Worth
Change Order Additions
Project Name Sanitar Sewer Rehabilitation Contract LXIV 64 , Part 1 City Sec No.: 42920
Project No.(s): P253-702170149383 DOE No. 3454 City Proj. No.: 01493
Project Sanitary Sewer Replacement on Santly Lane, Lincoln Avenue, Angle Avenue, NW 14th Street, North Main Street and
Description five alleys.
Contractor
City Project Mgr.
56 8" CIPP
57 Internal S�
58 Tie in exis
59 10" CIPP
� William J. Schultz, Inc. dlbla Circle "C" Construction Co.
Rakesh Chaube
ADDITIONS
e Reconnection
sewer line, backfill with CTS an
Lane
� Change Order: �2 Date: 10/1I2013
City Inspector Rand Horton
DEPT
Sewer
Sewer
Sewer
Sewer
Q Unit
946.00 LF
25.00 SY
1.00 LS
851.00 LF
$400.00
$3,500.00
$56.00
Total
$52,030.00
$10,000.00
$3,500.00
$47,656.00
113,186.00
ditions Sub Total
113,186.00
Page 2 of 4
F� R`T WO RT H Clty Of FOrt WOrth
� ' Change Order Deletions
Project Name
Project No.(s):
Project Description
Sanitary Sewer Rehabilitation Contract LXIV (64), Part 1 City Sec No.: 42920
P253-702170149383 DOE No. 3454 City Proj. No.: 01493
Sanitary Sewer Replacement on Sandy Lane, Lincoln Avenue, Angle Avenue, NW 14th Street, North Main Street
Contractor William J. Schultz, Inc. d/b/a Circle "C" Construction Co. Change Order: � Date 10/112013
City Project Mgr. Rakesh Chaubey City Inspector: Randy Horton
ITEM DESCRIPTION
5 8" PVC Sewer Line
7 12" Pipe Enlargement
36 4" Sewer Tap
40 4" Service Tap to HPDE
41 Trench Safetv
DELETIONS
DEPT
Sewer
Sewer
Sewer
Sewer
Sewer
Qty
1
20.00
1,797.00
Unit
LF
LF
EA
EA
LF
Unit Cost Total
$47.00
$52.00
$350.00
$500.00
$1.00
Water
Sewer
Page 3 of 4
Deletions Sub Total
$16,215.00
$75,504.00
$1,750.00
$10,000.00
$1,797.00
�
�
Page 4 of 4