HomeMy WebLinkAboutContract 42920-CO2 (2)��ORT WORTH City of Fort Worth '�'�S O 1�����. '� Change Order Request ����"� Project Name: Sanitary Sewer Rehabilitation Contract LXIV (64), Part 1 City Sec No.: 42920 Project No.(s): P253-702170149383 DOE No. 3454 city Proj. ►vo.: 01493 Project Description: Contractor: Sanitary Sewer Replacement on Sandy Lane, Lincoln Avenue, Angle Avenue, NW 14th Street, North Main Street and five alleys. William J. Schultz, Inc. d/b/a Circle "C" Construction Co. City Project Mgr. Rakesh Chaubey Phone Number: 817-392-6051 Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date ount of Proposed Chan Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Adtlitional Funding (if necessary) change order will provide for the following: Water CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) JUSTIFICATION . . . . Staff Sewer Change0rder# �2 Date: 10/1/2013 City Inspector: Randy Horton Phone Number: 682-432-4037 1,242,650.00 $40,215.00 ,282,865.00 $7,920.00 ,290,785,00 $10, 255.00 FOR CHANGE Totals E�i � ,11, 3.87% $1,553,312.50 The rehabilitation of a 345 feet segment of L-649 (8-inch) by CIPP instead of by open cut method in order to minimize traffic disruption on Main Street. The rehabilitation of a 1,452 feet segment of L-215 (8-inch/10-inch) instead of by pipe enlarge ' method in order to avoid potential damage from the vibration (created by the pipe enlar � process) to older houses that are adjacent to the sewer main. �;' ���0� Internal service reconnections for the CIPP process. �� connection of an existing 8-inch sewer line to a new project manhole. � ,r eletion of pay item quantities that are no longer needed on the project. �°q,r- �����a���-� c���o�� �tte� by. . e� �-� o��'��'��;�' request for 120 additional calendar days on the proje�t:� .� �, ,-�� ,'?..,� G�`�o �l��lf'[�� �i �t � .� Mary J. Contract Time (Calendar Days) 200 15 .:� � ►�� ;11y �, It is understootl and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents paymeniin full (both time and money) for all costs arising out of, or incidental to, the above Change Order. FnRT WORTH City of Fort Worth Change Order Additions Project Name Sanitar Sewer Rehabilitation Contract LXIV 64 , Part 1 City Sec No.: 42920 Project No.(s): P253-702170149383 DOE No. 3454 City Proj. No.: 01493 Project Sanitary Sewer Replacement on Santly Lane, Lincoln Avenue, Angle Avenue, NW 14th Street, North Main Street and Description five alleys. Contractor City Project Mgr. 56 8" CIPP 57 Internal S� 58 Tie in exis 59 10" CIPP � William J. Schultz, Inc. dlbla Circle "C" Construction Co. Rakesh Chaube ADDITIONS e Reconnection sewer line, backfill with CTS an Lane � Change Order: �2 Date: 10/1I2013 City Inspector Rand Horton DEPT Sewer Sewer Sewer Sewer Q Unit 946.00 LF 25.00 SY 1.00 LS 851.00 LF $400.00 $3,500.00 $56.00 Total $52,030.00 $10,000.00 $3,500.00 $47,656.00 113,186.00 ditions Sub Total 113,186.00 Page 2 of 4 F� R`T WO RT H Clty Of FOrt WOrth � ' Change Order Deletions Project Name Project No.(s): Project Description Sanitary Sewer Rehabilitation Contract LXIV (64), Part 1 City Sec No.: 42920 P253-702170149383 DOE No. 3454 City Proj. No.: 01493 Sanitary Sewer Replacement on Sandy Lane, Lincoln Avenue, Angle Avenue, NW 14th Street, North Main Street Contractor William J. Schultz, Inc. d/b/a Circle "C" Construction Co. Change Order: � Date 10/112013 City Project Mgr. Rakesh Chaubey City Inspector: Randy Horton ITEM DESCRIPTION 5 8" PVC Sewer Line 7 12" Pipe Enlargement 36 4" Sewer Tap 40 4" Service Tap to HPDE 41 Trench Safetv DELETIONS DEPT Sewer Sewer Sewer Sewer Sewer Qty 1 20.00 1,797.00 Unit LF LF EA EA LF Unit Cost Total $47.00 $52.00 $350.00 $500.00 $1.00 Water Sewer Page 3 of 4 Deletions Sub Total $16,215.00 $75,504.00 $1,750.00 $10,000.00 $1,797.00 � � Page 4 of 4