Loading...
HomeMy WebLinkAboutContract 45862-CO1� ���������� 86�-C� I ` �' FC� RT WO RT H City of Fort Worth �����`�e:' �- Change Order Request Project Name: Water and Sanitary Sewer Replacement Contract 2009, STM-M City Sec No.: 45862 Project No.(s): P253-603170147783 and P258-703170147783 DOE No. 6618 City Proj. No.: 01477 Project Description: Water and sanitary sewer main replacements on Sapping Place, Waverty Way, Lubbock Street and Covert Avenue, Contractor: CD Builders, Inc City Project Mgr. Chaubey Rakesh Phone Number: (817) 392-6051 Dept. � Water Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Pronosed Chanae Order Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) 000.38 CHANGE ORDERS to DATE (INCLUD/NG TH►S ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMDUNT (OR/GlNAL CONTRACT COST + 25%) TION concurs with the contractor's request 20 Contract Time :1' ':1 change order will provide for the installation of additional footage of sanitary sewer pipe that is necessary to plete the project. change order will also allow for the deletion of pay item quantities that are no longer necessary on the � r�n rr-� �� �� � � � xa� � � 0 � J. ���s�r, ���� Sewer Change Order # �1 Date: 619/2015 Ciry Inspector: Edward D'avila Phone Number: (817j 223-2268 $14,877.63 $14,877.63 $12.338.88 �., �-1, days on the project. � , _ ;-�� � ._ -v Totals 8.01 O.00°/D $1,187,499.99 � ' It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. � M&C Number ,� � � � G /`� __ ter De ate �'` %l�= "r� `� ( �i i / ) l. n Date A � � C. ; ; p �3... s-' __._�_ Ceuncil Actio►�r( ._ec N/A tii� �- M&C Date Approved Date R,! _ �, �,,•. •Da �c `(��i��j' � --r—P—= Date �!� F� � R T WC� K"T H c�ty of Fo�t wortn Change Order Additions Project Name Water and Sanitary Sewer Replacement Contract 2009, STM-M City Sec No.: 45862 Project No.(s): P253-603170147783 and P258-703170147783 DOE No. 6618 City Proj. No.: 01477 Project Description Contractor City Project Mgr Water and sanitary sewer main replacements on Sapping Place, Waverty Way, Lubbock Street and Covert Avenue. CD Builders, Inc Change Order:� Date; 6/9/2015 Chaubey Rakesh City Inspector Edward D'avila ADDITIONS hole Manhole Liner Vacuum iE� � Post-CCTV 3 test holes (1 Covert-1 Waveriy PVC Water Pipe Gate Valve Water Service Meter Relocation 17 16" Concrete Sewer Sewer Sewer LF �17,676.40 �11,400.00 430.29 535.00 495.70 1,134.20 11,409.84 2,200.00 971.85 4,223.24 2,869.40 1,802.85 Page 2 of 4 Additions Sub FORT Wpg°1 H City of Fort Worth �''" Change Order Deletions Project Name Water and Sanitary Sewer Replacement Contract 2009, STM-M Project No.(s): P2g3.603170147783 and P258-703170147783 DOE No Project Description 6618 City Sec No.: City Proj. No 45862 01477 Water and sanitary sewer main replacements on Sapping Place, Waverty Way, Lubbock Street and Covert Avenue. Contractor CD Builders, Inc City Project Mgr. Chaubey Rakesh ITEM DESCRIPTION 3 3311.0141 6" Water Pipe 15 3201.0400 Temporary Asphalt Pavir 18 3216.0102 6" Conc Curb and �utter 21 3292.0100 Block Sod Placement 23 Permanent Asphalt Pvmt Repair 2 3 6 8 13 ° Sewer Seroice " Clean out ' Manhole Extra Depth :oncrete Collar "Concrete Driveway Change Order: � Date 6/9l2015 City Inspector: Edward D'avila � DELETIONS DEPT Water Water Water Water Water Sewer Sewer Sewer Sewer Sewer Qty Unit 6.00 LF 2,066.41 LF 470.00 LF 95.00 SY 200.00 SY 4.00 EA 4.00 EA 23.00 EA 1462.00 SF Unit Cost Total $28.00 $168.00 $11.90 $24,590.2 $11.12 $5,226.40 $3.97 $377.15 $44.61 $8,922.00 $247.83 $99.14 $3.57 ,426.12 ,982.64 ,956.60 ,280.22 ,219.34 15,864.92 Page 3 of 4 �Deletions Sub Total �$55,148.75 o�Frc��� R�coRu crr� s�c�ef,��g �r: �ra�r�, p� � Page 4 of 4 unun� n_--'—'----- t--,.._._ w.. . .. .