Loading...
HomeMy WebLinkAboutContract 45999-CO1CFW Change Order Approval CO-OS-PaD Page 2 of 3 - � �;,. .`, .x_^ a�",\• � ' �ORT �ORTH�� c�ty of Fo�t wo�tn Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: 1 Change Order No.: CO-05-PaD City Sec. No.: 45999 Project Name: Wayfinding Sign Installations Project Numbers: Date Started: 2015-06-01 Date Due: 2015-06-04 DOE Numbers: Project Change in reflectivity material due to duribility concerns Description: witn specified product. Ten (10) working days will be added to order and apply the new product. Details are available in change order breakdown. Project Manager: Randy Hutcheson Contractor: Bunting Graphics, Inc. COUNCIL ACTION (If Required): M&C Log Name: M&C Number: COST AND DAYS SUMMARY: Department: Cost($) Planning & Development $ 30,287.14 � Total Cost: � 30,287.14 Total Requested Days: 10 Approval Status: � m c� m � m � � c � 0 � N � t—�''r� �� ' ,; : ; � - � ., � � i a � I ! ° � https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&Proces... 06/02/2015 City Inspector: Randy Hutcheson M&C Date: Requested . Days: 10 Fund Account Center: GR76-541200-022-302825-800 CFW Change Oi•der Appi�oval CO-OS-PaD Approved: Yes Comments: User: Randle Harwood Date: 2015-06-01 8:54 PM Approved: Yes Comments: User: Melinda Ramos Date: 2015-06-02 3:20 PM Approved: Yes Comments: User: Fernando Costa Date: 2015-06-02 3:34 PM Action Required :., _,.� ;'ii F�, ::: �•' � .. , o, �,� : ;�a � Page 3 of 3 . _:. _titi �. ;x � - �. , ! Please review, approve, and submit https://projectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?SiteId=51500&Proces... 06/02/2015 Allison Tidwell, Assistant to the City Sac�y �ORT"��RTH::: City of Fort Worth Change Order Request Breakdown Project Name Wayfinding Signage Installation City Sec # 45999 Client Project #(s) City Project Number 302825 CSJ 0902-48-802 TxDOT Project Number STP 2003 (528) MM Contractor Bunting Graphics, Inc. PM Randy Hutcheson Inspector Randy Hutcheson Change Order Submittal #�1 Date 05/29/2015 Dept. Original ContractAmount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proposed Change Order Revised Contract Amount P&D �498,560.16 $0.00 $0.00 $0.00 498,560.16 $30,287.14 528,847.30 $49,856.16 $49,856.16 Totals 198,560.16 498,560.16 $30,287.14 528.847.30 Contract Time Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%J $49, 856.16 $49,856.16 6.07% $623,200.20 171 171 10 181 JUSTIFICATION (REASONS) FOR CHANGE ORDER The protluct specified for messaging (names of locations and arrows) on each sign is Oracal 5800 Reflective and 8300 Transparent. During fabrication, Bunting Graphics, Inc. discoveretl that the 8300 Transparent pulled apart easily from the base 5800 Reflective material. They notified me of their concerns with the Oracal material. In response, I requested an investigation of the material to determine if the problem was associated with one for the following: 1. Wrong specification 2. Defective material 3. Improper application. In response, a Oracal product representative visitetl the fabrication facility at Bunting to observe the application process. No problems were observed. The remaining material was shippetl to the Oracal facility in Georgia. The manufacturer replicated the condition experienced at the fabrication plant. They also verifietl that the product was correctly specifietl for the application. They stated that they would write a special warranty for the use of their product in Fort Worth. The Oracal product has a 5 year warranty. During the investigation of the specifietl product, Bunting sought alternative materials. After review of a product from 3M, Bunting and our tlesign consultant, Corbin Design, Inc., I approved the substitution material (3M 4090 DG3 Diamond Grade Reflective Material). The new material carries a 12 year warranty. Due to separation concerns with the Oracal 8300 Transparent material, length of warranty, and the neetl for a special warranty, I am recommending a change in material. I have consultetl with primary community partners at Downtown Fort Worth, Inc. and they feel a change in product is acceptable. .� ;s; ,. . � � � L . �, :. POR_ T W()RTI�I -'•�- c�ty of Fort wortn Change Order Additions Project Name Wa�nding Signage Installation City Sec # 45999 Client Project # Ciry Project Number 302825 CSJ 0902-48-802 TxDOT Project Number STP 2003 (528) MM Contrxta Bunting Graphics, Inc. PM Randy Hutcheson Inspecior Randy Huicheson Change 0rder Submittal # O Date 05/29/2015 AU�I I IUNS �IL�u� ' ' • ` sl' .�' ����a���� — � • � � � � 1 . � � . � • • . . � .��i[Q�➢DIQQ�DI— ''��It� :Yiii) ���� r'i6ii — ----- — ----- — -----��. — -----',, — -----,, — -----' — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — -----�1 — ----� — ----- — ----- — ----- — ----- — ----- — ----- — ----- — �---- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — --_-- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- — ----- :� � — — � � . • � � �'��) �nange �raer Haoicions rage i or � / � i. , r',' � '. 1 �; Change Order Additions Page 2 of 2 r � � F:oe�_H c�ty of Fort wortn Change Order Deletions Project Name W ndin Si na e Installa6on City Sec # 45999 Client Project # Ci Project Number 302825 CSJ 0902-48-802 TxDOT Pro'ect Number STP 2003 528} MM Contractw Buntlng Graphics, Inc. PM Randy Hutcheson Inspecior Randy Hutcheson Change 0rder Submittal # Ol Date 05/29/2015 �ELEIIUNS ty nd mt ost ota P8D $0.00 Sub Total Dele6ons Change Order Deletions Page 1 of 2 �.1 � �i ; R • ' �� � ` S, i, t �` ;. j � _ Change Order Deletions Page 2 of 2