Project Name: Water and Sanitary Sewer Replacement Contract 2009, STM-M City Sec No.: 45862
Project No.(s): P253-603170147783 and P258-703170147783 DOE No. 6618 City Proj. No.: 01477
Project Description:
Water and sanitary sewer main replacements on Sapping Place, Waverty Way, Lubbock Street and Covert Avenue,
Contractor: CD Builders, Inc
City Project Mgr. Chaubey Rakesh
Phone Number: (817) 392-6051
Dept. � Water
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Pronosed Chanae Order
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
000.38
CHANGE ORDERS to DATE (INCLUD/NG TH►S ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMDUNT (OR/GlNAL CONTRACT COST + 25%)
TION
concurs with the contractor's request 20
Contract Time
:1'
':1
change order will provide for the installation of additional footage of sanitary sewer pipe that is necessary to
plete the project.
change order will also allow for the deletion of pay item quantities that are no longer necessary on the
�
r�n
rr-�
��
��
�
�
�
xa�
�
�
0
�
J. ���s�r,
����
Sewer
Change Order # �1 Date: 619/2015
Ciry Inspector: Edward D'avila
Phone Number: (817j 223-2268
$14,877.63
$14,877.63
$12.338.88
�., �-1,
days on the project.
�
, _ ;-��
� ._ -v
Totals
8.01
O.00°/D
$1,187,499.99
� '
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
�
M&C Number
,� �
� � G /`� __
ter De ate
�'` %l�= "r� `� ( �i i / ) l.
n Date A �
� C. ; ; p �3... s-' __._�_
Ceuncil Actio►�r( ._ec
N/A
tii�
�-
M&C Date Approved
Date
R,! _ �, �,,•.
•Da
�c `(��i��j' �
--r—P—=
Date
�!�
F� � R T WC� K"T H
c�ty of Fo�t wortn
Change Order Additions
Project Name Water and Sanitary Sewer Replacement Contract 2009, STM-M City Sec No.: 45862
Project No.(s): P253-603170147783 and P258-703170147783 DOE No. 6618 City Proj. No.: 01477
Project
Description
Contractor
City Project Mgr
Water and sanitary sewer main replacements on Sapping Place, Waverty Way, Lubbock Street and Covert Avenue.
CD Builders, Inc Change Order:� Date; 6/9/2015
Chaubey Rakesh City Inspector Edward D'avila
ADDITIONS
hole
Manhole Liner
Vacuum
iE�
�
Post-CCTV
3 test holes (1 Covert-1 Waveriy
PVC Water Pipe
Gate Valve
Water Service Meter Relocation
17 16" Concrete
Sewer
Sewer
Sewer
LF
�17,676.40
�11,400.00
430.29
535.00
495.70
1,134.20
11,409.84
2,200.00
971.85
4,223.24
2,869.40
1,802.85
Page 2 of 4 Additions Sub
FORT Wpg°1 H City of Fort Worth
�''" Change Order Deletions
Project Name Water and Sanitary Sewer Replacement Contract 2009, STM-M
Project No.(s): P2g3.603170147783 and P258-703170147783 DOE No
Project Description
6618
City Sec No.:
City Proj. No
45862
01477
Water and sanitary sewer main replacements on Sapping Place, Waverty Way, Lubbock Street and Covert
Avenue.
Contractor CD Builders, Inc
City Project Mgr. Chaubey Rakesh
ITEM DESCRIPTION
3 3311.0141 6" Water Pipe
15 3201.0400 Temporary Asphalt Pavir
18 3216.0102 6" Conc Curb and �utter
21 3292.0100 Block Sod Placement
23 Permanent Asphalt Pvmt Repair
2
3
6
8
13
° Sewer Seroice
" Clean out
' Manhole Extra Depth
:oncrete Collar
"Concrete Driveway
Change Order: � Date 6/9l2015
City Inspector: Edward D'avila �
DELETIONS
DEPT
Water
Water
Water
Water
Water
Sewer
Sewer
Sewer
Sewer
Sewer
Qty Unit
6.00 LF
2,066.41 LF
470.00 LF
95.00 SY
200.00 SY
4.00 EA
4.00 EA
23.00 EA
1462.00 SF
Unit Cost Total
$28.00 $168.00
$11.90 $24,590.2
$11.12 $5,226.40
$3.97 $377.15
$44.61 $8,922.00
$247.83
$99.14
$3.57
,426.12
,982.64
,956.60
,280.22
,219.34
15,864.92
Page 3 of 4 �Deletions Sub Total �$55,148.75